ML083220034: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 11/14/2008
| issue date = 11/14/2008
| title = NRC Operator Licensing Initial Exam Results, Nine Mile Point Nuclear Station, Unit 1 (Cover Letter Publically Available, Enclosures Withheld from Public) (Folder 1).NRC Operator Licensing Initial Exam Results, Nine Mile Point Nuclear Statio
| title = NRC Operator Licensing Initial Exam Results, Nine Mile Point Nuclear Station, Unit 1 (Cover Letter Publically Available, Enclosures Withheld from Public) (Folder 1).NRC Operator Licensing Initial Exam Results, Nine Mile Point Nuclear Statio
| author name = Hansell S L
| author name = Hansell S
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name = Shortell T J
| addressee name = Shortell T
| addressee affiliation = Constellation Energy Group
| addressee affiliation = Constellation Energy Group
| docket = 05000220
| docket = 05000220
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:November 14, 2008  
{{#Wiki_filter:November 14, 2008 Mr. Thomas J. Shortell Manager Training Constellation Energy Group Nine Mile Point Nuclear Station, Units 1 & 2 450 Lake Road Oswego, NY 13126
 
Mr. Thomas J. Shortell Manager Training Constellation Energy Group Nine Mile Point Nuclear Station, Units 1 & 2  
 
450 Lake Road Oswego, NY 13126  


==Subject:==
==Subject:==
NRC Operator Licensing Initial Exam Results Nine Mile Point Nuclear Station, Unit 1 (Cover letter publicly available; enclosures withheld from public.)  
NRC Operator Licensing Initial Exam Results Nine Mile Point Nuclear Station, Unit 1 (Cover letter publicly available; enclosures withheld from public.)


==Dear Mr. Shortell:==
==Dear Mr. Shortell:==


The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on October 13, 2008, and the walk-through (overall)  
The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on October 13, 2008, and the walk-through (overall) and/or simulator operating tests administered October 6 to October 10, 2008 at your facility.
 
This meets the intent of Section E.1 of ES-501 of NUREG 1021, Operator Licensing Examination Standards for Power Reactors. This information is considered proprietary in accordance with 10 CFR 2.390 and its supplements the information contained in the related examination report for your facility which will be issued shortly.
and/or simulator operat ing tests administered Oc tober 6 to October 10, 2008 at your facility. This meets the intent of Section E.1 of ES-501 of NUREG 1021, "Operator Licensing Examination Standards for Power Reactors.This information is considered "proprietary" in accordance with 10 CFR 2.390 and its supplements the information contained in the related examination report for your facility which will be issued shortly.  
As indicated in Enclosure 1, the completed ES-501-2, Power Plant Licensing Examination Results Summary, nine individuals were administered the examination and four passed.
 
However, we will not be issuing licenses for one of the applicants who passed - as explained in Section ES-501, paragraph D.3.c. - because any written examination with a passing grade of 82 percent or below is normally held for review until those applicants who failed the examination have had an opportunity to appeal their license denials. Two applicants who passed the examination will have their licenses issued once they have completed their waiver requirements. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license applications (i.e., NRC Form 398). is a copy of the licenses.
As indicated in Enclosure 1, the completed ES-501-2, "Power Plant Licensing Examination Results Summary," nine individuals were administered the examination and four passed.
However, we will not be issuing licenses for one of the applicants who passed - as explained in Section ES-501, paragraph D.3.c. - because any written examination with a passing grade of 82 percent or below is normally held for review until those applicants who failed the examination have had an opportunity to appeal their license denials. Two applicants who passed the examination will have their licenses issued once they have completed their waiver requirements.
contains the individual results ES-303-1 and 303-2, "Operator License Examination Report," for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appr opriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license app lications (i.e., NRC Form 398).  
 
is a copy of the licenses.   
 
T. Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.  


Sincerely,       /RA/
T. J. Shortell                                Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety  
Sincerely,
 
                                            /RA/
Docket No. 050-220 License No. DPR-63  
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 050-220 License No. DPR-63


==Enclosures:==
==Enclosures:==
: 1. ES-501-2, Power Plant Licensing Examination Results Summary  
: 1. ES-501-2, Power Plant Licensing Examination Results Summary
: 2. ES-303-1 and 303-2, Individual Examination Results  
: 2. ES-303-1 and 303-2, Individual Examination Results
: 3. Licenses
: 3. Licenses cc w/licenses:
Mr. Keith J. Polson, Vice President


cc w/licenses:
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
Mr. Keith J. Polson, Vice President Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
Sincerely,
Sincerely,       /RA/
                                                          /RA/
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 050-220 License No. DPR-63  
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 050-220 License No. DPR-63


==Enclosures:==
==Enclosures:==
: 1. ES-501-2, Power Plant Licensing Examination Results Summary  
: 1. ES-501-2, Power Plant Licensing Examination Results Summary
: 2. ES-303-1 and 303-2, Individual Examination Results  
: 2. ES-303-1 and 303-2, Individual Examination Results
: 3. Licenses
: 3. Licenses cc w/licenses:
 
Mr. Keith J. Polson, Vice President Distribution: w/o enclosures:
cc w/licenses:
Master Exam File SUNSI Review Complete:           CJB           (Reviewer=s Initials)
Mr. Keith J. Polson, Vice President  
ADAMS PKG NO.: ML081060454 DOCUMENT NAME: G:\DRS\Operations Branch\DANTONIO\Exam 09-NMP1 Oct 08 (U01690)\ExamNotificationLtr1.doc After declaring this document AAn Official Agency Record,@ it will be released to the Public.
 
OFFICE             RI/DRS/OB             RI/DRS/OB                 RI/DRS/OB NAME               CJBixler/CJB           JDAntonio/SLH For       SLHansell/SLH DATE               11/14/08               11/ 14 /08               11/ 14 /08 OFFICIAL RECORD COPY}}
Distribution: w/o enclosures:
Master Exam File
 
SUNSI Review Complete:             CJB               (Reviewer
=s Initials) ADAMS PKG NO.: ML081060454 DOCUMENT NAME:   G:\DRS\Operations Branch\DANTONIO\Exam 09-NMP1 Oct 08 (U01690)\ExamNotificationLtr1.doc After declaring this document AAn Official Agency Record,@ it will be released to the Public. OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB   NAME CJBixler
/CJB JD'Antonio/
SLH For SLHansell/SLH DATE 11/14/08   11/ 14 /08   11/ 14 /08 OFFICIAL RECORD COPY}}

Latest revision as of 12:09, 14 November 2019

NRC Operator Licensing Initial Exam Results, Nine Mile Point Nuclear Station, Unit 1 (Cover Letter Publically Available, Enclosures Withheld from Public) (Folder 1).NRC Operator Licensing Initial Exam Results, Nine Mile Point Nuclear Statio
ML083220034
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 11/14/2008
From: Hansell S
Operations Branch I
To: Shortell T
Constellation Energy Group
Hansell S
Shared Package
ML081060454 List:
References
TAC U01690
Download: ML083220034 (3)


Text

November 14, 2008 Mr. Thomas J. Shortell Manager Training Constellation Energy Group Nine Mile Point Nuclear Station, Units 1 & 2 450 Lake Road Oswego, NY 13126

Subject:

NRC Operator Licensing Initial Exam Results Nine Mile Point Nuclear Station, Unit 1 (Cover letter publicly available; enclosures withheld from public.)

Dear Mr. Shortell:

The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on October 13, 2008, and the walk-through (overall) and/or simulator operating tests administered October 6 to October 10, 2008 at your facility.

This meets the intent of Section E.1 of ES-501 of NUREG 1021, Operator Licensing Examination Standards for Power Reactors. This information is considered proprietary in accordance with 10 CFR 2.390 and its supplements the information contained in the related examination report for your facility which will be issued shortly.

As indicated in Enclosure 1, the completed ES-501-2, Power Plant Licensing Examination Results Summary, nine individuals were administered the examination and four passed.

However, we will not be issuing licenses for one of the applicants who passed - as explained in Section ES-501, paragraph D.3.c. - because any written examination with a passing grade of 82 percent or below is normally held for review until those applicants who failed the examination have had an opportunity to appeal their license denials. Two applicants who passed the examination will have their licenses issued once they have completed their waiver requirements. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license applications (i.e., NRC Form 398). is a copy of the licenses.

T. J. Shortell Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.

Sincerely,

/RA/

Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 050-220 License No. DPR-63

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary
2. ES-303-1 and 303-2, Individual Examination Results
3. Licenses cc w/licenses:

Mr. Keith J. Polson, Vice President

Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.

Sincerely,

/RA/

Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 050-220 License No. DPR-63

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary
2. ES-303-1 and 303-2, Individual Examination Results
3. Licenses cc w/licenses:

Mr. Keith J. Polson, Vice President Distribution: w/o enclosures:

Master Exam File SUNSI Review Complete: CJB (Reviewer=s Initials)

ADAMS PKG NO.: ML081060454 DOCUMENT NAME: G:\DRS\Operations Branch\DANTONIO\Exam 09-NMP1 Oct 08 (U01690)\ExamNotificationLtr1.doc After declaring this document AAn Official Agency Record,@ it will be released to the Public.

OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CJB JDAntonio/SLH For SLHansell/SLH DATE 11/14/08 11/ 14 /08 11/ 14 /08 OFFICIAL RECORD COPY