ML042990558: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 09/23/2004 | | issue date = 09/23/2004 | ||
| title = RB-09-2004 - Draft - Outline Comments | | title = RB-09-2004 - Draft - Outline Comments | ||
| author name = Gody A | | author name = Gody A | ||
| author affiliation = NRC/RGN-IV/DRS/OB | | author affiliation = NRC/RGN-IV/DRS/OB | ||
| addressee name = Hinnenkamp P | | addressee name = Hinnenkamp P | ||
| addressee affiliation = Entergy Operations, Inc | | addressee affiliation = Entergy Operations, Inc | ||
| docket = 05000458 | | docket = 05000458 | ||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:DRAFT OUTLINE | {{#Wiki_filter:DRAFT OUTLINE COMMENTS Administrative JPMs | ||
*What walk-throughs will be performed together? | * Radiation control topic involving entry and exit from the RCA for both the RO and SRO is too simple and should not be used. Resolution: The JPM will be more challenging because the entry will involve an additional entry into a high radiation area. | ||
ANS: | Walk-throughs | ||
-08, is the only part of the | * What walk-throughs will be performed together? ANS: JPMs 6, 7, and 8 and JPMs 2 and 3 will be performed simultaneously. | ||
Written* | * Any repeat use of previous NRC exam material? If so how much (in percentage) is the repeat? ANS: One JPM, #200-08, is the only part of the exam that is repeated from the last NRC exam. | ||
*Need a cross- | Scenarios | ||
* Identify the actual attributes given on ES-301-4 | |||
ANS: | * Form ES-301-5, Scenario 1, RO: The BOP does not have a normal evolution and the RO number 4 for Instrument/component should be number 5. Resolution: Will make changes to the ES-301-5 forms. | ||
*Which W/T JPM meets the response to | * Form ES-301-5, Scenario 1, SRO-I: As RO, the number 4 for instrument/component should be number 5. Resolution: Will make changes to the ES-301-5 forms. | ||
-2, item 3b(3))? | * I would like each specific applicant to have their own ES-301-5. | ||
ANS: | Written | ||
* Please include the KA description on the reference written exam. | |||
* For K/As that require the use of procedures, be sure that the question references a procedure. | |||
* Need a cross-reference between the outline subject and the question developed to address this subject. Resolution: A cross reference will be developed. | |||
* Record of rejected KAs, SRO Page 1 5th table entry, why rejected? ANS: Agree, the KA should not be rejected. Will develop a question for this KA. | |||
General | |||
* Would like a separate listing of the PRA and IPE insights (ES 201-2 item 4a). | |||
* Any repeats from the audit examination (ES 201-2, item 3a(3))? ANS: No | |||
* Which W/T JPM meets the response to the emergency or abnormal condition (ES 201-2, item 3b(3))? ANS: In-plant walk-throughs 1 and 2. | |||
* Is any SROU going to take only the 25 question test? ANS: No}} |
Latest revision as of 00:51, 24 November 2019
ML042990558 | |
Person / Time | |
---|---|
Site: | River Bend |
Issue date: | 09/23/2004 |
From: | Gody A Operations Branch IV |
To: | Hinnenkamp P Entergy Operations |
References | |
50-458/04-301, RB-09-2004 50-458/04-301 | |
Download: ML042990558 (2) | |
Text
DRAFT OUTLINE COMMENTS Administrative JPMs
- Radiation control topic involving entry and exit from the RCA for both the RO and SRO is too simple and should not be used. Resolution: The JPM will be more challenging because the entry will involve an additional entry into a high radiation area.
Walk-throughs
- What walk-throughs will be performed together? ANS: JPMs 6, 7, and 8 and JPMs 2 and 3 will be performed simultaneously.
- Any repeat use of previous NRC exam material? If so how much (in percentage) is the repeat? ANS: One JPM, #200-08, is the only part of the exam that is repeated from the last NRC exam.
Scenarios
- Identify the actual attributes given on ES-301-4
- Form ES-301-5, Scenario 1, RO: The BOP does not have a normal evolution and the RO number 4 for Instrument/component should be number 5. Resolution: Will make changes to the ES-301-5 forms.
- Form ES-301-5, Scenario 1, SRO-I: As RO, the number 4 for instrument/component should be number 5. Resolution: Will make changes to the ES-301-5 forms.
- I would like each specific applicant to have their own ES-301-5.
Written
- Please include the KA description on the reference written exam.
- For K/As that require the use of procedures, be sure that the question references a procedure.
- Need a cross-reference between the outline subject and the question developed to address this subject. Resolution: A cross reference will be developed.
- Record of rejected KAs, SRO Page 1 5th table entry, why rejected? ANS: Agree, the KA should not be rejected. Will develop a question for this KA.
General
- Any repeats from the audit examination (ES 201-2, item 3a(3))? ANS: No
- Which W/T JPM meets the response to the emergency or abnormal condition (ES 201-2, item 3b(3))? ANS: In-plant walk-throughs 1 and 2.
- Is any SROU going to take only the 25 question test? ANS: No