ML17277B387: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:REGULATORY ORMATION DISTRIBUTION SYS (RIOS)W ACCESSION NBR:8405010435 DOC~DATE: 84/04/25 NOTARIZED:
NO DOCKET FACIL:50 397 HPPSS Nuclear ProJect<Unit 2r Nashington Public Powe 05000397 AUTH~NAME AUTHOR AFFILIATION SORENSENiG,C, Washington, Public Power Supply System RECIP,NAME RE'CIPIKNT AFFILIATION SCHNENCERiA,'icensing, Branch 2
 
==SUBJECT:==
Updated application for-amend to License NPF 21rclarifying 840309 application"re change to Section 6 of Tech'pecs re util organitation L util organi2ation responsibilityiesi per NRC request<DI'STRIBUTION.CODE: B001S COPIES RECEIVED!LTR ENCL SIZE>>, TITLE" Licensing Submittal:
PSAR/FSAR Amdts 8, Related Correspondence' NOTES~RECIP IENT Il)CODE/NAME.
NRR/DL/ADL NRR LB2 LA INTERNALB ELO/HDS2 IE/DEPER/EPB 36 IE/DQASIP/QAB21 NRR/DE/CEB 11'RR/OE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB NRR/DHFS/HFEB40 NRA/DHFS/PSRB NRR/OSl/AEB 26 NRA/DSI/CPB 10.NRR/DSI/I CSB 16 NRR/OS I/PSB 19 NRR/DSI/RSB 23 RGN5 EXTERNAL;ACRS 41 DMB/DSS (AMDTS)LPOR 03 NSIC 05 COPIES LTTR KNCLt 1 0 1 0 0 3'3 1 1 2'1 1 1 1 1 1 1 1 1 1 1 1 3-3 6 6 1 1 1 1 RECIPIENT ID CaDE/NAME NRR LB2 BC AULUCK i R e 01 IE.FILE IE/DEPER/IRB 35 NRR/DK/AKAB NRR/OE/EHEB NRR/DK/GB 28 NRR/OK/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB
-32 NRR/DL/SSPB NRR/DSI/ASB NRR/OS I/CSB 09 NRR/OSI/METB 12 AB 22'KG F E 04/MIB BNL(AMDTS ONLY)FEMA"REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1 0 1 1 1 1 1 1 0 1 1 2 2 1 1 1 1 1 1 1 0 1 1, 1 1 1 1 1 0 1 1 1 1 1 1 f7 TOTAL NUMBER OP COPIES REQUIRED: LTTR BB ENCL i>>S H~)l h)r<<ai ,)iy's))$" lI ga l r l r'I>>'rr 0 II>>Hg'rr r)),'l ll>>>>lr.SIF rl)>>>>r r'r/, rr>>r rig p>>V+>>+fYP r Jr h f I'i q l,H'h)rli i F)>>hi)s)!)
F)>>)f l'r l r)r>>Zr)i>>>", h'S.)r,>>ry 8 f f))r>r iil.,l,'l i)C i)Fili if')ry f f>>,I'IFy I" ill')r>>)')Ii'rll'f 4 i, h f l>>IF~f Fr)Il f'f H)g rr)>>r i r"P I)f r g)i,p 4'l)h l f'l)llrI>>>>'>>r'I>>N SS P~e mrs we~~%e~m+)s'!r i)'l H r,y~,l)>q q,i i, r)gl,lri l ,r r , J"j 1 I I,''f),.>>,II I:"gli)i, I j I,>>I)l'I:," l<,'5'>>r'),'),l r s'r F x)rr'>>r<<)f Iw~II I 5)I)i', Il)l I s>>T Ij I i>>l jl'Ilk')),)lr:>>I>>IT'rl Ihk rk l,g II tl I hrr I r I)re Ji IH li rl II IH F'>>,'II~l rl<S'H>>(IH I)H i<H>>l:I<<',,y'1)X r>>lli, rr N$11)iri i'Xg, Il,'Ilg M pg i'I Cir Hrrr)1 I<f a, li th r rl I)X'')Hr>>3 K hs ,>>)"'r Iir>>r(),,I t, r~S I'l HC j ,)$>>I 0 Washington Public Power Supply System P.O.Box 968 3000 George Washington Way Richland, Washington 99352 (509)372-5000 April 25, 1984 G02-84-269 Docket No.50-397 Director of Nuclear Reactor Regulation Attention:
Nr.A.Schwencer, Chief Licensing Branch No.2 Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555
 
==Dear Nr.Schwencer:==
 
==Subject:==
 
==Reference:==
 
NUCLEAR PLANT NO.2 OPERATING LICENSE NPF-21, AHENDHENT RE(VEST CLARIFICATION Letter, G02-84-126, G.C.Sorensen (SS)to A.Schwencer (NRC),"Operating License NPF-21, Request for Amendment", dated Harch 9, 1984 As requested in a phone conversation with Nessrs.R.Auluck and F.Allenspach of your staff and P.Powell and H.Aeschliman (SS), the attached information is provided in clarification of the change to Section'of the WNP-2 technical specification requested by the referenced letter.Should you have any further questions, please contact Hr.P.L.Powell, Hanager, WNP-2 Licensing.
Very truly yours, G.C.Sorensen, Hanager Regulatory Programs PLP/tmh Attachment cc: R Auluck WS Chin D Hoffman N Lewis AD Toth-NRC-BPA-NRC-EFSEC-NRC Site 1'40501043 "00397 pDR pDOCK 0>0 pDR p Fl l gf;I ,fo II' The following chandi es represent only title changes.-No deletion of support to WNP-2 or change of personnel is represented in these changes: Power Generation Director to Assistant Managing Director for Operations Technology Director Health Physicist Training Manager to to to Engineering Director Health Physics/Chemistry Support Supervisor Technical Training Coordinator 2.The following changes represent minor administrative changes.No deletion of support to WNP-2 or change of personnel is represented in these changes: Support Services Director-reports to the Assistant Managing Director for Operations Spare Parts Material Supervisor
-fullfils, a matrix reporting function to the Plant Maintenance Manager as the Procurement Manager.Day-to-day reporting to the Maintenance Manager is required, long term policy reporting is to the Manager, Corporate Contracts and Materials Management.
3.The following positions have been added to the plant organization.
No deletion of support to WNP-2 is represented by these: changes.A Planning and Scheduling Supervisor has been added reporting directly to the.Plant Manager.Two Plant Engineering Supervisors have been added to the Plant Technical Manager's staff in response to increased activities and responsibilities.
The Shift Technical.
Advisers (STA's)are reflected as part of the Reactor Engineering Supervisor's staff.4.The member of P;-O.C.described as the Plant gA/gC Manager is the Plant gA Manager..5.The change to Se'ction.6.8.2 reflects implementing procedures f'r the Kealth Physics/Chemistry.Support Program as.being coordinated by the"Director of Support Services" instead of the"Manager, Radiological Programs".
This change is made because the"Manager, Radiological Programs" reports to the"Director of Support Services" who has the final responsibility for this area.No deletion of suport to WNP-2 or change'of personnel is represented in this change.
0 4 r}}

Revision as of 06:46, 12 July 2018

Updated Application for Amend to License NPF-21,clarifying 840309 Application Re Change to Section 6 of Tech Specs Re Util Organization & Util Organization Responsibilities, Per NRC Request
ML17277B387
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/25/1984
From: SORENSEN G C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: SCHWENCER A
Office of Nuclear Reactor Regulation
References
GO2-84-269, NUDOCS 8405010435
Download: ML17277B387 (6)


Text

REGULATORY ORMATION DISTRIBUTION SYS (RIOS)W ACCESSION NBR:8405010435 DOC~DATE: 84/04/25 NOTARIZED:

NO DOCKET FACIL:50 397 HPPSS Nuclear ProJect<Unit 2r Nashington Public Powe 05000397 AUTH~NAME AUTHOR AFFILIATION SORENSENiG,C, Washington, Public Power Supply System RECIP,NAME RE'CIPIKNT AFFILIATION SCHNENCERiA,'icensing, Branch 2

SUBJECT:

Updated application for-amend to License NPF 21rclarifying 840309 application"re change to Section 6 of Tech'pecs re util organitation L util organi2ation responsibilityiesi per NRC request<DI'STRIBUTION.CODE: B001S COPIES RECEIVED!LTR ENCL SIZE>>, TITLE" Licensing Submittal:

PSAR/FSAR Amdts 8, Related Correspondence' NOTES~RECIP IENT Il)CODE/NAME.

NRR/DL/ADL NRR LB2 LA INTERNALB ELO/HDS2 IE/DEPER/EPB 36 IE/DQASIP/QAB21 NRR/DE/CEB 11'RR/OE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB NRR/DHFS/HFEB40 NRA/DHFS/PSRB NRR/OSl/AEB 26 NRA/DSI/CPB 10.NRR/DSI/I CSB 16 NRR/OS I/PSB 19 NRR/DSI/RSB 23 RGN5 EXTERNAL;ACRS 41 DMB/DSS (AMDTS)LPOR 03 NSIC 05 COPIES LTTR KNCLt 1 0 1 0 0 3'3 1 1 2'1 1 1 1 1 1 1 1 1 1 1 1 3-3 6 6 1 1 1 1 RECIPIENT ID CaDE/NAME NRR LB2 BC AULUCK i R e 01 IE.FILE IE/DEPER/IRB 35 NRR/DK/AKAB NRR/OE/EHEB NRR/DK/GB 28 NRR/OK/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB

-32 NRR/DL/SSPB NRR/DSI/ASB NRR/OS I/CSB 09 NRR/OSI/METB 12 AB 22'KG F E 04/MIB BNL(AMDTS ONLY)FEMA"REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1 0 1 1 1 1 1 1 0 1 1 2 2 1 1 1 1 1 1 1 0 1 1, 1 1 1 1 1 0 1 1 1 1 1 1 f7 TOTAL NUMBER OP COPIES REQUIRED: LTTR BB ENCL i>>S H~)l h)r<<ai ,)iy's))$" lI ga l r l r'I>>'rr 0 II>>Hg'rr r)),'l ll>>>>lr.SIF rl)>>>>r r'r/, rr>>r rig p>>V+>>+fYP r Jr h f I'i q l,H'h)rli i F)>>hi)s)!)

F)>>)f l'r l r)r>>Zr)i>>>", h'S.)r,>>ry 8 f f))r>r iil.,l,'l i)C i)Fili if')ry f f>>,I'IFy I" ill')r>>)')Ii'rll'f 4 i, h f l>>IF~f Fr)Il f'f H)g rr)>>r i r"P I)f r g)i,p 4'l)h l f'l)llrI>>>>'>>r'I>>N SS P~e mrs we~~%e~m+)s'!r i)'l H r,y~,l)>q q,i i, r)gl,lri l ,r r , J"j 1 I I,f),.>>,II I:"gli)i, I j I,>>I)l'I:," l<,'5'>>r'),'),l r s'r F x)rr'>>r<<)f Iw~II I 5)I)i', Il)l I s>>T Ij I i>>l jl'Ilk')),)lr:>>I>>IT'rl Ihk rk l,g II tl I hrr I r I)re Ji IH li rl II IH F'>>,'II~l rl<S'H>>(IH I)H i<H>>l:I<<',,y'1)X r>>lli, rr N$11)iri i'Xg, Il,'Ilg M pg i'I Cir Hrrr)1 I<f a, li th r rl I)X)Hr>>3 K hs ,>>)"'r Iir>>r(),,I t, r~S I'l HC j ,)$>>I 0 Washington Public Power Supply System P.O.Box 968 3000 George Washington Way Richland, Washington 99352 (509)372-5000 April 25, 1984 G02-84-269 Docket No.50-397 Director of Nuclear Reactor Regulation Attention:

Nr.A.Schwencer, Chief Licensing Branch No.2 Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555

Dear Nr.Schwencer:

Subject:

Reference:

NUCLEAR PLANT NO.2 OPERATING LICENSE NPF-21, AHENDHENT RE(VEST CLARIFICATION Letter, G02-84-126, G.C.Sorensen (SS)to A.Schwencer (NRC),"Operating License NPF-21, Request for Amendment", dated Harch 9, 1984 As requested in a phone conversation with Nessrs.R.Auluck and F.Allenspach of your staff and P.Powell and H.Aeschliman (SS), the attached information is provided in clarification of the change to Section'of the WNP-2 technical specification requested by the referenced letter.Should you have any further questions, please contact Hr.P.L.Powell, Hanager, WNP-2 Licensing.

Very truly yours, G.C.Sorensen, Hanager Regulatory Programs PLP/tmh Attachment cc: R Auluck WS Chin D Hoffman N Lewis AD Toth-NRC-BPA-NRC-EFSEC-NRC Site 1'40501043 "00397 pDR pDOCK 0>0 pDR p Fl l gf;I ,fo II' The following chandi es represent only title changes.-No deletion of support to WNP-2 or change of personnel is represented in these changes: Power Generation Director to Assistant Managing Director for Operations Technology Director Health Physicist Training Manager to to to Engineering Director Health Physics/Chemistry Support Supervisor Technical Training Coordinator 2.The following changes represent minor administrative changes.No deletion of support to WNP-2 or change of personnel is represented in these changes: Support Services Director-reports to the Assistant Managing Director for Operations Spare Parts Material Supervisor

-fullfils, a matrix reporting function to the Plant Maintenance Manager as the Procurement Manager.Day-to-day reporting to the Maintenance Manager is required, long term policy reporting is to the Manager, Corporate Contracts and Materials Management.

3.The following positions have been added to the plant organization.

No deletion of support to WNP-2 is represented by these: changes.A Planning and Scheduling Supervisor has been added reporting directly to the.Plant Manager.Two Plant Engineering Supervisors have been added to the Plant Technical Manager's staff in response to increased activities and responsibilities.

The Shift Technical.

Advisers (STA's)are reflected as part of the Reactor Engineering Supervisor's staff.4.The member of P;-O.C.described as the Plant gA/gC Manager is the Plant gA Manager..5.The change to Se'ction.6.8.2 reflects implementing procedures f'r the Kealth Physics/Chemistry.Support Program as.being coordinated by the"Director of Support Services" instead of the"Manager, Radiological Programs".

This change is made because the"Manager, Radiological Programs" reports to the"Director of Support Services" who has the final responsibility for this area.No deletion of suport to WNP-2 or change'of personnel is represented in this change.

0 4 r