(3 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML14349A793 | | | number = ML14349A793 |
| | issue date = 12/15/2014 | | | issue date = 12/15/2014 |
| | title = FW: Request for Additional Information (RAI) Regarding Browns Ferry Units 1, 2, and 3 Alignment of Inservice Inspection (ASME Section Xi) Intervals (MF4854, MF4855, and MF4856) | | | title = NRR E-mail Capture - FW: Request for Additional Information (RAI) Regarding Browns Ferry Units 1, 2, and 3 Alignment of Inservice Inspection (ASME Section XI) Intervals (MF4854, MF4855, and MF4856) |
| | author name = Saba F E | | | author name = Saba F |
| | author affiliation = NRC/NRR/DORL/LPLII-2 | | | author affiliation = NRC/NRR/DORL/LPLII-2 |
| | addressee name = Williams G R | | | addressee name = Williams G |
| | addressee affiliation = Tennessee Valley Authority | | | addressee affiliation = Tennessee Valley Authority |
| | docket = 05000259, 05000260 | | | docket = 05000259, 05000260 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:1 NRR-PMDAPEm Resource From: Saba, Farideh Sent: Monday, December 15, 2014 12:59 PM To: Williams, Gordon Robert (grwilliams1@tva.gov) | | {{#Wiki_filter:NRR-PMDAPEm Resource From: Saba, Farideh Sent: Monday, December 15, 2014 12:59 PM To: Williams, Gordon Robert (grwilliams1@tva.gov) |
| Cc: Pfefferkorn, Candace | | Cc: Pfefferkorn, Candace |
|
| |
|
| ==Subject:== | | ==Subject:== |
| FW: Request for Additional Information (RAI) | | FW: Request for Additional Information (RAI) Regarding Browns Ferry Units 1, 2, and 3 Alignment of Inservice Inspection (ASME Section XI) Intervals (MF4854, MF4855, and MF4856) |
| Regarding Browns Ferry Units 1, 2, and 3 Alignment of Inservice Inspection (ASME Section XI) Intervals (MF4854, MF4855, and MF4856)Importance: | | Importance: High |
| High Gordon, By letter Dated September 12, 2014 (Agency Wide Document Access and Management System (ADAMS) Accession Number ML14260A365), the Tennessee Valley Authority (the licensee) submitted relief request ISI-45. The licensee is requesting an alternative, pursuant to Title 10 of the U.S. Code of Federal Regulations (CFR) Part 50, Section 55a, Paragraph (a)(3)(i), from inservice inspection (ISI) requirements pertaining to Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, so as to align the three separate ISI interval dates of the three Browns Ferry Nuclear Plant units to a single ten-year inspection interval date.
| | : Gordon, By letter Dated September 12, 2014 (Agency Wide Document Access and Management System (ADAMS) |
| The U.S. Nuclear Regulatory Commission staff requests that the licensee provide the following additional information to support the relief request by January 30, 2015, as agreed to during the clarification conference call on December 15, 2014. | | Accession Number ML14260A365), the Tennessee Valley Authority (the licensee) submitted relief request ISI- |
| | : 45. The licensee is requesting an alternative, pursuant to Title 10 of the U.S. Code of Federal Regulations (CFR) Part 50, Section 55a, Paragraph (a)(3)(i), from inservice inspection (ISI) requirements pertaining to Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, so as to align the three separate ISI interval dates of the three Browns Ferry Nuclear Plant units to a single ten-year inspection interval date. |
| | The U.S. Nuclear Regulatory Commission staff requests that the licensee provide the following additional information to support the relief request by January 30, 2015, as agreed to during the clarification conference call on December 15, 2014. |
| | RAI-1 Describe the process for rescheduling the remaining in-service inspections for each unit to meet the proposed modified end of the current ten-year inspection intervals. As examples, show the original schedule for the Category R-A item number 1.16 and Augmented Exam Category D inspections for Browns Ferry Unit 2 for the next two refueling outages and how they would be rescheduled if the inspection interval is modified. |
| | : Thanks, Farideh Farideh E. Saba, P.E. |
| | Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV 1 |
|
| |
|
| RAI-1 Describe the process for rescheduling the remaining in-service inspections for each unit to meet the proposed modified end of the current ten-year inspection intervals. As examples, show the original schedule for the Category R-A item number 1.16 and Augmented Exam Category D inspections for Browns Ferry Unit 2 for the next two refueling outages and how they would be rescheduled if the inspection interval is modified.
| | Hearing Identifier: NRR_PMDA Email Number: 1761 Mail Envelope Properties (36CF286628C20846A68047F2463233090125EF720A3B) |
| Thanks,
| |
| | |
| Farideh
| |
| | |
| Farideh E. Saba, P.E. Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV
| |
| | |
| Hearing Identifier: NRR_PMDA Email Number: 1761 Mail Envelope Properties (36CF286628C20846A68047F2463233090125EF720A3B) | |
|
| |
|
| ==Subject:== | | ==Subject:== |
| FW: Request for Additional Information (RAI) Regarding Browns Ferry Units 1, 2, and 3 Alignment of Inservice Inspection (ASME Section XI) Intervals (MF4854, MF4855, and MF4856) Sent Date: 12/15/2014 12:59:11 PM Received Date: 12/15/2014 12:59:13 PM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients: "Pfefferkorn, Candace" <Candace.Pfefferkorn@nrc.gov> Tracking Status: None "Williams, Gordon Robert (grwilliams1@tva.gov)" <grwilliams1@tva.gov> Tracking Status: None | | FW: Request for Additional Information (RAI) Regarding Browns Ferry Units 1, 2, and 3 Alignment of Inservice Inspection (ASME Section XI) Intervals (MF4854, MF4855, and MF4856) |
| | | Sent Date: 12/15/2014 12:59:11 PM Received Date: 12/15/2014 12:59:13 PM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients: |
| Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 1576 12/15/2014 12:59:13 PM | | "Pfefferkorn, Candace" <Candace.Pfefferkorn@nrc.gov> |
| | | Tracking Status: None "Williams, Gordon Robert (grwilliams1@tva.gov)" <grwilliams1@tva.gov> |
| Options Priority: High Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date: Recipients Received:}} | | Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 1576 12/15/2014 12:59:13 PM Options Priority: High Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date: |
| | Recipients Received:}} |
Letter Sequence RAI |
---|
|
|
MONTHYEARML14260A3652014-09-12012 September 2014 3 - ASME, Code Section XI-Inservice Inspection Program for the Unit 1 Second Ten-Year Inspection Interval, Unit 2 Fourth Ten-Year Inspection Interval and Unit 3 Third Ten-Year Inspection Interval, Request for an Alternative. Project stage: Request ML14349A7932014-12-15015 December 2014 NRR E-mail Capture - FW: Request for Additional Information (RAI) Regarding Browns Ferry Units 1, 2, and 3 Alignment of Inservice Inspection (ASME Section XI) Intervals (MF4854, MF4855, and MF4856) Project stage: RAI ML15028A4042015-01-27027 January 2015 Response to NRC Request for Additional Information Regarding Request for an Alternative ISI-45 Project stage: Response to RAI ML15191A3722015-08-0606 August 2015 Relief from the Requirements of American Association of Mechanical Engineers Code Section XI Inservice Inspection (ISI) Program, Request for an Alternative ISI-45 Project stage: Approval 2014-09-12
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML23355A2202023-12-21021 December 2023 Radiation Protection Inspection - Inspection Report 2024-01 ML23332A0042023-11-27027 November 2023 NRR E-mail Capture - Request for Additional Information Related to Proposed Revised Alternative 0-ISI-47 ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23243A9892023-08-29029 August 2023 Inspection Information Request ML23208A0872023-07-26026 July 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry 1, 2, and 3, Alternative Request 0-ISI-47 to Use an Alternative to ASME Code, Section XI, Examination Requirements for Examination Categories B-N-1 and B-N-2 ML23124A0082023-05-0303 May 2023 NRR E-mail Capture - Request for Additional Information Related to Proposed Alternative Requests for the 5th 10-Year Inservice Testing Interval for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML23117A0702023-04-26026 April 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry, 1, 2, and 3, License Amendment Request to Revise Tech Specs Surveillance Requirements 3.4.3.2 and 3.5.1.11 Safety Relief Valves (BFN TS-540) ML23097A0172023-04-0606 April 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry, Units 1, 2, and 3, License Amendment Request to Adopt TSTF-566-A and TSTF-580-A, Revision 1 ML23073A2082023-03-10010 March 2023 TVA Intentions on EA-22-122 - Choice Letter Response Email Message ML23073A2072023-03-10010 March 2023 TVA Intentions on EA-22-122 - Choice Letter Response Email Message - NRC Acknowledgement ML23075A0502023-03-10010 March 2023 TVA Intentions on EA-22-122 - Choice Letter Response Email Message and TVA Intentions on EA-22-122 - Choice Letter Response Email Message -- NRC Acknowledgement ML23052A0792023-02-21021 February 2023 NRR E-mail Capture - Acceptance Review for Browns Ferry and Sequoyah License Amendment Request to Adopt TSTF-541 ML23041A0022023-02-0909 February 2023 NRR E-mail Capture - Request for Additional Information Related to TVA Alternative Request BFN-0-ISI-32 (CNL-22-025) ML23013A1512023-01-13013 January 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Request to Use Later ASME OM Code Edition and Alternative Requests BFN-IST-01 Through BFN-IST-05 ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML23017A0062023-01-12012 January 2023 Initial Information Request Inspection Report: 2023001 ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML23004A0352023-01-0404 January 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry, Units 1, 2, and 3, License Amendment Request to Delete TS 3.6.3.1 by Adopting TSTF-478 ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22304A1852022-10-31031 October 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry, Units 1, 2, and 3, License Amendment Request to Remove Site Acreage Description from TS 4.1 ML22299A0292022-10-26026 October 2022 NRR E-mail Capture - Request for Additional Information for Relief Request BFN-2-ISI-003 Re Weld Examination Coverage ML22292A2722022-10-19019 October 2022 NRR E-mail Capture - Request for Additional Information Related to Tva'S Request to Adopt TSTF-505 and TSTF-439 for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML22265A1492022-09-21021 September 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Alternative Request BFN-0-ISI-32 ML22259A0392022-09-14014 September 2022 NRR E-mail Capture - Browns Ferry TSTF-505 Audit Questions - Part 5 ML22259A0382022-09-14014 September 2022 NRR E-mail Capture - Browns Ferry TSTF-505 Audit Questions - Part 4 ML22259A0372022-09-13013 September 2022 NRR E-mail Capture - Browns Ferry TSTF-505 Audit Questions - Part 3 ML22238A0672022-08-24024 August 2022 NRR E-mail Capture - Browns Ferry TSTF-505 Audit Questions - Part 2 ML22238A0652022-08-19019 August 2022 NRR E-mail Capture - Browns Ferry TSTF-505 Audit Questions ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22208A2172022-07-15015 July 2022 NRR E-mail Capture - Request for Additional Information Related to TVA Relief Request BFN-21-ISI-02 (CNL-21-081) ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22173A1682022-06-21021 June 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Unit 2, Relief Request BFN-2-ISI-003 ML22168A0802022-06-17017 June 2022 NRR E-mail Capture - Request for Confirmation of Information and Additional Information Related to Tva'S Request to Use Control Bay Chiller Cross-Tie ML22160A4742022-06-0303 June 2022 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Re LAR to Use Advanced Framatome Methodologies in Support of Atrium 11 Fuel ML22146A3342022-05-25025 May 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Relief Requests (EPID L-2022-LLR-0045 - 0047) ML22168A0392022-05-13013 May 2022 NRR E-mail Capture - Draft Request for Confirmation of Information and Additional Information Related to Tva'S Request to Use Control Bay Chiller Cross-Tie ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to Tva'S Request to Revised the TVA Plants' Radiological Emergency Plans ML22131A1692022-05-0303 May 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, License Amendment Request to Adopt TSTF-505 and TSTF-439 ML22091A1942022-03-0808 March 2022 2022 BFN POV Inspection Information Request ML22055A0772022-02-22022 February 2022 NRR E-mail Capture - Results of NRC SUNSI Review of Browns Ferry Nuclear Plant, Units 1, 2, and 3, Updated Final Safety Analysis Report, Amendment 29 ML22047A1612022-02-16016 February 2022 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Expand the SFP Criticality Safety Analysis for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML22038A1882022-02-0404 February 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Revise the TVA Radiological Emergency Plan ML22032A0322022-01-27027 January 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Unit 2, Alternative Request BFN-21-ISI-02 ML22025A4132022-01-25025 January 2022 RP Inspection Doc Request ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22010A0282022-01-0606 January 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry, Units 1, 2, and 3, License Amendment Request to Adopt TSTF-205-A, Rev. 3 and TSTF-563-A, and Rescind the Consolidation of Several Surveillance Requirements ML21349A2262021-12-15015 December 2021 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, License Amendment Request to Revise TS 3.8.7 for Installation of the Control Bay Chiller Cross-Tie ML21343A4212021-12-0909 December 2021 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1, 2, and 3, License Amendment Request to Revise TS 3.8.7 for Installation of the Control Bay Chiller Cross-Tie ML21334A3012021-11-30030 November 2021 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Acceptance of License Amendment Request Regarding Adoption of TSTF-568-A 2023-08-29
[Table view] |
Text
NRR-PMDAPEm Resource From: Saba, Farideh Sent: Monday, December 15, 2014 12:59 PM To: Williams, Gordon Robert (grwilliams1@tva.gov)
Cc: Pfefferkorn, Candace
Subject:
FW: Request for Additional Information (RAI) Regarding Browns Ferry Units 1, 2, and 3 Alignment of Inservice Inspection (ASME Section XI) Intervals (MF4854, MF4855, and MF4856)
Importance: High
- Gordon, By letter Dated September 12, 2014 (Agency Wide Document Access and Management System (ADAMS)
Accession Number ML14260A365), the Tennessee Valley Authority (the licensee) submitted relief request ISI-
- 45. The licensee is requesting an alternative, pursuant to Title 10 of the U.S. Code of Federal Regulations (CFR) Part 50, Section 55a, Paragraph (a)(3)(i), from inservice inspection (ISI) requirements pertaining to Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, so as to align the three separate ISI interval dates of the three Browns Ferry Nuclear Plant units to a single ten-year inspection interval date.
The U.S. Nuclear Regulatory Commission staff requests that the licensee provide the following additional information to support the relief request by January 30, 2015, as agreed to during the clarification conference call on December 15, 2014.
RAI-1 Describe the process for rescheduling the remaining in-service inspections for each unit to meet the proposed modified end of the current ten-year inspection intervals. As examples, show the original schedule for the Category R-A item number 1.16 and Augmented Exam Category D inspections for Browns Ferry Unit 2 for the next two refueling outages and how they would be rescheduled if the inspection interval is modified.
- Thanks, Farideh Farideh E. Saba, P.E.
Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV 1
Hearing Identifier: NRR_PMDA Email Number: 1761 Mail Envelope Properties (36CF286628C20846A68047F2463233090125EF720A3B)
Subject:
FW: Request for Additional Information (RAI) Regarding Browns Ferry Units 1, 2, and 3 Alignment of Inservice Inspection (ASME Section XI) Intervals (MF4854, MF4855, and MF4856)
Sent Date: 12/15/2014 12:59:11 PM Received Date: 12/15/2014 12:59:13 PM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients:
"Pfefferkorn, Candace" <Candace.Pfefferkorn@nrc.gov>
Tracking Status: None "Williams, Gordon Robert (grwilliams1@tva.gov)" <grwilliams1@tva.gov>
Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 1576 12/15/2014 12:59:13 PM Options Priority: High Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date:
Recipients Received: