ML083500472: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
#REDIRECT [[CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment E]]
{{Adams
| number = ML083500472
| issue date = 11/26/2008
| title = Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment E
| author name =
| author affiliation = Luminant Generation Co, LLC, Luminant Power
| addressee name =
| addressee affiliation = NRC/NRR
| docket = 05000445, 05000446
| license number =
| contact person =
| case reference number = CP-200801606, GL-04-002, TXX-08141
| document report number = ENR-2007-002743-20-01, ER-ESP-001, Rev 1
| document type = Report, Technical
| page count = 20
}}
 
=Text=
{{#Wiki_filter:Attachment E                          ER-ESP-00 1 Page 1 of 20                          Revision 1 Special Figures ENR-2007-002743-20-01
 
Attachment E                                            ER-ESP-001 Page 2 of 20                                            Revision 1 Figure 3.b-1 Zone Map El. 808'-0" ENR-2007-002743-20-01
 
Attachment E                                                          ER-ESP-001 Page 3 of 20                                                          Revision 1
                                                        -I21 S
S
                              \ý
                          -I Figure 3.b-2 Zone Map El. 822'-9" & 819'-8" ENR-2007-002743-20-01
 
Attachment E                                                        ER-ESP-00 1 Page 4 of 20                                                        Revision 1 205 206 251
                              * "          204 259 210 20909 Figure 3.b-3 Zone Map El. 832'-6"9 ENR-2007-002743-20-01
 
Attachment E                                                                  ER-ESP-00 1 Page 5 of 20                                                                  Revision 1 AK y
306    *'
                                              .,  300
                                                                .1
                        " - 311: :.: .'
I-
[-I 309          310 Z
Figure 3.b-4 Zone Map El. 860'-0" ENR-2007-002743-20-01
 
Attachment E                                                                ER-ESP-001 Page 6 of 20                                                                Revision 1 406 4      'It 4
                  )l 405 400 A
410    /%J I
p.
409 I
                                                'I
:/
                          .1
                          'I>
Figure 3.b-5 Zone Map El. 905'-9" ENR-2007-002743-20-01
 
Attachment E                                                        ER-ESP-001 Page 7 of 20                                                        Revision 1 Figure 3.b-6 28.6D ZOI in Loop 4 Compartment ENR-2007-002743-20-01
 
Attachment E                                                                ER-ESP-001 Page 8 of 20                                                                Revision 1 Figure 3.b-7 4.0D ZOI on Loop 4 Cross-Over Leg (Concrete Only)
ENR-2007-002743-20-0 1
 
Attachment E                                              ER-ESP-001 Page 9 of 20                                                Revision 1 07 13-06: 01 TXU "MIN-K" SAMPLE Figure 3.c-1 Min-K Sample End View ENR-2007-002743-20-01
 
Attachment E                                            ER-ESP-O0 1 Page l0 of 20                                            Revision 1 Figure 3.c-2 Min-K Sample at 80X ENR-2007-002743-20-01
 
Attachment E                                                ER-ESP-O0 1 Page 11 of 20                                              Revision 1 Figure 3.c-3 Min-K Sample at 2,500X ENR-2007-002743-20-01
 
Attachment E                                                                  ER-ESP-O01 Page 12 of 20                                                                  Revision 1 Figure 3.c-4 Min-K Sample at 5,OOOX Titanium Dioxide Particles ENR-2007-002743-20-01
 
Attachment E                                                              ER-ESP-OO1 Page 13 of 20                                                              Revision 1 Figure 3.e-1 Northwest isometric view lower containment CAD model ENR-2007-002743-20-01
 
Attachment E                                                                      ER-ESP-001 Page 14 of 20                                                                    Revision 1 Case 4b: Loop 4 Cold Leg Break Case 4a: Loop 4 Crossover Leg Break Case 4c: Loop 4 Hot Leg Break Case 4d: Loop 4 Surge Line Break 4          1        Case 7: SG Case 5: MSLB in  Blowdown Line Penetration Area    Break Figure 3.e-2 Postulated Break Locations ENR-2007-002743-20-O I
 
Attachment E                                                                                        ER-ESP-O01 Page 15 of 20                                                                                        Revision 1 Modeled Perimeter Region 2 Spray Modeled NE Stair Modeled Perimeter Region 3 Spray Drainage
                                                                                    +\ Modeled SE Stair Spray Drainage Modeled H2 Vent Spray Flow Modeled Region D Modeled Hydrogen              Spray Flow on Sump Vent Flow on Sump                    Train A Train 8 Figure 3.e-3 Diagram of significant features modeled ENR-2007-002743-20-01
 
Attachment E                                                              ER-ESP-00 1 Page 16 of 20                                                              Revision 1 Figure 3.e-4 Illustration of distinct floor levels ENR-2007-002743-20-01
 
Attachment E                                                              ER-ESP-001 Page 17 of 20                                                              Revision 1 Figure 3.e-5 Streamlines showing water origination areas for each sump (Loop 4 LBLOCA, two trains)
ENR-2007-002743-20-01
 
Attachment E                                                                      ER-ESP-O0 1 Page 18 of 20                                                                      Revision 1 Velocity (ft/s)
[l i;,
Figure 3.e-6 Vectors showing pool flow direction (Loop 4 LBLOCA Single Train Sump A)
ENR-2007-002743-20-01
 
Attachment E                                                                      ER-ESP-001 Page 19 of 20                                                                      Revision 1 Sump B North Approach Planes 1 to 30 Plane 30    (
11.1
                                      %I
                                      .\                          Plane 1 Figure 3.f-1 Cutting Planes for Test Flume Modeling ENR-2007-002743-20-01
 
Attachment E                                                                ER-ESP-001 Page 20 of 20                                                              Revision 1
                                                  /
a Sump A South Approach Planes 1 to 21                                            /
Plane 21 N /
Plane 1
                                                      /
Figure 3.f-2 Cutting Planes for Test Flume Modeling ENR-2007-002743-20-01}}

Latest revision as of 18:45, 12 March 2020

Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment E
ML083500472
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/26/2008
From:
Luminant Generation Co, Luminant Power
To:
Office of Nuclear Reactor Regulation
References
CP-200801606, GL-04-002, TXX-08141 ENR-2007-002743-20-01, ER-ESP-001, Rev 1
Download: ML083500472 (20)


Text

Attachment E ER-ESP-00 1 Page 1 of 20 Revision 1 Special Figures ENR-2007-002743-20-01

Attachment E ER-ESP-001 Page 2 of 20 Revision 1 Figure 3.b-1 Zone Map El. 808'-0" ENR-2007-002743-20-01

Attachment E ER-ESP-001 Page 3 of 20 Revision 1

-I21 S

S

-I Figure 3.b-2 Zone Map El. 822'-9" & 819'-8" ENR-2007-002743-20-01

Attachment E ER-ESP-00 1 Page 4 of 20 Revision 1 205 206 251

  • " 204 259 210 20909 Figure 3.b-3 Zone Map El. 832'-6"9 ENR-2007-002743-20-01

Attachment E ER-ESP-00 1 Page 5 of 20 Revision 1 AK y

306 *'

., 300

.1

" - 311: :.: .'

I-

[-I 309 310 Z

Figure 3.b-4 Zone Map El. 860'-0" ENR-2007-002743-20-01

Attachment E ER-ESP-001 Page 6 of 20 Revision 1 406 4 'It 4

)l 405 400 A

410 /%J I

p.

409 I

'I

/

.1

'I>

Figure 3.b-5 Zone Map El. 905'-9" ENR-2007-002743-20-01

Attachment E ER-ESP-001 Page 7 of 20 Revision 1 Figure 3.b-6 28.6D ZOI in Loop 4 Compartment ENR-2007-002743-20-01

Attachment E ER-ESP-001 Page 8 of 20 Revision 1 Figure 3.b-7 4.0D ZOI on Loop 4 Cross-Over Leg (Concrete Only)

ENR-2007-002743-20-0 1

Attachment E ER-ESP-001 Page 9 of 20 Revision 1 07 13-06: 01 TXU "MIN-K" SAMPLE Figure 3.c-1 Min-K Sample End View ENR-2007-002743-20-01

Attachment E ER-ESP-O0 1 Page l0 of 20 Revision 1 Figure 3.c-2 Min-K Sample at 80X ENR-2007-002743-20-01

Attachment E ER-ESP-O0 1 Page 11 of 20 Revision 1 Figure 3.c-3 Min-K Sample at 2,500X ENR-2007-002743-20-01

Attachment E ER-ESP-O01 Page 12 of 20 Revision 1 Figure 3.c-4 Min-K Sample at 5,OOOX Titanium Dioxide Particles ENR-2007-002743-20-01

Attachment E ER-ESP-OO1 Page 13 of 20 Revision 1 Figure 3.e-1 Northwest isometric view lower containment CAD model ENR-2007-002743-20-01

Attachment E ER-ESP-001 Page 14 of 20 Revision 1 Case 4b: Loop 4 Cold Leg Break Case 4a: Loop 4 Crossover Leg Break Case 4c: Loop 4 Hot Leg Break Case 4d: Loop 4 Surge Line Break 4 1 Case 7: SG Case 5: MSLB in Blowdown Line Penetration Area Break Figure 3.e-2 Postulated Break Locations ENR-2007-002743-20-O I

Attachment E ER-ESP-O01 Page 15 of 20 Revision 1 Modeled Perimeter Region 2 Spray Modeled NE Stair Modeled Perimeter Region 3 Spray Drainage

+\ Modeled SE Stair Spray Drainage Modeled H2 Vent Spray Flow Modeled Region D Modeled Hydrogen Spray Flow on Sump Vent Flow on Sump Train A Train 8 Figure 3.e-3 Diagram of significant features modeled ENR-2007-002743-20-01

Attachment E ER-ESP-00 1 Page 16 of 20 Revision 1 Figure 3.e-4 Illustration of distinct floor levels ENR-2007-002743-20-01

Attachment E ER-ESP-001 Page 17 of 20 Revision 1 Figure 3.e-5 Streamlines showing water origination areas for each sump (Loop 4 LBLOCA, two trains)

ENR-2007-002743-20-01

Attachment E ER-ESP-O0 1 Page 18 of 20 Revision 1 Velocity (ft/s)

[l i;,

Figure 3.e-6 Vectors showing pool flow direction (Loop 4 LBLOCA Single Train Sump A)

ENR-2007-002743-20-01

Attachment E ER-ESP-001 Page 19 of 20 Revision 1 Sump B North Approach Planes 1 to 30 Plane 30 (

11.1

%I

.\ Plane 1 Figure 3.f-1 Cutting Planes for Test Flume Modeling ENR-2007-002743-20-01

Attachment E ER-ESP-001 Page 20 of 20 Revision 1

/

a Sump A South Approach Planes 1 to 21 /

Plane 21 N /

Plane 1

/

Figure 3.f-2 Cutting Planes for Test Flume Modeling ENR-2007-002743-20-01