ML073450706: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 5: Line 5:
| author name = Peterson H
| author name = Peterson H
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name = Anderson R L
| addressee name = Anderson R
| addressee affiliation = Nuclear Management Co, LLC
| addressee affiliation = Nuclear Management Co, LLC
| docket = 05000331
| docket = 05000331
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:December 4, 2007  
{{#Wiki_filter:December 4, 2007 Mr. Richard L. Anderson Vice President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785
 
Mr. Richard L. Anderson  
 
Vice President  
 
Duane Arnold Energy Center  
 
3277 DAEC Road  
 
Palo, IA 52324-9785  


==SUBJECT:==
==SUBJECT:==
OPERATOR LICENSING EXAMINATION APPROVAL  
OPERATOR LICENSING EXAMINATION APPROVAL


==Dear Mr. Anderson:==
==Dear Mr. Anderson:==


The purpose of this letter is to confirm the final arrangements for the upcoming operator  
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Duane Arnold Energy Center.
 
The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and will separately provide a list of approved applicants to Mr. Jeffrey D. Morris, Manager - Nuclear Training. Note that any examination waivers and application denials have been addressed in separate correspondence.
licensing examinations at Duane Arnold Energy Center.  
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-1021, AOperator Licensing Examination Standards for Power Reactors,@ during the week of December 17, 2007. The NRC staff will administer the operating tests during the week of December 10, 2007.
 
Please contact Mr. Dell McNeil, at 630-829-9737, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,
license applications in connection with this examination and will separately provide a list of  
                                                /RA/
 
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49 DISTRIBUTION See next page
approved applicants to Mr. Jeffrey D. Morris, Manager - Nuclear Training. Note that any  
 
examination waivers and application denials have been addressed in separate correspondence.  
 
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-1021, A Operator Licensing Examination Standards for Power Reactors,@ during the week of December 17, 2007. The NRC staff will administer the operating tests during the week of December 10, 2007.  
 
Please contact Mr. Dell McNeil, at 630-829-9737, if you have any questions or identify any  
 
errors or changes in the license level (RO or SRO) or type of examination (partial or complete  
 
written examination and/or operating test) specified for each applicant.  
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be  
 
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PAR S) component of NRC's Agencywide Documents Access and Management System (ADAMS), a ccessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,       /RA/   Hironori Peterson, Chief Operations Branch Division of Reactor Safety  
 
Docket No. 50-331  
 
License No. DPR-49  
 
DISTRIBUTION See next page Mr. Richard L. Anderson Vice President
 
Duane Arnold Energy Center
 
3277 DAEC Road


Palo, IA 52324-9785  
Mr. Richard L. Anderson Vice President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785


==SUBJECT:==
==SUBJECT:==
OPERATOR LICENSING EXAMINATION APPROVAL  
OPERATOR LICENSING EXAMINATION APPROVAL


==Dear Mr. Anderson:==
==Dear Mr. Anderson:==


The purpose of this letter is to confirm the final arrangements for the upcoming operator  
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Duane Arnold Energy Center.
 
The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and will separately provide a list of approved applicants to Mr. Jeffrey D. Morris, Manager - Nuclear Training. Note that any examination waivers and application denials have been addressed in separate correspondence.
licensing examinations at Duane Arnold Energy Center.  
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-1021, AOperator Licensing Examination Standards for Power Reactors,@ during the week of December 17, 2007. The NRC staff will administer the operating tests during the week of December 10, 2007.
Please contact Mr. Dell McNeil, at 630-829-9737, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
                                                                  /RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49 DISTRIBUTION See next page DOCUMENT NAME: G:\DRS\Work in Progress\DUA 11__07 DRS OL Exam Approval Ltr.doc 9 Publicly Available            9 Non-Publicly Available              9 Sensitive          9 Non-Sensitive To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl ;E = Copy with attach/encl ; N = No copy OFFICE            RIII:DRS                        RIII:DRS                    RIII:DRS NAME              JKweiser:co                    DMcNeil                    HPeterson


The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator
DATE 12/04/07 12/04/07      12/04/07 OFFICIAL RECORD COPY


license applications in connection with this examination and will separately provide a list of
Letter to Richard L. Anderson from Hironori Peterson dated December 4, 2007.
 
approved applicants to Mr. Jeffrey D. Morris, Manager - Nuclear Training. Note that any
 
examination waivers and application denials have been addressed in separate correspondence.
 
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-1021, A Operator Licensing Examination Standards for Power Reactors,@ during the week of December 17, 2007. The NRC staff will administer the operating tests during the week of December 10, 2007.
 
Please contact Mr. Dell McNeil, at 630-829-9737, if you have any questions or identify any
 
errors or changes in the license level (RO or SRO) or type of examination (partial or complete
 
written examination and/or operating test) specified for each applicant.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
 
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PAR S) component of NRC's Agencywide Documents Access and Management System (ADAMS), a ccessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,        /RA/  Hironori Peterson, Chief Operations Branch Division of Reactor Safety
 
Docket No. 50-331
 
License No. DPR-49
 
DISTRIBUTION See next page
 
DOCUMENT NAME:  G:\DRS\Work in Progress\
DUA 11__07 DRS OL Exam Approval Ltr.doc  Publicly Available  Non-Publicly Available        Sensitive          Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl ;"E" = Copy with attach/encl ; "N" = No copy  OFFICE  RIII:DRS    RIII:DRS    RIII:DRS        NAME  JKweiser:co DMcNeil  HPeterson
 
DATE 12/04/07 12/04/07 12/04/07 OFFICIAL RECORD COPY
 
Letter to Richard L. Anderson from Hironori Peterson dated December 4, 2007.  


==SUBJECT:==
==SUBJECT:==
PERATOR LICENSING EXAMINATION APPROVAL  
PERATOR LICENSING EXAMINATION APPROVAL cc:     J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs Chief Radiological Emergency Preparedness Section, Dept. Of Homeland Security M. Rasmusson, State Liaison Officer J. Morris, Training Department
 
cc: J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer  


R. Helfrich, Senior Attorney
Letter to Richard L. Anderson from Hironori Peterson dated December 4, 2007.
 
M. Ross, Managing Attorney
 
W. Webster, Vice President, Nuclear Operations
 
M. Warner, Vice President, Nuclear Operations Support
 
R. Kundalkar, Vice President, Nuclear Engineering
 
J. Bjorseth, Site Director
 
D. Curtland, Plant Manager
 
S. Catron, Manager, Regulatory Affairs
 
Chief Radiological Emergency Preparedness Section, Dept. Of Homeland Security
 
M. Rasmusson, State Liaison Officer  J. Morris, Training Department Letter to Richard L. Anderson from Hironori Peterson dated December 4, 2007.  


==SUBJECT:==
==SUBJECT:==
PERATOR LICENSING EXAMINATION APPROVAL  
PERATOR LICENSING EXAMINATION APPROVAL cc:     J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs Chief Radiological Emergency Preparedness Section, Dept. Of Homeland Security M. Rasmusson, State Liaison Officer J. Morris, Training Department DISTRIBUTION:
 
TEB DWS RidsNrrDirsIrib MAS KGO JKH3 RJO CAA1 DRPIII DRSIII PLB1 TXN NLS}}
cc: J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer  
 
R. Helfrich, Senior Attorney  
 
M. Ross, Managing Attorney  
 
W. Webster, Vice President, Nuclear Operations  
 
M. Warner, Vice President, Nuclear Operations Support  
 
R. Kundalkar, Vice President, Nuclear Engineering  
 
J. Bjorseth, Site Director  
 
D. Curtland, Plant Manager  
 
S. Catron, Manager, Regulatory Affairs  
 
Chief Radiological Emergency Preparedness Section, Dept. Of Homeland Security  
 
M. Rasmusson, State Liaison Officer J. Morris, Training Department  
 
DISTRIBUTION
: TEB DWS RidsNrrDirsIrib  
 
MAS KGO JKH3 RJO CAA1 DRPIII DRSIII PLB1 TXN NLS}}

Latest revision as of 00:58, 23 November 2019

LTR Confirming the Final Arrangements for the Upcoming Operator Licensing Examinations at Duane Arnold Energy Center
ML073450706
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 12/04/2007
From: Hironori Peterson
Operations Branch III
To: Richard Anderson
Nuclear Management Co
References
Download: ML073450706 (5)


Text

December 4, 2007 Mr. Richard L. Anderson Vice President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Anderson:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Duane Arnold Energy Center.

The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and will separately provide a list of approved applicants to Mr. Jeffrey D. Morris, Manager - Nuclear Training. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-1021, AOperator Licensing Examination Standards for Power Reactors,@ during the week of December 17, 2007. The NRC staff will administer the operating tests during the week of December 10, 2007.

Please contact Mr. Dell McNeil, at 630-829-9737, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49 DISTRIBUTION See next page

Mr. Richard L. Anderson Vice President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Anderson:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Duane Arnold Energy Center.

The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and will separately provide a list of approved applicants to Mr. Jeffrey D. Morris, Manager - Nuclear Training. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-1021, AOperator Licensing Examination Standards for Power Reactors,@ during the week of December 17, 2007. The NRC staff will administer the operating tests during the week of December 10, 2007.

Please contact Mr. Dell McNeil, at 630-829-9737, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49 DISTRIBUTION See next page DOCUMENT NAME: G:\DRS\Work in Progress\DUA 11__07 DRS OL Exam Approval Ltr.doc 9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl ;E = Copy with attach/encl ; N = No copy OFFICE RIII:DRS RIII:DRS RIII:DRS NAME JKweiser:co DMcNeil HPeterson

DATE 12/04/07 12/04/07 12/04/07 OFFICIAL RECORD COPY

Letter to Richard L. Anderson from Hironori Peterson dated December 4, 2007.

SUBJECT:

PERATOR LICENSING EXAMINATION APPROVAL cc: J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs Chief Radiological Emergency Preparedness Section, Dept. Of Homeland Security M. Rasmusson, State Liaison Officer J. Morris, Training Department

Letter to Richard L. Anderson from Hironori Peterson dated December 4, 2007.

SUBJECT:

PERATOR LICENSING EXAMINATION APPROVAL cc: J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs Chief Radiological Emergency Preparedness Section, Dept. Of Homeland Security M. Rasmusson, State Liaison Officer J. Morris, Training Department DISTRIBUTION:

TEB DWS RidsNrrDirsIrib MAS KGO JKH3 RJO CAA1 DRPIII DRSIII PLB1 TXN NLS