Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 January 27, 2015 10 CFR 50.4 10 CFR 50.55a ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Subject:
Response to NRC Request for Additional Information Regarding Request for an Alternative ISI-45 for Browns Ferry Nuclear Plant, Units 1, 2, and 3 (TAC Nos. MF4854, MF4855, and MF4856)
References:
- 1. Letter from TVA to NRC, "American Society of Mechanical Engineers, Code Section Xl Inservice Inspection Program for the Unit 1 Second Ten-Year Inspection Interval, Unit 2 Fourth Ten-Year Inspection Interval, and Unit 3 Third Ten-Year Inspection Interval, Request for an Alternative ISI-45," dated September 12, 2014 (ADAMS Accession No. ML14260A365)
- 2. Electronic Mail from NRC to TVA, "Request for Additional Information (RAI) Regarding Browns Ferry Units 1, 2, and 3 Alignment of Inservice Inspection (ASME Section XI) Intervals (MF4854, MF4855, and MF4856)," dated December 15, 2014 (ADAMS Accession No. ML14349A793)
By letter dated September 12, 2014 (Reference 1), the Tennessee Valley Authority (TVA) submitted a request for an alternative from inservice inspection (ISI-45), pertaining to Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code for Browns Ferry Nuclear Plant (BFN), Units 1, 2, and 3, so as to align the separate ISI interval dates of the three BFN units to a single interval date.
By electronic mail dated December 15, 2014, the Nuclear Regulatory Commission (NRC) transmitted a request for additional information (RAI) (Reference 2). The due date for the response is January 30, 2015. The Enclosure to this letter provides TVA's response to the NRC RAI.
A0(4-
U.S. Nuclear Regulatory Commission Page 2 January 27, 2015 There are no new regulatory commitments contained in this submittal. Please address any questions regarding this submittal to Mr. Jamie L. Paul at (256) 729-2636.
Respectfully, K. J. Poison Site Vice President
Enclosure:
Response to Request for Additional Information (RAI) Regarding Alternative ASME Section XI Inservice Inspection Program (ISI-45) for the Unit 1 Second Ten-Year, Unit 2 Fourth Ten-Year, and Unit 3 Third Ten-Year, Inspection Intervals for Browns Ferry Nuclear Plant (BFN), Units 1, 2, and 3 cc (Enclosures):
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Project Manager - Browns Ferry Nuclear Plant
ENCLOSURE Response to Request for Additional Information (RAI) Regarding Alternative ASME Section XI Inservice Inspection Program (ISl-45) for the Unit I Second Ten-Year, Unit 2 Fourth Ten-Year, and Unit 3 Third Ten-Year, Inspection Intervals for Browns Ferry Nuclear Plant (BFN), Units 1, 2, and 3 NRC RAI No. I Describe the process for rescheduling the remaining in-service inspections for each unit to meet the proposed modified end of the current ten-year inspection intervals. As examples, show the original schedule for the Category R-A item number 1.16 and Augmented Exam Category D inspections for Browns Ferry Unit 2 for the next two refueling outages and how they would be rescheduled if the inspection interval is modified.
TVA Response The proposed scheduling of components for future inservice inspection will not change the dates as currently scheduled. For example, if a component is scheduled to be examined during U2R21 in the current interval schedule, then it will continue to be examined during the U2R21 outage in the modified interval schedule. The table below shows Category R-A, item number R1.16D components. There are only two welds in this item number at BFN Unit 2. These piping welds are to be examined every six years per regulatory commitments.
The welds were last examined in U2R17 and are scheduled to be examined during the U2R20, U2R23, and U2R26 outages. The proposed modified interval will continue to have these welds examined during those outages.
Because BFN Unit 2 is the most affected by this request for an alternative, a second example shows the Category B-A, item number BI. 12, Reactor Vessel vertical weld examination schedule. These examinations are currently scheduled for the last outage (Period 3) of the current interval as allowed by the Category B-A table in Section X1. The proposed interval schedule will have them examined during that same outage, but in the second period. These welds are examined every 10 years per Section Xl requirements
[Reference IWB-2420(a), 2007 edition with 2008 addenda].
The modified interval schedule is administrative only and is proposed to be in effect for the duration of BFN operation. The examination schedule for all components will be unaffected unless changes in regulatory requirements, ALARA concerns, or other similar situations occur that would require a change to meet BFN commitments.
E-1
Current and proposed modified Interval Schedules for R-A, RI. 16D and B-A, 51.12 Components Current InterA (41 Interval)
Subsequent Intem,-al (5' Interval)
Brons Ferry Unit 2 Perod Priod 2 Period 3 Period 1 Period 2 Period 3 IGSCC-Category Welds (R 1.,16D)
U2R17 LI2R18 U2R19 U2R2.0 LF2R21 U2R22 U2R23 U2R24 U2R25 U2R26 RWCtU-2-O03-070 C
S S
S DRHR-2-03 C
S I
S S
Proposed Modified Interval Proposed Subsequent Interval Browns Ferry Unit 2 Period 1 Period 2 Period 3 Period I Period 2 Period 3 DL2R 19 U2R20 U2R21 U2R22 U2R23 U2R24 U2R25 U2R26 U2R27 U2R28 RWCL-2-003-070 S
S S
DRi-iR-2-03 S
S m
S BovnFerUnt2C~zrent Inevl(4" Interval)
Subsequent Interval (5 Interval)
Category B UA B,-2 Welds Period 2 Period 3 Period I Period 2 Period 3 U2R17 U2R18 U2R19 U2R20 U2R21 U2R22 U2R23 U2R24 U2R25 U2R26 V-1-AB.C S
S V-2-A,B,C S
S ABC S
S F-4-A B.C S
S A.B,C S
S Browns Fery Unit 2 Proposed Modified Interval Proposed Subsequent Interval Category B-A, B1.12 Welds Period I Period 2 Period 3 Period 1 Penod 2 Penod 3 U2R 19 U2R20 U2R21 U2R22 U2R23 U2R24 U2R25 U2R26 LU2R27 U2R28 V-1-ABC S
S V-2-A,B,C S
S V-3-A,B,C S
S V-4-A,B.C S
S V-S-A.B,C S
S S = Scheduled C = Completed E-2