{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303 | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303 | ||
-1257 September 1, | -1257 September 1, 201 5 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D | ||
-C Chattanooga, TN 37402 | -C Chattanooga, TN 37402 | ||
-2801 | -2801 | ||
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THE BROWNS FERRY NUCLEAR PLANT UNIT S 1, 2 and 3, NRC INSPECTION REPORT 005000 259/2015005, | SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THE BROWNS FERRY NUCLEAR PLANT UNIT S 1, 2 and 3 , NRC INSPECTION REPORT 005000 259/2015005 , 005000 260/2015005, and 005000 296/2015005 Dear Mr. Shea | ||
: On August 13, 2015, the NRC completed its mid | : On August 13, 2015, the NRC completed its mid | ||
-cycle performance review of Browns Ferry Nuclear Plant | -cycle performance review of Browns Ferry Nuclear Plant | ||
. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, | . The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 20 1 4 through June 30, 20 1 This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facilit The NRC determined that overall, Browns Ferry Nuclear Plant operated in a manner that preserved public health and safety and met all cornerstone objective The NRC determined the performance at Browns Ferry Nuclear Plant during the most recent quarter was within the Licensee Response Column of the NRC | ||
's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facilit The enclosed inspection plan lists the inspections scheduled through June 30, 201 Routine inspections performed by resident inspectors are not included in the inspection pla The inspections listed during the second half of the inspection plan are tentative and may be revised at the end | 's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facilit The enclosed inspection plan lists the inspections scheduled through June 30 , 201 Routine inspections performed by resident inspectors are not included in the inspection pla The inspections listed during the second half of the inspection plan are tentative and may be revised at the end | ||
-of-cycle performance revie The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change This inspection plan does not include security related inspections, which will be sent via separate, non | -of-cycle performance revie The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change This inspection plan does not include security related inspections, which will be sent via separate, non | ||
-publicly available correspondenc In addition to the routine ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include Inspection Procedure (IP) 43004, "Inspection of Commercial | -publicly available correspondenc In addition to the routine ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include Inspection Procedure (IP) 43004, "Inspection of Commercial | ||
-Grade Dedication Programs | -Grade Dedication Programs | ||
," and an initial operator license examinatio J. Shea 2 In response to the accident at Fukushima, the Commission issued Order EA | ," and an initial operator license examinatio J. Shea 2 In response to the accident at Fukushima, the Commission issued Order EA | ||
- | -1 2-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond | ||
-Design-Basis External Events." This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond | -Design-Basis External Events." This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond | ||
-design-basis external even Additionally, the Commission issued Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." This Order requires licensees to have a reliable means of remotely monitoring wide | -design-basis external even Additionally, the Commission issued Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." This Order requires licensees to have a reliable means of remotely monitoring wide | ||
Line 42: | Line 42: | ||
" In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC | " In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC | ||
's "Rules of Practice, | 's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | ||
" a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | |||
-rm/adams.html (the Public Electronic Reading Room). | -rm/adams.html (the Public Electronic Reading Room). | ||
Line 55: | Line 54: | ||
Browns Ferry Inspection/Activity Plan | Browns Ferry Inspection/Activity Plan | ||
(07/01/2015 | (07/01/2015 - 06/30/2017) | ||
- 06/30/2017) | |||
cc distribution via ListServ | cc distribution via ListServ | ||
_________________________ | _________________________ | ||
XSUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE BDB3 CRK1 AJB3 NAME BBISHOP CKONTZ ABLAMEY DATE 8/25/2015 8/25/2015 8/31/2015 E-MAIL COPY? | XSUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE BDB3 CRK1 AJB3 NAME BBISHOP CKONTZ ABLAMEY DATE 8/25/2015 8/25/2015 8/31/2015 E-MAIL COPY? | ||
YES NO YES NO YES NO YES NO YES NO YES NO J. Shea 3 Letter to Joseph Shea from Alan Blamey dated September 1, 2015 | YES NO YES NO YES NO YES NO YES NO YES NO J. Shea 3 Letter to Joseph Shea from Alan Blamey dated September 1, 2015 SUBJEC T: MID-CYCLE ASSESSMENT LETTER FOR THE BROWNS FERRY NUCLEAR PLANT UNIT S 1, 2 and 3, NRC INSPECTION REPORT 005000 259/2015005 , 005000 260/2015005, and 005000 296/2015005 DISTRIBUTION | ||
: D. Gamberoni, RII L. Gibson, RII | : D. Gamberoni, RII L. Gibson, RII | ||
OE Mail RIDSNRRDIRS PUBLIC A. Adams, NRR RidsNrrPMBrownsFerry Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO) | OE Mail RIDSNRRDIRS PUBLIC A. Adams, NRR RidsNrrPMBrownsFerry Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO) | ||
Page 1 of 2 09/01/2015 10:14: | Page 1 of 2 09/01/2015 10:14:23 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteBrowns FerryInspection / Activity Plan 09/01/2015 | ||
-06/30/2017OL EXAM-INITIAL LICENSE EXAM PREP | -06/30/2017OL EXAM-INITIAL LICENSE EXAM PREP 3 1 BROWNS FERRY NOVEMBER 2015 INITIAL EXAM AT POWER FACILITIES V23463 10/19/2015 10/23/2015 CDBI-COMPONENT DESIGN BASES INSPECTION 8 1, 2, 3 IP Component Design Bases Inspection7111121 10/19/2015 10/23/2015 1, 2, 3 IP Component Design Bases Inspection711112111/30/2015 12/04/2015 1, 2, 3 IP Component Design Bases Inspection7111121 12/14/2015 12/18/2015 EP-EP EXERCISE 6 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes711140411/02/201511/06/2015 1, 2, 3 IP Exercise Evaluation - Hostile Action (HA) Event711140711/02/201511/06/2015 1, 2, 3 IP Performance Indicator Verification7115111/02/201511/06/2015OL EXAM-INITIAL LICENSE EXAM 3 1 BROWNS FERRY NOVEMBER 2015 INITIAL EXAM AT POWER FACILITIES V2346311/16/2015 12/04/2015 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2, 3 IP Problem Identification and Resolution71152B 02/08/2016 02/12/2016 1, 2, 3 IP Problem Identification and Resolution71152B 02/22/2016 02/26/2016 RP-RAD HAZARDS ANALYSIS AND TRANSPORTATION 2 1, 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 02/29/2016 03/04/2016 1, 2, 3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 02/29/2016 03/04/2016 ISI-UNIT 3 IN-SERVICE INSPECTION 1 3 IP Inservice Inspection Activities - BWR7111108G 03/07/201603/11/2016 LR-UNIT 3 POST APPROVAL LR PHASE 1 2 3 IP Post-Approval Site Inspection for License Renewal 71003 03/07/201603/11/2016 EQ-ENVIRONMENTAL QUALIFICATION INSPECTION 3 1, 2, 3 IP Component Design Bases Inspection7111121 03/21/2016 03/25/2016 1, 2, 3 IP Component Design Bases Inspection711112104/11/2016 04/15/2016 EP-EP PROGRAM INSPECTION 2 1, 2, 3 IP Exercise Evaluation7111401 06/06/2016 06/10/2016 1, 2, 3 IP A lert and Notification System Testing7111402 06/06/2016 06/10/2016 1, 2, 3 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 06/06/2016 06/10/2016 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes7111404 06/06/2016 06/10/2016 1, 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 06/06/2016 06/10/2016 1, 2, 3 IP Performance Indicator Verification71151 06/06/2016 06/10/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedure Page 2 of 2 09/01/2015 10:14:23 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteBrowns FerryInspection / Activity Plan 09/01/2015 | ||
-06/30/2017 RP-RP PUBLIC RAD SAFETY BASELINE | -06/30/2017 RP-RP PUBLIC RAD SAFETY BASELINE 2 1, 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 06/13/2016 06/17/2016 1, 2, 3 IP Radiological Environmental Monitoring Program71124.07 06/13/2016 06/17/2016 1, 2, 3 IP Performance Indicator Verification71151 06/13/2016 06/17/2016 TFPI-TRIENNIEL FIRE PROTECTION INSPECTION 4 1, 2, 3 IP Fire Protection [Triennial]7111105T 07/25/2016 07/29/2016 1, 2, 3 IP Fire Protection [Triennial]7111105T 08/08/2016 08/12/2016OL RQ-REQUAL INSP 2 1, 2, 3 IP Licensed Operator Requalification Program7111111B 09/12/2016 09/16/2016 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - BWR7111108G 10/10/2016 10/14/2016 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - BWR7111108G 03/13/2017 03/17/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 1 3 1, 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/13/2017 03/17/2017 1, 2, 3 IP Occupational ALARA Planning and Controls71124.02 03/13/2017 03/17/2017 1, 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/13/2017 03/17/2017 1, 2, 3 IP Occupational Dose Assessment71124.04 03/13/2017 03/17/2017 1, 2, 3 IP Radiation Monitoring Instrumentation71124.05 03/13/2017 03/17/2017 1, 2, 3 IP Performance Indicator Verification71151 03/13/2017 03/17/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 2 2 1, 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/27/2017 03/31/2017 1, 2, 3 IP Occupational ALARA Planning and Controls71124.02 03/27/2017 03/31/2017 1, 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/27/2017 03/31/2017 1, 2, 3 IP Occupational Dose Assessment71124.04 03/27/2017 03/31/2017 1, 2, 3 IP Radiation Monitoring Instrumentation71124.05 03/27/2017 03/31/2017 1, 2, 3 IP Performance Indicator Verification71151 03/27/2017 03/31/2017 EP-EP EXERCISE 6 1, 2, 3 IP Exercise Evaluation7111401 06/26/2017 06/30/2017 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes7111404 06/26/2017 06/30/2017 1, 2, 3 IP Exercise Evaluation - Scenario Review7111408 06/26/2017 06/30/2017 1, 2, 3 IP Performance Indicator Verification71151 06/26/2017 06/30/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | ||
}} | }} |
Revision as of 23:09, 8 July 2018
ML15244B010 | |
Person / Time | |
---|---|
Site: | Browns Ferry |
Issue date: | 09/01/2015 |
From: | Blamey A J Division Reactor Projects II |
To: | Shea J W Tennessee Valley Authority |
References | |
IR 2015005 | |
Download: ML15244B010 (6) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
-1257 September 1, 201 5 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D
-C Chattanooga, TN 37402
-2801
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THE BROWNS FERRY NUCLEAR PLANT UNIT S 1, 2 and 3 , NRC INSPECTION REPORT 005000 259/2015005 , 005000 260/2015005, and 005000 296/2015005 Dear Mr. Shea
- On August 13, 2015, the NRC completed its mid
-cycle performance review of Browns Ferry Nuclear Plant
. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 20 1 4 through June 30, 20 1 This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facilit The NRC determined that overall, Browns Ferry Nuclear Plant operated in a manner that preserved public health and safety and met all cornerstone objective The NRC determined the performance at Browns Ferry Nuclear Plant during the most recent quarter was within the Licensee Response Column of the NRC
's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facilit The enclosed inspection plan lists the inspections scheduled through June 30 , 201 Routine inspections performed by resident inspectors are not included in the inspection pla The inspections listed during the second half of the inspection plan are tentative and may be revised at the end
-of-cycle performance revie The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change This inspection plan does not include security related inspections, which will be sent via separate, non
-publicly available correspondenc In addition to the routine ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include Inspection Procedure (IP) 43004, "Inspection of Commercial
-Grade Dedication Programs
," and an initial operator license examinatio J. Shea 2 In response to the accident at Fukushima, the Commission issued Order EA
-1 2-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond
-Design-Basis External Events." This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond
-design-basis external even Additionally, the Commission issued Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." This Order requires licensees to have a reliable means of remotely monitoring wide
-range Spent Fuel Pool levels to support effective prioritization of even t mitigation and recovery actions in the event of a beyond
-design-basis external even The NRC is conducting audits of licensee efforts towards compliance with these Orders
. The audit was completed for Browns Ferry in January of 2015, and the information gathered will aid staff in development of the Safety Evaluation for the sit After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issue Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above performing TI 191:
"Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi
-Unit Dose Assessment Plans.
" In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC
's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4415 with any questions you have regarding this lette
Sincerely,/RA/
Alan Blamey, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.:
50-259, 50-260, 50-296 License No DPR-33, DPR-52, DPR-68
Enclosure:
Browns Ferry Inspection/Activity Plan
(07/01/2015 - 06/30/2017)
cc distribution via ListServ
_________________________
XSUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE BDB3 CRK1 AJB3 NAME BBISHOP CKONTZ ABLAMEY DATE 8/25/2015 8/25/2015 8/31/2015 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO J. Shea 3 Letter to Joseph Shea from Alan Blamey dated September 1, 2015 SUBJEC T: MID-CYCLE ASSESSMENT LETTER FOR THE BROWNS FERRY NUCLEAR PLANT UNIT S 1, 2 and 3, NRC INSPECTION REPORT 005000 259/2015005 , 005000 260/2015005, and 005000 296/2015005 DISTRIBUTION
- D. Gamberoni, RII L. Gibson, RII
OE Mail RIDSNRRDIRS PUBLIC A. Adams, NRR RidsNrrPMBrownsFerry Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
Page 1 of 2 09/01/2015 10:14:23 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteBrowns FerryInspection / Activity Plan 09/01/2015
-06/30/2017OL EXAM-INITIAL LICENSE EXAM PREP 3 1 BROWNS FERRY NOVEMBER 2015 INITIAL EXAM AT POWER FACILITIES V23463 10/19/2015 10/23/2015 CDBI-COMPONENT DESIGN BASES INSPECTION 8 1, 2, 3 IP Component Design Bases Inspection7111121 10/19/2015 10/23/2015 1, 2, 3 IP Component Design Bases Inspection711112111/30/2015 12/04/2015 1, 2, 3 IP Component Design Bases Inspection7111121 12/14/2015 12/18/2015 EP-EP EXERCISE 6 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes711140411/02/201511/06/2015 1, 2, 3 IP Exercise Evaluation - Hostile Action (HA) Event711140711/02/201511/06/2015 1, 2, 3 IP Performance Indicator Verification7115111/02/201511/06/2015OL EXAM-INITIAL LICENSE EXAM 3 1 BROWNS FERRY NOVEMBER 2015 INITIAL EXAM AT POWER FACILITIES V2346311/16/2015 12/04/2015 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2, 3 IP Problem Identification and Resolution71152B 02/08/2016 02/12/2016 1, 2, 3 IP Problem Identification and Resolution71152B 02/22/2016 02/26/2016 RP-RAD HAZARDS ANALYSIS AND TRANSPORTATION 2 1, 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 02/29/2016 03/04/2016 1, 2, 3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 02/29/2016 03/04/2016 ISI-UNIT 3 IN-SERVICE INSPECTION 1 3 IP Inservice Inspection Activities - BWR7111108G 03/07/201603/11/2016 LR-UNIT 3 POST APPROVAL LR PHASE 1 2 3 IP Post-Approval Site Inspection for License Renewal 71003 03/07/201603/11/2016 EQ-ENVIRONMENTAL QUALIFICATION INSPECTION 3 1, 2, 3 IP Component Design Bases Inspection7111121 03/21/2016 03/25/2016 1, 2, 3 IP Component Design Bases Inspection711112104/11/2016 04/15/2016 EP-EP PROGRAM INSPECTION 2 1, 2, 3 IP Exercise Evaluation7111401 06/06/2016 06/10/2016 1, 2, 3 IP A lert and Notification System Testing7111402 06/06/2016 06/10/2016 1, 2, 3 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 06/06/2016 06/10/2016 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes7111404 06/06/2016 06/10/2016 1, 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 06/06/2016 06/10/2016 1, 2, 3 IP Performance Indicator Verification71151 06/06/2016 06/10/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedure Page 2 of 2 09/01/2015 10:14:23 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteBrowns FerryInspection / Activity Plan 09/01/2015
-06/30/2017 RP-RP PUBLIC RAD SAFETY BASELINE 2 1, 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 06/13/2016 06/17/2016 1, 2, 3 IP Radiological Environmental Monitoring Program71124.07 06/13/2016 06/17/2016 1, 2, 3 IP Performance Indicator Verification71151 06/13/2016 06/17/2016 TFPI-TRIENNIEL FIRE PROTECTION INSPECTION 4 1, 2, 3 IP Fire Protection [Triennial]7111105T 07/25/2016 07/29/2016 1, 2, 3 IP Fire Protection [Triennial]7111105T 08/08/2016 08/12/2016OL RQ-REQUAL INSP 2 1, 2, 3 IP Licensed Operator Requalification Program7111111B 09/12/2016 09/16/2016 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - BWR7111108G 10/10/2016 10/14/2016 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - BWR7111108G 03/13/2017 03/17/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 1 3 1, 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/13/2017 03/17/2017 1, 2, 3 IP Occupational ALARA Planning and Controls71124.02 03/13/2017 03/17/2017 1, 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/13/2017 03/17/2017 1, 2, 3 IP Occupational Dose Assessment71124.04 03/13/2017 03/17/2017 1, 2, 3 IP Radiation Monitoring Instrumentation71124.05 03/13/2017 03/17/2017 1, 2, 3 IP Performance Indicator Verification71151 03/13/2017 03/17/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 2 2 1, 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/27/2017 03/31/2017 1, 2, 3 IP Occupational ALARA Planning and Controls71124.02 03/27/2017 03/31/2017 1, 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/27/2017 03/31/2017 1, 2, 3 IP Occupational Dose Assessment71124.04 03/27/2017 03/31/2017 1, 2, 3 IP Radiation Monitoring Instrumentation71124.05 03/27/2017 03/31/2017 1, 2, 3 IP Performance Indicator Verification71151 03/27/2017 03/31/2017 EP-EP EXERCISE 6 1, 2, 3 IP Exercise Evaluation7111401 06/26/2017 06/30/2017 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes7111404 06/26/2017 06/30/2017 1, 2, 3 IP Exercise Evaluation - Scenario Review7111408 06/26/2017 06/30/2017 1, 2, 3 IP Performance Indicator Verification71151 06/26/2017 06/30/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.