|
|
Line 21: |
Line 21: |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
| REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 AND SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 (CAC NOS. MF7112 AND MF7113) | | REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 AND SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 (CAC NOS. MF7112 AND MF7113) |
|
| |
|
| ==Dear Mr. Repko:== | | ==Dear Mr. Repko:== |
| By letter dated November 19, 2015 (Agencywide Documents Access and Management System Accession (ADAMS) No. ML 15323A351 | | By letter dated November 19, 2015 (Agencywide Documents Access and Management System Accession (ADAMS) No. ML 15323A351 |
| ), you submitted an affidavit that you executed on November 19, 2015, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390: DPC-NE-3008-P, | | ), you submitted an affidavit that you executed on November 19, 2015, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390: DPC-NE-3008-P, 'Thermal-Hydraulic Models for Transient Analysis" (Proprietary) |
| 'Thermal-Hydraulic Models for Transient Analysis" (Proprietary) | | A nonproprietary copy of this document has been placed in the U.S. Nuclear Regulatory Commission (NRC) Public Document Room and added to the NRC Library in ADAMS. The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: 4.(ii)(a) |
| A nonproprietary copy of this document has been placed in the U.S. Nuclear Regulatory Commission (NRC) Public Document Room and added to the NRC Library in ADAMS. The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: | |
| 4.(ii)(a) | |
| The information requested to be withheld reveals distinguishing aspects of a process (or component, structure, tool, method, etc.) whose use by a vendor or consultant, without a license from Duke Energy, would constitute a competitive economic advantage to that 4.(ii)(c) | | The information requested to be withheld reveals distinguishing aspects of a process (or component, structure, tool, method, etc.) whose use by a vendor or consultant, without a license from Duke Energy, would constitute a competitive economic advantage to that 4.(ii)(c) |
| Use by a competitor of the information requested to be withheld would reduce the competitor's expenditure of resources, or improve its competitive | | Use by a competitor of the information requested to be withheld would reduce the competitor's expenditure of resources, or improve its competitive position, in the design, manufacture, shipment, installation assurance of quality or licensing of a similar product. |
| : position, in the design, manufacture,
| |
| : shipment, installation assurance of quality or licensing of a similar product.
| |
| R. Repko We have reviewed your application and the material in accordance with the requirements of 1 O CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. | | R. Repko We have reviewed your application and the material in accordance with the requirements of 1 O CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. |
| Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. | | Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. |
| Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. | |
| If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. | | If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. |
| If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. | | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. |
Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARML16012A1322016-02-0101 February 2016 Request for Withholding Information from Public Disclosure for H. B. Robinson Steam Electric Plant, Unit No. 2 and Shearon Harris Nuclear Power Plant, Unit 1 Project stage: Withholding Request Acceptance 2016-02-01
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 IR 05000400/20230042024-01-30030 January 2024 Integrated Inspection Report 05000400/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230032023-11-0909 November 2023 Integrated Inspection Report 05000400/2023003 IR 05000261/20230032023-11-0707 November 2023 Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23234A1702023-10-0303 October 2023 Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230052023-08-23023 August 2023 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400/2023005) ML23235A0552023-08-23023 August 2023 Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) ML23234A2542023-08-22022 August 2023 RQ Inspection Notification Letter IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 Integrated Inspection Report 05000261/2023002 IR 05000400/20234022023-07-26026 July 2023 Security Baseline Inspection Report 05000400/2023402 IR 05000400/20230022023-07-24024 July 2023 Integrated Inspection Report 05000400/2023002 IR 05000400/20234402023-07-17017 July 2023 Special Inspection Report 05000400/2023440 and Preliminary Greater than Green Finding and Apparent Violation Cover Letter IR 05000261/20234022023-05-30030 May 2023 Cyber Security Inspection Report 05000261/2023402 ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality IR 05000400/20243012023-05-15015 May 2023 Notification of Licensed Operator Initial Examination 05000400/2024301 IR 05000400/20230012023-05-10010 May 2023 Integrated Inspection Report 05000400 2023001 IR 05000400/20234042023-05-0404 May 2023 Cyber Security Inspection Report 05000400/2023404 IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23118A1392023-04-28028 April 2023 Submittal of Updated Final Safety Analysis Report (Amendment 65), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes IR 05000400/20234032023-04-0505 April 2023 Security Baseline Inspection Report 05000400/2023403 IR 05000400/20230102023-03-15015 March 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000400/2023010 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000400/20220062023-03-0101 March 2023 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2022006 IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final ML23033A5272023-02-0808 February 2023 Correction of Typographical Errors Incurred During Issuance of License Amendment No. 196 IR 05000400/20220042023-02-0707 February 2023 Integrated Inspection Report 05000400/2022004 ML23020A1252023-01-23023 January 2023 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000400/2023403) ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22339A1362022-12-0101 December 2022 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000400/20220032022-11-10010 November 2022 Integrated Inspection Report 05000400/2022003 IR 05000261/20220032022-11-0303 November 2022 Integrated Inspection Report 05000261 2022003 2024-01-08
[Table view] Category:Proprietary Information Review
MONTHYEARML22213A0682022-08-0505 August 2022 Request for Withholding Information from Public Disclosure for H. B. Robinson Steam Electric Plant, Unit 2 ML22125A1942022-05-12012 May 2022 Request for Withholding Information from Public Disclosure for H.B. Robinson Steam Electric Plant, Unit 2 ML21033B0842021-03-0303 March 2021 Request for Withholding Information from Public Disclosure ML20217L1272020-08-26026 August 2020 Request for Withholding Information from Public Disclosure ML20199M3812020-08-10010 August 2020 Request for Withholding Information from Public Disclosure for Shearon Harris Nuclear Power Plant, Unit 1 ML20070R6332020-03-16016 March 2020 Request for Withholding Information from Public Disclosure for Shearon Harris Nuclear Power Plant, Unit 1 ML18166A3222018-09-28028 September 2018 Request for Withholding of Proprietary Information from Public Disclosure for Shearon Harris Nuclear Power Plant, Unit 1, and H. B. Robinson Steam Electric Plant Unit No. 2 ML17332A4642017-12-21021 December 2017 Request for Withholding of Proprietary Information from Public Disclosure for Shearon Harris Nuclear Power Plant, Unit 1, and H. B. Robinson Steam Electric Plant Unit No. 2 ML17079A5372017-03-24024 March 2017 Request for Withholding of Proprietary Information from Public Disclosure ML16336A1212017-02-14014 February 2017 Request for Withholding of Proprietary Information from Public Disclosure ML16335A3442016-12-12012 December 2016 Request for Withholding Information from Public Disclosure ML16292A5222016-10-27027 October 2016 Request for Withholding Information from Public Disclosure H.B. Robinson Steam Electric Plant, Unit No. 2 and Shearon Harris Nuclear Power Plant (CAC Nos. MF6648 and MF6649) ML16145A1652016-06-24024 June 2016 Request for Withholding of Proprietary Information from Public Disclosure for Shearon Harris Nuclear Power Plant, Unit 1, and H. B. Robinson Steam Electric Plant Unit No. 2 ML16127A0562016-06-15015 June 2016 Shearon Harris Nuclear Plant, Unit 1- Request For Withholding Of Proprietary Information From Public Disclosure (CAC No. MF7195) ML16124A9962016-05-27027 May 2016 Request for Withholding of Proprietary Information from Public Disclosure for Shearon Harris Nuclear Power Plant, Unit 1, and H. B. Robinson Steam Electric Plant Unit No. 2 ML16040A2312016-02-29029 February 2016 Request for Withholding Information from Public Disclosure for Shearon Harris Nuclear Power Plant, Unit 1, and H.B. Robinson Steam Electric Plant, Unit 2 ML16012A1322016-02-0101 February 2016 Request for Withholding Information from Public Disclosure for H. B. Robinson Steam Electric Plant, Unit No. 2 and Shearon Harris Nuclear Power Plant, Unit 1 ML15328A0612015-12-16016 December 2015 Request for Withholding of Proprietary Information from Public Disclosure for Shearon Harris Nuclear Power Plant, Unit 1 and H. B. Robinson Steam Electric Plant Unit No. 2 ML15197A5052015-08-24024 August 2015 Request for Withholding Information from Public Disclosure ML15201A1872015-08-24024 August 2015 Request for Withholding Information from Public Disclosure ML15180A0812015-08-0707 August 2015 Request for Withholding of Proprietary Information from Public Disclosure ML15182A1832015-08-0707 August 2015 Request for Withholding of Proprietary Information from Public Disclosure ML15180A0722015-08-0707 August 2015 Request for Withholding of Proprietary Information from Public Disclosure ML15009A2842015-01-22022 January 2015 Request for Withholding of Proprietary Information from Public Disclosure ML12067A2322012-03-16016 March 2012 Request of Withholding Information from Public Disclosure ML11265A2632011-10-12012 October 2011 ISFSI, Shearon Harris Unit 1, H. B. Robinson, Unit 2, H. B. Robinson ISFSI, Crystal River, Unit 3, Request for Withholding Information from Public Disclosure ML1018303312010-07-26026 July 2010 Request for Withholding Information from Public Disclosure ML1010601022010-06-0909 June 2010 Request for Withholding Information from Public Disclosure ML1011305202010-05-0606 May 2010 Carolina Power and Light Company - Request for Withholding of Proprietary Information from Public Disclosure for the Shearon Harris Nuclear Power Plant, Unit 1 ML1007605692010-03-26026 March 2010 Carolina Power and Light Company - Request for Withholding of Proprietary Information from Public Disclosure for the Shearon Harris Nuclear Power Plant, Unit 1 ML1002809022010-01-29029 January 2010 Request for Withholding Information from Public Disclosure ML0918308732009-07-23023 July 2009 Request for Withholding Information from Public Disclosure ML0813100162008-05-16016 May 2008 Carolina Power and Light Company - Request for Withholding of Proprietary Information from Public Disclosure for Shearon Harris Nuclear Power Plant, Unit 1 ML0734606762008-01-16016 January 2008 Carolina Power and Light Company- Request for Withholding of Proprietary Information from Public Disclosure for H.B. Robinson Steam Electric Plant, Unit No. 2 TAC No. MD7468) ML0321207062003-07-30030 July 2003 Withholding of Proprietary Version of Westinghouse Electric Company'S Topical Reports WCAP-15628 & WCAP-15363, Revision 1 - Request for Withholding Information from Public Disclosure 2022-08-05
[Table view] |
Text
Mr. Regis T. Repko Senior Vice President UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 20555-0001 February 1, 2016 Governance, Projects and Engineering Duke Energy Corporation Mail Code EC07H P.O. Box 1006 Charlotte, NC 28201-1006
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 AND SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 (CAC NOS. MF7112 AND MF7113)
Dear Mr. Repko:
By letter dated November 19, 2015 (Agencywide Documents Access and Management System Accession (ADAMS) No. ML 15323A351
), you submitted an affidavit that you executed on November 19, 2015, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390: DPC-NE-3008-P, 'Thermal-Hydraulic Models for Transient Analysis" (Proprietary)
A nonproprietary copy of this document has been placed in the U.S. Nuclear Regulatory Commission (NRC) Public Document Room and added to the NRC Library in ADAMS. The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: 4.(ii)(a)
The information requested to be withheld reveals distinguishing aspects of a process (or component, structure, tool, method, etc.) whose use by a vendor or consultant, without a license from Duke Energy, would constitute a competitive economic advantage to that 4.(ii)(c)
Use by a competitor of the information requested to be withheld would reduce the competitor's expenditure of resources, or improve its competitive position, in the design, manufacture, shipment, installation assurance of quality or licensing of a similar product.
R. Repko We have reviewed your application and the material in accordance with the requirements of 1 O CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
R. Repko If you have any questions regarding this matter, I may be reached at (301) 415-2760 or Martha.Barillas@nrc.gov.
Docket Nos. 50-261 and 50-400 cc: Mr. Benjamin C. Waldrep Site Vice President Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road MIC HNP01 New Hill, NC 27562-0165 Mr. Richard Michael Glover Site Vice President H. B. Robinson Steam Electric Plant Duke Energy 3581 West Entrance Road, RNPA01 Hartsville, SC 29550 Additional Distribution via Listserv MJ. :arillas, Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation R. Repko If you have any questions regarding this matter, I may be reached at (301) 415-2760 or Martha. Barillas@nrc.gov.
Docket Nos. 50-261 and 50-400 cc: Mr. Benjamin C. Waldrep Site Vice President Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road M/C HNP01 New Hill, NC 27562-0165 Mr. Richard Michael Glover Site Vice President H.B. Robinson Steam Electric Plant Duke Energy 3581 West Entrance Road, RNPA01 Hartsville, SC 29550 Additional Distribution via Listserv DISTRIBUTION:
PUBLIC RidsACRS_MailCTR Resource RidsNrrPMShearonHarris Resource RidsNrrPMRobinson Resource Sincerely, IRA PBuckberg for/ Martha Barillas, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsNrrLABClayton Resource RidsNrrDssSnpb Resource RidsNrrDorlLpl2-2 Resource ADAMS Accession No.: ML 16012A132 OFFICE NRR/DORL/LPLll-2/PM NRR/DORL/LPLll-2/LA NRR/DSS/SNPB/BC NAME MBarillas (LRonewicz for) BClayton JDean DATE 1/21/2016 1/12/2016 1/21/2016 OFFICE NRR/DORL/LPLll-2/BC N RR/DORL/LPL!
1-2/PM NAME BBeasley (PBuckberg for) MBarillas DATE 1/22/2016 2/01/2016 OFFICIAL RECORD COPY