ML15137A004

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - FCS: RAI Number 2 for RR-14, Rvh Leakage/Asme Code Case N-729-1
ML15137A004
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/15/2015
From: Lyon F
Plant Licensing Branch IV
To: Hansher B
Omaha Public Power District
References
TAC MF6206
Download: ML15137A004 (4)


Text

NRR-PMDAPEm Resource From: Lyon, Fred Sent: Friday, May 15, 2015 4:24 PM To: bhansher@oppd.com; medwards@oppd.com; SIMPKIN, TERRENCE W (twsimpkin@oppd.com)

Cc: Alley, David; Collins, Jay; Tsao, John; Cumblidge, Stephen; Schneider, Max; Gepford, Heather; Miller, Geoffrey; Hagar, Bob; Anchondo, Isaac; Baquera, Mica; Markley, Michael; Wilson, George; Lund, Louise; Ross-Lee, MaryJane; Lubinski, John

Subject:

FCS: RAI Number 2 for RR-14, RVH Leakage/ASME Code Case N-729-1 (TAC No. MF6206)

REQUEST FOR ADDITIONAL INFORMATION OMAHA PUBLIC POWER DISTRICT FORT CALHOUN STATION, UNIT NO. 1 DOCKET NO. 50-285 By letter dated May 9, and supplemented May 13, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML15129A004 and ML15135A387, respectively), Omaha Public Power District submitted RR-14 for Fort Calhoun Station, Unit 1.

The NRC staff has reviewed the information provided in your application and determined that the additional information below is required in order to complete its formal review.

1. Please provide the photographs and descriptions of all nozzles for which foreign material was identified. Please ensure that the photos cover 360 degrees for each nozzle.
2. Please provide the calculations supporting the time to nozzle ejection included in previous submissions.
3. For each nozzle which exhibited foreign material near the annulus, including staining, please identify the source of the material and provide a justification for the leakage being from that source (e.g., a chemical and/or isotopic analysis of the material at the annulus showing the material to be inconsistent with RCS chemistry; evidence that the material is non-adherent, or evidence that a leakage path exists from a point above each nozzle under consideration to a point below the nozzle such that it is reasonable to conclude that fluid would have entered the annulus of the nozzle under consideration).
4. The EPRI publication Materials Reliability Program: Reactor Vessel Closure Head Penetration Safety Assessment for U.S. Pressurized Water Reactor (PWR) Plants (MRP-110) Evaluations Supporting the MRP Inspection Plan identifies the leakage required to cause wastage of the carbon steel to be caused by a leak rate of 0.1 gpm. Please include the following as compensatory measures in the proposed alternative, or provide a technical basis as to why the following compensatory measures would not be required to assure that less than 0.1 gallon per minute (gpm) is leaking through any control rod drive or ICI nozzles:
a. The use of administrative controls such that the plant would shut down on an unidentified leak rate greater than 0.1 gpm above a stable baseline, or the use of radiation monitoring equipment near the head and administrative controls over the equipment to shut down the plant at detected radiation levels equivalent to a leak rate of 0.1 gpm above a stable baseline.
b. Perform a bare-metal visual inspection on the upper head on the first outage of greater than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> which occurs after at least 4 months of operation in accordance with the criteria contained in ASME code case N-729-1.
c. At the next refueling outage, conduct UT/surface examinations of all nozzles.

1

5. Please provide the radiation dose estimate for completing supplemental UT/surface examinations, including the justification for the estimate. Also, please provide the dose estimate for the supplemental examinations as a percentage of the total outage dose estimate.

2

Hearing Identifier: NRR_PMDA Email Number: 2078 Mail Envelope Properties (Fred.Lyon@nrc.gov20150515162300)

Subject:

FCS: RAI Number 2 for RR-14, RVH Leakage/ASME Code Case N-729-1 (TAC No. MF6206)

Sent Date: 5/15/2015 4:23:47 PM Received Date: 5/15/2015 4:23:00 PM From: Lyon, Fred Created By: Fred.Lyon@nrc.gov Recipients:

"Alley, David" <David.Alley@nrc.gov>

Tracking Status: None "Collins, Jay" <Jay.Collins@nrc.gov>

Tracking Status: None "Tsao, John" <John.Tsao@nrc.gov>

Tracking Status: None "Cumblidge, Stephen" <Stephen.Cumblidge@nrc.gov>

Tracking Status: None "Schneider, Max" <Max.Schneider@nrc.gov>

Tracking Status: None "Gepford, Heather" <Heather.Gepford@nrc.gov>

Tracking Status: None "Miller, Geoffrey" <Geoffrey.Miller@nrc.gov>

Tracking Status: None "Hagar, Bob" <Bob.Hagar@nrc.gov>

Tracking Status: None "Anchondo, Isaac" <Isaac.Anchondo@nrc.gov>

Tracking Status: None "Baquera, Mica" <Mica.Baquera@nrc.gov>

Tracking Status: None "Markley, Michael" <Michael.Markley@nrc.gov>

Tracking Status: None "Wilson, George" <George.Wilson@nrc.gov>

Tracking Status: None "Lund, Louise" <Louise.Lund@nrc.gov>

Tracking Status: None "Ross-Lee, MaryJane" <MaryJane.Ross-Lee@nrc.gov>

Tracking Status: None "Lubinski, John" <John.Lubinski@nrc.gov>

Tracking Status: None "bhansher@oppd.com" <bhansher@oppd.com>

Tracking Status: None "medwards@oppd.com" <medwards@oppd.com>

Tracking Status: None "SIMPKIN, TERRENCE W (twsimpkin@oppd.com)" <twsimpkin@oppd.com>

Tracking Status: None Post Office:

Files Size Date & Time

MESSAGE 3134 5/15/2015 4:23:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: