{{#Wiki_filter:OmabhaPubisPowOlrid 444 South 16W Street MallOmaha, NE 68102-2247 LIC-15-0071 May 17, 201510 CFR 50.55aU.S. Nuclear Regulatory Commission Attn: Document Control DeskWashington, DC 20555-0001 Fort Calhoun Station, Unit No. 1Renewed Facility Operating License No. DPR-40NRC Docket No. 50-285
{{#Wiki_filter:OmabhaPubisPowOlrid 444 South 16W Street Mall Omaha, NE 68102-2247 LIC-15-0071 May 17, 2015 10 CFR 50.55a U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285  


==Subject:==
==Subject:==
 
Supplemental Information Associated with Omaha Public Power District (OPPD)Relief Request RR-14  
Supplemental Information Associated with Omaha Public Power District (OPPD)Relief Request RR-14


==References:==
==References:==


See Page 2This letter provides supplemental information to Omaha Public Power District (OPPD) Requestfor Relief RR-14 (Reference  
See Page 2 This letter provides supplemental information to Omaha Public Power District (OPPD) Request for Relief RR-14 (Reference  
: 1) and the OPPD response to a Request for Additional Information (Reference 5). Specifically, this letter provides revised proposed alternative and supplemental information to question 3 of Reference 5 as discussed in a conference call held betweenmembers of OPPD staff and the NRC on May 17, 2015.If you should have any questions regarding this submittal or require additional information, please contact Mr. Bill R. Hansher at 402-533-6894.
: 1) and the OPPD response to a Request for Additional Information (Reference 5). Specifically, this letter provides revised proposed alternative and supplemental information to question 3 of Reference 5 as discussed in a conference call held between members of OPPD staff and the NRC on May 17, 2015.If you should have any questions regarding this submittal or require additional information, please contact Mr. Bill R. Hansher at 402-533-6894.
Respcfl,uisP. ortpassiSite Vice President and CNOLPC/BRH/brh Attachments:  
Respcfl, uisP. ortpassi Site Vice President and CNO LPC/BRH/brh Attachments:  
: 1. Revised Proposed Alternative
: 1. Revised Proposed Alternative
: 2. Supplemental Response to NRC Request for Additional Information Regarding Relief Request RR-14 Question 3c: M. L. Dapas, NRC Regional Administrator, Region IVC. F. Lyon, NRC Senior Project ManagerS. M. Schneider, NRC Senior Resident Inspector Employment with Equal Opportunity U. S. Nuclear Regulatory Commission LIC-1 5-0071Page 2References
: 2. Supplemental Response to NRC Request for Additional Information Regarding Relief Request RR-14 Question 3 c: M. L. Dapas, NRC Regional Administrator, Region IV C. F. Lyon, NRC Senior Project Manager S. M. Schneider, NRC Senior Resident Inspector Employment with Equal Opportunity U. S. Nuclear Regulatory Commission LIC-1 5-0071 Page 2 References
: 1. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "Relief RequestNumber RR-1 4, Request for Relief from Paragraph  
: 1. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "Relief Request Number RR-1 4, Request for Relief from Paragraph  
-3142.1 (c) of ASME Code Case N-729-1 for Reactor Vessel Head Penetration Nozzle Welds," dated May 9, 2015 (LIC-15-0066)2. E-mail from NRC (C. F. Lyon) to OPPD (B. R. Hansher),  
-3142.1 (c) of ASME Code Case N-729-1 for Reactor Vessel Head Penetration Nozzle Welds," dated May 9, 2015 (LIC-15-0066)2. E-mail from NRC (C. F. Lyon) to OPPD (B. R. Hansher), "Fort Calhoun Station, Unit No.1-Request for Additional Information for Fort Calhoun Relief Request RR-14, Reactor Vessel Head Inspections," dated May 11, 2015 3. E-mail from NRC (C. F. Lyon) to OPPD (B. R. Hansher), "RAIs for RR-14 (TAC No.MF6206)," dated May 12, 2015 4. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "Omaha Public Power District (OPPD) Response to NRC Request for Additional Information Regarding Relief Request RR-14," dated May 13, 2015 (LIC-15-0069)
"Fort Calhoun Station, Unit No.1-Request for Additional Information for Fort Calhoun Relief Request RR-14, ReactorVessel Head Inspections,"
: 5. E-mail from NRC (C. F. Lyon) to OPPD (B. R. Hansher), "FCS: RAI Number 2 for RR-14, RVH Leakage/ASME Code Case N-729-1 (TAC No. MF6206)," dated May 15, 2015 6. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "Omaha Public Power District (OPPD) Response to NRC Request for Additional Information Regarding Relief Request RR-14," dated May 16, 2015 (LIC-15-0070)
dated May 11, 20153. E-mail from NRC (C. F. Lyon) to OPPD (B. R. Hansher),  
LIC-1 5-0071 Attachment 1 Page 1 Revised Proposed Alternative Repairs to identified boric acid leakage sources will be made on RC-100, CEDM RC-10-24, and ICI Port #44 during the current refueling outage. Repairs to identified component cooling water (CCW) leakage sources will be made on CEDMs RC-10-03, RC-10-12, RC-10-14, RC-10-27, RC-1 0-35, and RC-1 0-39 during the current refueling outage. This corrects the known sources of leakage. Procedure OP-ST-RC-3007, Periodic Reactor Coolant System Integrity Test, which specifies inspection areas inside containment including the ICI Ports, CEDM housings, and RC-100, will be performed.
"RAIs for RR-14 (TAC No.MF6206),"
This surveillance test will verify the correction of the identified leaks and confirm the absence of new leaks.During Operating Cycle 28 OPPD will use administrative controls such that at an unidentified leak rate increase of greater than 0.1 gpm above stable baseline, actions will be taken to identify the source of the leakage. If the source is not identified within 24 hours, actions will be taken to shut the plant down.The "stable baseline" is the baseline mean defined in procedure, ER-AP-331-1003 "RCS Leakage Monitoring and Action Plan". ER-AP-331-1003 establishes the controls and expectations for monitoring Reactor Coolant System (RCS) leakage under the Exelon Nuclear Boric Acid Corrosion Control (BACC) program and the PWR Owner's Group (PWROG)Operations Subcommittee "Needed" Recommendations under letters OG-07-387  
dated May 12, 20154. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "Omaha PublicPower District (OPPD) Response to NRC Request for Additional Information Regarding Relief Request RR-14," dated May 13, 2015 (LIC-15-0069)
&OG-08-400, and associated guidance for these recommendations contained in WCAPs 16423 & 16465. It also defines the methodology used to establish acceptable baseline values.The "Stable Baseline" (Baseline Mean) is defined as a normal, steady state mean value for a given plant condition (gpm @ 60F to 70F and atmospheric pressure).
: 5. E-mail from NRC (C. F. Lyon) to OPPD (B. R. Hansher),  
This is established during nominal Mode 1 plant conditions.
"FCS: RAI Number 2 for RR-14,RVH Leakage/ASME Code Case N-729-1 (TAC No. MF6206),"
Following every outage, the previous quarter's (prior to the outage) Baseline Mean RCS unidentified leak rate value and Standard Deviation are used upon startup for a new fuel cycle or until such time as the plant systems become more stable and better values can be calculated.
dated May 15, 20156. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "Omaha PublicPower District (OPPD) Response to NRC Request for Additional Information Regarding Relief Request RR-14," dated May 16, 2015 (LIC-15-0070)
Following a refueling outage it may take several weeks for the RCS leak rate to stabilize, because it takes time for equipment packing to swell, seals to run-in, etc. depending on the cycle. A revised baseline from the previous quarter is established based upon plant response post outage.The FCS experience over several outages (past 4), indicates that this takes nominally about one month. Following FCR27, it is expected that a "stable baseline" will be established approximately 4 weeks post startup.During Operating Cycle 28, OPPD will perform a bare-metal visual inspection on the upper RVH in accordance with the criteria contained in ASME Code Case N-729-1 on the first Cold Shutdown of greater than 72 hours that occurs after at least 4 months of operation.
LIC-1 5-0071Attachment 1Page 1Revised Proposed Alternative Repairs to identified boric acid leakage sources will be made on RC-100, CEDM RC-10-24, andICI Port #44 during the current refueling outage. Repairs to identified component cooling water(CCW) leakage sources will be made on CEDMs RC-10-03, RC-10-12, RC-10-14, RC-10-27, RC-1 0-35, and RC-1 0-39 during the current refueling outage. This corrects the known sourcesof leakage.
During Refueling Outage FCR28 OPPD will conduct UT/surface examinations of all RVH nozzles.
Procedure OP-ST-RC-3007, Periodic Reactor Coolant System Integrity Test, whichspecifies inspection areas inside containment including the ICI Ports, CEDM housings, and RC-100, will be performed.
LIC-1 5-0071 Attachment 2 Page 1 Supplemental Response to NRC Request for Additional Information Regarding Relief Request RR-14 Question 3 NRC Question 3 For each nozzle which exhibited foreign material near the annulus, including staining, please identify the source of the material and provide a justification for the leakage being from that source (e.g., a chemical and/or isotopic analysis of the material at the annulus showing the material to be inconsistent with RCS chemistry; evidence that the material is non-adherent, or evidence that a leakage path exists from a point above each nozzle under consideration to a point below the nozzle such that it is reasonable to conclude that fluid would have entered the annulus of the nozzle under consideration).
This surveillance test will verify the correction of the identified leaks andconfirm the absence of new leaks.During Operating Cycle 28 OPPD will use administrative controls such that at an unidentified leak rate increase of greater than 0.1 gpm above stable baseline, actions will be taken toidentify the source of the leakage.
Attachment 2 provides revised supplemental information to characterize and further clarify why we have reasonable assurance that the discovered deposits originated from other sources than the nozzles. This is shown in the revised attached Source Identification Diagram. This revised diagram depicts the dispersion of leakage from ICI-44, RC-10-24, RC-100, and the CCW flex hose. Also shown this diagram is the general flow of wash down liquid and where it tends to accumulate on the downhill side of various penetrations, particularly at the ICI locations.
If the source is not identified within 24 hours, actions will betaken to shut the plant down.The "stable baseline" is the baseline mean defined in procedure, ER-AP-331-1003 "RCSLeakage Monitoring and Action Plan". ER-AP-331-1003 establishes the controls andexpectations for monitoring Reactor Coolant System (RCS) leakage under the Exelon NuclearBoric Acid Corrosion Control (BACC) program and the PWR Owner's Group (PWROG)Operations Subcommittee "Needed" Recommendations under letters OG-07-387  
Additionally, chemical analysis was obtained for both loose and adherent particles.
&OG-08-400, and associated guidance for these recommendations contained in WCAPs 16423 & 16465. Italso defines the methodology used to establish acceptable baseline values.The "Stable Baseline" (Baseline Mean) is defined as a normal, steady state mean value for agiven plant condition (gpm @ 60F to 70F and atmospheric pressure).
The results of this analysis indicates that the source of leakage is from sources other than nozzle.
This is established duringnominal Mode 1 plant conditions.
LIC-1 5-0071 Attachment 2 Page 2 Source Identification Diagram.~ .,~ICI-44 Graylock leak spray distribution*
Following every outage, the previous quarter's (prior to the outage) Baseline Mean RCSunidentified leak rate value and Standard Deviation are used upon startup for a new fuel cycleor until such time as the plant systems become more stable and better values can becalculated.
I CCW Flex Hose Leak IC]-4 i RC-10-24 RC 10O0Packing LeA.Accumulation
Following a refueling outage it may take several weeks for the RCS leak rate tostabilize, because it takes time for equipment packing to swell, seals to run-in, etc. depending on the cycle. A revised baseline from the previous quarter is established based upon plantresponse post outage.The FCS experience over several outages (past 4), indicates that this takes nominally aboutone month. Following FCR27, it is expected that a "stable baseline" will be established approximately 4 weeks post startup.During Operating Cycle 28, OPPD will perform a bare-metal visual inspection on the upper RVHin accordance with the criteria contained in ASME Code Case N-729-1 on the first ColdShutdown of greater than 72 hours that occurs after at least 4 months of operation.
&St Stud 1 4--Majority ofoCCW Deposit Area*Flow of Fluid Causing Rust in -_Downstream Annulus RC-100 Packing Leak through Insulation*
During Refueling Outage FCR28 OPPD will conduct UT/surface examinations of all RVHnozzles.
*Arrows for RC-100 and CCW leak deposit areas indicate further disoersion from indiratid  
LIC-1 5-0071Attachment 2Page 1Supplemental Response to NRC Request for Additional Information Regarding Relief Request RR-14 Question 3NRC Question 3For each nozzle which exhibited foreign material near the annulus, including  
;krpx LIC-1 5-0071 Attachment 2 Page 3 Reference DiagramSTUD  
: staining, please identify the source of the material and provide a justification for the leakagebeing from that source (e.g., a chemical and/or isotopic analysis of the material at theannulus showing the material to be inconsistent with RCS chemistry; evidence thatthe material is non-adherent, or evidence that a leakage path exists from a pointabove each nozzle under consideration to a point below the nozzle such that it isreasonable to conclude that fluid would have entered the annulus of the nozzle underconsideration).
.r sp r 43 )?;5 220*119-I 34 31 k4 LIC-15-0071 Attachment 2 Page 4 CEDM Nozzle 1 A sample was taken but the amount of material was not sufficient for analysis.
Attachment 2 provides revised supplemental information to characterize and further clarifywhy we have reasonable assurance that the discovered deposits originated from othersources than the nozzles.
It is expected some accumulation would be present based on the location of the penetration because of the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 above the annulus region. CEDM Nozzle 1 is on the periphery of the leakage area. In addition, this nozzle is located at the top of the head in the center, resultina in anv liauid material traversina down the curvature of the head.View -000 View -090" Picture is somewhat blurred 0 Fillet of the annulus is smooth with no* Fillet of annulus is difficult to discern but no apparent build-up or reduction in material build-up or reduction in material is evident 9 No indication of wastage or surface[ No indication of wastage or surface erosion erosion a Minor staining within the annulus* Minor staining within the annulus
This is shown in the revised attached Source Identification Diagram.
* Very small quantity of apparent debris* No debris visible in the annulus to obstruct found to be lint, is present in the annulus.successful visual examination This debris did not preclude the ability to successfully complete the required VE exam View- 180 View- 270* Fillet of the annulus is smooth with no
This revised diagram depicts the dispersion of leakage from ICI-44, RC-10-24, RC-100, and the CCW flex hose. Also shown this diagram is the general flow of wash downliquid and where it tends to accumulate on the downhill side of various penetrations, particularly at the ICI locations.
* Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material 0 No indication of wastage or surface 9 No indication of wastage or surface erosion erosion 0 Minor staining identified in the annulus.* Minor staining identified in the annulus.
Additionally, chemical analysis was obtained for both looseand adherent particles.
* No debris visible in the annulus to obstruct* No debris visible in the annulus to obstruct successful visual examination successful visual examination LIC-1 5-0071 Attachment 2 Page 5 CEDM Nozzle 2 A sample was taken but the amount of material was not sufficient for analysis.
The results of this analysis indicates that the source of leakage isfrom sources other than nozzle.
It is expected some accumulation would be present based on the location of the penetration because of the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 above the annulus region. CEDM Nozzle 4 is on the periphery of the leakaqe area.View -000 View -090* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Minor staining within the annulus 0 Minor staining within the annulus" Very small quantity of apparent debris & No debris visible in the annulus to obstruct found to be lint, is present in the annulus. successful visual examination This debris did not preclude the ability to successfully complete the required VE exam.View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface & No indication of wastage or surface erosion erosion" No staining identified in the annulus.
LIC-1 5-0071Attachment 2Page 2Source Identification Diagram.~ .,~ICI-44 Graylock leakspray distribution*
ICCW FlexHose LeakIC]-4iRC-10-24RC 10O0Packing LeA.Accumulation
&StStud 14--Majority ofoCCWDeposit Area*Flow of FluidCausing Rust in -_Downstream AnnulusRC-100 Packing Leakthrough Insulation*
*Arrows for RC-100 and CCW leak deposit areasindicate further disoersion from indiratid  
;krpx LIC-1 5-0071Attachment 2Page 3Reference DiagramSTUD  
.r sp r43 )?;5220*119-I 3431 k4 LIC-15-0071 Attachment 2Page 4CEDM Nozzle 1A sample was taken but the amount of material was not sufficient for analysis.
It is expectedsome accumulation would be present based on the location of the penetration because of theCCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 above the annulus region. CEDM Nozzle 1is on the periphery of the leakage area. In addition, this nozzle is located at the top of the headin the center, resultina in anv liauid material traversina down the curvature of the head.View -000 View -090" Picture is somewhat blurred 0 Fillet of the annulus is smooth with no* Fillet of annulus is difficult to discern but no apparent build-up or reduction in materialbuild-up or reduction in material is evident 9 No indication of wastage or surface[ No indication of wastage or surface erosionerosion a Minor staining within the annulus* Minor staining within the annulus
* Very small quantity of apparent debris* No debris visible in the annulus to obstruct found to be lint, is present in the annulus.successful visual examination This debris did not preclude the ability tosuccessfully complete the required VEexamView- 180 View- 270* Fillet of the annulus is smooth with no
* Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material0 No indication of wastage or surface 9 No indication of wastage or surface erosionerosion 0 Minor staining identified in the annulus.* Minor staining identified in the annulus.
* No debris visible in the annulus to obstruct* No debris visible in the annulus to obstruct successful visual examination successful visual examination LIC-1 5-0071Attachment 2Page 5CEDM Nozzle 2A sample was taken but the amount of material was not sufficient for analysis.
It is expectedsome accumulation would be present based on the location of the penetration because of theCCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 above the annulus region. CEDM Nozzle 4is on the periphery of the leakaqe area.View -000 View -090* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion* Minor staining within the annulus 0 Minor staining within the annulus" Very small quantity of apparent debris & No debris visible in the annulus to obstructfound to be lint, is present in the annulus.
successful visual examination This debris did not preclude the ability tosuccessfully complete the required VEexam.View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface & No indication of wastage or surfaceerosion erosion" No staining identified in the annulus.
* No staining identified in the annulus." No debris visible in the annulus to obstruct
* No staining identified in the annulus." No debris visible in the annulus to obstruct
* Very small quantity of apparent debrissuccessful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability tosuccessfully complete the required VEexam.
* Very small quantity of apparent debris successful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam.
LIC-1 5-0071Attachment 2Page 6CEDM Nozzle 3A sample was taken with the following results:
LIC-1 5-0071 Attachment 2 Page 6 CEDM Nozzle 3 A sample was taken with the following results: pH = 9.33, Boron = 105 ppm, Tolytriazole  
pH = 9.33, Boron = 105 ppm, Tolytriazole  
= 34 ppm. Isotopic evidence indicated the presence of Co-58, Co-60, Nb-95, Zr-95 and Cs-137. The CCW Flex Hose leak deposited material on CEDM Nozzles 3, 8 and 19 above the annulus reoion. correlatina with the chemical analysis results which indicates the samDle was CCW.View -000 View -090* Fillet of the annulus is smooth with no apparent build-up or reduction in material* No indication of wastage or surface erosion" Minor staining within the annulus" Very small quantity of apparent debris found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam" Minor paint was observed on head near penetration
= 34ppm. Isotopic evidence indicated the presence of Co-58, Co-60, Nb-95, Zr-95 and Cs-137. TheCCW Flex Hose leak deposited material on CEDM Nozzles 3, 8 and 19 above the annulusreoion. correlatina with the chemical analysis results which indicates the samDle was CCW.View -000View -090* Fillet of the annulus is smooth with noapparent build-up or reduction in material* No indication of wastage or surfaceerosion" Minor staining within the annulus" Very small quantity of apparent debrisfound to be lint, is present in the annulus.This debris did not preclude the ability tosuccessfully complete the required VEexam" Minor paint was observed on head nearpenetration
* Fillet of the annulus is smooth with no apparent build-up or reduction in material* No indication of wastage or surface erosion" Minor staining within the annulus" No debris visible in the annulus to obstruct successful visual examination View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Minor staining identified in the bottom of 0 Minor staining identified in the bottom of the annulus. the annulus.* No debris visible in the annulus to obstruct e Very small quantity of apparent debris successful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam.
* Fillet of the annulus is smooth with noapparent build-up or reduction in material* No indication of wastage or surfaceerosion" Minor staining within the annulus" No debris visible in the annulus to obstructsuccessful visual examination View -180View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion* Minor staining identified in the bottom of 0 Minor staining identified in the bottom ofthe annulus.
LIC-1 5-0071 Attachment 2 Page 7 CEOM Nozzle 4 A sample was taken but the amount of material was not sufficient for analysis.
the annulus.* No debris visible in the annulus to obstruct e Very small quantity of apparent debrissuccessful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability tosuccessfully complete the required VEexam.
It is expected some accumulation would be present based on the location of the penetration because of the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 above the annulus region. CEDM Nozzle 4 is on the oeriDherv of the leakaae area.View -000 View -090* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Minor staining within the annulus 0 Minor staining within the annulus* No debris visible in the annulus to obstruct
LIC-1 5-0071Attachment 2Page 7CEOM Nozzle 4A sample was taken but the amount of material was not sufficient for analysis.
* Very small quantity of apparent debris successful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam.View -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" Minor staining within the annulus 0 Minor staining within the annulus* Very small quantity of apparent debris 0 Very small quantity of apparent debris found to be lint, is present in the annulus. found to be lint, is present in the annulus.This debris did not preclude the ability to This debris did not preclude the ability to successfully complete the required VE successfully complete the required VE exam. exam.
It is expectedsome accumulation would be present based on the location of the penetration because of theCCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 above the annulus region. CEDM Nozzle 4is on the oeriDherv of the leakaae area.View -000View -090* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion* Minor staining within the annulus 0 Minor staining within the annulus* No debris visible in the annulus to obstruct
LIC-1 5-0071 Attachment 2 Page 8 CEDM Nozzle 5 No sample was taken from CEDM Nozzle 5. It is expected some accumulation would be present based on the location of the penetration because the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 was above the annulus region. Minor accumulation would also be expected from the leak on the packing of RC-1 00, Reactor Vessel Deripherv of the leaka~ae areas.Head Vent Valve. CEDM Nozzle 5 is on the View -000 View -090* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface
* Very small quantity of apparent debrissuccessful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability tosuccessfully complete the required VEexam.View -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion" Minor staining within the annulus 0 Minor staining within the annulus* Very small quantity of apparent debris 0 Very small quantity of apparent debrisfound to be lint, is present in the annulus.
* No indication of wastage or surface erosion erosion" No staining identified in the annulus. a Minor staining within the annulus" Very small quantity of apparent debris 0 Very small quantity of apparent debris found to be lint, is present in the annulus. found to be lint or paint flecks, is present in This debris did not preclude the ability to the annulus. This debris did not preclude successfully complete the required VE the ability to successfully complete the exam. required VE exam.View -180 View -270* Fillet of the annulus is smooth with no
found to be lint, is present in the annulus.This debris did not preclude the ability to This debris did not preclude the ability tosuccessfully complete the required VE successfully complete the required VEexam. exam.
* Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface a No indication of wastage or surface erosion erosion* No staining identified in the annulus. 0 No staining identified in the annulus." Very small quantity of apparent debris 0 Very small quantity of apparent debris found to be lint, is present in the annulus. found to be lint, is present in the annulus.This debris did not preclude the ability to This debris did not preclude the ability to successfully complete the required VE successfully complete the required VE exam. exam.
LIC-1 5-0071Attachment 2Page 8CEDM Nozzle 5No sample was taken from CEDM Nozzle 5. It is expected some accumulation would be presentbased on the location of the penetration because the CCW Flex Hose leak on CEDM Nozzles 3,8 and 19 was above the annulus region. Minor accumulation would also be expected from theleak on the packing of RC-1 00, Reactor VesselDeripherv of the leaka~ae areas.Head Vent Valve. CEDM Nozzle 5 is on theView -000 View -090* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface
LIC-1 5-0071 Attachment 2 Page 9 CEDM Nozzle 6 A sample was taken but the amount of material was not sufficient for analysis.
* No indication of wastage or surfaceerosion erosion" No staining identified in the annulus.
It is expected some accumulation would be present based on the location of the penetration because the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 was above the annulus region. CEDM Nozzle 6 is on the periphery of the leakage area.View -000 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Minor staining within the annulus
a Minor staining within the annulus" Very small quantity of apparent debris 0 Very small quantity of apparent debrisfound to be lint, is present in the annulus.
* Minor staining within the annulus due to" Very small quantity of apparent debris water residue found to be lint, is present in the annulus. a Very small quantity of apparent debris This debris did not preclude the ability to found to be lint, is present in the annulus.successfully complete the required VE This debris did not preclude the ability to exam successfully complete the required VE exam View -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
found to be lint or paint flecks, is present inThis debris did not preclude the ability to the annulus.
* No indication of wastage or surface erosion erosion* Minor staining within the annulus and on 0 Staining identified on the CEDM nozzle the CEDM nozzle. and within the annulus.* No debris visible in the annulus to obstruct 9 No debris visible in the annulus to obstruct successful visual examination successful visual examination LIC-1 5-0071 Attachment 2 Page 10 CEDM Nozzle 7 No sample was taken from CEDM Nozzle 7. It is expected accumulation would be present based on the location of the penetration because the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 was located above the annulus region. CEDM Nozzle 7 is located directly next to CEDM Nozzles 3. 8 and 19.View -000 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" No staining within the annulus
This debris did not precludesuccessfully complete the required VE the ability to successfully complete theexam. required VE exam.View -180 View -270* Fillet of the annulus is smooth with no
* Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface a No indication of wastage or surfaceerosion erosion* No staining identified in the annulus.
0 No staining identified in the annulus." Very small quantity of apparent debris 0 Very small quantity of apparent debrisfound to be lint, is present in the annulus.
found to be lint, is present in the annulus.This debris did not preclude the ability to This debris did not preclude the ability tosuccessfully complete the required VE successfully complete the required VEexam. exam.
LIC-1 5-0071Attachment 2Page 9CEDM Nozzle 6A sample was taken but the amount of material was not sufficient for analysis.
It is expectedsome accumulation would be present based on the location of the penetration because theCCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 was above the annulus region. CEDMNozzle 6 is on the periphery of the leakage area.View -000 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion* Minor staining within the annulus
* Minor staining within the annulus due to" Very small quantity of apparent debris water residuefound to be lint, is present in the annulus.
a Very small quantity of apparent debrisThis debris did not preclude the ability to found to be lint, is present in the annulus.successfully complete the required VE This debris did not preclude the ability toexam successfully complete the required VEexamView -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
* No indication of wastage or surfaceerosion erosion* Minor staining within the annulus and on 0 Staining identified on the CEDM nozzlethe CEDM nozzle. and within the annulus.* No debris visible in the annulus to obstruct 9 No debris visible in the annulus to obstructsuccessful visual examination successful visual examination LIC-1 5-0071Attachment 2Page 10CEDM Nozzle 7No sample was taken from CEDM Nozzle 7. It is expected accumulation would be presentbased on the location of the penetration because the CCW Flex Hose leak on CEDM Nozzles 3,8 and 19 was located above the annulus region. CEDM Nozzle 7 is located directly next toCEDM Nozzles 3. 8 and 19.View -000View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion" No staining within the annulus
* No staining within the annulus* No debris visible in the annulus to obstruct
* No staining within the annulus* No debris visible in the annulus to obstruct
* Very small quantity of apparent debrissuccessful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability tosuccessfully complete the required VEexamView -180 View -270" Fillet of the annulus is smooth with no
* Very small quantity of apparent debris successful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam View -180 View -270" Fillet of the annulus is smooth with no
* Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion* No staining within the annulus 0 No Staining identified in the annulus." Very small quantity of apparent debris 0 No debris visible in the annulus to obstructfound to be lint, is present in the annulus.
* Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* No staining within the annulus 0 No Staining identified in the annulus." Very small quantity of apparent debris 0 No debris visible in the annulus to obstruct found to be lint, is present in the annulus. successful visual examination; indication of This debris did not preclude the ability to one piece of lint in the annulus region in successfully complete the required VE the photo exam LIC-15-0071 Attachment 2 Page 11 CEDM Nozzle 8 A sample was taken with the following result: pH = 8.61. The amount of sample was insufficient to test for boron; however, it is expected the sample would have indicated CCW. The CCW Flex Hose leak was from above CEDM Nozzle 8, correlating with the chemical analysis results which indicate the sample was CCW.View -045 View -135" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
successful visual examination; indication ofThis debris did not preclude the ability to one piece of lint in the annulus region insuccessfully complete the required VE the photoexam LIC-15-0071 Attachment 2Page 11CEDM Nozzle 8A sample was taken with the following result: pH = 8.61. The amount of sample was insufficient to test for boron; however, it is expected the sample would have indicated CCW. The CCW FlexHose leak was from above CEDM Nozzle 8, correlating with the chemical analysis results whichindicate the sample was CCW.View -045 View -135" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
* No indication of wastage or surface erosion erosion" No staining within the annulus 0 Minor staining within the annulus* No debris visible in the annulus to obstruct
* No indication of wastage or surfaceerosion erosion" No staining within the annulus 0 Minor staining within the annulus* No debris visible in the annulus to obstruct
* No debris visible in the annulus to obstruct successful visual examination successful visual examination
* No debris visible in the annulus to obstructsuccessful visual examination successful visual examination
* Reflection is visible on the right-hand side e Minor surface irregularity visible on surface of the photo of CEDM housing View -180 View -315* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface
* Reflection is visible on the right-hand side e Minor surface irregularity visible on surfaceof the photo of CEDM housingView -180 View -315* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface
* No indication of wastage or surface erosion erosion* Minor staining at the bottom of the annulus
* No indication of wastage or surfaceerosion erosion* Minor staining at the bottom of the annulus
* Minor staining on the left side of the" No debris visible in the annulus to obstruct annulus successful visual examination 0 No debris visible in the annulus to obstruct successful visual examination LIC-1 5-0071 Attachment 2 Page 12 CEDM Nozzle 10 A sample was taken but the amount of material was not sufficient for analysis.
* Minor staining on the left side of the" No debris visible in the annulus to obstruct annulussuccessful visual examination 0 No debris visible in the annulus to obstructsuccessful visual examination LIC-1 5-0071Attachment 2Page 12CEDM Nozzle 10A sample was taken but the amount of material was not sufficient for analysis.
Minor accumulation is expected to be present based on the location of the penetration because the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 was above the annulus region and the leak from the ICI 44 Graylock castlenuts.
Minoraccumulation is expected to be present based on the location of the penetration because theCCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 was above the annulus region and the leakfrom the ICI 44 Graylock castlenuts.
A spray pattern was evident on nearby penetrations from the leak on IC0 44. CEDM Nozzle 10 is on the pnriphery of both leakage areas.View -000 Description  
A spray pattern was evident on nearby penetrations fromthe leak on IC0 44. CEDM Nozzle 10 is on the pnriphery of both leakage areas.View -000 Description  
-090" Fillet of the annulus is smooth with no a Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal" No indication of wastage or surface erosion 9 No indication of wastage or surface erosion" No debris visible in the annulus to obstruct 0 No debris visible in the annulus to obstruct successful visual examination, successful visual examination.
-090" Fillet of the annulus is smooth with no a Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in metal" No indication of wastage or surface erosion 9 No indication of wastage or surface erosion" No debris visible in the annulus to obstruct 0 No debris visible in the annulus to obstructsuccessful visual examination, successful visual examination.
* Minor staining within the annulus View -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal" No indication of wastage or surface erosion 0 No indication of wastage or surface erosion" No debris visible in the annulus to obstruct 0 No debris visible in the annulus to obstruct successful visual examination, successful visual examination." Minor staining within the annulus 0 Minor staining within the annulus LIC-1 5-0071 Attachment 2 Page 13 CEDM Nozzle 11 Sample was taken with the following result: pH = 6.0. The amount of sample was insufficient to test for boron. Only trace amounts of deposit would be expected on CEDM Nozzle 11 because of its location away from the known leaks. Trace amounts are expected due to loose accumulation beina circulated bv ventilation.
* Minor staining within the annulusView -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in metal" No indication of wastage or surface erosion 0 No indication of wastage or surface erosion" No debris visible in the annulus to obstruct 0 No debris visible in the annulus to obstructsuccessful visual examination, successful visual examination.
View -000 Description
" Minor staining within the annulus 0 Minor staining within the annulus LIC-1 5-0071Attachment 2Page 13CEDM Nozzle 11Sample was taken with the following result: pH = 6.0. The amount of sample was insufficient totest for boron. Only trace amounts of deposit would be expected on CEDM Nozzle 11 becauseof its location away from the known leaks. Trace amounts are expected due to looseaccumulation beina circulated bv ventilation.
-090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion
View -000Description
-090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in metal* No indication of wastage or surface 0 No indication of wastage or surface erosionerosion
* Very small quantity of apparent debris* No debris visible in the annulus to obstruct found to be lint, is present in the annulus.successful visual examination.
* Very small quantity of apparent debris* No debris visible in the annulus to obstruct found to be lint, is present in the annulus.successful visual examination.
This debris did not preclude the ability to" Minor staining within the annulus successfully complete the required VEexam0 Minor staining within the annulusView -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in apparent build-up or reduction in metalmaterial
This debris did not preclude the ability to" Minor staining within the annulus successfully complete the required VE exam 0 Minor staining within the annulus View -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in apparent build-up or reduction in metal material
* No indication of wastage or surface" No indication of wastage or surface erosionerosion
* No indication of wastage or surface" No indication of wastage or surface erosion erosion
* No debris visible in the annulus to" Very small quantity of apparent debris obstruct successful visual examination.
* No debris visible in the annulus to" Very small quantity of apparent debris obstruct successful visual examination.
found to be lint, is present in the
found to be lint, is present in the
* Minor staining within the annulusannulus.
* Minor staining within the annulus annulus. This debris did not preclude 0 Picture is somewhat blurred the ability to successfully complete the required VE exam" Minor staining within the annulus" Picture is somewhat blurred LIC-1 5-0071 Attachment 2 Page 14 CEDM Nozzle 12 No sample was taken for CEDM Nozzle 12. Only trace amounts of deposit would be expected on CEDM Nozzle 12 because of its proximity to known leakage from the packing on RC-100, Reactor Vessel Head Vent Valve. CEDM Nozzle 12 is located on the periphery of the leakage area from RC-100.View -000 Description  
This debris did not preclude 0 Picture is somewhat blurredthe ability to successfully complete therequired VE exam" Minor staining within the annulus" Picture is somewhat blurred LIC-1 5-0071Attachment 2Page 14CEDM Nozzle 12No sample was taken for CEDM Nozzle 12. Only trace amounts of deposit would be expectedon CEDM Nozzle 12 because of its proximity to known leakage from the packing on RC-100,Reactor Vessel Head Vent Valve. CEDM Nozzle 12 is located on the periphery of the leakagearea from RC-100.View -000 Description  
-090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal" No indication of wastage or surface e No indication of wastage or surface erosion erosion
-090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in metal" No indication of wastage or surface e No indication of wastage or surface erosionerosion
* No debris visible in the annulus to obstruct" No debris visible in the annulus to obstruct successful visual examination successful visual examination.
* No debris visible in the annulus to obstruct" No debris visible in the annulus to obstruct successful visual examination successful visual examination.
0 Minor staining within the annulus* Minor staining within the annulusView -180 View -270" Fillet of the annulus is smooth with no
0 Minor staining within the annulus* Minor staining within the annulus View -180 View -270" Fillet of the annulus is smooth with no
* Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in metal" No indication of wastage or surface 0 No indication of wastage or surface erosionerosion
* Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion
* No debris visible in the annulus to obstruct" Very small quantity of apparent debris successful visual examination.
* No debris visible in the annulus to obstruct" Very small quantity of apparent debris successful visual examination.
found to be lint, is present in the annulus.
found to be lint, is present in the annulus. 9 Minor staining within the annulus This debris did not preclude the ability to successfully complete the required VE exam* Minor staining within the annulus LIC-1 5-0071 Attachment 2 Page 15 CEDM Nozzle 14 No sample was taken from CEDM Nozzle 14. It is expected some accumulation would be present, based on the location of the penetration, because the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 was above the annulus region. CEDM Nozzle 14 is located near CEDM Nozzles 3, 8 and 19 on the DerDherv.View- 045 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface
9 Minor staining within the annulusThis debris did not preclude the ability tosuccessfully complete the required VEexam* Minor staining within the annulus LIC-1 5-0071Attachment 2Page 15CEDM Nozzle 14No sample was taken from CEDM Nozzle 14. It is expected some accumulation would bepresent, based on the location of the penetration, because the CCW Flex Hose leak on CEDMNozzles 3, 8 and 19 was above the annulus region. CEDM Nozzle 14 is located near CEDMNozzles 3, 8 and 19 on the DerDherv.
* No indication of wastage or surface erosion erosion" Minor staining within the annulus 0 Minor staining within the annulus" No debris visible in the annulus to obstruct
View- 045 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface
* No debris visible in the annulus to obstruct successful visual examination successful visual examination View -225 View -315" Fillet of the annulus is smooth with no
* No indication of wastage or surfaceerosion erosion" Minor staining within the annulus 0 Minor staining within the annulus" No debris visible in the annulus to obstruct
* Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material 0 No indication of wastage or surface
* No debris visible in the annulus to obstructsuccessful visual examination successful visual examination View -225 View -315" Fillet of the annulus is smooth with no
* No indication of wastage or surface erosion erosion" No staining identified in the annulus.
* Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material0 No indication of wastage or surface
* Minor staining within the annulus" Very small quantity of apparent debris 0 No debris visible in the annulus to obstruct found to be lint, is present in the annulus. successful visual examination This debris did not preclude the ability to successfully complete the required VE exam LIC-1 5-0071 Attachment 2 Page 16 CEDM Nozzle 15 No sample was taken from CEDM Nozzle 15. It is expected some accumulation would be present, based on the location of the penetration, because the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 was above the annulus region and the leak from the ICI 44 Graylock castlenuts.
* No indication of wastage or surfaceerosion erosion" No staining identified in the annulus.
A spray pattern was evident on nearby penetrations from the leak on ICI 44. CEDM Nozzle 15~ is located directly next to CFDM Nozzle 8.Nozzle.........
* Minor staining within the annulus" Very small quantity of apparent debris 0 No debris visible in the annulus to obstructfound to be lint, is present in the annulus.
15 is................toCEM Nzze ...View -00 View -090 0 Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface .No indication of wastage or surface erosion erosion* Minor staining within the annulus
successful visual examination This debris did not preclude the ability tosuccessfully complete the required VEexam LIC-1 5-0071Attachment 2Page 16CEDM Nozzle 15No sample was taken from CEDM Nozzle 15. It is expected some accumulation would bepresent, based on the location of the penetration, because the CCW Flex Hose leak on CEDMNozzles 3, 8 and 19 was above the annulus region and the leak from the ICI 44 Graylockcastlenuts.
* Minor staining within the annulus* No debris visible in the annulus to obstruct e No debris visible in the annulus to obstruct successful visual examination successful visual examination View -180 View -270 0 Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* No staining identified in the annulus. a No staining identified in the annulus.* Very small quantity of apparent debris 0 Very small quantity of apparent debris found to be lint, is present in the annulus. found to be lint, is present in the annulus.This debris did not preclude the ability to This debris did not preclude the ability to successfully complete the required VE successfully complete the required VE exam exam LIC-1 5-0071 Attachment 2 Page 17 CEDM Nozzle 16 No sample was taken from CEDM Nozzle 16. Minor accumulation is expected to be present due to loose accumulation being circulated from the leak from the ICI 44 Graylock castlenuts.
A spray pattern was evident on nearby penetrations from the leak on ICI 44. CEDMNozzle 15~ is located directly next to CFDM Nozzle 8.Nozzle.........
CEDM Nozzle 16 is on the peripherv of the leakaae area.View -000 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion
15 is................toCEM Nzze ...View -00 View -0900 Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface .No indication of wastage or surfaceerosion erosion* Minor staining within the annulus
* Minor staining within the annulus* No debris visible in the annulus to obstruct e No debris visible in the annulus to obstructsuccessful visual examination successful visual examination View -180 View -2700 Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion* No staining identified in the annulus.
a No staining identified in the annulus.* Very small quantity of apparent debris 0 Very small quantity of apparent debrisfound to be lint, is present in the annulus.
found to be lint, is present in the annulus.This debris did not preclude the ability to This debris did not preclude the ability tosuccessfully complete the required VE successfully complete the required VEexam exam LIC-1 5-0071Attachment 2Page 17CEDM Nozzle 16No sample was taken from CEDM Nozzle 16. Minor accumulation is expected to be present dueto loose accumulation being circulated from the leak from the ICI 44 Graylock castlenuts.
CEDMNozzle 16 is on the peripherv of the leakaae area.View -000 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in metal* No indication of wastage or surface 0 No indication of wastage or surface erosionerosion
* No debris visible in the annulus to obstruct* No debris visible in the annulus to obstruct successful visual examination successful visual examination.
* No debris visible in the annulus to obstruct* No debris visible in the annulus to obstruct successful visual examination successful visual examination.
* No staining identified in the annulus.* No staining identified in the annulus.View 270 View -270* Fillet of the annulus is smooth with no
* No staining identified in the annulus.* No staining identified in the annulus.View 270 View -270* Fillet of the annulus is smooth with no
* Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in metal" No indication of wastage or surface 0 No indication of wastage or surface erosionerosion 0 No debris visible in the annulus to obstruct* No debris visible in the annulus to obstruct successful visual examination.
* Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion 0 No debris visible in the annulus to obstruct* No debris visible in the annulus to obstruct successful visual examination.
successful visual examination 0 No staining identified in the annulus.* No staining identified in the annulus.
successful visual examination 0 No staining identified in the annulus.* No staining identified in the annulus.
LIC-1 5-0071Attachment 2Page 18CEDM Nozzle 17No sample was taken from CEDM Nozzle 17. It is expected accumulation would be presentbased on the location of the penetration because of the proximity to the packing leak on RC-100, Reactor Vessel Head Vent Valve. CEDM Nozzle 17 is located directly in the path of theRC-100 leakage.View -000 Description  
LIC-1 5-0071 Attachment 2 Page 18 CEDM Nozzle 17 No sample was taken from CEDM Nozzle 17. It is expected accumulation would be present based on the location of the penetration because of the proximity to the packing leak on RC-100, Reactor Vessel Head Vent Valve. CEDM Nozzle 17 is located directly in the path of the RC-100 leakage.View -000 Description  
-090" Fillet of the annulus is smooth with no & Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in metal" No indication of wastage or surface 0 No indication of wastage or surface erosionerosion 0 No debris visible in the annulus to obstruct* No debris visible in the annulus to obstruct successful visual examination successful visual examination.
-090" Fillet of the annulus is smooth with no & Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion 0 No debris visible in the annulus to obstruct* No debris visible in the annulus to obstruct successful visual examination successful visual examination.
0 Minor staining within the annulus" Minor staining within the annulusView -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in metal* No indication of wastage or surface 0 No indication of wastage or surface erosionerosion
0 Minor staining within the annulus" Minor staining within the annulus View -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion
* No debris visible in the annulus to obstruct* Very small quantity of apparent debris successful visual examination.
* No debris visible in the annulus to obstruct* Very small quantity of apparent debris successful visual examination.
found to be lint or paint flecks, is present in
found to be lint or paint flecks, is present in
* Minor staining within the annulusthe annulus.
* Minor staining within the annulus the annulus. This debris did not preclude the ability to successfully complete the required VE exam* Minor staining within the annulus LIC-15-0071 Attachment 2 Page 19 CEDM Nozzle 18 No sample was taken for CEDM Nozzle 18. It is expected some accumulation would be present based on the location of the penetration because the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 was above the annulus region. CEDM Nozzle 18 is on the periphery of the leakage area.View -000 Description  
This debris did not precludethe ability to successfully complete therequired VE exam* Minor staining within the annulus LIC-15-0071 Attachment 2Page 19CEDM Nozzle 18No sample was taken for CEDM Nozzle 18. It is expected some accumulation would be presentbased on the location of the penetration because the CCW Flex Hose leak on CEDM Nozzles 3,8 and 19 was above the annulus region. CEDM Nozzle 18 is on the periphery of the leakagearea.View -000 Description  
-090* Fillet of the annulus is smooth with no # Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion
-090* Fillet of the annulus is smooth with no # Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in metal* No indication of wastage or surface 0 No indication of wastage or surface erosionerosion
* No debris visible in the annulus to obstruct" No debris visible in the annulus to obstruct successful visual examination successful visual examination.
* No debris visible in the annulus to obstruct" No debris visible in the annulus to obstruct successful visual examination successful visual examination.
0 Minor staining within the annulus" Minor staining within the annulusView -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in metal* No indication of wastage or surface 0 No indication of wastage or surface erosionerosion
0 Minor staining within the annulus" Minor staining within the annulus View -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion
* No debris visible in the annulus to obstruct* No staining visible in the annulus successful visual examination.
* No debris visible in the annulus to obstruct* No staining visible in the annulus successful visual examination." Very small quantity of apparent debris found to be lint or paint flecks, is present in the annulus. This debris did not preclude the ability to successfully complete the required VE exam LIC-1 5-0071 Attachment 2 Page 20 CEDM Nozzle 19 No sample was taken from CEDM Nozzle 19. Significant accumulation is expected on CEDM Nozzle 19 because the CCW Flex Hose leak was from directlv above CEDM Nozzle 19.View -000 View -090 9* Fillet of the annulus is smooth with no apparent build-up or reduction in material* No indication of wastage or surface erosion* Minor staining within the annulus* Very small quantity of apparent debris found to be lint is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam* Piece of lint visible in the picture was removed with air following the photo insDection
" Very small quantity of apparent debrisfound to be lint or paint flecks, is present inthe annulus.
* Fillet of the annulus is smooth with no apparent build-up or reduction in material" No indication of wastage or surface erosion* Minor staining within the annulus" No debris visible in the annulus to obstruct successful visual examination View -135 View -180* Fillet of the annulus is smooth with no
This debris did not precludethe ability to successfully complete therequired VE exam LIC-1 5-0071Attachment 2Page 20CEDM Nozzle 19No sample was taken from CEDM Nozzle 19. Significant accumulation is expected on CEDMNozzle 19 because the CCW Flex Hose leak was from directlv above CEDM Nozzle 19.View -000View -0909* Fillet of the annulus is smooth with noapparent build-up or reduction in material* No indication of wastage or surfaceerosion* Minor staining within the annulus* Very small quantity of apparent debrisfound to be lint is present in the annulus.This debris did not preclude the ability tosuccessfully complete the required VEexam* Piece of lint visible in the picture wasremoved with air following the photoinsDection
* Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface
* Fillet of the annulus is smooth with noapparent build-up or reduction in material" No indication of wastage or surface erosion* Minor staining within the annulus" No debris visible in the annulus to obstructsuccessful visual examination View -135 View -180* Fillet of the annulus is smooth with no
* No indication of wastage or surface erosion erosion* Minor staining within the annulus
* Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface
* No indication of wastage or surfaceerosion erosion* Minor staining within the annulus
* No staining identified in the annulus.* Minor staining in a ring around the
* No staining identified in the annulus.* Minor staining in a ring around the
* No debris visible in the annulus to obstructannulus.
* No debris visible in the annulus to obstruct annulus. successful visual examination
successful visual examination
* No debris visible in the annulus to obstruct successful visual examination LIC-15-0071 Attachment 2 Page 21 CEDM Nozzle 20 No sample was taken from CEDM Nozzle 20. Accumulation is expected to be present based on the location of the penetration because of the leak from the ICI 44 Graylock castlenuts.
* No debris visible in the annulus to obstructsuccessful visual examination LIC-15-0071 Attachment 2Page 21CEDM Nozzle 20No sample was taken from CEDM Nozzle 20. Accumulation is expected to be present based onthe location of the penetration because of the leak from the ICI 44 Graylock castlenuts.
A spray pattern was evident on nearby penetrations from the leak on ICI 44 and CEDM Nozzle 20 is near ICI 44.View -045 View -090* Fillet of the annulus is smooth with no
A spraypattern was evident on nearby penetrations from the leak on ICI 44 and CEDM Nozzle 20 isnear ICI 44.View -045 View -090* Fillet of the annulus is smooth with no
* Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface erosion
* Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface erosion
* No indication of wastage or surface erosion" Minor staining within the annulus 9 Minor staining within the annulus" Very small quantity of apparent debris
* No indication of wastage or surface erosion" Minor staining within the annulus 9 Minor staining within the annulus" Very small quantity of apparent debris
* No debris visible in the annulus to obstructfound to be lint or paint flecks, is present in successful visual examination the annulus.
* No debris visible in the annulus to obstruct found to be lint or paint flecks, is present in successful visual examination the annulus. This debris did not preclude the ability to successfully complete the required VE exam View -180 View -315" Fillet of the annulus is smooth with no
This debris did not precludethe ability to successfully complete therequired VE examView -180 View -315" Fillet of the annulus is smooth with no
* Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface erosion
* Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface erosion
* No indication of wastage or surface erosion" Minor staining within the annulus
* No indication of wastage or surface erosion" Minor staining within the annulus
* Minor staining within the annulus" No debris visible in the annulus to obstruct 9 Very small quantity of apparent debrissuccessful visual examination found to be lint or paint flecks, is present inthe annulus.
* Minor staining within the annulus" No debris visible in the annulus to obstruct 9 Very small quantity of apparent debris successful visual examination found to be lint or paint flecks, is present in the annulus. This debris did not preclude the ability to successfully complete the required VE exam LIC-1 5-0071 Attachment 2 Page 22 CEDM Nozzle 21 No sample was taken from CEDM Nozzle 21. It is expected some accumulation would be present based on the location of the penetration because of the proximity to the leak from packing on RC-100, Reactor Vessel Head Vent Valve. CEDM Nozzle 21 is located on the periphery of the RC-100 leakage.View -165 View -235" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
This debris did not precludethe ability to successfully complete therequired VE exam LIC-1 5-0071Attachment 2Page 22CEDM Nozzle 21No sample was taken from CEDM Nozzle 21. It is expected some accumulation would bepresent based on the location of the penetration because of the proximity to the leak frompacking on RC-100, Reactor Vessel Head Vent Valve. CEDM Nozzle 21 is located on theperiphery of the RC-100 leakage.View -165 View -235" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
* No indication of wastage or surface erosion erosion* No observable staining within the annulus
* No indication of wastage or surfaceerosion erosion* No observable staining within the annulus
* No observable staining within the annulus* No debris visible in the annulus to obstruct
* No observable staining within the annulus* No debris visible in the annulus to obstruct
* Very small quantity of apparent debrissuccessful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability tosuccessfully complete the required VEexamView -270 View -300* Fillet of the annulus is smooth with no
* Very small quantity of apparent debris successful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam View -270 View -300* Fillet of the annulus is smooth with no
* Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion" Minor staining within the annulus
* Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" Minor staining within the annulus
* No observable staining within the annulus" Very small quantity of apparent debris
* No observable staining within the annulus" Very small quantity of apparent debris
* No debris visible in the annulus to obstructfound to be lint, is present in the annulus.
* No debris visible in the annulus to obstruct found to be lint, is present in the annulus. successful visual examination This debris did not preclude the ability to successfully complete the required VE exam LIC-1 5-0071 Attachment 2 Page 23 CEDM Nozzle 22 No sample was taken for CEDM Nozzle 22. Only trace amounts of deposit would be expected on CEDM Nozzle 22 because of its location away from the known leaks. Trace amounts are expected due to loose accumulation being circulated by ventilation.
successful visual examination This debris did not preclude the ability tosuccessfully complete the required VEexam LIC-1 5-0071Attachment 2Page 23CEDM Nozzle 22No sample was taken for CEDM Nozzle 22. Only trace amounts of deposit would be expectedon CEDM Nozzle 22 because of its location away from the known leaks. Trace amounts areexpected due to loose accumulation being circulated by ventilation.
View -000 Description  
View -000 Description  
-090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in metal" No indication of wastage or surface erosion 9 No indication of wastage or surface erosion" No debris visible in the annulus to obstruct 0 No debris visible in the annulus to obstructsuccessful visual examination, successful visual examination
-090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal" No indication of wastage or surface erosion 9 No indication of wastage or surface erosion" No debris visible in the annulus to obstruct 0 No debris visible in the annulus to obstruct successful visual examination, successful visual examination" Minor staining within the annulus
" Minor staining within the annulus
* Minor staining within the annulus View -180 View -270" Fillet of the annulus is smooth with no
* Minor staining within the annulusView -180 View -270" Fillet of the annulus is smooth with no
* Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal" No indication of wastage or surface erosion 9 No indication of wastage or surface erosion" No debris visible in the annulus to obstruct
* Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in metal" No indication of wastage or surface erosion 9 No indication of wastage or surface erosion" No debris visible in the annulus to obstruct
* Very small quantity of apparent debris found successful visual examination, to be lint or paint flecks, is present in the" Minor staining within the annulus annulus. This debris did not preclude the ability to successfully complete the required VE exam* Minor staining within the annulus LIC-1 5-0071 Attachment 2 Page 24 CEDM Nozzle 23 No sample was taken from CEDM Nozzle 23. It is expected accumulation would be present based on the location of the penetration because of the proximity to the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19. CEDM Nozzle 23 is located directly next to CEDM Nozzles 3, 8 and 19.View -000 View -080" Fillet of the annulus is smooth with no e Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface erosion e No indication of wastage or surface erosion" No staining identified in the annulus. e No staining identified in the annulus." Very small quantity of apparent debris found
* Very small quantity of apparent debris foundsuccessful visual examination, to be lint or paint flecks, is present in the" Minor staining within the annulus annulus.
* Very small quantity of apparent debris found to be lint or paint flecks, is present in the to be lint or paint flecks, is present in the annulus. This debris did not preclude the annulus. This debris did not preclude the ability to successfully complete the required ability to successfully complete the required VE exam VE exam View -100 View -270* Fillet of the annulus is smooth with no
This debris did not preclude theability to successfully complete the requiredVE exam* Minor staining within the annulus LIC-1 5-0071Attachment 2Page 24CEDM Nozzle 23No sample was taken from CEDM Nozzle 23. It is expected accumulation would be presentbased on the location of the penetration because of the proximity to the CCW Flex Hose leak onCEDM Nozzles 3, 8 and 19. CEDM Nozzle 23 is located directly next to CEDM Nozzles 3, 8 and19.View -000 View -080" Fillet of the annulus is smooth with no e Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface erosion e No indication of wastage or surface erosion" No staining identified in the annulus.
* Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface erosion
e No staining identified in the annulus." Very small quantity of apparent debris found
* Very small quantity of apparent debris foundto be lint or paint flecks, is present in the to be lint or paint flecks, is present in theannulus.
This debris did not preclude the annulus.
This debris did not preclude theability to successfully complete the required ability to successfully complete the requiredVE exam VE examView -100 View -270* Fillet of the annulus is smooth with no
* Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface erosion
* No indication of wastage or surface erosion" No staining identified in the annulus.
* No indication of wastage or surface erosion" No staining identified in the annulus.
* No staining identified in the annulus." Very small quantity of apparent debris found
* No staining identified in the annulus." Very small quantity of apparent debris found
* Very small quantity of apparent debris foundto be lint or paint flecks, is present in the to be lint or paint flecks, is present in theannulus.
* Very small quantity of apparent debris found to be lint or paint flecks, is present in the to be lint or paint flecks, is present in the annulus. This debris did not preclude the annulus. This debris did not preclude the ability to successfully complete the required ability to successfully complete the required VE exam VE exam LIC-15-0071 Attachment 2 Page 25 CEDM Nozzle 24 No sample was taken from CEDM Nozzle 24. It is expected accumulation would be present based on the location of the penetration and the proximity to the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19. CEDM Nozzle 24 is located directly next to CEDM Nozzles 3.8 and 19.View -090 View -110" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
This debris did not preclude the annulus.
* No indication of wastage or surface erosion erosion" Minor staining within the annulus 0 Minor staining within the annulus* No debris visible in the annulus to obstruct 9 Very small quantity of apparent debris successful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam View -205 View -300* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Minor staining within the annulus 0 No staining identified in the annulus.* No debris visible in the annulus to obstruct
This debris did not preclude theability to successfully complete the required ability to successfully complete the requiredVE exam VE exam LIC-15-0071 Attachment 2Page 25CEDM Nozzle 24No sample was taken from CEDM Nozzle 24. It is expected accumulation would be presentbased on the location of the penetration and the proximity to the CCW Flex Hose leak on CEDMNozzles 3, 8 and 19. CEDM Nozzle 24 is located directly next to CEDM Nozzles 3.8 and 19.View -090 View -110" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
* Very small quantity of apparent debris successful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam LIC-1 5-0071 Attachment 2 Page 26 CEDM Nozzle 25 No sample was taken from CEDM Nozzle 25. Accumulation is expected to be present based on the location of the penetration because of the proximity of the leak from the ICI 44 Graylock castlenuts.
* No indication of wastage or surfaceerosion erosion" Minor staining within the annulus 0 Minor staining within the annulus* No debris visible in the annulus to obstruct 9 Very small quantity of apparent debrissuccessful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability tosuccessfully complete the required VEexamView -205 View -300* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion* Minor staining within the annulus 0 No staining identified in the annulus.* No debris visible in the annulus to obstruct
A spray pattern was evident on nearby penetrations from the leak on ICI 44 and CEDM Nozzle 25 is directly in front of ICI 44.View -135 View -180* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
* Very small quantity of apparent debrissuccessful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability tosuccessfully complete the required VEexam LIC-1 5-0071Attachment 2Page 26CEDM Nozzle 25No sample was taken from CEDM Nozzle 25. Accumulation is expected to be present based onthe location of the penetration because of the proximity of the leak from the ICI 44 Graylockcastlenuts.
* No indication of wastage or surface erosion erosion" Minor staining within the annulus 0 Minor staining within the annulus* No debris visible in the annulus to obstruct
A spray pattern was evident on nearby penetrations from the leak on ICI 44 andCEDM Nozzle 25 is directly in front of ICI 44.View -135 View -180* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
* Very small quantity of apparent debris successful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam View -270 View -335* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Minor staining within the annulus. 0 No staining identified in the annulus.* Very small quantity of apparent debris
* No indication of wastage or surfaceerosion erosion" Minor staining within the annulus 0 Minor staining within the annulus* No debris visible in the annulus to obstruct
* No debris visible in the annulus to obstruct found to be lint, is present in the annulus. successful visual examination This debris did not preclude the ability to successfully complete the required VE exam LIC-1 5-0071 Attachment 2 Page 27 CEDM Nozzle 26 No sample was taken from CEDM Nozzle 26. Accumulation is expected to be present based on the location of the penetration because of the proximity to the leak from the ICI 44 Graylock castlenuts.
* Very small quantity of apparent debrissuccessful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability tosuccessfully complete the required VEexamView -270 View -335* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion* Minor staining within the annulus.
A spray pattern was evident on nearby penetrations from the leak on ICI 44 and CEDM Nozzle 26 is directly in front of ICI 44.View -045 View -90* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" Minor staining within the annulus on the 0 Minor staining within the annulus down-slope side
0 No staining identified in the annulus.* Very small quantity of apparent debris
* No debris visible in the annulus to obstruct* No debris visible in the annulus to obstruct successful visual examination successful visual examination View -180 View -335* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Minor staining within the annulus.
* No debris visible in the annulus to obstructfound to be lint, is present in the annulus.
* Minor staining within the annulus.* No debris visible in the annulus to obstruct e No debris visible in the annulus to obstruct successful visual examination successful visual examination LIC-1 5-0071 Attachment 2 Page 28 CEOM Nozzle 27 No sample was taken from CEDM Nozzle 27. It is expected minor accumulation would be present based on the location of the penetration because of the proximity to the leak from packing on RC-100, Reactor Vessel Head Vent Valve. CEDM Nozzle 27 is located on the periphery of the RC-100 leakage.View -000 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 9 No indication of wastage or surface erosion erosion" Minor staining within the annulus 0 Minor staining within the annulus* No debris visible in the annulus to obstruct
successful visual examination This debris did not preclude the ability tosuccessfully complete the required VEexam LIC-1 5-0071Attachment 2Page 27CEDM Nozzle 26No sample was taken from CEDM Nozzle 26. Accumulation is expected to be present based onthe location of the penetration because of the proximity to the leak from the ICI 44 Graylockcastlenuts.
* No debris visible in the annulus to obstruct successful visual examination successful visual examination View -180 View -270* Photo is somewhat blurred 0 Fillet of the annulus is smooth with no" Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material 0 No indication of wastage or surface" No indication of wastage or surface erosion erosion 0 No staining identified in the annulus.* Minor staining within the annulus 0 Very small quantity of apparent debris* Very small quantity of apparent debris found to be lint, is present in the annulus.found to be lint, is present in the annulus. This debris did not preclude the ability to This debris did not preclude the ability to successfully complete the required VE successfully complete the required VE exam exam LIC-1 5-0071 Attachment 2 Page 29 CEDM Nozzle 28 No sample was taken from CEDM Nozzle 28. It is expected accumulation would be present based on the location of the penetration because of the proximity to the leak from packing on RC-100, Reactor Vessel Head Vent Valve. CEDM Nozzle 2B is located directly in the path of the RC-100 leakaqe.View -000 View -090" Fillet of the annulus is smooth with no & Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" Minor staining within the annulus 0 Minor staining within the annulus* Very small quantity of apparent debris 0 Very small quantity of apparent debris found to be lint or paint flecks, is present in found to be lint or paint flecks, is present in the annulus. This debris did not preclude the annulus. This debris did not preclude the ability to successfully complete the the ability to successfully complete the required VE exam required VE exam View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
A spray pattern was evident on nearby penetrations from the leak on ICI 44 andCEDM Nozzle 26 is directly in front of ICI 44.View -045 View -90* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion" Minor staining within the annulus on the 0 Minor staining within the annulusdown-slope side
* No indication of wastage or surface erosion erosion* Minor staining within the annulus
* No debris visible in the annulus to obstruct* No debris visible in the annulus to obstruct successful visual examination successful visual examination View -180 View -335* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion* Minor staining within the annulus.
* Minor staining within the annulus.* No debris visible in the annulus to obstruct e No debris visible in the annulus to obstructsuccessful visual examination successful visual examination LIC-1 5-0071Attachment 2Page 28CEOM Nozzle 27No sample was taken from CEDM Nozzle 27. It is expected minor accumulation would bepresent based on the location of the penetration because of the proximity to the leak frompacking on RC-100, Reactor Vessel Head Vent Valve. CEDM Nozzle 27 is located on theperiphery of the RC-100 leakage.View -000 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 9 No indication of wastage or surfaceerosion erosion" Minor staining within the annulus 0 Minor staining within the annulus* No debris visible in the annulus to obstruct
* No debris visible in the annulus to obstructsuccessful visual examination successful visual examination View -180 View -270* Photo is somewhat blurred 0 Fillet of the annulus is smooth with no" Fillet of the annulus is smooth with no apparent build-up or reduction in materialapparent build-up or reduction in material 0 No indication of wastage or surface" No indication of wastage or surface erosionerosion 0 No staining identified in the annulus.* Minor staining within the annulus 0 Very small quantity of apparent debris* Very small quantity of apparent debris found to be lint, is present in the annulus.found to be lint, is present in the annulus.
This debris did not preclude the ability toThis debris did not preclude the ability to successfully complete the required VEsuccessfully complete the required VE examexam LIC-1 5-0071Attachment 2Page 29CEDM Nozzle 28No sample was taken from CEDM Nozzle 28. It is expected accumulation would be presentbased on the location of the penetration because of the proximity to the leak from packing onRC-100, Reactor Vessel Head Vent Valve. CEDM Nozzle 2B is located directly in the path of theRC-100 leakaqe.View -000View -090" Fillet of the annulus is smooth with no & Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion" Minor staining within the annulus 0 Minor staining within the annulus* Very small quantity of apparent debris 0 Very small quantity of apparent debrisfound to be lint or paint flecks, is present in found to be lint or paint flecks, is present inthe annulus.
This debris did not preclude the annulus.
This debris did not precludethe ability to successfully complete the the ability to successfully complete therequired VE exam required VE examView -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
* No indication of wastage or surfaceerosion erosion* Minor staining within the annulus
* Minor staining within the annulus" Very small quantity of apparent debris
* Minor staining within the annulus" Very small quantity of apparent debris
* Very small quantity of apparent debrisfound to be lint or paint flecks, is present in found to be lint or paint flecks, is present inthe annulus.
* Very small quantity of apparent debris found to be lint or paint flecks, is present in found to be lint or paint flecks, is present in the annulus. This debris did not preclude the annulus. This debris did not preclude the ability to successfully complete the the ability to successfully complete the required VE exam required VE exam LIC-1 5-0071 Attachment 2 Page 30 CEDM Nozzle 29 No sample was taken for CEDM Nozzle 29. Minor accumulation is expected to be present based on the location of the penetration because of the proximity to the leakage from the packing of RC-100, Reactor Vessel Head Vent Valve. CEDM Nozzle 29 is on the periphery of the leakage area.View -000 View -090* Fillet of the annulus is smooth with no
This debris did not preclude the annulus.
* Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Minor staining within the annulus 0 Minor staining within the annulus* Very small quantity of apparent debris
This debris did not precludethe ability to successfully complete the the ability to successfully complete therequired VE exam required VE exam LIC-1 5-0071Attachment 2Page 30CEDM Nozzle 29No sample was taken for CEDM Nozzle 29. Minor accumulation is expected to be presentbased on the location of the penetration because of the proximity to the leakage from thepacking of RC-100, Reactor Vessel Head Vent Valve. CEDM Nozzle 29 is on the periphery ofthe leakage area.View -000View -090* Fillet of the annulus is smooth with no
* Very small quantity of apparent debris found to be lint, is present in the annulus. found to be lint, is present in the annulus.This debris did not preclude the ability to This debris did not preclude the ability to successfully complete the required VE successfully complete the required VE exam exam View -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Minor staining identified in the annulus. 0 Minor staining identified in the annulus." Very small quantity of apparent debris 9 Very small quantity of apparent debris found to be lint, is present in the annulus. found to be lint, is present in the annulus.This debris did not preclude the ability to This debris did not preclude the ability to successfully complete the required VE successfully complete the required VE exam exam LIC-15-0071 Attachment 2 Page 31 CEDM Nozzle 30 A sample was taken from CEDM Nozzle 30 with the following results: pH=9.45, boron=132 ppm, Tolyltriazole=86 ppm. Isotopic evidence indicated the presence of Co-58, Co-60, Nb-95 and Cs-137. It is expected minor accumulation would be present based on the location of the penetration because of the proximity to the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 above the annulus region. This accumulation corresponds to the chemical analysis results.CEDM Nozzle 30 is on the periphery of the leaka e area.View -000 View -090* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material, apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion. erosion* Minor staining within the annulus. 0 Minor staining within the annulus" No debris is visible within the annulus. 0 No debris is visible within the annulus.View -180 View -270* Fillet of the annulus is smooth with no
* Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion* Minor staining within the annulus 0 Minor staining within the annulus* Very small quantity of apparent debris
* Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* No staining visible within the annulus
* Very small quantity of apparent debrisfound to be lint, is present in the annulus.
* Minor staining within the annulus" No debris is visible within the annulus. 0 No debris is visible within the annulus.
found to be lint, is present in the annulus.This debris did not preclude the ability to This debris did not preclude the ability tosuccessfully complete the required VE successfully complete the required VEexam examView -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion* Minor staining identified in the annulus.
LIC-1 5-0071 Attachment 2 Page 32 CEDM Nozzle 31 No sample was taken from CEDM Nozzle 31. It is expected some accumulation would be present based on the location of the penetration because the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 was above the annulus region. CEDM Nozzle 31 is located near CEDM Nozzles 3, 8 and 19 on the periphery.
0 Minor staining identified in the annulus." Very small quantity of apparent debris 9 Very small quantity of apparent debrisfound to be lint, is present in the annulus.
View -000 View -090" Fillet of the annulus is smooth with no apparent build-up or reduction in material* No indication of wastage or surface erosion* Very small quantity of apparent debris found to be lint or paint flecks, is present in the annulus. This debris did not preclude the ability to successfully complete the required VE exam* No staining visible in annulus 0 0 0 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material No indication of wastage or surface erosion Minor staining within the annulus Very small quantity of apparent debris found to be lint or paint flecks, is present in the annulus. This debris did not preclude the ability to successfully complete the required VE exam View -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" Minor staining within the annulus 0 Minor staining identified in the annulus* Very small quantity of apparent debris 0 Very small quantity of apparent debris found to be lint or paint flecks, is present in found to be lint, is present in the annulus.the annulus. This debris did not preclude This debris did not preclude the ability to the ability to successfully complete the successfully complete the required VE required VE exam exam LIC-1 5-0071 Attachment 2 Page 33 CEDM Nozzle 32 No sample was taken from CEDM Nozzle 32. It is expected some accumulation would be present based on the location of the penetration because the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 was above the annulus region. CEDM Nozzle 32 is located near CEDM Nozzles 3, 8 and 19, on the periphery.
found to be lint, is present in the annulus.This debris did not preclude the ability to This debris did not preclude the ability tosuccessfully complete the required VE successfully complete the required VEexam exam LIC-15-0071 Attachment 2Page 31CEDM Nozzle 30A sample was taken from CEDM Nozzle 30 with the following results:
View -000 View -090* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* No visible staining within the annulus
pH=9.45, boron=132 ppm,Tolyltriazole=86 ppm. Isotopic evidence indicated the presence of Co-58, Co-60, Nb-95 and Cs-137. It is expected minor accumulation would be present based on the location of thepenetration because of the proximity to the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19above the annulus region. This accumulation corresponds to the chemical analysis results.CEDM Nozzle 30 is on the periphery of the leaka e area.View -000 View -090* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material, apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surfaceerosion.
* Minor staining within the annulus* Very small quantity of apparent debris a Very small quantity of apparent debris found to be lint, is present in the annulus. found to be hardened CCW deposits is This debris did not preclude the ability to present in the annulus. CEDM Nozzle 32 is successfully complete the required VE in the CCW leakage flowpath, this debris exam did not preclude the ability to successfully complete the required VE exam View -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Minor staining within the annulus.
erosion* Minor staining within the annulus.
* No staining identified in the annulus.* Very small quantity of apparent debris 0 Very small quantity of apparent debris found to be lint or paint flecks, is present in found to be lint or paint flecks, is present in the annulus. This debris did not preclude the annulus. This debris did not preclude the ability to successfully complete the the ability to successfully complete the required VE exam required VE exam LIC-1 5-0071 Attachment 2 Page 34 CEDM Nozzle 33 No sample was taken from CEDM Nozzle 33. Accumulation is expected to be present based on the location of the penetration because of the proximity to the leak from the ICI 44 Graylock castlenuts.
0 Minor staining within the annulus" No debris is visible within the annulus.
A spray pattern was evident on nearby penetrations from the leak on ICI 44 and CEDM Nozzle 33 is directly in front of ICI 44.View -000 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in" No indication of wastage or surface material erosion 0 No indication of wastage or surface" Minor staining within the annulus erosion" No debris visible in the annulus to obstruct 0 No staining identified in the annulus.successful visual examination
0 No debris is visible within the annulus.View -180 View -270* Fillet of the annulus is smooth with no
* No debris visible in the annulus to obstruct successful visual examination View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" Minor staining within the annulus
* Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion* No staining visible within the annulus
* Minor staining within the annulus" No debris is visible within the annulus.
0 No debris is visible within the annulus.
LIC-1 5-0071Attachment 2Page 32CEDM Nozzle 31No sample was taken from CEDM Nozzle 31. It is expected some accumulation would bepresent based on the location of the penetration because the CCW Flex Hose leak on CEDMNozzles 3, 8 and 19 was above the annulus region. CEDM Nozzle 31 is located near CEDMNozzles 3, 8 and 19 on the periphery.
View -000View -090" Fillet of the annulus is smooth with noapparent build-up or reduction in material* No indication of wastage or surfaceerosion* Very small quantity of apparent debrisfound to be lint or paint flecks, is present inthe annulus.
This debris did not precludethe ability to successfully complete therequired VE exam* No staining visible in annulus0000Fillet of the annulus is smooth with noapparent build-up or reduction in materialNo indication of wastage or surfaceerosionMinor staining within the annulusVery small quantity of apparent debrisfound to be lint or paint flecks, is present inthe annulus.
This debris did not precludethe ability to successfully complete therequired VE examView -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion" Minor staining within the annulus 0 Minor staining identified in the annulus* Very small quantity of apparent debris 0 Very small quantity of apparent debrisfound to be lint or paint flecks, is present in found to be lint, is present in the annulus.the annulus.
This debris did not preclude This debris did not preclude the ability tothe ability to successfully complete the successfully complete the required VErequired VE exam exam LIC-1 5-0071Attachment 2Page 33CEDM Nozzle 32No sample was taken from CEDM Nozzle 32. It is expected some accumulation would bepresent based on the location of the penetration because the CCW Flex Hose leak on CEDMNozzles 3, 8 and 19 was above the annulus region. CEDM Nozzle 32 is located near CEDMNozzles 3, 8 and 19, on the periphery.
View -000 View -090* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion* No visible staining within the annulus
* Minor staining within the annulus* Very small quantity of apparent debris a Very small quantity of apparent debrisfound to be lint, is present in the annulus.
found to be hardened CCW deposits isThis debris did not preclude the ability to present in the annulus.
CEDM Nozzle 32 issuccessfully complete the required VE in the CCW leakage flowpath, this debrisexam did not preclude the ability to successfully complete the required VE examView -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion* Minor staining within the annulus.
* No staining identified in the annulus.* Very small quantity of apparent debris 0 Very small quantity of apparent debrisfound to be lint or paint flecks, is present in found to be lint or paint flecks, is present inthe annulus.
This debris did not preclude the annulus.
This debris did not precludethe ability to successfully complete the the ability to successfully complete therequired VE exam required VE exam LIC-1 5-0071Attachment 2Page 34CEDM Nozzle 33No sample was taken from CEDM Nozzle 33. Accumulation is expected to be present based onthe location of the penetration because of the proximity to the leak from the ICI 44 Graylockcastlenuts.
A spray pattern was evident on nearby penetrations from the leak on ICI 44 andCEDM Nozzle 33 is directly in front of ICI 44.View -000 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in" No indication of wastage or surface materialerosion 0 No indication of wastage or surface" Minor staining within the annulus erosion" No debris visible in the annulus to obstruct 0 No staining identified in the annulus.successful visual examination
* No debris visible in the annulus toobstruct successful visual examination View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion" Minor staining within the annulus
* No staining identified in the annulus.* No debris visible in the annulus to obstruct
* No staining identified in the annulus.* No debris visible in the annulus to obstruct
* Very small quantity of apparent debrissuccessful visual examination found to be lint or paint flecks, is present inthe annulus.
* Very small quantity of apparent debris successful visual examination found to be lint or paint flecks, is present in the annulus. This debris did not preclude the ability to successfully complete the required VE exam LIC-1 5-0071 Attachment 2 Page 35 CEDM Nozzle 34 No sample was taken from CEDM Nozzle 34. Minor accumulation is expected to be present based on the location of the penetration because of the proximity to the leak from the ICI 44 Graylock castlenuts.
This debris did not precludethe ability to successfully complete therequired VE exam LIC-1 5-0071Attachment 2Page 35CEDM Nozzle 34No sample was taken from CEDM Nozzle 34. Minor accumulation is expected to be presentbased on the location of the penetration because of the proximity to the leak from the ICI 44Graylock castlenuts.
A spray pattern was evident on nearby penetrations from the leak on ICI 44. UILUM Nozzle 34 is on the periphery ot the pray region from IUI 44.View -000 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in apparent build-up or reduction in material material" No indication of wastage or surface
A spray pattern was evident on nearby penetrations from the leak on ICI44. UILUM Nozzle 34 is on the periphery ot the pray region from IUI 44.View -000 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in apparent build-up or reduction inmaterial material" No indication of wastage or surface
* No indication of wastage or surface erosion erosion* Minor staining within the annulus
* No indication of wastage or surfaceerosion erosion* Minor staining within the annulus
* Minor staining within the annulus" Very small quantity of apparent debris 0 Very small quantity of apparent debris found to be lint, is present in the found to be lint, is present in the annulus. This debris did not preclude annulus. This debris did not preclude the ability to successfully complete the the ability to successfully complete the required VE exam. required VE exam View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in apparent build-up or reduction in material material" No indication of wastage or surface 9 No indication of wastage or surface erosion erosion" Very small quantity of apparent debris
* Minor staining within the annulus" Very small quantity of apparent debris 0 Very small quantity of apparent debrisfound to be lint, is present in the found to be lint, is present in theannulus.
* Very small quantity of apparent debris found to be lint, is present in the found to be lint, is present in the annulus. This debris did not preclude annulus. This debris did not preclude the ability to successfully complete the the ability to successfully complete the required VE exam required VE exam" Minor staining within the annulus
This debris did not preclude annulus.
* Minor staining within the annulus* A small amount of liquid water was present in the annulus LIC-1 5-0071 Attachment 2 Page 36 CEDM Nozzle 35 No sample was taken from CEDM Nozzle 35. Only trace amounts of deposit would be expected on CEDM Nozzle 35 because of its location away from the known leaks. Trace amounts are expected due to loose accumulation being circulated by ventilation.
This debris did not precludethe ability to successfully complete the the ability to successfully complete therequired VE exam. required VE examView -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in apparent build-up or reduction inmaterial material" No indication of wastage or surface 9 No indication of wastage or surfaceerosion erosion" Very small quantity of apparent debris
* Very small quantity of apparent debrisfound to be lint, is present in the found to be lint, is present in theannulus.
This debris did not preclude annulus.
This debris did not precludethe ability to successfully complete the the ability to successfully complete therequired VE exam required VE exam" Minor staining within the annulus
* Minor staining within the annulus* A small amount of liquid water waspresent in the annulus LIC-1 5-0071Attachment 2Page 36CEDM Nozzle 35No sample was taken from CEDM Nozzle 35. Only trace amounts of deposit would be expectedon CEDM Nozzle 35 because of its location away from the known leaks. Trace amounts areexpected due to loose accumulation being circulated by ventilation.
View -000 View -090* Fillet of the annulus is smooth with no
View -000 View -090* Fillet of the annulus is smooth with no
* Fillet of the annulus is smooth with noapparent build-up or reduction in apparent build-up or reduction inmaterial material" No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion* Very small quantity of apparent debris 0 Very small quantity of apparent debrisfound to be lint, is present in the found to be lint, is present in theannulus.
* Fillet of the annulus is smooth with no apparent build-up or reduction in apparent build-up or reduction in material material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Very small quantity of apparent debris 0 Very small quantity of apparent debris found to be lint, is present in the found to be lint, is present in the annulus. This debris did not preclude annulus. This debris did not preclude the ability to successfully complete the the ability to successfully complete the required VE exam required VE exam* Minor staining within the annulus
This debris did not preclude annulus.
* No staining identified in the annulus.View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in apparent build-up or reduction in material material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* No debris visible in the annulus to 9 No debris visible in the annulus to obstruct successful visual examination, obstruct successful visual examination.
This debris did not precludethe ability to successfully complete the the ability to successfully complete therequired VE exam required VE exam* Minor staining within the annulus
* No staining identified in the annulus. 0 Minor staining within the annulus* A small amount of liquid water was present in the annulus LIC-1 5-0071 Attachment 2 Page 37 CEDM Nozzle 36 No sample was taken from CEDM Nozzle 36. It is expected accumulation would be present based on the location of the penetration because of the proximity to the leak from the packing on RC-1 00, Reactor Vessel Head Vent Valve. CEDM Nozzle 36 is located directly in front of the RC-100.View -000 View -090* Fillet of the annulus is smooth with no
* No staining identified in the annulus.View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in apparent build-up or reduction inmaterial material" No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion* No debris visible in the annulus to 9 No debris visible in the annulus toobstruct successful visual examination, obstruct successful visual examination.
* Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" Minor staining within the annulus
* No staining identified in the annulus.
* Very small quantity of apparent debris* Very small quantity of apparent debris found to be lint, is present in the annulus.found to be lint, is present in the annulus. This debris did not preclude the ability to This debris did not preclude the ability to successfully complete the required VE successfully complete the required VE exam exam.
0 Minor staining within the annulus* A small amount of liquid water waspresent in the annulus LIC-1 5-0071Attachment 2Page 37CEDM Nozzle 36No sample was taken from CEDM Nozzle 36. It is expected accumulation would be presentbased on the location of the penetration because of the proximity to the leak from the packingon RC-1 00, Reactor Vessel Head Vent Valve. CEDM Nozzle 36 is located directly in front of theRC-100.View -000 View -090* Fillet of the annulus is smooth with no
* Minor staining within the annulus View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface erosion
* Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion" Minor staining within the annulus
* No indication of wastage or surface erosion" Very small quantity of apparent debris found 9 Very small quantity of apparent debris to be lint, is present in the annulus. This found to be lint, is present in the annulus.debris did not preclude the ability to This debris did not preclude the ability to successfully complete the required VE exam successfully complete the required VE" Minor staining within the annulus exam I Minor staining within the annulus LIC-15-0071 Attachment 2 Page 38 CEDM Nozzle 37 No sample was taken from CEDM Nozzle 37. It is expected accumulation would be present based on the location of the penetration because of the proximity to the leak from the packing on RC-100, Reactor Vessel Head Vent Valve. CEDM Nozzle 37 is located directly in the path of the RC-100 leakaae.View -000 View -090* Fillet of the annulus is smooth with no
* Very small quantity of apparent debris* Very small quantity of apparent debris found to be lint, is present in the annulus.found to be lint, is present in the annulus.
* Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Minor staining identified in the annulus. 0 Minor staining identified in the annulus.* No debris visible in the annulus to obstruct @ Very small quantity of apparent debris successful visual examination, found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam.View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface a No indication of wastage or surface erosion erosion" Minor staining identified in the annulus. 0 Minor staining identified in the annulus.* No debris visible in the annulus to obstruct
This debris did not preclude the ability toThis debris did not preclude the ability to successfully complete the required VEsuccessfully complete the required VE examexam.
* Very small quantity of apparent debris successful visual examination, found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam.
* Minor staining within the annulusView -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface erosion
LIC-15-0071 Attachment 2 Page 39 CEDM Nozzle 38 A sample was taken with the following results: pH = 10.1. Isotopic results included evidence of Co-58, Co-60, Nb-95 and Cs-1 37. It is expected some accumulation would be present based on the location of the penetration because of the proximity to the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19. CEDM Nozzle 38 is located near CEDM Nozzles 3, 8 and 19 on the periDherv.
* No indication of wastage or surface erosion" Very small quantity of apparent debris found 9 Very small quantity of apparent debristo be lint, is present in the annulus.
View -000 I View -090" Fillet of the annulus is smooth with no .Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" Minor staining within the annulus 0 Minor staining within the annulus* No debris visible in the annulus to obstruct
This found to be lint, is present in the annulus.debris did not preclude the ability to This debris did not preclude the ability tosuccessfully complete the required VE exam successfully complete the required VE" Minor staining within the annulus examI Minor staining within the annulus LIC-15-0071 Attachment 2Page 38CEDM Nozzle 37No sample was taken from CEDM Nozzle 37. It is expected accumulation would be presentbased on the location of the penetration because of the proximity to the leak from the packingon RC-100, Reactor Vessel Head Vent Valve. CEDM Nozzle 37 is located directly in the path ofthe RC-100 leakaae.View -000 View -090* Fillet of the annulus is smooth with no
* Very small quantity of apparent debris successful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam.View -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
* Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion* Minor staining identified in the annulus.
* No indication of wastage or surface erosion erosion" Minor staining at the top of the photo of the 9 Minor staining at the bottom of the annulus annulus 0 Very small quantity of apparent debris" Very small quantity of apparent debris found to be lint, is present in the annulus.found to be lint, is present in the annulus. This debris did not preclude the ability to This debris did not preclude the ability to successfully complete the required VE successfully complete the required VE exam.exam.
0 Minor staining identified in the annulus.* No debris visible in the annulus to obstruct  
LIC-1 5-0071 Attachment 2 Page 40 CEDM Nozzle 39 No sample was taken from CEDM Nozzle 39. It is expected some accumulation would be present based on the location of the penetration primarily from the leak from the ICI 44 Graylock castlenuts but also from the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 above the annulus region. A spray pattern was evident on nearby penetrations from the leak on ICI 44.CEDM Nozzle 39 is located near ICI 44.View -000 View -090* Fillet of the annulus is smooth with no
@ Very small quantity of apparent debrissuccessful visual examination, found to be lint, is present in the annulus.This debris did not preclude the ability tosuccessfully complete the required VEexam.View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface a No indication of wastage or surfaceerosion erosion" Minor staining identified in the annulus.
* Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Minor staining within the annulus S No staining within the annulus* No debris visible in the annulus to obstruct
0 Minor staining identified in the annulus.* No debris visible in the annulus to obstruct
* Very small quantity of apparent debris successful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam.View -180 View -270" Fillet of the annulus is smooth with no
* Very small quantity of apparent debrissuccessful visual examination, found to be lint, is present in the annulus.This debris did not preclude the ability tosuccessfully complete the required VEexam.
* Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" No staining identified in the annulus. & Minor staining within the annulus" No debris visible in the annulus to obstruct
LIC-15-0071 Attachment 2Page 39CEDM Nozzle 38A sample was taken with the following results:
* Very small quantity of apparent debris successful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam.
pH = 10.1. Isotopic results included evidence ofCo-58, Co-60, Nb-95 and Cs-1 37. It is expected some accumulation would be present based onthe location of the penetration because of the proximity to the CCW Flex Hose leak on CEDMNozzles 3, 8 and 19. CEDM Nozzle 38 is located near CEDM Nozzles 3, 8 and 19 on theperiDherv.
LIC-1 5-0071 Attachment 2 Page 41 CEDM Nozzle 40 No sample was taken from CEDM Nozzle 40. Only trace amounts of deposit would be expected on CEDM Nozzle 40 because of its location away from the known leaks. Trace amounts are expected due to loose accumulation being circulated by ventilation.
View -000I View -090" Fillet of the annulus is smooth with no .Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion" Minor staining within the annulus 0 Minor staining within the annulus* No debris visible in the annulus to obstruct
View -000 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" Very small quantity of apparent debris
* Very small quantity of apparent debrissuccessful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability tosuccessfully complete the required VEexam.View -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
* Very small quantity of apparent debris found to be lint, is present in the annulus. found to be lint, is present in the annulus.This debris did not preclude the ability to This debris did not preclude the ability to successfully complete the required VE successfully complete the required VE exam. exam." Minor staining within the annulus
* No indication of wastage or surfaceerosion erosion" Minor staining at the top of the photo of the 9 Minor staining at the bottom of the annulusannulus 0 Very small quantity of apparent debris" Very small quantity of apparent debris found to be lint, is present in the annulus.found to be lint, is present in the annulus.
* Minor staining within the annulus View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
This debris did not preclude the ability toThis debris did not preclude the ability to successfully complete the required VEsuccessfully complete the required VE exam.exam.
* No indication of wastage or surface erosion erosion" Very small quantity of apparent debris 0 No debris visible in the annulus to obstruct found to be lint, is present in the annulus. successful visual examination.
LIC-1 5-0071Attachment 2Page 40CEDM Nozzle 39No sample was taken from CEDM Nozzle 39. It is expected some accumulation would bepresent based on the location of the penetration primarily from the leak from the ICI 44 Graylockcastlenuts but also from the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 above theannulus region. A spray pattern was evident on nearby penetrations from the leak on ICI 44.CEDM Nozzle 39 is located near ICI 44.View -000View -090* Fillet of the annulus is smooth with no
This debris did not preclude the ability to 9 Minor staining within the annulus successfully complete the required VE exam." Minor staining within the annulus LIC-15-0071 Attachment 2 Page 42 CEDM Nozzle 41 No sample was taken from CEDM Nozzle 41. It is expected accumulation would be present based on the location of the penetration because of the proximity to the leak from the packing on RC-1 00, Reactor Vessel Head Vent Valve. CEDM Nozzle 41 is located directly in front of the RC-I 00.View -000 View -090* Fillet of the annulus is smooth with no
* Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion* Minor staining within the annulus S No staining within the annulus* No debris visible in the annulus to obstruct
* Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface
* Very small quantity of apparent debrissuccessful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability tosuccessfully complete the required VEexam.View -180 View -270" Fillet of the annulus is smooth with no
* No indication of wastage or surface erosion erosion" Minor staining within the annulus
* Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion" No staining identified in the annulus.  
* Minor staining within the annulus" Very small quantity of apparent debris 9 No debris visible in the annulus to obstruct found to be lint, is present in the annulus. successful visual examination This debris did not preclude the ability to successfully complete the required VE exam.View -180 View -270* Fillet of the annulus is smooth with no
& Minor staining within the annulus" No debris visible in the annulus to obstruct
* Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface
* Very small quantity of apparent debrissuccessful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability tosuccessfully complete the required VEexam.
* No indication of wastage or surface erosion erosion e Minor staining within the annulus* Minor staining within the annulus
LIC-1 5-0071Attachment 2Page 41CEDM Nozzle 40No sample was taken from CEDM Nozzle 40. Only trace amounts of deposit would be expectedon CEDM Nozzle 40 because of its location away from the known leaks. Trace amounts areexpected due to loose accumulation being circulated by ventilation.
View -000 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion" Very small quantity of apparent debris
* Very small quantity of apparent debrisfound to be lint, is present in the annulus.
found to be lint, is present in the annulus.This debris did not preclude the ability to This debris did not preclude the ability tosuccessfully complete the required VE successfully complete the required VEexam. exam." Minor staining within the annulus
* Minor staining within the annulusView -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
* No indication of wastage or surfaceerosion erosion" Very small quantity of apparent debris 0 No debris visible in the annulus to obstructfound to be lint, is present in the annulus.
successful visual examination.
This debris did not preclude the ability to 9 Minor staining within the annulussuccessfully complete the required VEexam." Minor staining within the annulus LIC-15-0071 Attachment 2Page 42CEDM Nozzle 41No sample was taken from CEDM Nozzle 41. It is expected accumulation would be presentbased on the location of the penetration because of the proximity to the leak from the packingon RC-1 00, Reactor Vessel Head Vent Valve. CEDM Nozzle 41 is located directly in front of theRC-I 00.View -000 View -090* Fillet of the annulus is smooth with no
* Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface
* No indication of wastage or surfaceerosion erosion" Minor staining within the annulus
* Minor staining within the annulus" Very small quantity of apparent debris 9 No debris visible in the annulus to obstructfound to be lint, is present in the annulus.
successful visual examination This debris did not preclude the ability tosuccessfully complete the required VEexam.View -180 View -270* Fillet of the annulus is smooth with no
* Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface
* No indication of wastage or surface erosionerosion e Minor staining within the annulus* Minor staining within the annulus
* No debris visible in the annulus to obstruct" Very small quantity of apparent debris successful visual examination.
* No debris visible in the annulus to obstruct" Very small quantity of apparent debris successful visual examination.
found to be lint, is present in the annulus.This debris did not preclude the ability tosuccessfully complete the required VEexam.
found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam.
LIC-1 5-0071Attachment 2Page 43ICI Nozzle 42No sample was taken from ICI Nozzle 42. Only trace amounts of deposit would be expected onICI Nozzle 42 because of its location away from the known leaks. Trace amounts are expecteddue to loose accumulation being circulated by ventilation.
LIC-1 5-0071 Attachment 2 Page 43 ICI Nozzle 42 No sample was taken from ICI Nozzle 42. Only trace amounts of deposit would be expected on ICI Nozzle 42 because of its location away from the known leaks. Trace amounts are expected due to loose accumulation being circulated by ventilation.
View -000 View -090" Fillet of the annulus is mostly smooth with
View -000 View -090" Fillet of the annulus is mostly smooth with
* Fillet of the annulus is smooth with nono apparent reduction in material apparent build-up or reduction in material" No indication of wastage or surface 9 No indication of wastage or surfaceerosion erosion" No debris visible in the annulus to obstruct 9 Very small quantity of apparent debrissuccessful visual examination, found to be lint, is present in the annulus." Minor staining within the annulus This debris did not preclude the ability to* Signs of CCW deposits collected due to successfully complete the required VEwater pooling in the bottom of the annulus exam.* Minor staining within the annulusView -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
* Fillet of the annulus is smooth with no no apparent reduction in material apparent build-up or reduction in material" No indication of wastage or surface 9 No indication of wastage or surface erosion erosion" No debris visible in the annulus to obstruct 9 Very small quantity of apparent debris successful visual examination, found to be lint, is present in the annulus." Minor staining within the annulus This debris did not preclude the ability to* Signs of CCW deposits collected due to successfully complete the required VE water pooling in the bottom of the annulus exam.* Minor staining within the annulus View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
* No indication of wastage or surfaceerosion erosion* Very small quantity of apparent debris
* No indication of wastage or surface erosion erosion* Very small quantity of apparent debris
* No debris visible in the annulus to obstructfound to be lint, is present in the annulus.
* No debris visible in the annulus to obstruct found to be lint, is present in the annulus. successful visual examination.
successful visual examination.
This debris did not preclude the ability to
This debris did not preclude the ability to
* Minor staining within the annulussuccessfully complete the required VEexam.* Minor staining within the annulus LIC-1 5-0071Attachment 2Page 44ICI Nozzle 43No sample was taken from ICI Nozzle 43. It is expected accumulation would be presentbased on the location of the penetration because of the proximity to the CCW Flex Hoseleak on CEDM Nozzles 3, 8 and 19. ICI Nozzle 43 is located directly downslope fromCEDM Nozzles 3, 8 and 19.View -090View -1804.* Fillet of the annulus is smooth with noapparent build-up or reduction inmaterial" No indication of wastage or surfaceerosion* Very small quantity of apparentdebris found to be lint, is present inthe annulus.
* Minor staining within the annulus successfully complete the required VE exam.* Minor staining within the annulus LIC-1 5-0071 Attachment 2 Page 44 ICI Nozzle 43 No sample was taken from ICI Nozzle 43. It is expected accumulation would be present based on the location of the penetration because of the proximity to the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19. ICI Nozzle 43 is located directly downslope from CEDM Nozzles 3, 8 and 19.View -090 View -180 4.* Fillet of the annulus is smooth with no apparent build-up or reduction in material" No indication of wastage or surface erosion* Very small quantity of apparent debris found to be lint, is present in the annulus. This debris did not preclude the ability to successfully complete the required VE exam.* Minor staining within the annulus" Visible line where insulation interface occurs" Fillet of the annulus is smooth with no apparent build-up or reduction in material* No indication of wastage or surface erosion" No debris visible in the annulus to obstruct successful visual examination.
This debris did notpreclude the ability to successfully complete the required VE exam.* Minor staining within the annulus" Visible line where insulation interface occurs" Fillet of the annulus is smooth with noapparent build-up or reduction in material* No indication of wastage or surfaceerosion" No debris visible in the annulus toobstruct successful visual examination.
* Minor staining within the annulus* Visible line where insulation interface occurs View -270 View -335" Fillet of the annulus is smooth with no 9 Fillet of the annulus is smooth with no apparent build-up or reduction in apparent build-up or reduction in material material 0 No indication of wastage or surface" No indication of wastage or surface erosion erosion 0 Very small quantity of apparent debris* Very small quantity of apparent found to be lint, is present in the annulus.debris found to be lint, is present in This debris did not preclude the ability to the annulus. This debris did not successfully complete the required VE preclude the ability to successfully exam.complete the required VE exam. 0 Minor staining within the annulus* Minor staining within the annulus a Visible line where insulation interface occurs LIC-15-0071 Attachment 2 Page 45 ICI Nozzle 44 No sample was taken from ICI Nozzle 44. Significant accumulation is expected on ICI Nozzle 44 due to the leak from the Graylock castlenuts on this nozzle.View -000 View -090* Fillet of the annulus is smooth with no
* Minor staining within the annulus* Visible line where insulation interface occursView -270 View -335" Fillet of the annulus is smooth with no 9 Fillet of the annulus is smooth with noapparent build-up or reduction in apparent build-up or reduction in materialmaterial 0 No indication of wastage or surface" No indication of wastage or surface erosionerosion 0 Very small quantity of apparent debris* Very small quantity of apparent found to be lint, is present in the annulus.debris found to be lint, is present in This debris did not preclude the ability tothe annulus.
* Fillet of the annulus is smooth with no apparent build-up or reduction in apparent build-up or reduction in material material 0 No indication of wastage or surface" No indication of wastage or surface erosion erosion
This debris did not successfully complete the required VEpreclude the ability to successfully exam.complete the required VE exam. 0 Minor staining within the annulus* Minor staining within the annulus a Visible line where insulation interface occurs LIC-15-0071 Attachment 2Page 45ICI Nozzle 44No sample was taken from ICI Nozzle 44. Significant accumulation is expected on ICINozzle 44 due to the leak from the Graylock castlenuts on this nozzle.View -000 View -090* Fillet of the annulus is smooth with no
* Minor staining within the annulus" Minor staining within the annulus & Very small quantity of apparent debris" No debris visible in the annulus to found to be lint, is present in the annulus.obstruct successful visual This debris did not preclude the ability to examination, successfully complete the required VE exam.& Visible line where insulation interface occurs View -180 View -270* Fillet of the annulus is smooth with no e Fillet of the annulus is smooth with no apparent build-up or reduction in apparent build-up or reduction in material material 0 No indication of wastage or surface* No indication of wastage or surface erosion erosion
* Fillet of the annulus is smooth with noapparent build-up or reduction in apparent build-up or reduction in materialmaterial 0 No indication of wastage or surface" No indication of wastage or surface erosionerosion
* Minor staining within the annulus" Minor staining within the annulus & Very small quantity of apparent debris" No debris visible in the annulus to found to be lint, is present in the annulus.obstruct successful visual This debris did not preclude the ability toexamination, successfully complete the required VEexam.& Visible line where insulation interface occursView -180 View -270* Fillet of the annulus is smooth with no e Fillet of the annulus is smooth with noapparent build-up or reduction in apparent build-up or reduction in materialmaterial 0 No indication of wastage or surface* No indication of wastage or surface erosionerosion
* Minor staining within the annulus* Minor staining within the annulus 0 No debris visible in the annulus to" Very small quantity of apparent obstruct successful visual examination.
* Minor staining within the annulus* Minor staining within the annulus 0 No debris visible in the annulus to" Very small quantity of apparent obstruct successful visual examination.
debris found to be lint, is present inthe annulus.
debris found to be lint, is present in the annulus. This debris did not preclude the ability to successfully complete the required VE exam.
This debris did notpreclude the ability to successfully complete the required VE exam.
LIC-1 5-0071 Attachment 2 Page 46 ICl Nozzle 45 No sample was taken from ICI Nozzle 45. Significant accumulation is expected on ICI Nozzle 45 due to the leak from the Graylock castlenuts directly across from this nozzle.Y View -090 View -180" Fillet of the annulus is smooth with no apparent build-up or reduction in material* No indication of wastage or surface erosion" A small quantity of liquid water can be seen in the annulus* Very small quantity of apparent debris found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam." Minor staining within the annulus* Fillet of the annulus is smooth with no apparent build-up or reduction in material" No indication of wastage or surface erosion* A small quantity of liquid water can be seen in the annulus" No debris visible in the annulus to obstruct successful visual examination.
LIC-1 5-0071Attachment 2Page 46ICl Nozzle 45No sample was taken from ICI Nozzle 45. Significant accumulation is expected on ICI Nozzle 45due to the leak from the Graylock castlenuts directly across from this nozzle.YView -090View -180" Fillet of the annulus is smooth with noapparent build-up or reduction in material* No indication of wastage or surfaceerosion" A small quantity of liquid water can beseen in the annulus* Very small quantity of apparent debrisfound to be lint, is present in the annulus.This debris did not preclude the ability tosuccessfully complete the required VEexam." Minor staining within the annulus* Fillet of the annulus is smooth with noapparent build-up or reduction in material" No indication of wastage or surfaceerosion* A small quantity of liquid water can beseen in the annulus" No debris visible in the annulus to obstructsuccessful visual examination.
* Minor staining within the annulus View -270 View -335 4" Fillet of the annulus is smooth with no apparent build-up or reduction in material* No indication of wastage or surface erosion" Very small quantity of apparent debris found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam.* Minor staining within the annulus" Fillet of the annulus is smooth with no apparent build-up or reduction in material" No indication of wastage or surface erosion" Very small quantity of apparent debris found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam.* Minor staining within the annulus I.
* Minor staining within the annulusView -270View -3354" Fillet of the annulus is smooth with noapparent build-up or reduction in material* No indication of wastage or surfaceerosion" Very small quantity of apparent debrisfound to be lint, is present in the annulus.This debris did not preclude the ability tosuccessfully complete the required VEexam.* Minor staining within the annulus" Fillet of the annulus is smooth with noapparent build-up or reduction in material" No indication of wastage or surfaceerosion" Very small quantity of apparent debrisfound to be lint, is present in the annulus.This debris did not preclude the ability tosuccessfully complete the required VEexam.* Minor staining within the annulusI.
LIC-1 5-0071 Attachment 2 Page 47 ICI Nozzle 46 No sample was taken from ICI Nozzle 46. It is expected accumulation would be present based on the location of the penetration because of the proximity to the leak from the packing on RC-100, Reactor Vessel Head Vent Valve. ICI Nozzle 46 is located directly in the path of the RC-100 leakage.View -000 View -090# Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material o No indication of wastage or surface
LIC-1 5-0071Attachment 2Page 47ICI Nozzle 46No sample was taken from ICI Nozzle 46. It is expected accumulation would be present basedon the location of the penetration because of the proximity to the leak from the packing on RC-100, Reactor Vessel Head Vent Valve. ICI Nozzle 46 is located directly in the path of the RC-100 leakage.View -000 View -090# Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in materialo No indication of wastage or surface
* No indication of wastage or surface erosion erosion# No debris visible in the annulus to obstruct
* No indication of wastage or surfaceerosion erosion# No debris visible in the annulus to obstruct
* No debris visible in the annulus to obstruct successful visual examination, successful visual examination.
* No debris visible in the annulus to obstructsuccessful visual examination, successful visual examination.
o Minor staining within the annulus 0 Minor staining within the annulus 0 Apparent white line around annulus was determined to be a reflection following additional inspections View -180 View -270" Fillet of the annulus is smooth with no
o Minor staining within the annulus 0 Minor staining within the annulus0 Apparent white line around annulus wasdetermined to be a reflection following additional inspections View -180 View -270" Fillet of the annulus is smooth with no
* Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
* Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
* No indication of wastage or surface erosion erosion" No debris visible in the annulus to obstruct
* No indication of wastage or surfaceerosion erosion" No debris visible in the annulus to obstruct
* No debris visible in the annulus to obstruct successful visual examination.
* No debris visible in the annulus to obstructsuccessful visual examination.
successful visual examination.
successful visual examination.
* Minor staining within the annulus 0 Minor staining within the annulus* A small quantity of liquid water can beseen in the annulus LI C- 15-0071Attachment 2Page 48ICI Nozzle 47No sample was taken from ICI Nozzle 47. It is expected accumulation would be present basedon the location of the penetration because of the proximity to the leak from the packing on RC-100, Reactor Vessel Head Vent Valve. ICI Nozzle 47 is located directly in the path of the RC-100 leakage.View -000 View -090* Fillet of the annulus is smooth with no .Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion* No debris visible in the annulus to obstruct
* Minor staining within the annulus 0 Minor staining within the annulus* A small quantity of liquid water can be seen in the annulus LI C- 15-0071 Attachment 2 Page 48 ICI Nozzle 47 No sample was taken from ICI Nozzle 47. It is expected accumulation would be present based on the location of the penetration because of the proximity to the leak from the packing on RC-100, Reactor Vessel Head Vent Valve. ICI Nozzle 47 is located directly in the path of the RC-100 leakage.View -000 View -090* Fillet of the annulus is smooth with no .Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* No debris visible in the annulus to obstruct
* No debris visible in the annulus to obstructsuccessful visual examination, successful visual examination.
* No debris visible in the annulus to obstruct successful visual examination, successful visual examination." Minor staining within the annulus 0 Minor staining within the annulus View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" No debris visible in the annulus to obstruct
" Minor staining within the annulus 0 Minor staining within the annulusView -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion" No debris visible in the annulus to obstruct
* No debris visible in the annulus to obstruct successful visual examination, successful visual examination." Minor staining within the annulus 0 Minor staining within the annulus* Apparent white line around annulus was determined to be a reflection following additional inspections LIC-15-0071 Attachment 2 Page 49 RC-100 No sample was taken from the RC-1 00, Reactor Vessel Head Vent Valve penetration.
* No debris visible in the annulus to obstructsuccessful visual examination, successful visual examination.
It is expected accumulation would be present due to the leakage from packing on RC-100.View -000 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" No staining identified in the annulus. 0 No staining identified in the annulus" A small piece of debris is visible but away
" Minor staining within the annulus 0 Minor staining within the annulus* Apparent white line around annulus wasdetermined to be a reflection following additional inspections LIC-15-0071 Attachment 2Page 49RC-100No sample was taken from the RC-1 00, Reactor Vessel Head Vent Valve penetration.
* Very small quantity of apparent debris from the annulus. This debris did not found to be lint, is present in the annulus.preclude the ability to successfully This debris did not preclude the ability to complete the required VE exam. successfully complete the required VE exam.View- 180 View -270* Fillet of the annulus is smooth with no
It isexpected accumulation would be present due to the leakage from packing on RC-100.View -000 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surfaceerosion erosion" No staining identified in the annulus.
* Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion
0 No staining identified in the annulus" A small piece of debris is visible but away
* Very small quantity of apparent debrisfrom the annulus.
This debris did not found to be lint, is present in the annulus.preclude the ability to successfully This debris did not preclude the ability tocomplete the required VE exam. successfully complete the required VEexam.View- 180 View -270* Fillet of the annulus is smooth with no
* Fillet of the annulus is smooth with noapparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosionerosion
* No staining identified in the annulus.* No staining identified in the annulus.
* No staining identified in the annulus.* No staining identified in the annulus.
* A small piece of debris is visible but away* A small piece of debris is visible but away from the annulus.
* A small piece of debris is visible but away* A small piece of debris is visible but away from the annulus. This debris did not from the annulus. This debris did not preclude the ability to successfully preclude the ability to successfully complete the required VE exam.complete the required VE exam..}}
This debris did notfrom the annulus.
This debris did not preclude the ability to successfully preclude the ability to successfully complete the required VE exam.complete the required VE exam..}}

Revision as of 02:43, 9 July 2018

Fort Calhoun Station, Unit 1, Supplemental Information Associated with Omaha Public Power District (OPPD) Relief Request RR-14
ML15142A411
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/17/2015
From: Cortopassi L P
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-15-0071, TAC MF6206
Download: ML15142A411 (52)


Text

OmabhaPubisPowOlrid 444 South 16W Street Mall Omaha, NE 68102-2247 LIC-15-0071 May 17, 2015 10 CFR 50.55a U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285

Subject:

Supplemental Information Associated with Omaha Public Power District (OPPD)Relief Request RR-14

References:

See Page 2 This letter provides supplemental information to Omaha Public Power District (OPPD) Request for Relief RR-14 (Reference

1) and the OPPD response to a Request for Additional Information (Reference 5). Specifically, this letter provides revised proposed alternative and supplemental information to question 3 of Reference 5 as discussed in a conference call held between members of OPPD staff and the NRC on May 17, 2015.If you should have any questions regarding this submittal or require additional information, please contact Mr. Bill R. Hansher at 402-533-6894.

Respcfl, uisP. ortpassi Site Vice President and CNO LPC/BRH/brh Attachments:

1. Revised Proposed Alternative
2. Supplemental Response to NRC Request for Additional Information Regarding Relief Request RR-14 Question 3 c: M. L. Dapas, NRC Regional Administrator, Region IV C. F. Lyon, NRC Senior Project Manager S. M. Schneider, NRC Senior Resident Inspector Employment with Equal Opportunity U. S. Nuclear Regulatory Commission LIC-1 5-0071 Page 2 References
1. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "Relief Request Number RR-1 4, Request for Relief from Paragraph

-3142.1 (c) of ASME Code Case N-729-1 for Reactor Vessel Head Penetration Nozzle Welds," dated May 9, 2015 (LIC-15-0066)2. E-mail from NRC (C. F. Lyon) to OPPD (B. R. Hansher), "Fort Calhoun Station, Unit No.1-Request for Additional Information for Fort Calhoun Relief Request RR-14, Reactor Vessel Head Inspections," dated May 11, 2015 3. E-mail from NRC (C. F. Lyon) to OPPD (B. R. Hansher), "RAIs for RR-14 (TAC No.MF6206)," dated May 12, 2015 4. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "Omaha Public Power District (OPPD) Response to NRC Request for Additional Information Regarding Relief Request RR-14," dated May 13, 2015 (LIC-15-0069)

5. E-mail from NRC (C. F. Lyon) to OPPD (B. R. Hansher), "FCS: RAI Number 2 for RR-14, RVH Leakage/ASME Code Case N-729-1 (TAC No. MF6206)," dated May 15, 2015 6. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "Omaha Public Power District (OPPD) Response to NRC Request for Additional Information Regarding Relief Request RR-14," dated May 16, 2015 (LIC-15-0070)

LIC-1 5-0071 Attachment 1 Page 1 Revised Proposed Alternative Repairs to identified boric acid leakage sources will be made on RC-100, CEDM RC-10-24, and ICI Port #44 during the current refueling outage. Repairs to identified component cooling water (CCW) leakage sources will be made on CEDMs RC-10-03, RC-10-12, RC-10-14, RC-10-27, RC-1 0-35, and RC-1 0-39 during the current refueling outage. This corrects the known sources of leakage. Procedure OP-ST-RC-3007, Periodic Reactor Coolant System Integrity Test, which specifies inspection areas inside containment including the ICI Ports, CEDM housings, and RC-100, will be performed.

This surveillance test will verify the correction of the identified leaks and confirm the absence of new leaks.During Operating Cycle 28 OPPD will use administrative controls such that at an unidentified leak rate increase of greater than 0.1 gpm above stable baseline, actions will be taken to identify the source of the leakage. If the source is not identified within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, actions will be taken to shut the plant down.The "stable baseline" is the baseline mean defined in procedure, ER-AP-331-1003 "RCS Leakage Monitoring and Action Plan". ER-AP-331-1003 establishes the controls and expectations for monitoring Reactor Coolant System (RCS) leakage under the Exelon Nuclear Boric Acid Corrosion Control (BACC) program and the PWR Owner's Group (PWROG)Operations Subcommittee "Needed" Recommendations under letters OG-07-387

&OG-08-400, and associated guidance for these recommendations contained in WCAPs 16423 & 16465. It also defines the methodology used to establish acceptable baseline values.The "Stable Baseline" (Baseline Mean) is defined as a normal, steady state mean value for a given plant condition (gpm @ 60F to 70F and atmospheric pressure).

This is established during nominal Mode 1 plant conditions.

Following every outage, the previous quarter's (prior to the outage) Baseline Mean RCS unidentified leak rate value and Standard Deviation are used upon startup for a new fuel cycle or until such time as the plant systems become more stable and better values can be calculated.

Following a refueling outage it may take several weeks for the RCS leak rate to stabilize, because it takes time for equipment packing to swell, seals to run-in, etc. depending on the cycle. A revised baseline from the previous quarter is established based upon plant response post outage.The FCS experience over several outages (past 4), indicates that this takes nominally about one month. Following FCR27, it is expected that a "stable baseline" will be established approximately 4 weeks post startup.During Operating Cycle 28, OPPD will perform a bare-metal visual inspection on the upper RVH in accordance with the criteria contained in ASME Code Case N-729-1 on the first Cold Shutdown of greater than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> that occurs after at least 4 months of operation.

During Refueling Outage FCR28 OPPD will conduct UT/surface examinations of all RVH nozzles.

LIC-1 5-0071 Attachment 2 Page 1 Supplemental Response to NRC Request for Additional Information Regarding Relief Request RR-14 Question 3 NRC Question 3 For each nozzle which exhibited foreign material near the annulus, including staining, please identify the source of the material and provide a justification for the leakage being from that source (e.g., a chemical and/or isotopic analysis of the material at the annulus showing the material to be inconsistent with RCS chemistry; evidence that the material is non-adherent, or evidence that a leakage path exists from a point above each nozzle under consideration to a point below the nozzle such that it is reasonable to conclude that fluid would have entered the annulus of the nozzle under consideration).

Attachment 2 provides revised supplemental information to characterize and further clarify why we have reasonable assurance that the discovered deposits originated from other sources than the nozzles. This is shown in the revised attached Source Identification Diagram. This revised diagram depicts the dispersion of leakage from ICI-44, RC-10-24, RC-100, and the CCW flex hose. Also shown this diagram is the general flow of wash down liquid and where it tends to accumulate on the downhill side of various penetrations, particularly at the ICI locations.

Additionally, chemical analysis was obtained for both loose and adherent particles.

The results of this analysis indicates that the source of leakage is from sources other than nozzle.

LIC-1 5-0071 Attachment 2 Page 2 Source Identification Diagram.~ .,~ICI-44 Graylock leak spray distribution*

I CCW Flex Hose Leak IC]-4 i RC-10-24 RC 10O0Packing LeA.Accumulation

&St Stud 1 4--Majority ofoCCW Deposit Area*Flow of Fluid Causing Rust in -_Downstream Annulus RC-100 Packing Leak through Insulation*

  • Arrows for RC-100 and CCW leak deposit areas indicate further disoersion from indiratid
krpx LIC-1 5-0071 Attachment 2 Page 3 Reference DiagramSTUD

.r sp r 43 )?;5 220*119-I 34 31 k4 LIC-15-0071 Attachment 2 Page 4 CEDM Nozzle 1 A sample was taken but the amount of material was not sufficient for analysis.

It is expected some accumulation would be present based on the location of the penetration because of the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 above the annulus region. CEDM Nozzle 1 is on the periphery of the leakage area. In addition, this nozzle is located at the top of the head in the center, resultina in anv liauid material traversina down the curvature of the head.View -000 View -090" Picture is somewhat blurred 0 Fillet of the annulus is smooth with no* Fillet of annulus is difficult to discern but no apparent build-up or reduction in material build-up or reduction in material is evident 9 No indication of wastage or surface[ No indication of wastage or surface erosion erosion a Minor staining within the annulus* Minor staining within the annulus

  • Very small quantity of apparent debris* No debris visible in the annulus to obstruct found to be lint, is present in the annulus.successful visual examination This debris did not preclude the ability to successfully complete the required VE exam View- 180 View- 270* Fillet of the annulus is smooth with no
  • Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material 0 No indication of wastage or surface 9 No indication of wastage or surface erosion erosion 0 Minor staining identified in the annulus.* Minor staining identified in the annulus.
  • No debris visible in the annulus to obstruct* No debris visible in the annulus to obstruct successful visual examination successful visual examination LIC-1 5-0071 Attachment 2 Page 5 CEDM Nozzle 2 A sample was taken but the amount of material was not sufficient for analysis.

It is expected some accumulation would be present based on the location of the penetration because of the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 above the annulus region. CEDM Nozzle 4 is on the periphery of the leakaqe area.View -000 View -090* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Minor staining within the annulus 0 Minor staining within the annulus" Very small quantity of apparent debris & No debris visible in the annulus to obstruct found to be lint, is present in the annulus. successful visual examination This debris did not preclude the ability to successfully complete the required VE exam.View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface & No indication of wastage or surface erosion erosion" No staining identified in the annulus.

  • No staining identified in the annulus." No debris visible in the annulus to obstruct
  • Very small quantity of apparent debris successful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam.

LIC-1 5-0071 Attachment 2 Page 6 CEDM Nozzle 3 A sample was taken with the following results: pH = 9.33, Boron = 105 ppm, Tolytriazole

= 34 ppm. Isotopic evidence indicated the presence of Co-58, Co-60, Nb-95, Zr-95 and Cs-137. The CCW Flex Hose leak deposited material on CEDM Nozzles 3, 8 and 19 above the annulus reoion. correlatina with the chemical analysis results which indicates the samDle was CCW.View -000 View -090* Fillet of the annulus is smooth with no apparent build-up or reduction in material* No indication of wastage or surface erosion" Minor staining within the annulus" Very small quantity of apparent debris found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam" Minor paint was observed on head near penetration

  • Fillet of the annulus is smooth with no apparent build-up or reduction in material* No indication of wastage or surface erosion" Minor staining within the annulus" No debris visible in the annulus to obstruct successful visual examination View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Minor staining identified in the bottom of 0 Minor staining identified in the bottom of the annulus. the annulus.* No debris visible in the annulus to obstruct e Very small quantity of apparent debris successful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam.

LIC-1 5-0071 Attachment 2 Page 7 CEOM Nozzle 4 A sample was taken but the amount of material was not sufficient for analysis.

It is expected some accumulation would be present based on the location of the penetration because of the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 above the annulus region. CEDM Nozzle 4 is on the oeriDherv of the leakaae area.View -000 View -090* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Minor staining within the annulus 0 Minor staining within the annulus* No debris visible in the annulus to obstruct

  • Very small quantity of apparent debris successful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam.View -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" Minor staining within the annulus 0 Minor staining within the annulus* Very small quantity of apparent debris 0 Very small quantity of apparent debris found to be lint, is present in the annulus. found to be lint, is present in the annulus.This debris did not preclude the ability to This debris did not preclude the ability to successfully complete the required VE successfully complete the required VE exam. exam.

LIC-1 5-0071 Attachment 2 Page 8 CEDM Nozzle 5 No sample was taken from CEDM Nozzle 5. It is expected some accumulation would be present based on the location of the penetration because the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 was above the annulus region. Minor accumulation would also be expected from the leak on the packing of RC-1 00, Reactor Vessel Deripherv of the leaka~ae areas.Head Vent Valve. CEDM Nozzle 5 is on the View -000 View -090* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface

  • No indication of wastage or surface erosion erosion" No staining identified in the annulus. a Minor staining within the annulus" Very small quantity of apparent debris 0 Very small quantity of apparent debris found to be lint, is present in the annulus. found to be lint or paint flecks, is present in This debris did not preclude the ability to the annulus. This debris did not preclude successfully complete the required VE the ability to successfully complete the exam. required VE exam.View -180 View -270* Fillet of the annulus is smooth with no
  • Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface a No indication of wastage or surface erosion erosion* No staining identified in the annulus. 0 No staining identified in the annulus." Very small quantity of apparent debris 0 Very small quantity of apparent debris found to be lint, is present in the annulus. found to be lint, is present in the annulus.This debris did not preclude the ability to This debris did not preclude the ability to successfully complete the required VE successfully complete the required VE exam. exam.

LIC-1 5-0071 Attachment 2 Page 9 CEDM Nozzle 6 A sample was taken but the amount of material was not sufficient for analysis.

It is expected some accumulation would be present based on the location of the penetration because the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 was above the annulus region. CEDM Nozzle 6 is on the periphery of the leakage area.View -000 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Minor staining within the annulus

  • Minor staining within the annulus due to" Very small quantity of apparent debris water residue found to be lint, is present in the annulus. a Very small quantity of apparent debris This debris did not preclude the ability to found to be lint, is present in the annulus.successfully complete the required VE This debris did not preclude the ability to exam successfully complete the required VE exam View -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
  • No indication of wastage or surface erosion erosion* Minor staining within the annulus and on 0 Staining identified on the CEDM nozzle the CEDM nozzle. and within the annulus.* No debris visible in the annulus to obstruct 9 No debris visible in the annulus to obstruct successful visual examination successful visual examination LIC-1 5-0071 Attachment 2 Page 10 CEDM Nozzle 7 No sample was taken from CEDM Nozzle 7. It is expected accumulation would be present based on the location of the penetration because the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 was located above the annulus region. CEDM Nozzle 7 is located directly next to CEDM Nozzles 3. 8 and 19.View -000 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" No staining within the annulus
  • No staining within the annulus* No debris visible in the annulus to obstruct
  • Very small quantity of apparent debris successful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam View -180 View -270" Fillet of the annulus is smooth with no
  • Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* No staining within the annulus 0 No Staining identified in the annulus." Very small quantity of apparent debris 0 No debris visible in the annulus to obstruct found to be lint, is present in the annulus. successful visual examination; indication of This debris did not preclude the ability to one piece of lint in the annulus region in successfully complete the required VE the photo exam LIC-15-0071 Attachment 2 Page 11 CEDM Nozzle 8 A sample was taken with the following result: pH = 8.61. The amount of sample was insufficient to test for boron; however, it is expected the sample would have indicated CCW. The CCW Flex Hose leak was from above CEDM Nozzle 8, correlating with the chemical analysis results which indicate the sample was CCW.View -045 View -135" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
  • No indication of wastage or surface erosion erosion" No staining within the annulus 0 Minor staining within the annulus* No debris visible in the annulus to obstruct
  • No debris visible in the annulus to obstruct successful visual examination successful visual examination
  • Reflection is visible on the right-hand side e Minor surface irregularity visible on surface of the photo of CEDM housing View -180 View -315* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface
  • No indication of wastage or surface erosion erosion* Minor staining at the bottom of the annulus
  • Minor staining on the left side of the" No debris visible in the annulus to obstruct annulus successful visual examination 0 No debris visible in the annulus to obstruct successful visual examination LIC-1 5-0071 Attachment 2 Page 12 CEDM Nozzle 10 A sample was taken but the amount of material was not sufficient for analysis.

Minor accumulation is expected to be present based on the location of the penetration because the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 was above the annulus region and the leak from the ICI 44 Graylock castlenuts.

A spray pattern was evident on nearby penetrations from the leak on IC0 44. CEDM Nozzle 10 is on the pnriphery of both leakage areas.View -000 Description

-090" Fillet of the annulus is smooth with no a Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal" No indication of wastage or surface erosion 9 No indication of wastage or surface erosion" No debris visible in the annulus to obstruct 0 No debris visible in the annulus to obstruct successful visual examination, successful visual examination.

  • Minor staining within the annulus View -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal" No indication of wastage or surface erosion 0 No indication of wastage or surface erosion" No debris visible in the annulus to obstruct 0 No debris visible in the annulus to obstruct successful visual examination, successful visual examination." Minor staining within the annulus 0 Minor staining within the annulus LIC-1 5-0071 Attachment 2 Page 13 CEDM Nozzle 11 Sample was taken with the following result: pH = 6.0. The amount of sample was insufficient to test for boron. Only trace amounts of deposit would be expected on CEDM Nozzle 11 because of its location away from the known leaks. Trace amounts are expected due to loose accumulation beina circulated bv ventilation.

View -000 Description

-090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion

  • Very small quantity of apparent debris* No debris visible in the annulus to obstruct found to be lint, is present in the annulus.successful visual examination.

This debris did not preclude the ability to" Minor staining within the annulus successfully complete the required VE exam 0 Minor staining within the annulus View -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in apparent build-up or reduction in metal material

  • No indication of wastage or surface" No indication of wastage or surface erosion erosion
  • No debris visible in the annulus to" Very small quantity of apparent debris obstruct successful visual examination.

found to be lint, is present in the

  • Minor staining within the annulus annulus. This debris did not preclude 0 Picture is somewhat blurred the ability to successfully complete the required VE exam" Minor staining within the annulus" Picture is somewhat blurred LIC-1 5-0071 Attachment 2 Page 14 CEDM Nozzle 12 No sample was taken for CEDM Nozzle 12. Only trace amounts of deposit would be expected on CEDM Nozzle 12 because of its proximity to known leakage from the packing on RC-100, Reactor Vessel Head Vent Valve. CEDM Nozzle 12 is located on the periphery of the leakage area from RC-100.View -000 Description

-090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal" No indication of wastage or surface e No indication of wastage or surface erosion erosion

  • No debris visible in the annulus to obstruct" No debris visible in the annulus to obstruct successful visual examination successful visual examination.

0 Minor staining within the annulus* Minor staining within the annulus View -180 View -270" Fillet of the annulus is smooth with no

  • Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion
  • No debris visible in the annulus to obstruct" Very small quantity of apparent debris successful visual examination.

found to be lint, is present in the annulus. 9 Minor staining within the annulus This debris did not preclude the ability to successfully complete the required VE exam* Minor staining within the annulus LIC-1 5-0071 Attachment 2 Page 15 CEDM Nozzle 14 No sample was taken from CEDM Nozzle 14. It is expected some accumulation would be present, based on the location of the penetration, because the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 was above the annulus region. CEDM Nozzle 14 is located near CEDM Nozzles 3, 8 and 19 on the DerDherv.View- 045 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface

  • No indication of wastage or surface erosion erosion" Minor staining within the annulus 0 Minor staining within the annulus" No debris visible in the annulus to obstruct
  • No debris visible in the annulus to obstruct successful visual examination successful visual examination View -225 View -315" Fillet of the annulus is smooth with no
  • Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material 0 No indication of wastage or surface
  • No indication of wastage or surface erosion erosion" No staining identified in the annulus.
  • Minor staining within the annulus" Very small quantity of apparent debris 0 No debris visible in the annulus to obstruct found to be lint, is present in the annulus. successful visual examination This debris did not preclude the ability to successfully complete the required VE exam LIC-1 5-0071 Attachment 2 Page 16 CEDM Nozzle 15 No sample was taken from CEDM Nozzle 15. It is expected some accumulation would be present, based on the location of the penetration, because the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 was above the annulus region and the leak from the ICI 44 Graylock castlenuts.

A spray pattern was evident on nearby penetrations from the leak on ICI 44. CEDM Nozzle 15~ is located directly next to CFDM Nozzle 8.Nozzle.........

15 is................toCEM Nzze ...View -00 View -090 0 Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface .No indication of wastage or surface erosion erosion* Minor staining within the annulus

  • Minor staining within the annulus* No debris visible in the annulus to obstruct e No debris visible in the annulus to obstruct successful visual examination successful visual examination View -180 View -270 0 Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* No staining identified in the annulus. a No staining identified in the annulus.* Very small quantity of apparent debris 0 Very small quantity of apparent debris found to be lint, is present in the annulus. found to be lint, is present in the annulus.This debris did not preclude the ability to This debris did not preclude the ability to successfully complete the required VE successfully complete the required VE exam exam LIC-1 5-0071 Attachment 2 Page 17 CEDM Nozzle 16 No sample was taken from CEDM Nozzle 16. Minor accumulation is expected to be present due to loose accumulation being circulated from the leak from the ICI 44 Graylock castlenuts.

CEDM Nozzle 16 is on the peripherv of the leakaae area.View -000 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion

  • No debris visible in the annulus to obstruct* No debris visible in the annulus to obstruct successful visual examination successful visual examination.
  • No staining identified in the annulus.* No staining identified in the annulus.View 270 View -270* Fillet of the annulus is smooth with no
  • Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion 0 No debris visible in the annulus to obstruct* No debris visible in the annulus to obstruct successful visual examination.

successful visual examination 0 No staining identified in the annulus.* No staining identified in the annulus.

LIC-1 5-0071 Attachment 2 Page 18 CEDM Nozzle 17 No sample was taken from CEDM Nozzle 17. It is expected accumulation would be present based on the location of the penetration because of the proximity to the packing leak on RC-100, Reactor Vessel Head Vent Valve. CEDM Nozzle 17 is located directly in the path of the RC-100 leakage.View -000 Description

-090" Fillet of the annulus is smooth with no & Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion 0 No debris visible in the annulus to obstruct* No debris visible in the annulus to obstruct successful visual examination successful visual examination.

0 Minor staining within the annulus" Minor staining within the annulus View -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion

  • No debris visible in the annulus to obstruct* Very small quantity of apparent debris successful visual examination.

found to be lint or paint flecks, is present in

  • Minor staining within the annulus the annulus. This debris did not preclude the ability to successfully complete the required VE exam* Minor staining within the annulus LIC-15-0071 Attachment 2 Page 19 CEDM Nozzle 18 No sample was taken for CEDM Nozzle 18. It is expected some accumulation would be present based on the location of the penetration because the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 was above the annulus region. CEDM Nozzle 18 is on the periphery of the leakage area.View -000 Description

-090* Fillet of the annulus is smooth with no # Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion

  • No debris visible in the annulus to obstruct" No debris visible in the annulus to obstruct successful visual examination successful visual examination.

0 Minor staining within the annulus" Minor staining within the annulus View -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion

  • No debris visible in the annulus to obstruct* No staining visible in the annulus successful visual examination." Very small quantity of apparent debris found to be lint or paint flecks, is present in the annulus. This debris did not preclude the ability to successfully complete the required VE exam LIC-1 5-0071 Attachment 2 Page 20 CEDM Nozzle 19 No sample was taken from CEDM Nozzle 19. Significant accumulation is expected on CEDM Nozzle 19 because the CCW Flex Hose leak was from directlv above CEDM Nozzle 19.View -000 View -090 9* Fillet of the annulus is smooth with no apparent build-up or reduction in material* No indication of wastage or surface erosion* Minor staining within the annulus* Very small quantity of apparent debris found to be lint is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam* Piece of lint visible in the picture was removed with air following the photo insDection
  • Fillet of the annulus is smooth with no apparent build-up or reduction in material" No indication of wastage or surface erosion* Minor staining within the annulus" No debris visible in the annulus to obstruct successful visual examination View -135 View -180* Fillet of the annulus is smooth with no
  • Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface
  • No indication of wastage or surface erosion erosion* Minor staining within the annulus
  • No staining identified in the annulus.* Minor staining in a ring around the
  • No debris visible in the annulus to obstruct annulus. successful visual examination
  • No debris visible in the annulus to obstruct successful visual examination LIC-15-0071 Attachment 2 Page 21 CEDM Nozzle 20 No sample was taken from CEDM Nozzle 20. Accumulation is expected to be present based on the location of the penetration because of the leak from the ICI 44 Graylock castlenuts.

A spray pattern was evident on nearby penetrations from the leak on ICI 44 and CEDM Nozzle 20 is near ICI 44.View -045 View -090* Fillet of the annulus is smooth with no

  • Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface erosion
  • No indication of wastage or surface erosion" Minor staining within the annulus 9 Minor staining within the annulus" Very small quantity of apparent debris
  • No debris visible in the annulus to obstruct found to be lint or paint flecks, is present in successful visual examination the annulus. This debris did not preclude the ability to successfully complete the required VE exam View -180 View -315" Fillet of the annulus is smooth with no
  • Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface erosion
  • No indication of wastage or surface erosion" Minor staining within the annulus
  • Minor staining within the annulus" No debris visible in the annulus to obstruct 9 Very small quantity of apparent debris successful visual examination found to be lint or paint flecks, is present in the annulus. This debris did not preclude the ability to successfully complete the required VE exam LIC-1 5-0071 Attachment 2 Page 22 CEDM Nozzle 21 No sample was taken from CEDM Nozzle 21. It is expected some accumulation would be present based on the location of the penetration because of the proximity to the leak from packing on RC-100, Reactor Vessel Head Vent Valve. CEDM Nozzle 21 is located on the periphery of the RC-100 leakage.View -165 View -235" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
  • No indication of wastage or surface erosion erosion* No observable staining within the annulus
  • No observable staining within the annulus* No debris visible in the annulus to obstruct
  • Very small quantity of apparent debris successful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam View -270 View -300* Fillet of the annulus is smooth with no
  • Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" Minor staining within the annulus
  • No observable staining within the annulus" Very small quantity of apparent debris
  • No debris visible in the annulus to obstruct found to be lint, is present in the annulus. successful visual examination This debris did not preclude the ability to successfully complete the required VE exam LIC-1 5-0071 Attachment 2 Page 23 CEDM Nozzle 22 No sample was taken for CEDM Nozzle 22. Only trace amounts of deposit would be expected on CEDM Nozzle 22 because of its location away from the known leaks. Trace amounts are expected due to loose accumulation being circulated by ventilation.

View -000 Description

-090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal" No indication of wastage or surface erosion 9 No indication of wastage or surface erosion" No debris visible in the annulus to obstruct 0 No debris visible in the annulus to obstruct successful visual examination, successful visual examination" Minor staining within the annulus

  • Minor staining within the annulus View -180 View -270" Fillet of the annulus is smooth with no
  • Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in metal" No indication of wastage or surface erosion 9 No indication of wastage or surface erosion" No debris visible in the annulus to obstruct
  • Very small quantity of apparent debris found successful visual examination, to be lint or paint flecks, is present in the" Minor staining within the annulus annulus. This debris did not preclude the ability to successfully complete the required VE exam* Minor staining within the annulus LIC-1 5-0071 Attachment 2 Page 24 CEDM Nozzle 23 No sample was taken from CEDM Nozzle 23. It is expected accumulation would be present based on the location of the penetration because of the proximity to the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19. CEDM Nozzle 23 is located directly next to CEDM Nozzles 3, 8 and 19.View -000 View -080" Fillet of the annulus is smooth with no e Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface erosion e No indication of wastage or surface erosion" No staining identified in the annulus. e No staining identified in the annulus." Very small quantity of apparent debris found
  • Very small quantity of apparent debris found to be lint or paint flecks, is present in the to be lint or paint flecks, is present in the annulus. This debris did not preclude the annulus. This debris did not preclude the ability to successfully complete the required ability to successfully complete the required VE exam VE exam View -100 View -270* Fillet of the annulus is smooth with no
  • Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface erosion
  • No indication of wastage or surface erosion" No staining identified in the annulus.
  • No staining identified in the annulus." Very small quantity of apparent debris found
  • Very small quantity of apparent debris found to be lint or paint flecks, is present in the to be lint or paint flecks, is present in the annulus. This debris did not preclude the annulus. This debris did not preclude the ability to successfully complete the required ability to successfully complete the required VE exam VE exam LIC-15-0071 Attachment 2 Page 25 CEDM Nozzle 24 No sample was taken from CEDM Nozzle 24. It is expected accumulation would be present based on the location of the penetration and the proximity to the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19. CEDM Nozzle 24 is located directly next to CEDM Nozzles 3.8 and 19.View -090 View -110" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
  • No indication of wastage or surface erosion erosion" Minor staining within the annulus 0 Minor staining within the annulus* No debris visible in the annulus to obstruct 9 Very small quantity of apparent debris successful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam View -205 View -300* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Minor staining within the annulus 0 No staining identified in the annulus.* No debris visible in the annulus to obstruct
  • Very small quantity of apparent debris successful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam LIC-1 5-0071 Attachment 2 Page 26 CEDM Nozzle 25 No sample was taken from CEDM Nozzle 25. Accumulation is expected to be present based on the location of the penetration because of the proximity of the leak from the ICI 44 Graylock castlenuts.

A spray pattern was evident on nearby penetrations from the leak on ICI 44 and CEDM Nozzle 25 is directly in front of ICI 44.View -135 View -180* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface

  • No indication of wastage or surface erosion erosion" Minor staining within the annulus 0 Minor staining within the annulus* No debris visible in the annulus to obstruct
  • Very small quantity of apparent debris successful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam View -270 View -335* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Minor staining within the annulus. 0 No staining identified in the annulus.* Very small quantity of apparent debris
  • No debris visible in the annulus to obstruct found to be lint, is present in the annulus. successful visual examination This debris did not preclude the ability to successfully complete the required VE exam LIC-1 5-0071 Attachment 2 Page 27 CEDM Nozzle 26 No sample was taken from CEDM Nozzle 26. Accumulation is expected to be present based on the location of the penetration because of the proximity to the leak from the ICI 44 Graylock castlenuts.

A spray pattern was evident on nearby penetrations from the leak on ICI 44 and CEDM Nozzle 26 is directly in front of ICI 44.View -045 View -90* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" Minor staining within the annulus on the 0 Minor staining within the annulus down-slope side

  • No debris visible in the annulus to obstruct* No debris visible in the annulus to obstruct successful visual examination successful visual examination View -180 View -335* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Minor staining within the annulus.
  • Minor staining within the annulus.* No debris visible in the annulus to obstruct e No debris visible in the annulus to obstruct successful visual examination successful visual examination LIC-1 5-0071 Attachment 2 Page 28 CEOM Nozzle 27 No sample was taken from CEDM Nozzle 27. It is expected minor accumulation would be present based on the location of the penetration because of the proximity to the leak from packing on RC-100, Reactor Vessel Head Vent Valve. CEDM Nozzle 27 is located on the periphery of the RC-100 leakage.View -000 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 9 No indication of wastage or surface erosion erosion" Minor staining within the annulus 0 Minor staining within the annulus* No debris visible in the annulus to obstruct
  • No debris visible in the annulus to obstruct successful visual examination successful visual examination View -180 View -270* Photo is somewhat blurred 0 Fillet of the annulus is smooth with no" Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material 0 No indication of wastage or surface" No indication of wastage or surface erosion erosion 0 No staining identified in the annulus.* Minor staining within the annulus 0 Very small quantity of apparent debris* Very small quantity of apparent debris found to be lint, is present in the annulus.found to be lint, is present in the annulus. This debris did not preclude the ability to This debris did not preclude the ability to successfully complete the required VE successfully complete the required VE exam exam LIC-1 5-0071 Attachment 2 Page 29 CEDM Nozzle 28 No sample was taken from CEDM Nozzle 28. It is expected accumulation would be present based on the location of the penetration because of the proximity to the leak from packing on RC-100, Reactor Vessel Head Vent Valve. CEDM Nozzle 2B is located directly in the path of the RC-100 leakaqe.View -000 View -090" Fillet of the annulus is smooth with no & Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" Minor staining within the annulus 0 Minor staining within the annulus* Very small quantity of apparent debris 0 Very small quantity of apparent debris found to be lint or paint flecks, is present in found to be lint or paint flecks, is present in the annulus. This debris did not preclude the annulus. This debris did not preclude the ability to successfully complete the the ability to successfully complete the required VE exam required VE exam View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
  • No indication of wastage or surface erosion erosion* Minor staining within the annulus
  • Minor staining within the annulus" Very small quantity of apparent debris
  • Very small quantity of apparent debris found to be lint or paint flecks, is present in found to be lint or paint flecks, is present in the annulus. This debris did not preclude the annulus. This debris did not preclude the ability to successfully complete the the ability to successfully complete the required VE exam required VE exam LIC-1 5-0071 Attachment 2 Page 30 CEDM Nozzle 29 No sample was taken for CEDM Nozzle 29. Minor accumulation is expected to be present based on the location of the penetration because of the proximity to the leakage from the packing of RC-100, Reactor Vessel Head Vent Valve. CEDM Nozzle 29 is on the periphery of the leakage area.View -000 View -090* Fillet of the annulus is smooth with no
  • Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Minor staining within the annulus 0 Minor staining within the annulus* Very small quantity of apparent debris
  • Very small quantity of apparent debris found to be lint, is present in the annulus. found to be lint, is present in the annulus.This debris did not preclude the ability to This debris did not preclude the ability to successfully complete the required VE successfully complete the required VE exam exam View -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Minor staining identified in the annulus. 0 Minor staining identified in the annulus." Very small quantity of apparent debris 9 Very small quantity of apparent debris found to be lint, is present in the annulus. found to be lint, is present in the annulus.This debris did not preclude the ability to This debris did not preclude the ability to successfully complete the required VE successfully complete the required VE exam exam LIC-15-0071 Attachment 2 Page 31 CEDM Nozzle 30 A sample was taken from CEDM Nozzle 30 with the following results: pH=9.45, boron=132 ppm, Tolyltriazole=86 ppm. Isotopic evidence indicated the presence of Co-58, Co-60, Nb-95 and Cs-137. It is expected minor accumulation would be present based on the location of the penetration because of the proximity to the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 above the annulus region. This accumulation corresponds to the chemical analysis results.CEDM Nozzle 30 is on the periphery of the leaka e area.View -000 View -090* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material, apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion. erosion* Minor staining within the annulus. 0 Minor staining within the annulus" No debris is visible within the annulus. 0 No debris is visible within the annulus.View -180 View -270* Fillet of the annulus is smooth with no
  • Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* No staining visible within the annulus
  • Minor staining within the annulus" No debris is visible within the annulus. 0 No debris is visible within the annulus.

LIC-1 5-0071 Attachment 2 Page 32 CEDM Nozzle 31 No sample was taken from CEDM Nozzle 31. It is expected some accumulation would be present based on the location of the penetration because the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 was above the annulus region. CEDM Nozzle 31 is located near CEDM Nozzles 3, 8 and 19 on the periphery.

View -000 View -090" Fillet of the annulus is smooth with no apparent build-up or reduction in material* No indication of wastage or surface erosion* Very small quantity of apparent debris found to be lint or paint flecks, is present in the annulus. This debris did not preclude the ability to successfully complete the required VE exam* No staining visible in annulus 0 0 0 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material No indication of wastage or surface erosion Minor staining within the annulus Very small quantity of apparent debris found to be lint or paint flecks, is present in the annulus. This debris did not preclude the ability to successfully complete the required VE exam View -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" Minor staining within the annulus 0 Minor staining identified in the annulus* Very small quantity of apparent debris 0 Very small quantity of apparent debris found to be lint or paint flecks, is present in found to be lint, is present in the annulus.the annulus. This debris did not preclude This debris did not preclude the ability to the ability to successfully complete the successfully complete the required VE required VE exam exam LIC-1 5-0071 Attachment 2 Page 33 CEDM Nozzle 32 No sample was taken from CEDM Nozzle 32. It is expected some accumulation would be present based on the location of the penetration because the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 was above the annulus region. CEDM Nozzle 32 is located near CEDM Nozzles 3, 8 and 19, on the periphery.

View -000 View -090* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* No visible staining within the annulus

  • Minor staining within the annulus* Very small quantity of apparent debris a Very small quantity of apparent debris found to be lint, is present in the annulus. found to be hardened CCW deposits is This debris did not preclude the ability to present in the annulus. CEDM Nozzle 32 is successfully complete the required VE in the CCW leakage flowpath, this debris exam did not preclude the ability to successfully complete the required VE exam View -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Minor staining within the annulus.
  • No staining identified in the annulus.* Very small quantity of apparent debris 0 Very small quantity of apparent debris found to be lint or paint flecks, is present in found to be lint or paint flecks, is present in the annulus. This debris did not preclude the annulus. This debris did not preclude the ability to successfully complete the the ability to successfully complete the required VE exam required VE exam LIC-1 5-0071 Attachment 2 Page 34 CEDM Nozzle 33 No sample was taken from CEDM Nozzle 33. Accumulation is expected to be present based on the location of the penetration because of the proximity to the leak from the ICI 44 Graylock castlenuts.

A spray pattern was evident on nearby penetrations from the leak on ICI 44 and CEDM Nozzle 33 is directly in front of ICI 44.View -000 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in" No indication of wastage or surface material erosion 0 No indication of wastage or surface" Minor staining within the annulus erosion" No debris visible in the annulus to obstruct 0 No staining identified in the annulus.successful visual examination

  • No debris visible in the annulus to obstruct successful visual examination View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" Minor staining within the annulus
  • No staining identified in the annulus.* No debris visible in the annulus to obstruct
  • Very small quantity of apparent debris successful visual examination found to be lint or paint flecks, is present in the annulus. This debris did not preclude the ability to successfully complete the required VE exam LIC-1 5-0071 Attachment 2 Page 35 CEDM Nozzle 34 No sample was taken from CEDM Nozzle 34. Minor accumulation is expected to be present based on the location of the penetration because of the proximity to the leak from the ICI 44 Graylock castlenuts.

A spray pattern was evident on nearby penetrations from the leak on ICI 44. UILUM Nozzle 34 is on the periphery ot the pray region from IUI 44.View -000 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in apparent build-up or reduction in material material" No indication of wastage or surface

  • No indication of wastage or surface erosion erosion* Minor staining within the annulus
  • Minor staining within the annulus" Very small quantity of apparent debris 0 Very small quantity of apparent debris found to be lint, is present in the found to be lint, is present in the annulus. This debris did not preclude annulus. This debris did not preclude the ability to successfully complete the the ability to successfully complete the required VE exam. required VE exam View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in apparent build-up or reduction in material material" No indication of wastage or surface 9 No indication of wastage or surface erosion erosion" Very small quantity of apparent debris
  • Very small quantity of apparent debris found to be lint, is present in the found to be lint, is present in the annulus. This debris did not preclude annulus. This debris did not preclude the ability to successfully complete the the ability to successfully complete the required VE exam required VE exam" Minor staining within the annulus
  • Minor staining within the annulus* A small amount of liquid water was present in the annulus LIC-1 5-0071 Attachment 2 Page 36 CEDM Nozzle 35 No sample was taken from CEDM Nozzle 35. Only trace amounts of deposit would be expected on CEDM Nozzle 35 because of its location away from the known leaks. Trace amounts are expected due to loose accumulation being circulated by ventilation.

View -000 View -090* Fillet of the annulus is smooth with no

  • Fillet of the annulus is smooth with no apparent build-up or reduction in apparent build-up or reduction in material material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Very small quantity of apparent debris 0 Very small quantity of apparent debris found to be lint, is present in the found to be lint, is present in the annulus. This debris did not preclude annulus. This debris did not preclude the ability to successfully complete the the ability to successfully complete the required VE exam required VE exam* Minor staining within the annulus
  • No staining identified in the annulus.View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in apparent build-up or reduction in material material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* No debris visible in the annulus to 9 No debris visible in the annulus to obstruct successful visual examination, obstruct successful visual examination.
  • No staining identified in the annulus. 0 Minor staining within the annulus* A small amount of liquid water was present in the annulus LIC-1 5-0071 Attachment 2 Page 37 CEDM Nozzle 36 No sample was taken from CEDM Nozzle 36. It is expected accumulation would be present based on the location of the penetration because of the proximity to the leak from the packing on RC-1 00, Reactor Vessel Head Vent Valve. CEDM Nozzle 36 is located directly in front of the RC-100.View -000 View -090* Fillet of the annulus is smooth with no
  • Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" Minor staining within the annulus
  • Very small quantity of apparent debris* Very small quantity of apparent debris found to be lint, is present in the annulus.found to be lint, is present in the annulus. This debris did not preclude the ability to This debris did not preclude the ability to successfully complete the required VE successfully complete the required VE exam exam.
  • Minor staining within the annulus View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface erosion
  • No indication of wastage or surface erosion" Very small quantity of apparent debris found 9 Very small quantity of apparent debris to be lint, is present in the annulus. This found to be lint, is present in the annulus.debris did not preclude the ability to This debris did not preclude the ability to successfully complete the required VE exam successfully complete the required VE" Minor staining within the annulus exam I Minor staining within the annulus LIC-15-0071 Attachment 2 Page 38 CEDM Nozzle 37 No sample was taken from CEDM Nozzle 37. It is expected accumulation would be present based on the location of the penetration because of the proximity to the leak from the packing on RC-100, Reactor Vessel Head Vent Valve. CEDM Nozzle 37 is located directly in the path of the RC-100 leakaae.View -000 View -090* Fillet of the annulus is smooth with no
  • Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Minor staining identified in the annulus. 0 Minor staining identified in the annulus.* No debris visible in the annulus to obstruct @ Very small quantity of apparent debris successful visual examination, found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam.View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface a No indication of wastage or surface erosion erosion" Minor staining identified in the annulus. 0 Minor staining identified in the annulus.* No debris visible in the annulus to obstruct
  • Very small quantity of apparent debris successful visual examination, found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam.

LIC-15-0071 Attachment 2 Page 39 CEDM Nozzle 38 A sample was taken with the following results: pH = 10.1. Isotopic results included evidence of Co-58, Co-60, Nb-95 and Cs-1 37. It is expected some accumulation would be present based on the location of the penetration because of the proximity to the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19. CEDM Nozzle 38 is located near CEDM Nozzles 3, 8 and 19 on the periDherv.

View -000 I View -090" Fillet of the annulus is smooth with no .Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" Minor staining within the annulus 0 Minor staining within the annulus* No debris visible in the annulus to obstruct

  • Very small quantity of apparent debris successful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam.View -180 View -270* Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
  • No indication of wastage or surface erosion erosion" Minor staining at the top of the photo of the 9 Minor staining at the bottom of the annulus annulus 0 Very small quantity of apparent debris" Very small quantity of apparent debris found to be lint, is present in the annulus.found to be lint, is present in the annulus. This debris did not preclude the ability to This debris did not preclude the ability to successfully complete the required VE successfully complete the required VE exam.exam.

LIC-1 5-0071 Attachment 2 Page 40 CEDM Nozzle 39 No sample was taken from CEDM Nozzle 39. It is expected some accumulation would be present based on the location of the penetration primarily from the leak from the ICI 44 Graylock castlenuts but also from the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19 above the annulus region. A spray pattern was evident on nearby penetrations from the leak on ICI 44.CEDM Nozzle 39 is located near ICI 44.View -000 View -090* Fillet of the annulus is smooth with no

  • Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* Minor staining within the annulus S No staining within the annulus* No debris visible in the annulus to obstruct
  • Very small quantity of apparent debris successful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam.View -180 View -270" Fillet of the annulus is smooth with no
  • Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" No staining identified in the annulus. & Minor staining within the annulus" No debris visible in the annulus to obstruct
  • Very small quantity of apparent debris successful visual examination found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam.

LIC-1 5-0071 Attachment 2 Page 41 CEDM Nozzle 40 No sample was taken from CEDM Nozzle 40. Only trace amounts of deposit would be expected on CEDM Nozzle 40 because of its location away from the known leaks. Trace amounts are expected due to loose accumulation being circulated by ventilation.

View -000 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" Very small quantity of apparent debris

  • Very small quantity of apparent debris found to be lint, is present in the annulus. found to be lint, is present in the annulus.This debris did not preclude the ability to This debris did not preclude the ability to successfully complete the required VE successfully complete the required VE exam. exam." Minor staining within the annulus
  • Minor staining within the annulus View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
  • No indication of wastage or surface erosion erosion" Very small quantity of apparent debris 0 No debris visible in the annulus to obstruct found to be lint, is present in the annulus. successful visual examination.

This debris did not preclude the ability to 9 Minor staining within the annulus successfully complete the required VE exam." Minor staining within the annulus LIC-15-0071 Attachment 2 Page 42 CEDM Nozzle 41 No sample was taken from CEDM Nozzle 41. It is expected accumulation would be present based on the location of the penetration because of the proximity to the leak from the packing on RC-1 00, Reactor Vessel Head Vent Valve. CEDM Nozzle 41 is located directly in front of the RC-I 00.View -000 View -090* Fillet of the annulus is smooth with no

  • Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface
  • No indication of wastage or surface erosion erosion" Minor staining within the annulus
  • Minor staining within the annulus" Very small quantity of apparent debris 9 No debris visible in the annulus to obstruct found to be lint, is present in the annulus. successful visual examination This debris did not preclude the ability to successfully complete the required VE exam.View -180 View -270* Fillet of the annulus is smooth with no
  • Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface
  • No indication of wastage or surface erosion erosion e Minor staining within the annulus* Minor staining within the annulus
  • No debris visible in the annulus to obstruct" Very small quantity of apparent debris successful visual examination.

found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam.

LIC-1 5-0071 Attachment 2 Page 43 ICI Nozzle 42 No sample was taken from ICI Nozzle 42. Only trace amounts of deposit would be expected on ICI Nozzle 42 because of its location away from the known leaks. Trace amounts are expected due to loose accumulation being circulated by ventilation.

View -000 View -090" Fillet of the annulus is mostly smooth with

  • Fillet of the annulus is smooth with no no apparent reduction in material apparent build-up or reduction in material" No indication of wastage or surface 9 No indication of wastage or surface erosion erosion" No debris visible in the annulus to obstruct 9 Very small quantity of apparent debris successful visual examination, found to be lint, is present in the annulus." Minor staining within the annulus This debris did not preclude the ability to* Signs of CCW deposits collected due to successfully complete the required VE water pooling in the bottom of the annulus exam.* Minor staining within the annulus View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
  • No indication of wastage or surface erosion erosion* Very small quantity of apparent debris
  • No debris visible in the annulus to obstruct found to be lint, is present in the annulus. successful visual examination.

This debris did not preclude the ability to

  • Minor staining within the annulus successfully complete the required VE exam.* Minor staining within the annulus LIC-1 5-0071 Attachment 2 Page 44 ICI Nozzle 43 No sample was taken from ICI Nozzle 43. It is expected accumulation would be present based on the location of the penetration because of the proximity to the CCW Flex Hose leak on CEDM Nozzles 3, 8 and 19. ICI Nozzle 43 is located directly downslope from CEDM Nozzles 3, 8 and 19.View -090 View -180 4.* Fillet of the annulus is smooth with no apparent build-up or reduction in material" No indication of wastage or surface erosion* Very small quantity of apparent debris found to be lint, is present in the annulus. This debris did not preclude the ability to successfully complete the required VE exam.* Minor staining within the annulus" Visible line where insulation interface occurs" Fillet of the annulus is smooth with no apparent build-up or reduction in material* No indication of wastage or surface erosion" No debris visible in the annulus to obstruct successful visual examination.
  • Minor staining within the annulus* Visible line where insulation interface occurs View -270 View -335" Fillet of the annulus is smooth with no 9 Fillet of the annulus is smooth with no apparent build-up or reduction in apparent build-up or reduction in material material 0 No indication of wastage or surface" No indication of wastage or surface erosion erosion 0 Very small quantity of apparent debris* Very small quantity of apparent found to be lint, is present in the annulus.debris found to be lint, is present in This debris did not preclude the ability to the annulus. This debris did not successfully complete the required VE preclude the ability to successfully exam.complete the required VE exam. 0 Minor staining within the annulus* Minor staining within the annulus a Visible line where insulation interface occurs LIC-15-0071 Attachment 2 Page 45 ICI Nozzle 44 No sample was taken from ICI Nozzle 44. Significant accumulation is expected on ICI Nozzle 44 due to the leak from the Graylock castlenuts on this nozzle.View -000 View -090* Fillet of the annulus is smooth with no
  • Fillet of the annulus is smooth with no apparent build-up or reduction in apparent build-up or reduction in material material 0 No indication of wastage or surface" No indication of wastage or surface erosion erosion
  • Minor staining within the annulus" Minor staining within the annulus & Very small quantity of apparent debris" No debris visible in the annulus to found to be lint, is present in the annulus.obstruct successful visual This debris did not preclude the ability to examination, successfully complete the required VE exam.& Visible line where insulation interface occurs View -180 View -270* Fillet of the annulus is smooth with no e Fillet of the annulus is smooth with no apparent build-up or reduction in apparent build-up or reduction in material material 0 No indication of wastage or surface* No indication of wastage or surface erosion erosion
  • Minor staining within the annulus* Minor staining within the annulus 0 No debris visible in the annulus to" Very small quantity of apparent obstruct successful visual examination.

debris found to be lint, is present in the annulus. This debris did not preclude the ability to successfully complete the required VE exam.

LIC-1 5-0071 Attachment 2 Page 46 ICl Nozzle 45 No sample was taken from ICI Nozzle 45. Significant accumulation is expected on ICI Nozzle 45 due to the leak from the Graylock castlenuts directly across from this nozzle.Y View -090 View -180" Fillet of the annulus is smooth with no apparent build-up or reduction in material* No indication of wastage or surface erosion" A small quantity of liquid water can be seen in the annulus* Very small quantity of apparent debris found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam." Minor staining within the annulus* Fillet of the annulus is smooth with no apparent build-up or reduction in material" No indication of wastage or surface erosion* A small quantity of liquid water can be seen in the annulus" No debris visible in the annulus to obstruct successful visual examination.

  • Minor staining within the annulus View -270 View -335 4" Fillet of the annulus is smooth with no apparent build-up or reduction in material* No indication of wastage or surface erosion" Very small quantity of apparent debris found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam.* Minor staining within the annulus" Fillet of the annulus is smooth with no apparent build-up or reduction in material" No indication of wastage or surface erosion" Very small quantity of apparent debris found to be lint, is present in the annulus.This debris did not preclude the ability to successfully complete the required VE exam.* Minor staining within the annulus I.

LIC-1 5-0071 Attachment 2 Page 47 ICI Nozzle 46 No sample was taken from ICI Nozzle 46. It is expected accumulation would be present based on the location of the penetration because of the proximity to the leak from the packing on RC-100, Reactor Vessel Head Vent Valve. ICI Nozzle 46 is located directly in the path of the RC-100 leakage.View -000 View -090# Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material o No indication of wastage or surface

  • No indication of wastage or surface erosion erosion# No debris visible in the annulus to obstruct
  • No debris visible in the annulus to obstruct successful visual examination, successful visual examination.

o Minor staining within the annulus 0 Minor staining within the annulus 0 Apparent white line around annulus was determined to be a reflection following additional inspections View -180 View -270" Fillet of the annulus is smooth with no

  • Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface
  • No indication of wastage or surface erosion erosion" No debris visible in the annulus to obstruct
  • No debris visible in the annulus to obstruct successful visual examination.

successful visual examination.

  • Minor staining within the annulus 0 Minor staining within the annulus* A small quantity of liquid water can be seen in the annulus LI C- 15-0071 Attachment 2 Page 48 ICI Nozzle 47 No sample was taken from ICI Nozzle 47. It is expected accumulation would be present based on the location of the penetration because of the proximity to the leak from the packing on RC-100, Reactor Vessel Head Vent Valve. ICI Nozzle 47 is located directly in the path of the RC-100 leakage.View -000 View -090* Fillet of the annulus is smooth with no .Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion* No debris visible in the annulus to obstruct
  • No debris visible in the annulus to obstruct successful visual examination, successful visual examination." Minor staining within the annulus 0 Minor staining within the annulus View -180 View -270" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material" No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" No debris visible in the annulus to obstruct
  • No debris visible in the annulus to obstruct successful visual examination, successful visual examination." Minor staining within the annulus 0 Minor staining within the annulus* Apparent white line around annulus was determined to be a reflection following additional inspections LIC-15-0071 Attachment 2 Page 49 RC-100 No sample was taken from the RC-1 00, Reactor Vessel Head Vent Valve penetration.

It is expected accumulation would be present due to the leakage from packing on RC-100.View -000 View -090" Fillet of the annulus is smooth with no 0 Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion" No staining identified in the annulus. 0 No staining identified in the annulus" A small piece of debris is visible but away

  • Very small quantity of apparent debris from the annulus. This debris did not found to be lint, is present in the annulus.preclude the ability to successfully This debris did not preclude the ability to complete the required VE exam. successfully complete the required VE exam.View- 180 View -270* Fillet of the annulus is smooth with no
  • Fillet of the annulus is smooth with no apparent build-up or reduction in material apparent build-up or reduction in material* No indication of wastage or surface 0 No indication of wastage or surface erosion erosion
  • No staining identified in the annulus.* No staining identified in the annulus.
  • A small piece of debris is visible but away* A small piece of debris is visible but away from the annulus. This debris did not from the annulus. This debris did not preclude the ability to successfully preclude the ability to successfully complete the required VE exam.complete the required VE exam..