{{#Wiki_filter:N!Nebraska Public Power DistrictAlways there when you need usNLS2015133 December 21, 2015U.S. Nuclear Regulatory Commission Attention:
{{#Wiki_filter:N!Nebraska Public Power District Always there when you need us NLS2015133 December 21, 2015 U.S. Nuclear Regulatory Commission Attention:
Document Control DeskWashington, D.C. 20555-0001
Document Control Desk Washington, D.C. 20555-0001


==Subject:==
==Subject:==
 
Response to Nuclear Regulatory Commission Request for Additional Information for Relief Request for Fifth Ten-Year Inservice Inspection Interval, RI5-02 Cooper Nuclear Station, Docket No. 50-298, DPR-46  
Response to Nuclear Regulatory Commission Request for Additional Information for Relief Request for Fifth Ten-Year Inservice Inspection  
: Interval, RI5-02Cooper Nuclear Station, Docket No. 50-298, DPR-46


==References:==
==References:==
: 1. Email from Thomas Wengert, Nuclear Regulatory Commission, to Jim Shaw,Nebraska Public Power District, dated November 19, 2015, "Cooper -10CFR50.55a Request for Fifth Ten-Year Inservice Inspection  
: 1. Email from Thomas Wengert, Nuclear Regulatory Commission, to Jim Shaw, Nebraska Public Power District, dated November 19, 2015, "Cooper -10CFR 50.55a Request for Fifth Ten-Year Inservice Inspection Interval, RI5-02 (CAC No. MF6336)" 2. Letter from Oscar A. Limpias, Nebraska Public Power District, to the U.S.Nuclear Regulatory Commission, dated June 9, 2015, "10 CFR 50.55a Requests for Fifth Ten-Year Inservice Inspection Interval" (ML15167A066)
: Interval, RI5-02(CAC No. MF6336)"2. Letter from Oscar A. Limpias, Nebraska Public Power District, to the U.S.Nuclear Regulatory Commission, dated June 9, 2015, "10 CFR 50.55aRequests for Fifth Ten-Year Inservice Inspection Interval" (ML15167A066)


==Dear Sir or Madam:==
==Dear Sir or Madam:==
The purpose of this letter is for the Nebraska Public Power District to respond to the NuclearRegulatory Commnission's Request for Additional Information (RAI) (Reference  
The purpose of this letter is for the Nebraska Public Power District to respond to the Nuclear Regulatory Commnission's Request for Additional Information (RAI) (Reference  
: 1) related to theCooper Nuclear Station "10 CFR 50.55a Requests for Fifth Ten-Year Inservice Inspection Interval" (Reference 2).The response to the specific RAI question is provided in the attachment to this letter.This letter does not contain any new regulatory commitments.
: 1) related to the Cooper Nuclear Station "10 CFR 50.55a Requests for Fifth Ten-Year Inservice Inspection Interval" (Reference 2).The response to the specific RAI question is provided in the attachment to this letter.This letter does not contain any new regulatory commitments.
If you have any questions concerning this matter, please contact Jim Shaw, Licensing Manager,at (402) 825-2788.
If you have any questions concerning this matter, please contact Jim Shaw, Licensing Manager, at (402) 825-2788.Vice President  
Vice President  
-Nuclear and Chief Nuclear Officer POBox. 9 / Bwnil, N 8321-098 M Tele phone: (402) 825-3811 /Fax:. (402) 825-5211 www.nppd.com NLS2015 133 Page 2 of 2/dv  
-Nuclearand Chief Nuclear OfficerPOBox. 9 / Bwnil, N 8321-098 MTele phone: (402) 825-3811  
/Fax:. (402) 825-5211www.nppd.com NLS2015 133Page 2 of 2/dv


==Attachment:==
==Attachment:==


Response to Nuclear Regulatory Commission Request for Additional Information for 10 CFR 50.55a Request for Fifth Ten-Year Inservice Inspection
Response to Nuclear Regulatory Commission Request for Additional Information for 10 CFR 50.55a Request for Fifth Ten-Year Inservice Inspection Interval, RI5-02 cc: Regional Administrator w/ attachment USNRC -Region IV Cooper Project Manager wI/attachment USNRC -NRR Project Directorate IV- 1 Senior Resident Inspector wI/attachment USNRC -CNS NPG Distribution w/o attachment CNS Records w/ attachment NLS2015 133 Attachment Page 1 of 2 Attachment Response to Nuclear Regulatory Commission Request for Additional Information for 10 CFR 50.55a Request for Fifth Ten-Year Inservice Inspection Interval, R15-02 Cooper Nuclear Station, Docket No. 50-298, DPR-46 The Nuclear Regulatory Commission (NRC) request for additional information (RAL) regarding the 10 CFR 50.55a Request for Fifth Ten-Year Inservice Inspection Interval is shown in italics.The Nebraska Public Power District (NPPD) response to the request is shown in normal font.RAI November 9. 2015 E-mail In an e-mail dated September 16, 2015 (ADAMS Accession No. ML15259A5 79), the staff requested the following request for additional information (RAI) concerning the subject relief request submitted on June 9, 2015 (ADAMS Accession No. ML15167A066).
: Interval, RI5-02cc: Regional Administrator w/ attachment USNRC -Region IVCooper Project Manager wI/attachment USNRC -NRR Project Directorate IV- 1Senior Resident Inspector wI/attachment USNRC -CNSNPG Distribution w/o attachment CNS Records w/ attachment NLS2015 133Attachment Page 1 of 2Attachment Response to Nuclear Regulatory Commission Request for Additional Information for10 CFR 50.55a Request for Fifth Ten-Year Inservice Inspection  
RAI-1 and RAI-2 are not included.RAJ-3: Confirm whether a plant-specific leakage assessment was performed, as required by B WR VIP-18, B WR VIP-41, and BWR VIP- 76 for the internals at CNS [Cooper Nuclear Station] that accounts for the leakage from all internals that impact the ability to cool the core and maintain peak clad temperature (PCT) within allowed limits during postulated loss of coolant accidents.
: Interval, R15-02Cooper Nuclear Station, Docket No. 50-298, DPR-46The Nuclear Regulatory Commission (NRC) request for additional information (RAL) regarding the 10 CFR 50.55a Request for Fifth Ten-Year Inservice Inspection Interval is shown in italics.The Nebraska Public Power District (NPPD) response to the request is shown in normal font.RAINovember
Provide a summary of fall internal components included in the leakage assessment along with a summary of the following for each component: (a) the number and length of all cracks detected in past examinations for the component (b) the number and length of fall cracks evaluated in the leakage assessment (c) the calculated leak rate from each crack evaluated in the leakage assessment Confirm whether a plant-specific integrated leakage assessment (ifany) associated with the aforementioned R VI components was performed at CNS.In a letter dated October 21, 2015 (ADAMS Accession No. ML15301A249), the licensee sent a response to this RAI. The staff noted that the licensee did not provide information related to the following issue: "Confirm whether a plant-specific leakage assessment was performed, as required by B WR VIP-18, B WR VIP-41, and B WR VIP- 76 for the internals at CNS that accounts for the leakage from all internals that impact the ability to cool the core and maintain peak clad temperature (PCT) within allowed limits during postulated loss of coolant accidents."
: 9. 2015 E-mailIn an e-mail dated September 16, 2015 (ADAMS Accession No. ML15259A5 79), the staffrequested the following request for additional information (RAI) concerning the subject reliefrequest submitted on June 9, 2015 (ADAMS Accession No. ML15167A066).
NLS2015 133 Attachment Page 2 of 2 The NRC staff requests the licensee to provide this information.
RAI-1 and RAI-2are not included.
November 19. 2015 E-mail On November 9, 2015, the U.S. Nuclear Regulatory Commission (NRC) staff sent Nebraska Public Power District (the licensee) the draft request for additional information (RAI), provided below. This RA1 is related to the Cooper Nuclear Station (CNS) relief request concerning the fifth Ten-Year Inservice Inspection Interval, RIS5-02.A clarification conference call was conducted on November 10, 2015, between the NRC staff and CNS representatives.
RAJ-3: Confirm whether a plant-specific leakage assessment was performed, as requiredby B WR VIP-18, B WR VIP-41, and BWR VIP- 76 for the internals at CNS [CooperNuclear Station]
The topic for discussion during this call is related to RAI-3, which was initially sent to the licensee in an e-mail dated September 16, 2015 (ADAMS Accession No.ML15259A5 79).During the call, the licensee agreed to provide the following additional information related to RA1-3 : The staff requested that the licensee provide a brief summary of the plant-specific integrated leakage assessment considering the flaws in the core spray piping, ]et pumps, and core shroud (assuming through wall cracking).
that accounts for the leakage from all internals that impact theability to cool the core and maintain peak clad temperature (PCT) within allowedlimits during postulated loss of coolant accidents.
The licensee agreed to provide the requested information within 45 days of the date of the conference call.NPPD Response In the context of the integrated leakage assessment over one 24-month cycle, the leakage through core spray is conservatively calculated to be 104.2 gallons per minute (gpm) with an allowable limit of 117.5 gpm. For the jet pump DF-l flaw, the leakage was calculated to be 4.8 gpm with an allowable limit of 25 gpm. The CNS SAFER/GESTR-LOCA analysis assumed 100 gpm leakage in core spray, so adding the leakage of the jet pump diffuser of 25 gpm along with the postulated flaws in the core shroud of 1,250 gpm, the combined leakage would increase the peak cladding temperature approximately 10 degrees Fahrenheit (0 F).The plant-specific integrated leakage assessment concluded that postulated leakage through the shroud at all eight horizontal welds and twenty-three vertical welds combined with leakage in the jet pump diffuser weld and core spray piping could increase the PCT analyzed in the CNS SAFER/GESTR-LOCA analysis by approximately 10 0 F, or from 2140°F to 2150 0 F but still below the 10 CFR 50.46(b) regulatory limit of 2200°F. The assessment, using conservative assumptions and BWRVIP methodology, demonstrated that leakage from these reactor pressure vessel internals over a 24-month cycle results in less than a 1% increase in PCT.}}
Provide a summary of fallinternal components included in the leakage assessment along with a summary ofthe following for each component:
(a) the number and length of all cracks detected in past examinations for thecomponent (b) the number and length of fall cracks evaluated in the leakage assessment (c) the calculated leak rate from each crack evaluated in the leakage assessment Confirm whether a plant-specific integrated leakage assessment (ifany) associated with the aforementioned R VI components was performed at CNS.In a letter dated October 21, 2015 (ADAMS Accession No. ML15301A249),
the licensee sent aresponse to this RAI. The staff noted that the licensee did not provide information related to thefollowing issue:"Confirm whether a plant-specific leakage assessment was performed, as required byB WR VIP-18, B WR VIP-41, and B WR VIP- 76 for the internals at CNS that accounts for theleakage from all internals that impact the ability to cool the core and maintain peak cladtemperature (PCT) within allowed limits during postulated loss of coolant accidents."
NLS2015 133Attachment Page 2 of 2The NRC staff requests the licensee to provide this information.
November  
: 19. 2015 E-mailOn November 9, 2015, the U.S. Nuclear Regulatory Commission (NRC) staff sent NebraskaPublic Power District (the licensee) the draft request for additional information (RAI), providedbelow. This RA1 is related to the Cooper Nuclear Station (CNS) relief request concerning thefifth Ten-Year Inservice Inspection  
: Interval, RIS5-02.A clarification conference call was conducted on November 10, 2015, between the NRC staff andCNS representatives.
The topic for discussion during this call is related to RAI-3, which wasinitially sent to the licensee in an e-mail dated September 16, 2015 (ADAMS Accession No.ML15259A5 79).During the call, the licensee agreed to provide the following additional information related toRA1-3 :The staff requested that the licensee provide a brief summary of the plant-specific integrated leakage assessment considering the flaws in the core spray piping, ]et pumps, and core shroud(assuming through wall cracking).
The licensee agreed to provide the requested information within 45 days of the date of the conference call.NPPD ResponseIn the context of the integrated leakage assessment over one 24-month cycle, the leakage throughcore spray is conservatively calculated to be 104.2 gallons per minute (gpm) with an allowable limit of 117.5 gpm. For the jet pump DF-l flaw, the leakage was calculated to be 4.8 gpm withan allowable limit of 25 gpm. The CNS SAFER/GESTR-LOCA analysis assumed 100 gpmleakage in core spray, so adding the leakage of the jet pump diffuser of 25 gpm along with thepostulated flaws in the core shroud of 1,250 gpm, the combined leakage would increase the peakcladding temperature approximately 10 degrees Fahrenheit (0F).The plant-specific integrated leakage assessment concluded that postulated leakage through theshroud at all eight horizontal welds and twenty-three vertical welds combined with leakage in thejet pump diffuser weld and core spray piping could increase the PCT analyzed in the CNSSAFER/GESTR-LOCA analysis by approximately 100F, or from 2140°F to 21500F but stillbelow the 10 CFR 50.46(b) regulatory limit of 2200°F. The assessment, using conservative assumptions and BWRVIP methodology, demonstrated that leakage from these reactor pressurevessel internals over a 24-month cycle results in less than a 1% increase in PCT.}}

Revision as of 17:06, 8 July 2018

Cooper - Response to Nuclear Regulatory Commission Request for Additional Information for Relief Request for Fifth Ten-Year Inservice Inspection Interval, R15-02
ML15364A013
Person / Time
Site: Cooper Entergy icon.png
Issue date: 12/21/2015
From: Limpias O A
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CAC MF6336, NLS2015133
Download: ML15364A013 (4)


Text

N!Nebraska Public Power District Always there when you need us NLS2015133 December 21, 2015 U.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C. 20555-0001

Subject:

Response to Nuclear Regulatory Commission Request for Additional Information for Relief Request for Fifth Ten-Year Inservice Inspection Interval, RI5-02 Cooper Nuclear Station, Docket No. 50-298, DPR-46

References:

1. Email from Thomas Wengert, Nuclear Regulatory Commission, to Jim Shaw, Nebraska Public Power District, dated November 19, 2015, "Cooper -10CFR 50.55a Request for Fifth Ten-Year Inservice Inspection Interval, RI5-02 (CAC No. MF6336)" 2. Letter from Oscar A. Limpias, Nebraska Public Power District, to the U.S.Nuclear Regulatory Commission, dated June 9, 2015, "10 CFR 50.55a Requests for Fifth Ten-Year Inservice Inspection Interval" (ML15167A066)

Dear Sir or Madam:

The purpose of this letter is for the Nebraska Public Power District to respond to the Nuclear Regulatory Commnission's Request for Additional Information (RAI) (Reference

1) related to the Cooper Nuclear Station "10 CFR 50.55a Requests for Fifth Ten-Year Inservice Inspection Interval" (Reference 2).The response to the specific RAI question is provided in the attachment to this letter.This letter does not contain any new regulatory commitments.

If you have any questions concerning this matter, please contact Jim Shaw, Licensing Manager, at (402) 825-2788.Vice President

-Nuclear and Chief Nuclear Officer POBox. 9 / Bwnil, N 8321-098 M Tele phone: (402) 825-3811 /Fax:. (402) 825-5211 www.nppd.com NLS2015 133 Page 2 of 2/dv

Attachment:

Response to Nuclear Regulatory Commission Request for Additional Information for 10 CFR 50.55a Request for Fifth Ten-Year Inservice Inspection Interval, RI5-02 cc: Regional Administrator w/ attachment USNRC -Region IV Cooper Project Manager wI/attachment USNRC -NRR Project Directorate IV- 1 Senior Resident Inspector wI/attachment USNRC -CNS NPG Distribution w/o attachment CNS Records w/ attachment NLS2015 133 Attachment Page 1 of 2 Attachment Response to Nuclear Regulatory Commission Request for Additional Information for 10 CFR 50.55a Request for Fifth Ten-Year Inservice Inspection Interval, R15-02 Cooper Nuclear Station, Docket No. 50-298, DPR-46 The Nuclear Regulatory Commission (NRC) request for additional information (RAL) regarding the 10 CFR 50.55a Request for Fifth Ten-Year Inservice Inspection Interval is shown in italics.The Nebraska Public Power District (NPPD) response to the request is shown in normal font.RAI November 9. 2015 E-mail In an e-mail dated September 16, 2015 (ADAMS Accession No. ML15259A5 79), the staff requested the following request for additional information (RAI) concerning the subject relief request submitted on June 9, 2015 (ADAMS Accession No. ML15167A066).

RAI-1 and RAI-2 are not included.RAJ-3: Confirm whether a plant-specific leakage assessment was performed, as required by B WR VIP-18, B WR VIP-41, and BWR VIP- 76 for the internals at CNS [Cooper Nuclear Station] that accounts for the leakage from all internals that impact the ability to cool the core and maintain peak clad temperature (PCT) within allowed limits during postulated loss of coolant accidents.

Provide a summary of fall internal components included in the leakage assessment along with a summary of the following for each component: (a) the number and length of all cracks detected in past examinations for the component (b) the number and length of fall cracks evaluated in the leakage assessment (c) the calculated leak rate from each crack evaluated in the leakage assessment Confirm whether a plant-specific integrated leakage assessment (ifany) associated with the aforementioned R VI components was performed at CNS.In a letter dated October 21, 2015 (ADAMS Accession No. ML15301A249), the licensee sent a response to this RAI. The staff noted that the licensee did not provide information related to the following issue: "Confirm whether a plant-specific leakage assessment was performed, as required by B WR VIP-18, B WR VIP-41, and B WR VIP- 76 for the internals at CNS that accounts for the leakage from all internals that impact the ability to cool the core and maintain peak clad temperature (PCT) within allowed limits during postulated loss of coolant accidents."

NLS2015 133 Attachment Page 2 of 2 The NRC staff requests the licensee to provide this information.

November 19. 2015 E-mail On November 9, 2015, the U.S. Nuclear Regulatory Commission (NRC) staff sent Nebraska Public Power District (the licensee) the draft request for additional information (RAI), provided below. This RA1 is related to the Cooper Nuclear Station (CNS) relief request concerning the fifth Ten-Year Inservice Inspection Interval, RIS5-02.A clarification conference call was conducted on November 10, 2015, between the NRC staff and CNS representatives.

The topic for discussion during this call is related to RAI-3, which was initially sent to the licensee in an e-mail dated September 16, 2015 (ADAMS Accession No.ML15259A5 79).During the call, the licensee agreed to provide the following additional information related to RA1-3 : The staff requested that the licensee provide a brief summary of the plant-specific integrated leakage assessment considering the flaws in the core spray piping, ]et pumps, and core shroud (assuming through wall cracking).

The licensee agreed to provide the requested information within 45 days of the date of the conference call.NPPD Response In the context of the integrated leakage assessment over one 24-month cycle, the leakage through core spray is conservatively calculated to be 104.2 gallons per minute (gpm) with an allowable limit of 117.5 gpm. For the jet pump DF-l flaw, the leakage was calculated to be 4.8 gpm with an allowable limit of 25 gpm. The CNS SAFER/GESTR-LOCA analysis assumed 100 gpm leakage in core spray, so adding the leakage of the jet pump diffuser of 25 gpm along with the postulated flaws in the core shroud of 1,250 gpm, the combined leakage would increase the peak cladding temperature approximately 10 degrees Fahrenheit (0 F).The plant-specific integrated leakage assessment concluded that postulated leakage through the shroud at all eight horizontal welds and twenty-three vertical welds combined with leakage in the jet pump diffuser weld and core spray piping could increase the PCT analyzed in the CNS SAFER/GESTR-LOCA analysis by approximately 10 0 F, or from 2140°F to 2150 0 F but still below the 10 CFR 50.46(b) regulatory limit of 2200°F. The assessment, using conservative assumptions and BWRVIP methodology, demonstrated that leakage from these reactor pressure vessel internals over a 24-month cycle results in less than a 1% increase in PCT.