|
|
Line 13: |
Line 13: |
| | page count = 3 | | | page count = 3 |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 November 13, 2012 |
| | |
| | Mr. Raymond Lieb Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station |
| | |
| | 5501 North State Route 2 |
| | |
| | Oak Harbor, OH 43449-9760 |
| | |
| | ==SUBJECT:== |
| | ASSESSMENT FOLLOW-UP LETTER FOR DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 |
| | |
| | ==Dear Mr. Lieb,== |
| | |
| | As a result of its continuous review of plant performance, the NRC updated its assessment of Davis-Besse Nuclear Power Station, Unit 1. The NRC's evaluation consisted of a review of performance indicators and inspection results. This letter informs you of the NRC's assessment of Davis-Besse Nuclear Power Station, Unit 1, and its plans for a future inspection at your facility. This letter supplements, but does not supersede, the mid-cycle letter issued on September 4, 2012. |
| | On November 8, 2012, the NRC forwarded a letter that stated the final significance determination of one or more greater-than-green inspection findings in the Security |
| | |
| | Cornerstone. |
| | |
| | The NRC determined the performance at Davis-Besse Nuclear Power Station, Unit 1, to be in the Regulatory Response Column of the Reac tor Oversight Process Action Matrix beginning third quarter of 2012. Therefore, the NRC plans to conduct a supplemental inspection. The NRC requests that your staff provide notification of your readiness for the NRC to conduct this supplemental inspection. |
| | |
| | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be |
| | |
| | available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | |
| | Please contact Jamnes Cameron at 630-829-9833 with any questions you have regarding this letter. |
| | Sincerely, |
| | /RA/ by Gary L. Shear For |
| | |
| | Steven K. West, Director |
| | |
| | Division of Reactor Projects |
| | |
| | Docket No. 50-346 License No. NPF-3 |
| | |
| | cc: Distribution via ListServŽ |
| | |
| | Please contact Jamnes Cameron at 630-829-9833 with any questions you have regarding this letter. Sincerely, /RA/ by Gary L. Shear For |
| | |
| | Steven K. West, Director |
| | |
| | Division of Reactor Projects |
| | |
| | Docket No. 50-346 License No. NPF-3 |
| | |
| | cc: Distribution via ListServŽ DISTRIBUTION: |
| | Cayetano Santos |
| | |
| | RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource |
| | |
| | Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa |
| | |
| | Carole Ariano Linda Linn DRPIII DRSIII Tammy Tomczak ROPassessment.Resource@nrc.gov |
| | |
| | DOCUMENT NAME: Davis-Besse Assessment Follow-up Letter Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII-DRP RIII-DRP RIII-DRP RIII NAME TBriley:mz JCameron GShear for SWest DATE 11/13/12 11/13/12 11/13/12 OFFICIAL RECORD COPY}} |
Revision as of 19:37, 1 August 2018
|
---|
Category:Letter
MONTHYEARML24303A3282024-10-29029 October 2024 Information Request for the Cyber Security Baseline Inspection Identification to Perform Inspection ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 the Associated Independent Spent Fuel Storage Installations IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments 2024-09-06
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 November 13, 2012
Mr. Raymond Lieb Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station
5501 North State Route 2
Oak Harbor, OH 43449-9760
SUBJECT:
ASSESSMENT FOLLOW-UP LETTER FOR DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1
Dear Mr. Lieb,
As a result of its continuous review of plant performance, the NRC updated its assessment of Davis-Besse Nuclear Power Station, Unit 1. The NRC's evaluation consisted of a review of performance indicators and inspection results. This letter informs you of the NRC's assessment of Davis-Besse Nuclear Power Station, Unit 1, and its plans for a future inspection at your facility. This letter supplements, but does not supersede, the mid-cycle letter issued on September 4, 2012.
On November 8, 2012, the NRC forwarded a letter that stated the final significance determination of one or more greater-than-green inspection findings in the Security
Cornerstone.
The NRC determined the performance at Davis-Besse Nuclear Power Station, Unit 1, to be in the Regulatory Response Column of the Reac tor Oversight Process Action Matrix beginning third quarter of 2012. Therefore, the NRC plans to conduct a supplemental inspection. The NRC requests that your staff provide notification of your readiness for the NRC to conduct this supplemental inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Jamnes Cameron at 630-829-9833 with any questions you have regarding this letter.
Sincerely,
/RA/ by Gary L. Shear For
Steven K. West, Director
Division of Reactor Projects
Docket No. 50-346 License No. NPF-3
cc: Distribution via ListServŽ
Please contact Jamnes Cameron at 630-829-9833 with any questions you have regarding this letter. Sincerely, /RA/ by Gary L. Shear For
Steven K. West, Director
Division of Reactor Projects
Docket No. 50-346 License No. NPF-3
cc: Distribution via ListServŽ DISTRIBUTION:
Cayetano Santos
RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource
Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa
Carole Ariano Linda Linn DRPIII DRSIII Tammy Tomczak ROPassessment.Resource@nrc.gov
DOCUMENT NAME: Davis-Besse Assessment Follow-up Letter Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII-DRP RIII-DRP RIII-DRP RIII NAME TBriley:mz JCameron GShear for SWest DATE 11/13/12 11/13/12 11/13/12 OFFICIAL RECORD COPY