{{#Wiki_filter:STATEOFRHODEISLANDANDPROVIDENCE PLANTATIONS RhodeIslandAtomicEnergyCommission 16ReactorRoadNarragansett, Rl02882-1165 Telephone
{{#Wiki_filter:STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS Rhode Island Atomic Energy Commission 16 Reactor Road Narragansett, Rl 02882-1165 Telephone#401-874-2600 July 19, 2017 Docket No.50-193 Document Control Desk u.s.Nuclear Regulatory Commission (NRC)11555 Rockville Pike Rockville, Maryland 20852 Attn: Mr.Patrick Boyle, Project Manager
#401-874-2600 July19,2017DocketNo.50-193DocumentControlDesku.s.NuclearRegulatory Commission (NRC)11555Rockville PikeRockville, Maryland20852Attn:Mr.PatrickBoyle,ProjectManager


==DearMr.Boyle:==
==Dear Mr.Boyle:==
Thisletterandtheenclosures constitute theannualreportrequiredbytheRINSCTechnical Specifications (Section6.7.1).Enclosure 1providesreactoroperating statistics.
This letter and the enclosures constitute the annual report required by the RINSC Technical Specifications (Section 6.7.1).Enclosure 1 provides reactor operating statistics. provides information pertaining to unscheduled reactor shutdowns or scrams.Enclosure 3 discusses maintenance operations performed during the reporting period.Enclosure 4 describes changes to the facility carried out under the conditions of Section 50.59 of Chapter 10 of the Code of Federal Regulations.
Enclosure 2providesinformation pertaining tounscheduled reactorshutdowns orscrams.Enclosure 3discusses maintenance operations performed duringthereporting period.Enclosure 4describes changestothefacilitycarriedoutundertheconditions ofSection50.59ofChapter10oftheCodeofFederalRegulations.
Lastly, Enclosure 5 summarizes the radiological controls information.
Lastly,Enclosure 5summarizes theradiological controlsinformation.
If there are any questions regarding this information, please call me at 401-874-9442.
Ifthereareanyquestions regarding thisinformation, pleasecallmeat401-874-9442.
Sincerely, Paul W Martin Jr Reactor Supervisor Enclosures (5)Copy to: Mr.Craig Bassett, USNRC Dr.John J.Breen, Chairman, NRSC Dr.Clinton Chichester, Chairman, RIAEC Dr.Nancy Breen, RIAEC Mr.Howard Chun, RIAEC Dr.Yana K.Reshetnyak, RIAEC Dr.Nitin Padture, RIAEC   Reactor Operating Statistics Technical Specification Section 6.7.1.1 Month Year Operating MWHof Hours Operation July 2016 27.52 30.33 August 2016 32.47 31.50 September 2016 26.28 24.36 October 2016 14.40 16.57 November 2016 36.00 41.02 December 2016 30.45 37.36 January 2017 13.35 8.42 February 2017 52.95 54.38 March 2017 77.27 86.81 April 2017 123.42 206.18 May 2017 161.93 269.45 June 2017 154.38 261.78 Total FY2017 750.42 1068.15 MWH or 44.51 MWD Total Energy Output Since Initial Criticality 66,785.33 MWH or 2782.72 MWD ENCLOSURE 2 UNSCHEDULED SHUTDOWNS OR SCRAMS Technical Specification Section 6.7.1.2 Page 1 of 1 The following is a list of the unscheduled shutdowns or scrams that occurred during the 2016-2017 reporting period: Date Run Logbook Page Cause Description No.07/01016 9179 62 75 Watchdog Scrammed twice during start-up due to computer Scram communication error, had to reboot com device on the reactor bridge 07/20116 9183 62 80 Instrumentation Scrammed twice due to range isolator output for WR channell being irratic.Isolator was replaced.09/19116 9201 62 102 Operator Operator error during the performance of rod worth testing with trainee.09/22116 9202 62 104 Power surge Momentary loss of power to scram magnets attributed to AC power pertibations.
Sincerely, PaulWMartinJrReactorSupervisor Enclosures (5)Copyto:Mr.CraigBassett,USNRCDr.JohnJ.Breen,Chairman, NRSCDr.ClintonChichester,
11/03116 9212 62 115 Operator Auto scram while raising reactor power, range selection error.02/07117 9238 62 148 Instrumentation Short period Scram prior to reaching criticality due to signal noise.02/18/17 9239 62 149 Operator Auto scram while changing reactor operating mode for training.02/14117 9241 62 152 Equipment Manually scrammed due to exhaust blower motor failure failure, confmement ventilation inoperable to support reactor operation.
: Chairman, RIAECDr.NancyBreen,RIAECMr.HowardChun,RIAECDr.YanaK.Reshetnyak, RIAECDr.NitinPadture,RIAEC Enclosure 1ReactorOperating Statistics Technical Specification Section6.7.1.1MonthYearOperating MWHofHoursOperation July201627.5230.33August201632.4731.50September 201626.2824.36October201614.4016.57November201636.0041.02December201630.4537.36January201713.358.42February201752.9554.38March201777.2786.81April2017123.42206.18May2017161.93269.45June2017154.38261.78TotalFY2017750.421068.15MWHor44.51MWDTotalEnergyOutputSinceInitialCriticality 66,785.33 MWHor2782.72MWD ENCLOSURE 2UNSCHEDULED SHUTDOWNS ORSCRAMSTechnical Specification Section6.7.1.2Page1of1Thefollowing isalistoftheunscheduled shutdowns orscramsthatoccurredduringthe2016-2017 reporting period:DateRunLogbookPageCauseDescription No.07/0101691796275WatchdogScrammedtwiceduringstart-upduetocomputerScramcommunication error,hadtorebootcomdeviceonthereactorbridge07/2011691836280Instrumentation ScrammedtwiceduetorangeisolatoroutputforWRchannellbeingirratic.Isolatorwasreplaced.
02/16117 9244 62 155 Instrumentation Scram while raising blade 1, no indications, no known cause.02/21117 9245 63 1 Instrumentation Scram while raising blade 3, prior to reaching criticality due to signal noise.03/02117 9252 63 8 Instrumentation Scram while raising blade 1, prior to reaching criticality due to signal noise.03/07117 9255 63 11 Instrumentation Scram prior to reaching criticality due to signal noise.03/08117 9256 63 12 Instrumentation Short period Scram twice just after reaching criticality due to signal noise.03116117 9260 63 17 Instrumentation Operator manually scrammed reactor due to erratic indication on shim safety blade#2 05/04117 9287 63 46 Operator Operator inadvertently initiated a manual rundown.05117117 9292 63 52 Instrumentation Instrument rack 4 UPS pertibation caused loss of flow auto scram 05118117 9293 63 54 Instrumentation Instrument rack 4 UPS failure caused loss of flow auto scram 06129117 9314 63 77 Instrumentation Scram while raising blade 1, prior to reaching criticality due to signal noise.
09/19116920162102OperatorOperatorerrorduringtheperformance ofrodworthtestingwithtrainee.09/22116920262104PowersurgeMomentary lossofpowertoscrammagnetsattributed toACpowerpertibations.
ENCLOSURE 3 MAINTENANCE OPERATIONS Technical Specification 6.7.1.3 requires a listing of the major maintenance operations performed in the 2016-2017 reporting period including their impact upon the safe operation of the reactor and the reasons for the corrective maintenance.
11/03116921262115OperatorAutoscramwhileraisingreactorpower,rangeselection error.02/07117923862148Instrumentation ShortperiodScrampriortoreachingcriticality duetosignalnoise.02/18/17923962149OperatorAutoscramwhilechangingreactoroperating modefortraining.
The new stack radiation monitor was installed.
02/14117924162152Equipment Manuallyscrammedduetoexhaustblowermotorfailurefailure,confmement ventilation inoperable tosupportreactoroperation.
The new monitor is a significant upgrade and has the latest technology and far more capabilities than the old monitor.The current plan is that it will be placed in service as the primary stack monitor as soon as it has been made capable of indicating in the control room and the old monitor will continue to be maintained as a backup for as long as it continues to remain functional.
02/16117924462155Instrumentation Scramwhileraisingblade1,noindications, noknowncause.02/211179245631Instrumentation Scramwhileraisingblade3,priortoreachingcriticality duetosignalnoise.03/021179252638Instrumentation Scramwhileraisingblade1,priortoreachingcriticality duetosignalnoise.03/0711792556311Instrumentation Scrampriortoreachingcriticality duetosignalnoise.03/0811792566312Instrumentation ShortperiodScramtwicejustafterreachingcriticality duetosignalnoise.0311611792606317Instrumentation Operatormanuallyscrammedreactorduetoerraticindication onshimsafetyblade#205/0411792876346OperatorOperatorinadvertently initiated amanualrundown.0511711792926352Instrumentation Instrument rack4UPSpertibation causedlossofflowautoscram0511811792936354Instrumentation Instrument rack4UPSfailurecausedlossofflowautoscram0612911793146377Instrumentation Scramwhileraisingblade1,priortoreachingcriticality duetosignalnoise.
The Inlet Temperature Scram was implemented to comply with the new RINSe Technical Specifications that were approved as part of the re-licensing effort.
ENCLOSURE 3MAINTENANCE OPERATIONS Technical Specification 6.7.1.3requiresalistingofthemajormaintenance operations performed inthe2016-2017 reporting periodincluding theirimpactuponthesafeoperation ofthereactorandthereasonsforthecorrective maintenance.
ENCLOSURE 4 FACILITY CHANGES-10CFR50.59 REVIEW Technical Specification 6.7.1.4 requires that we provide a listing and description of any 10 CFR 50.59 evaluations conducted during the 2016-2017 reporting period.A 10 CFR 50.59 evaluation was performed on the following facility changes:*New stack radiation monitor*Inlet Temperature Scram implemented, Outlet Temperature Scram eliminated to comply with the new TS requirements.
Thenewstackradiation monitorwasinstalled.
*Area Radiation Monitor upgrade.Note: This screened out as no review required, however, at the last NRC inspection visit, it was strongly recommended that we do a review.After completing the review, a conference call was held to try to understand why we were asked to complete a review on something that clearly screened out as no review required.After coming to a better understanding of the configuration and operation of our facility, it was agreed that a review was not necessary or required.All three of these 50.59 reviews are attached.
Thenewmonitorisasignificant upgradeandhasthelatesttechnology andfarmorecapabilities thantheoldmonitor.Thecurrentplanisthatitwillbeplacedinserviceastheprimarystackmonitorassoonasithasbeenmadecapableofindicating inthecontrolroomandtheoldmonitorwillcontinuetobemaintained asabackupforaslongasitcontinues toremainfunctional.
ENCLOSURE 5 RADIOLOGICAL CONTROLS 1.Environmental Surveys outside the Facility-Technical Specification 6.7.1.6 Quarterly TLD1 badges are deployed outside the reactor building in three separate locations.
TheInletTemperature Scramwasimplemented tocomplywiththenewRINSeTechnical Specifications thatwereapprovedaspartofthere-licensing effort.
The quarterly doses in units of mrem are shown in the table below.LOCATION 3 rd QTR 4 th QTR 1 st QTR 2 nd QTR2016201620172017 Northeast Wall 8 4 a 16 Demineralizer Door 53 59 75 390 Heat Exchanger Door 26 39 53 171 The general public does not frequent these locations and therefore occupancy factors may be used to approximate annual dose.The allowable annual external dose must be below 100 mrem per year.Assuming that the maximum time that a member of the general public would be present in one of these locations is 10 minutes per day, an occupancy factor of 0.025 can be used to obtain the annual dose that would be received by a member of the general public, in any of these areas.The annual dose at the Northeast Wall, Demineralizer and Heat Exchanger Doors is dependent on the operations schedule of the reactor.Ignoring the fact that the dose rate is not present 24 hours per day, and applying the occupancy factor of 0.025 2 , the annual dose that would be receive by an individual in the demineralizer room would be 14.43 mrem.The dose received at the Heat Exchanger Door would be 7.23 mrem.The annual dose received at the Northeast wall would be 0.7 mrem.The variations from quarter to quarter and from previous reports are also due in part to movements of items within the reactor building during the fiscal year and varying use of the different irradiation facilities.
ENCLOSURE 4FACILITYCHANGES-10CFR50.59 REVIEWTechnical Specification 6.7.1.4requiresthatweprovidealistinganddescription ofany10CFR50.59evaluations conducted duringthe2016-2017 reporting period.A10CFR50.59evaluation wasperformed onthefollowing facilitychanges:*Newstackradiation monitor*InletTemperature Scramimplemented, OutletTemperature Scrameliminated tocomplywiththenewTSrequirements.
2.Annual Exposures Exceeding 500 mrem for facility members, 100 mrem for non-staff members or 10 mrem for members of the general public-Technical Specification 6.7.1.7 There were no personnel exposures greater than Technical Specification 6.7.1.7.requirements.
*AreaRadiation Monitorupgrade.Note:Thisscreenedoutasnoreviewrequired, however,atthelastNRCinspection visit,itwasstronglyrecommended thatwedoareview.Aftercompleting thereview,aconference callwasheldtotrytounderstand whywewereaskedtocompleteareviewonsomething thatclearlyscreenedoutasnoreviewrequired.
lThermoluminescent Dosimeter; Mirion Technology reads the dosimeters at minimum of 1 mrem.2 Occupancy factor was changed from 0.01 to 0.025.0.01 was derived using occupancy factor and use factor (it was assumed that the reactor is not running 8 hours every day).We will use 0.025, from NCRP 147 for Outdoors, unattended parking lots, attics, stairways, unattended elevators, janitor's closets.0.025 is more conservative number than 0.01.
Aftercomingtoabetterunderstanding oftheconfiguration andoperation ofourfacility, itwasagreedthatareviewwasnotnecessary orrequired.
3.Radioactive Effluents-Technical Specification 6.7.1.5 A.Individual gaseous effluent concentrations for each reactor operation are recorded on the Monthly Information Sheets (Form NSC-78).The concentration of radioactive materials in the effluent released from the facility exhaust stacks shall not exceed 1 E+05 times concentrations specified in 1 OCFR20, Appendix B, Table II, when averaged overtimeperiods permitted by 1 OCFR20.3 Gamma spectroscopy of stack gas samples has shown that the principal gaseous effluent is Argon-41.The maximum concentration for this principle contaminant permitted under Technical Specifications is 1 E-8 IJCi/cc x1 E+5=1 E-3 IJCi/cc.Average concentrations released during the year were less than 0.0683 of the limit.The total Argon-41 release during the reporting period was 149.54 curies.The calculated effective dose equivalent for this release is 3 mrem/year (COMPLY Code).The Comply Code report is attached.B.Liquid effluent concentrations released to the environment are documented on the Sewer Discharge Report (NSC-09).Each release was approved prior to discharge with its pH being within the acceptable range and with the sum of the fractions of the respective radioisotopes per month being below the discharge limit of 1.For the reporting period, the total volume of discharge was 1.84E7 ml.The isotopes and their relative activities discharged are given below.Radioisotope Total Activity Discharged (microcuries)
Allthreeofthese50.59reviewsareattached.
H-3 1720.1 C-14 60.15 Pb-214 2.86 Bi-214 5.58 K-40 34.56 3 Technical Specifications, Section 3.7.2.1 Attachment B 10 CFR 50.59 Review NSC-51 Date: Title: 1/27/17 Approved By: Stack Monitor Upgrade Michael J.Davis As an attachment to this form, provide a written description of the proposed modification, the purpose for making the modification, and a justification for the answer to each of the following questions:
ENCLOSURE 5RADIOLOGICAL CONTROLS1.Environmental SurveysoutsidetheFacility-Technical Specification 6.7.1.6Quarterly TLD1badgesaredeployedoutsidethereactorbuildinginthreeseparatelocations.
1.Does the change require a change to the Technical Specifications of the R-95 License?YN A review of the RINSe Technical Specifications indicates that: A.Section 3.7.1.1 Whenever the following operations are in progress:*The reactor is operating.
Thequarterly dosesinunitsofmremareshowninthetablebelow.LOCATION3rdQTR4thQTR1stQTR2ndQTR2016201620172017Northeast Wall84a16Demineralizer Door535975390HeatExchanger Door263953171Thegeneralpublicdoesnotfrequenttheselocations andtherefore occupancy factorsmaybeusedtoapproximate annualdose.Theallowable annualexternaldosemustbebelow100mremperyear.Assumingthatthemaximumtimethatamemberofthegeneralpublicwouldbepresentinoneoftheselocations is10minutesperday,anoccupancy factorof0.025canbeusedtoobtaintheannualdosethatwouldbereceivedbyamemberofthegeneralpublic,inanyoftheseareas.TheannualdoseattheNortheast Wall,Demineralizer andHeatExchanger Doorsisdependent ontheoperations scheduleofthereactor.Ignoringthefactthatthedoserateisnotpresent24hoursperday,andapplyingtheoccupancy factorof0.0252,theannualdosethatwouldbereceivebyanindividual inthedemineralizer roomwouldbe14.43mrem.ThedosereceivedattheHeatExchanger Doorwouldbe7.23mrem.TheannualdosereceivedattheNortheast wallwouldbe0.7mrem.Thevariations fromquartertoquarterandfrompreviousreportsarealsodueinparttomovements ofitemswithinthereactorbuildingduringthefiscalyearandvaryinguseofthedifferent irradiation facilities.
*Irradiated fuel handling is in progress.*Experiment handling is in progress for an experiment that has a significant fission product, or gaseous effluent activation product inventory.
2.AnnualExposures Exceeding 500mremforfacilitymembers,100mremfornon-staff membersor10mremformembersofthegeneralpublic-Technical Specification 6.7.1.7Therewerenopersonnel exposures greaterthanTechnical Specification 6.7.1.7.requirements.
*Any work on the core or control rods that could cause a reactivity change of more than 0.60%.l\k/k is in progress.*Any experiment movement that could cause a reactivity change of more than 0.60%.l\k/k is in progress.3.7.1.1.1 A minimum of one radiation monitor that is capable of warning personnel of high radiation levels in the confinement gaseous and particulate effluent (Table 3.2, Required Radiation Monitors, lines 1.1 and 1.2)shall be operating.
lThermoluminescent Dosimeter; MirionTechnology readsthedosimeters atminimumof1mrem.2Occupancy factorwaschangedfrom0.01to0.025.0.01wasderivedusingoccupancy factorandusefactor(itwasassumedthatthereactorisnotrunning8hourseveryday).Wewilluse0.025,fromNCRP147forOutdoors, unattended parkinglots,attics,stairways, unattended elevators, janitor's closets.0.025ismoreconservative numberthan0.01.
3.7.1.1.2 If the detector described in specification 3.7.1.1.1 fails during operation, within one hour, place in service a suitable alternative air monitor or begin an hourly grab sample analysis (grab sample analysis applies to particulate only)in lieu of having a functioning monitor.B.Section 3.7.1.2 3.7.1.2.1 The stack gaseous monitor shall alarm when radiation levels of the stack gas are 2.5 times normal levels, or greater.
3.Radioactive Effluents
3.7.1.2.2 The stack particulate monitor shall alarm when radiation levels of the stack particulates are 2 times normal levels, or greater.C.Section 3.7 Table 3-2 Required Radiation Monitors 3.2.1 Required Radiation Monitors Line Description Maximum Minimum Function Operating#Set Point Required Mode 1.1 Confinement 2.5 times 1 Indication and As per Building Exhaust normal alarm both 3.7.1.1.1 Stack Gaseous locally and in control room 1.2 Confinement 2 times 1 Indication and As per Building Exhaust normal alarm both 3.7.1.1.1 Stack Particulate locally and in control room The new stack monitor is capable of fulfilling all of the monitoring and alarm capabilities required by the Technical Specifications.
-Technical Specification 6.7.1.5A.Individual gaseouseffluentconcentrations foreachreactoroperation arerecordedontheMonthlyInformation Sheets(FormNSC-78).Theconcentration ofradioactive materials intheeffluentreleasedfromthefacilityexhauststacksshallnotexceed1E+05timesconcentrations specified in1OCFR20,AppendixB,TableII,whenaveragedovertimeperiods permitted by1OCFR20.3Gammaspectroscopy ofstackgassampleshasshownthattheprincipal gaseouseffluentisArgon-41.
Consequently, this change does not require a change to the Technical Specifications of the R-95 License.2.Could the change result in more than a minimal increase in the frequency of occurrence of an accident that has been previously evaluated in the SAR?YN This change involves replacing a radiation monitoring instrument which is not associated with any of the reactor safety systems and does not have any effect on reactor operation.
Themaximumconcentration forthisprinciple contaminant permitted underTechnical Specifications is1E-8IJCi/ccx1E+5=1E-3IJCi/cc.Averageconcentrations releasedduringtheyearwerelessthan0.0683ofthelimit.ThetotalArgon-41releaseduringthereporting periodwas149.54curies.Thecalculated effective doseequivalent forthisreleaseis3mrem/year (COMPLYCode).TheComplyCodereportisattached.
Consequently, this change will not increase the frequency of occurrence of an accident that has been previously evaluated in the SAR.3.Could the change result in more than a minimal increase in the likelihood of occurrence of a malfunction of a structure, system, or component that is important to safety and evaluated in the SAR?YN This change involves replacing a radiation monitoring instrument which is not associated with any of the reactor safety systems and does not have any effect on reactor operation.
B.Liquideffluentconcentrations releasedtotheenvironment aredocumented ontheSewerDischarge Report(NSC-09).
Consequently, this change will not increase the likelihood of occurrence of a malfunction of a structure, system, or component that is important to safety and evaluated in the SAR.4.Could the change result in more than a minimal increase in the consequences of an accident that is evaluated in the SAR?YN This change involves replacing a radiation monitoring instrument which is not associated with any of the reactor safety systems and does not have any effect on reactor operation.
Eachreleasewasapprovedpriortodischarge withitspHbeingwithintheacceptable rangeandwiththesumofthefractions oftherespective radioisotopes permonthbeingbelowthedischarge limitof1.Forthereporting period,thetotalvolumeofdischarge was1.84E7ml.Theisotopesandtheirrelativeactivities discharged aregivenbelow.Radioisotope TotalActivityDischarged (microcuries)
Consequently, this change will not increase the consequences of an accident that is evaluated in the SAR.5.Could the change result in more than a minimal increase in the consequences of a malfunction of a structure, system, or component that is important to safety and evaluated in the SAR?Y N This change involves replacing a radiation monitoring instrument which is not associated with any of the reactor safety systems and does not have any effect on reactor operation.
H-31720.1C-1460.15Pb-2142.86Bi-2145.58K-4034.563Technical Specifications, Section3.7.2.1 Attachment B10CFR50.59ReviewNSC-51Date:Title:1/27/17ApprovedBy:StackMonitorUpgradeMichaelJ.DavisAsanattachment tothisform,provideawrittendescription oftheproposedmodification, thepurposeformakingthemodification, andajustification fortheanswertoeachofthefollowing questions:
Consequently, this change will not result in an increase in the consequences of a malfunction of a structure, system, or component that is important to safety and evaluated in the SAR.6.Could the change result in creating the possibility of an accident of a different type than the accidents that have been evaluated in the SAR?y N This change involves replacing a radiation monitoring instrument which is not associated with any of the reactor safety systems and does not have any effect on reactor operation.
1.DoesthechangerequireachangetotheTechnical Specifications oftheR-95License?YNAreviewoftheRINSeTechnical Specifications indicates that:A.Section3.7.1.1Wheneverthefollowing operations areinprogress:
Consequently, this change will not result in creating the possibility of an accident of a different type than the accidents that have been evaluated in the SAR.7.Could the change result in creating the possibility for a malfunction of a structure, system, or component that is important to safety, with a different result than predicted in the SAR?Y N This change involves replacing a radiation monitoring instrument which is not associated with any of the reactor safety systems and does not have any effect on reactor operation.
*Thereactorisoperating.
Consequently, this change will not result in creating the possibility of a malfunction of a structure, system, or component that is important to safety, with a different result than predicted in the SAR.8.Could the change result in a design basis limit for a fission product barrier as described in the SAR being altered or exceeded?y N This change involves replacing a radiation monitoring instrument which is not part of any fission product barrier.Consequently, this change will not result in a design basis limit for a fission product barrier as described in the SAR being altered or exceeded.9.Could the change result in a departure from a method of evaluation used in the SAR for establishing the design bases for the facility?Y N This change involves replacing a radiation monitoring instrument which was not used in the SAR as a method of evaluation for establishing the design bases for the facility.Consequently, this change will not result in a departure from a method of evaluation used in the SAR for establishing the design bases for the facility.If the answer to any of these questions is yes, then an NRC approved license amendment pursuant to 10 CFR 50.90 shall be obtained before the modification is implemented.
*Irradiated fuelhandlingisinprogress.
Attachment B 10 CFR 50.59 Review NSC-51 Date: Title: 3/1/17 Approved By: Area Radiation Monitor Upgrade Michael J.Davis As an attachment to this form, provide a written description of the proposed modification, the purpose for making the modification, and a justification for the answer to each of the following questions:
*Experiment handlingisinprogressforanexperiment thathasasignificant fissionproduct,orgaseouseffluentactivation productinventory.
1.Does the change require a change to the Technical Specifications of the R-95 License?YN A review of the RINSC Technical Specifications indicates that: A.Section 3.7.1.1.3 This specification requires that a minimum of one gamma sensitive radiation monitor that is capable of warning personnel of high radiation levels shall be on the main floor of the Confinement Building and over the pool when the reactor is operating.
*Anyworkonthecoreorcontrolrodsthatcouldcauseareactivity changeofmorethan0.60%.l\k/kisinprogress.
The new monitors are both gamma and neutron sensitive, and will be maintained on the main floor and at the pool top.B.Section3.7.1.2.3 This specification requires that the area radiation monitors shall alarm when radiation levels are 2 times normal levels, or greater.The new monitors have alarming capability, and will be set to alarm when radiation levels are 2 times normal levels, or greater.C.Sections 4.7.1.1.1 and 4.7.1.1.2 This specification requires that the area radiation monitors on the main floor of the Confinement Building and over the pool are verified to be operable each day prior to the reactor being started up from the shutdown condition, and after the channel has been repaired.This schedule will be maintained.
*Anyexperiment movementthatcouldcauseareactivity changeofmorethan0.60%.l\k/kisinprogress.
D.Sections 4.7.1.2.1 and 4.7.1.2.2 This specification requires that the area radiation monitors on the main floor of the Confinement Building and over the pool shall be channel calibrated and channel tested annually.Thisschedule will be maintained.
3.7.1.1.1 Aminimumofoneradiation monitorthatiscapableofwarningpersonnel ofhighradiation levelsintheconfinement gaseousandparticulate effluent(Table3.2,RequiredRadiation
Consequently, this change does not require a change to the Technical Specifications of the R-95 License.
: Monitors, lines1.1and1.2)shallbeoperating.
2.Could the change result in more than a minimal increase in the frequency of occurrence of an accident that has been previously evaluated in the SAR?YN This change involves replacing radiation monitoring instruments which are not associated with any of the reactor safety systems and does not have any affect on reactor operation.
3.7.1.1.2 Ifthedetectordescribed inspecification 3.7.1.1.1 failsduringoperation, withinonehour,placeinserviceasuitablealternative airmonitororbeginanhourlygrabsampleanalysis(grabsampleanalysisappliestoparticulate only)inlieuofhavingafunctioning monitor.B.Section3.7.1.23.7.1.2.1 Thestackgaseousmonitorshallalarmwhenradiation levelsofthestackgasare2.5timesnormallevels,orgreater.
Consequently, this change will not increase the frequency of occurrence of an accident that has been previously evaluated in the SAR.3.Could the change result in more than a minimal increase in the likelihood of occurrence of a malfunction of a structure, system, or component that is important to safety and evaluated in the SAR?YN This change involves replacing radiation monitoring instruments which are not associated with any of the reactor safety systems and does not have any affect on reactor operation.
3.7.1.2.2 Thestackparticulate monitorshallalarmwhenradiation levelsofthestackparticulates are2timesnormallevels,orgreater.C.Section3.7Table3-2RequiredRadiation Monitors3.2.1RequiredRadiation MonitorsLineDescription MaximumMinimumFunctionOperating
Consequently, this change will not increase the likelihood of occurrence of a malfunction of a structure, system, or component that is important to safety and evaluated in the SAR.4.Could the change result in more than a minimal increase in the consequences of an accident that is evaluated in the SAR?YN This change involves replacing radiation monitoring instruments which are not associated with any of the reactor safety systems and does not have any affect on reactor operation.
#SetPointRequiredMode1.1Confinement 2.5times1Indication andAsperBuildingExhaustnormalalarmboth3.7.1.1.1 StackGaseouslocallyandincontrolroom1.2Confinement 2times1Indication andAsperBuildingExhaustnormalalarmboth3.7.1.1.1 StackParticulate locallyandincontrolroomThenewstackmonitoriscapableoffulfilling allofthemonitoring andalarmcapabilities requiredbytheTechnical Specifications.
Consequently, this change will not increase the consequences of an accident that is evaluated in the SAR.5.Could the change result in more than a minimal increase in the consequences of a malfunction of a structure, system, or component that is important to safety and evaluated in the SAR?YN This change involves replacing radiation monitoring instruments which are not associated with any of the reactor safety systems and does not have any affect on reactor operation.
Consequently, thischangedoesnotrequireachangetotheTechnical Specifications oftheR-95License.2.Couldthechangeresultinmorethanaminimalincreaseinthefrequency ofoccurrence ofanaccidentthathasbeenpreviously evaluated intheSAR?YNThischangeinvolvesreplacing aradiation monitoring instrument whichisnotassociated withanyofthereactorsafetysystemsanddoesnothaveanyeffectonreactoroperation.
Consequently, this change will not result in an increase in the consequences of a malfunction of a structure, system, or component that is important to safety and evaluated in the SAR.6.Could the change result in creating the possibility of an accident of a different type than the accidents that have been evaluated in the SAR?YN This change involves replacing radiation monitoring instruments which are not associated with any of the reactor safety systems and does not have any affect on reactor operation.
Consequently, thischangewillnotincreasethefrequency ofoccurrence ofanaccidentthathasbeenpreviously evaluated intheSAR.3.Couldthechangeresultinmorethanaminimalincreaseinthelikelihood ofoccurrence ofamalfunction ofastructure, system,orcomponent thatisimportant tosafetyandevaluated intheSAR?YNThischangeinvolvesreplacing aradiation monitoring instrument whichisnotassociated withanyofthereactorsafetysystemsanddoesnothaveanyeffectonreactoroperation.
Consequently, this change will not result in creating the possibility of an accident of a different type than the accidents that have been evaluated in the SAR.
Consequently, thischangewillnotincreasethelikelihood ofoccurrence ofamalfunction ofastructure, system,orcomponent thatisimportant tosafetyandevaluated intheSAR.4.Couldthechangeresultinmorethanaminimalincreaseintheconsequences ofanaccidentthatisevaluated intheSAR?YNThischangeinvolvesreplacing aradiation monitoring instrument whichisnotassociated withanyofthereactorsafetysystemsanddoesnot haveanyeffectonreactoroperation.
7.Could the change result in creating the possibility for a malfunction of a structure, system, or component that is important to safety, with a different result than predicted in the SAR?Y N This change involves replacing radiation monitoring instruments which are not associated with any of the reactor safety systems and does not have any affect on reactor operation.
Consequently, thischangewillnotincreasetheconsequences ofanaccidentthatisevaluated intheSAR.5.Couldthechangeresultinmorethanaminimalincreaseintheconsequences ofamalfunction ofastructure, system,orcomponent thatisimportant tosafetyandevaluated intheSAR?YNThischangeinvolvesreplacing aradiation monitoring instrument whichisnotassociated withanyofthereactorsafetysystemsanddoesnothaveanyeffectonreactoroperation.
Consequently, this change will not result in creating the possibility of a malfunction of a structure, system, or component that is important to safety, with a different result than predicted in the SAR.8.Could the change result in a design basis limit for a fission product barrier as described in the SAR being altered or exceeded?Y N This change involves replacing radiation monitoring instruments which are not part of any fission product barrier.Consequently, this change will not result in a design basis limit for a fission product barrier as described in the SAR being altered or exceeded.9.Could the change result in a departure from a method of evaluation used in the SAR for establishing the design bases for the facility?Y N This change involves replacing radiation monitoring instruments which are not used in the SAR as a method of evaluation for establishing the design bases for the facility.Consequently, this change will not result in a departure from a method of evaluation used in the SAR for establishing the design bases for the facility.If the answer to any of these questions is yes, then an NRC approved license amendment pursuant to 10 CFR 50.90 shall be obtained before the modification is implemented.
Consequently, thischangewillnotresultinanincreaseintheconsequences ofamalfunction ofastructure, system,orcomponent thatisimportant tosafetyandevaluated intheSAR.6.Couldthechangeresultincreatingthepossibility ofanaccidentofadifferent typethantheaccidents thathavebeenevaluated intheSAR?yNThischangeinvolvesreplacing aradiation monitoring instrument whichisnotassociated withanyofthereactorsafetysystemsanddoesnothaveanyeffectonreactoroperation.
Attachment B 10 CFR 50.59 Review NSC-51 Date:___------'-1.:.....:/1'-='0.:.....:/1:....:....7 Ap proved By: Michael J.Davis Title: 170110 Coolant Temperature Scram Set Point Change As an attachment to this form, provide a written description of the proposed modification, the purpose for making the modification, and a justification for the answer to each of the following questions:
Consequently, thischangewillnotresultincreatingthepossibility ofanaccidentofadifferent typethantheaccidents thathavebeenevaluated intheSAR.7.Couldthechangeresultincreatingthepossibility foramalfunction ofastructure, system,orcomponent thatisimportant tosafety,withadifferent resultthanpredicted intheSAR?YNThischangeinvolvesreplacing aradiation monitoring instrument whichisnotassociated withanyofthereactorsafetysystemsanddoesnothaveanyeffectonreactoroperation.
1.Does the change require a change to the Technical Specifications of the R-95 License?YN This modification involves implementing a change in the facility Technical Specifications so that cooling system temperature scram set points are consistent with new specifications.
Consequently, thischangewillnotresultincreatingthepossibility ofamalfunction ofastructure, system,orcomponent thatisimportant tosafety,withadifferent resultthanpredicted intheSAR.8.Couldthechangeresultinadesignbasislimitforafissionproductbarrierasdescribed intheSARbeingalteredorexceeded?
The new settings are: Indicator Function Required Actual Set Point Set Point Pool Temperature Scram 127 F 126 F Inlet Temperature Alarm None 115 F Inlet Temperature Scram 122 F 119 F Outlet Temperature Alarm None 126 F 2.Could the change result in more than a minimal increase in the frequency of occurrence of an accident that has been previously evaluated in the SAR?YN This modification has no impact on reactor operation, or anything that could cause an accident.It is strictly a slight change in the cooling system temperature alarm and scram set points.3.Could the change result in more than a minimal increase in the likelihood of occurrence of a malfunction of a structure, system, or component that is important to safety and evaluated in the SAR?YN This modification has no impact on the ability of the temperature system displays, and their associated relays from functioning.
yNThischangeinvolvesreplacing aradiation monitoring instrument whichisnotpartofanyfissionproductbarrier.Consequently, thischangewillnotresultinadesignbasislimitforafissionproductbarrierasdescribed intheSARbeingalteredorexceeded.
4.Could the change result in more than a minimal increase in the consequences of an accident that is evaluated in the SAR?YN The new Safety Analysis shows that these changes in temperature set points will have no significant increase in the consequences of an accident that has been evaluated in the SAR.
9.Couldthechangeresultinadeparture fromamethodofevaluation usedintheSARforestablishing thedesignbasesforthefacility?
5.Could the change result in more than a minimal increase in the consequences of a malfunction of a structure, system, or component that is important to safety and evaluated in the SAR?YN The new Safety Analysis shows that these changes in temperature set points will have no significant increase in the consequences of a malfunction of a structure, system, or component that is important to safety and evaluated in the SAR.6.Could the change result in creating the possibility of an accident of a different type than the accidents that have been evaluated in the SAR?YN This modification is simply a set point change and has no impact on any type of accident other than those involving overheating the fuel cladding, which have been evaluated in the SAR.7.Could the change result in creating the possibility for a malfunction of a structure, system, or component that is important to safety, with a different resultthanpredicted in the SAR?YN This modification has no impact on structure, system, or component malfunctions.
YNThischangeinvolvesreplacing aradiation monitoring instrument whichwasnotusedintheSARasamethodofevaluation forestablishing thedesignbasesforthefacility.
8.Could the change result in a design basis limit for a fission product barrier as described in the SAR being altered or exceeded?y N This modification has no impact on design basis limits for fission product barriers as described in the SAR.9.Could the change result in a departure from a method of evaluation used in the SAR for establishing the design bases for the facility?YN This modification cannot result in a departure from a method of evaluation used in the SAR for establishing the design bases for the facility.If the answer to any of these questions is yes, then an NRC approved license amendment pursuant to 10 CFR 50.90 shall be obtained before the modification is implemented.
Consequently, thischangewillnotresultin adeparture fromamethodofevaluation usedintheSARforestablishing thedesignbasesforthefacility.
2017 Ar-41 release COMPLY: Vl.7.40 CFR Part 61 National Emission Standards for Hazardous Air Pollutants REPORT ON COMPLIANCE WITH 7/12/2017 9:40 THE CLEAN AIR ACT LIMITS FOR RADIONUCLIDE EMISSIONS FROM THE COMPLY CODE-Vl.7.Prepared by: RI Atomic Energy Commission RI Nuclear Science Center 16 Reactor Road)Narragansett)
Iftheanswertoanyofthesequestions isyes,thenanNRCapprovedlicenseamendment pursuantto10CFR50.90shallbeobtainedbeforethemodification isimplemented.
RI 02882 Sangho Nam 401-874-2600 Prepared for: u.S.Environmental Protection Agency Office of Radiation and Indoor Air Washington)
Attachment B10CFR50.59ReviewNSC-51Date:Title:3/1/17ApprovedBy:AreaRadiation MonitorUpgradeMichaelJ.DavisAsanattachment tothisform,provideawrittendescription oftheproposedmodification, thepurposeformakingthemodification, andajustification fortheanswertoeachofthefollowing questions:
DC 20460 Page 1 2017 Ar-41 release COMPLY: V1.7.2017 Ar-41 Realse Report SCREENING LEVEL 4 DATA ENTERED: Release Rate Nuclide (curies/YEAR)
1.DoesthechangerequireachangetotheTechnical Specifications oftheR-95License?YNAreviewoftheRINSCTechnical Specifications indicates that:A.Section3.7.1.1.3 Thisspecification requiresthataminimumofonegammasensitive radiation monitorthatiscapableofwarningpersonnel ofhighradiation levelsshallbeonthemainflooroftheConfinement Buildingandoverthepoolwhenthereactorisoperating.
AR-41 1.495E+02 Release height 35 meters.Building height 18 meters.7/12/2017 9:40 The source and receptor are not on the same building.Building width 18 meters.Building length 20 meters.STACK DISTANCES)
Thenewmonitorsarebothgammaandneutronsensitive, andwillbemaintained onthemainfloorandatthepooltop.B.Section3.7.1.2.3 Thisspecification requiresthatthearearadiation monitorsshallalarmwhenradiation levelsare2timesnormallevels,orgreater.Thenewmonitorshavealarmingcapability, andwillbesettoalarmwhenradiation levelsare2timesnormallevels,orgreater.C.Sections4.7.1.1.1 and4.7.1.1.2 Thisspecification requiresthatthearearadiation monitorsonthemainflooroftheConfinement Buildingandoverthepoolareverifiedtobeoperableeachdaypriortothereactorbeingstartedupfromtheshutdowncondition, andafterthechannelhasbeenrepaired.
FILE: stack data 100.dat Distance DIR (meters)---------N 100.0 NNE 100.0 NE 100.0 ENE 100.0 E 100.0 Page 2 2017 Ar-41 release ESE 100.0 SE 100.0 SSE 100.0 S 100.0 SSW 100.0 SW 100.0 WSW 100.0 W 100.0 WNW 100.0 NW 100.0 NNW 100.0 COMPLY: V1.7.WINDROSE DATA)FILE: 2016 wind rose data 2m.dat Source of wind rose data: 2016 Wind rose data Dates of coverage: 1954-1994 Wind rose location: Narragansett)
Thisschedulewillbemaintained.
RI Distance to facility: 155 m Percent calm: 0.05 Wind Speed FROM Frequency (meters/s)
D.Sections4.7.1.2.1 and4.7.1.2.2 Thisspecification requiresthatthearearadiation monitorsonthemainflooroftheConfinement Buildingandoverthepoolshallbechannelcalibrated andchanneltestedannually.Thisschedule willbemaintained.
-------------------
Consequently, thischangedoesnotrequireachangetotheTechnical Specifications oftheR-95License.
N 0.062 2.00 NNE 0.058 2.00 NE 0.044 2.00 ENE 0.013 2.00 E 0.012 2.00 ESE 0.013 2.00 SE 0.058 2.00 SSE 0.049 2.00 S 0.058 2.00 SSW 0.084 2.00 SW 0.105 2.00 WSW 0.064 2.00 W 0.068 2.00 WNW 0.095 2.00 NW 0.104 2.00 NNW 0.068 2.00 Distance from the SOURCE to the FARM producing VEGETABLES is 100 meters.Page 3 7/12/2017 9:40 2017 Ar-41 release Distance from the SOURCE to the FARM producing MILK is 100 meters.Distance from the SOURCE to the FARM producing MEAT is 100 meters.NOTES: The receptor exposed to the highest concentration is located 100.meters from the source in the NE sector.He gets his VEGETABLES from a farm located 100.meters from the source in the NE sector.He gets his MEAT from a farm located 100.meters from the source in the NE sector.He gets his MILK from a farm located 100.meters from the source in the NE sector.Input parameters outside the"normal" range: COMPLY: Vl.7.Windrose wind frequency is unusually LOW.RESULTS: 7/12/2017 9:40 Effective dose equivalent:
2.Couldthechangeresultinmorethanaminimalincreaseinthefrequency ofoccurrence ofanaccidentthathasbeenpreviously evaluated intheSAR?YNThischangeinvolvesreplacing radiation monitoring instruments whicharenotassociated withanyofthereactorsafetysystemsanddoesnothaveanyaffectonreactoroperation.
***Comply at level 4.This facility is in COMPLIANCE.
Consequently, thischangewillnotincreasethefrequency ofoccurrence ofanaccidentthathasbeenpreviously evaluated intheSAR.3.Couldthechangeresultinmorethanaminimalincreaseinthelikelihood ofoccurrence ofamalfunction ofastructure, system,orcomponent thatisimportant tosafetyandevaluated intheSAR?YNThischangeinvolvesreplacing radiation monitoring instruments whicharenotassociated withanyofthereactorsafetysystemsanddoesnothaveanyaffectonreactoroperation.
3.0 mrem/yr.It mayor may not be EXEMPT from reporting to the EPA.You may contact your regional EPA office for more information.
Consequently, thischangewillnotincreasethelikelihood ofoccurrence ofamalfunction ofastructure, system,orcomponent thatisimportant tosafetyandevaluated intheSAR.4.Couldthechangeresultinmorethanaminimalincreaseintheconsequences ofanaccidentthatisevaluated intheSAR?YNThischangeinvolvesreplacing radiation monitoring instruments whicharenotassociated withanyofthereactorsafetysystemsanddoesnothaveanyaffectonreactoroperation.
Consequently, thischangewillnotincreasetheconsequences ofanaccidentthatisevaluated intheSAR.5.Couldthechangeresultinmorethanaminimalincreaseintheconsequences ofamalfunction ofastructure, system,orcomponent thatisimportant tosafetyandevaluated intheSAR?YNThischangeinvolvesreplacing radiation monitoring instruments whicharenotassociated withanyofthereactorsafetysystemsanddoesnothaveanyaffectonreactoroperation.
Consequently, thischangewillnotresultinanincreaseintheconsequences ofamalfunction ofastructure, system,orcomponent thatisimportant tosafetyandevaluated intheSAR.6.Couldthechangeresultincreatingthepossibility ofanaccidentofadifferent typethantheaccidents thathavebeenevaluated intheSAR?YNThischangeinvolvesreplacing radiation monitoring instruments whicharenotassociated withanyofthereactorsafetysystemsanddoesnothaveanyaffectonreactoroperation.
Consequently, thischangewillnotresultincreatingthepossibility ofanaccidentofadifferent typethantheaccidents thathavebeenevaluated intheSAR.
7.Couldthechangeresultincreatingthepossibility foramalfunction ofastructure, system,orcomponent thatisimportant tosafety,withadifferent resultthanpredicted intheSAR?YNThischangeinvolvesreplacing radiation monitoring instruments whicharenotassociated withanyofthereactorsafetysystemsanddoesnothaveanyaffectonreactoroperation.
Consequently, thischangewillnotresultincreatingthepossibility ofamalfunction ofastructure, system,orcomponent thatisimportant tosafety,withadifferent resultthanpredicted intheSAR.8.Couldthechangeresultinadesignbasislimitforafissionproductbarrierasdescribed intheSARbeingalteredorexceeded?
YNThischangeinvolvesreplacing radiation monitoring instruments whicharenotpartofanyfissionproductbarrier.Consequently, thischangewillnotresultinadesignbasislimitforafissionproductbarrierasdescribed intheSARbeingalteredorexceeded.
9.Couldthechangeresultinadeparture fromamethodofevaluation usedintheSARforestablishing thedesignbasesforthefacility?
YNThischangeinvolvesreplacing radiation monitoring instruments whicharenotusedintheSARasamethodofevaluation forestablishing thedesignbasesforthefacility.
Consequently, thischangewillnotresultinadeparture fromamethodofevaluation usedintheSARforestablishing thedesignbasesforthefacility.
Iftheanswertoanyofthesequestions isyes,thenanNRCapprovedlicenseamendment pursuantto10CFR50.90shallbeobtainedbeforethemodification isimplemented.
Attachment B10CFR50.59ReviewNSC-51Date:___------'-1.:.....:/1'-='0.:.....:/1:....:....7 ApprovedBy:MichaelJ.DavisTitle:170110CoolantTemperature ScramSetPointChangeAsanattachment tothisform,provideawrittendescription oftheproposedmodification, thepurposeformakingthemodification, andajustification fortheanswertoeachofthefollowing questions:
1.DoesthechangerequireachangetotheTechnical Specifications oftheR-95License?YNThismodification involvesimplementing achangeinthefacilityTechnical Specifications sothatcoolingsystemtemperature scramsetpointsareconsistent withnewspecifications.
Thenewsettingsare:Indicator FunctionRequiredActualSetPointSetPointPoolTemperature Scram127F126FInletTemperature AlarmNone115FInletTemperature Scram122F119FOutletTemperature AlarmNone126F2.Couldthechangeresultinmorethanaminimalincreaseinthefrequency ofoccurrence ofanaccidentthathasbeenpreviously evaluated intheSAR?YNThismodification hasnoimpactonreactoroperation, oranythingthatcouldcauseanaccident.
Itisstrictlyaslightchangeinthecoolingsystemtemperature alarmandscramsetpoints.3.Couldthechangeresultinmorethanaminimalincreaseinthelikelihood ofoccurrence ofamalfunction ofastructure, system,orcomponent thatisimportant tosafetyandevaluated intheSAR?YNThismodification hasnoimpactontheabilityofthetemperature systemdisplays, andtheirassociated relaysfromfunctioning.
4.Couldthechangeresultinmorethanaminimalincreaseintheconsequences ofanaccidentthatisevaluated intheSAR?YNThenewSafetyAnalysisshowsthatthesechangesintemperature setpointswillhavenosignificant increaseintheconsequences ofanaccidentthathasbeenevaluated intheSAR.
5.Couldthechangeresultinmorethanaminimalincreaseintheconsequences ofamalfunction ofastructure, system,orcomponent thatisimportant tosafetyandevaluated intheSAR?YNThenewSafetyAnalysisshowsthatthesechangesintemperature setpointswillhavenosignificant increaseintheconsequences ofamalfunction ofastructure, system,orcomponent thatisimportant tosafetyandevaluated intheSAR.6.Couldthechangeresultincreatingthepossibility ofanaccidentofadifferent typethantheaccidents thathavebeenevaluated intheSAR?YNThismodification issimplyasetpointchangeandhasnoimpactonanytypeofaccidentotherthanthoseinvolving overheating thefuelcladding, whichhavebeenevaluated intheSAR.7.Couldthechangeresultincreatingthepossibility foramalfunction ofastructure, system,orcomponent thatisimportant tosafety,withadifferent resultthanpredicted intheSAR?YNThismodification hasnoimpactonstructure, system,orcomponent malfunctions.
8.Couldthechangeresultinadesignbasislimitforafissionproductbarrierasdescribed intheSARbeingalteredorexceeded?
yNThismodification hasnoimpactondesignbasislimitsforfissionproductbarriersasdescribed intheSAR.9.Couldthechangeresultinadeparture fromamethodofevaluation usedintheSARforestablishing thedesignbasesforthefacility?YNThismodification cannotresultinadeparture fromamethodofevaluation usedintheSARforestablishing thedesignbasesforthefacility.
Iftheanswertoanyofthesequestions isyes,thenanNRCapprovedlicenseamendment pursuantto10CFR50.90shallbeobtainedbeforethemodification isimplemented.
2017Ar-41releaseCOMPLY:Vl.7.40CFRPart61NationalEmissionStandards forHazardous AirPollutants REPORTONCOMPLIANCE WITH7/12/2017 9:40THECLEANAIRACTLIMITSFORRADIONUCLIDE EMISSIONS FROMTHECOMPLYCODE-Vl.7.Preparedby:RIAtomicEnergyCommission RINuclearScienceCenter16ReactorRoad)Narragansett)
RI02882SanghoNam401-874-2600 Preparedfor:u.S.Environmental Protection AgencyOfficeofRadiation andIndoorAirWashington)
DC20460Page1 2017Ar-41releaseCOMPLY:V1.7.2017Ar-41RealseReportSCREENING LEVEL4DATAENTERED:ReleaseRateNuclide(curies/YEAR)
AR-411.495E+02 Releaseheight35meters.Buildingheight18meters.7/12/2017 9:40Thesourceandreceptorarenotonthesamebuilding.
Buildingwidth18meters.Buildinglength20meters.STACKDISTANCES)
FILE:stackdata100.datDistanceDIR(meters)---------
N100.0NNE100.0NE100.0ENE100.0E100.0Page2 2017Ar-41releaseESE100.0SE100.0SSE100.0S100.0SSW100.0SW100.0WSW100.0W100.0WNW100.0NW100.0NNW100.0COMPLY:V1.7.WINDROSEDATA)FILE:2016windrosedata2m.datSourceofwindrosedata:2016WindrosedataDatesofcoverage:
1954-1994 Windroselocation:
Narragansett)
RIDistancetofacility:
155mPercentcalm:0.05WindSpeedFROMFrequency (meters/s)
---------
----------
N0.0622.00NNE0.0582.00NE0.0442.00ENE0.0132.00E0.0122.00ESE0.0132.00SE0.0582.00SSE0.0492.00S0.0582.00SSW0.0842.00SW0.1052.00WSW0.0642.00W0.0682.00WNW0.0952.00NW0.1042.00NNW0.0682.00DistancefromtheSOURCEtotheFARMproducing VEGETABLES is100meters.Page37/12/2017 9:40 2017Ar-41releaseDistancefromtheSOURCEtotheFARMproducing MILKis100meters.DistancefromtheSOURCEtotheFARMproducing MEATis100meters.NOTES:Thereceptorexposedtothehighestconcentration islocated100.metersfromthesourceintheNEsector.HegetshisVEGETABLES fromafarmlocated100.metersfromthesourceintheNEsector.HegetshisMEATfromafarmlocated100.metersfromthesourceintheNEsector.HegetshisMILKfromafarmlocated100.metersfromthesourceintheNEsector.Inputparameters outsidethe"normal"range:COMPLY:Vl.7.Windrosewindfrequency isunusually LOW.RESULTS:7/12/2017 9:40Effective doseequivalent:
***Complyatlevel4.ThisfacilityisinCOMPLIANCE.
3.0mrem/yr.ItmayormaynotbeEXEMPTfromreporting totheEPA.YoumaycontactyourregionalEPAofficeformoreinformation.
**********
**********
ENDOFCOMPLIANCE REPORT**********
END OF COMPLIANCE REPORT**********
Page4}}
Page 4}}

Revision as of 18:52, 7 July 2018

Rhode Island Nuclear Science Center - Annual Operating Report, Per Technical Specifications 6.7.1
ML17201A005
Person / Time
Site: Rhode Island Atomic Energy Commission
Issue date: 07/19/2017
From: Martin P W
State of RI, Atomic Energy Comm, Nuclear Science Ctr
To: Patrick Boyle
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML17201A005 (20)


Text

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS Rhode Island Atomic Energy Commission 16 Reactor Road Narragansett, Rl 02882-1165 Telephone#401-874-2600 July 19, 2017 Docket No.50-193 Document Control Desk u.s.Nuclear Regulatory Commission (NRC)11555 Rockville Pike Rockville, Maryland 20852 Attn: Mr.Patrick Boyle, Project Manager

Dear Mr.Boyle:

This letter and the enclosures constitute the annual report required by the RINSC Technical Specifications (Section 6.7.1).Enclosure 1 provides reactor operating statistics. provides information pertaining to unscheduled reactor shutdowns or scrams.Enclosure 3 discusses maintenance operations performed during the reporting period.Enclosure 4 describes changes to the facility carried out under the conditions of Section 50.59 of Chapter 10 of the Code of Federal Regulations.

Lastly, Enclosure 5 summarizes the radiological controls information.

If there are any questions regarding this information, please call me at 401-874-9442.

Sincerely, Paul W Martin Jr Reactor Supervisor Enclosures (5)Copy to: Mr.Craig Bassett, USNRC Dr.John J.Breen, Chairman, NRSC Dr.Clinton Chichester, Chairman, RIAEC Dr.Nancy Breen, RIAEC Mr.Howard Chun, RIAEC Dr.Yana K.Reshetnyak, RIAEC Dr.Nitin Padture, RIAEC Reactor Operating Statistics Technical Specification Section 6.7.1.1 Month Year Operating MWHof Hours Operation July 2016 27.52 30.33 August 2016 32.47 31.50 September 2016 26.28 24.36 October 2016 14.40 16.57 November 2016 36.00 41.02 December 2016 30.45 37.36 January 2017 13.35 8.42 February 2017 52.95 54.38 March 2017 77.27 86.81 April 2017 123.42 206.18 May 2017 161.93 269.45 June 2017 154.38 261.78 Total FY2017 750.42 1068.15 MWH or 44.51 MWD Total Energy Output Since Initial Criticality 66,785.33 MWH or 2782.72 MWD ENCLOSURE 2 UNSCHEDULED SHUTDOWNS OR SCRAMS Technical Specification Section 6.7.1.2 Page 1 of 1 The following is a list of the unscheduled shutdowns or scrams that occurred during the 2016-2017 reporting period: Date Run Logbook Page Cause Description No.07/01016 9179 62 75 Watchdog Scrammed twice during start-up due to computer Scram communication error, had to reboot com device on the reactor bridge 07/20116 9183 62 80 Instrumentation Scrammed twice due to range isolator output for WR channell being irratic.Isolator was replaced.09/19116 9201 62 102 Operator Operator error during the performance of rod worth testing with trainee.09/22116 9202 62 104 Power surge Momentary loss of power to scram magnets attributed to AC power pertibations.

11/03116 9212 62 115 Operator Auto scram while raising reactor power, range selection error.02/07117 9238 62 148 Instrumentation Short period Scram prior to reaching criticality due to signal noise.02/18/17 9239 62 149 Operator Auto scram while changing reactor operating mode for training.02/14117 9241 62 152 Equipment Manually scrammed due to exhaust blower motor failure failure, confmement ventilation inoperable to support reactor operation.

02/16117 9244 62 155 Instrumentation Scram while raising blade 1, no indications, no known cause.02/21117 9245 63 1 Instrumentation Scram while raising blade 3, prior to reaching criticality due to signal noise.03/02117 9252 63 8 Instrumentation Scram while raising blade 1, prior to reaching criticality due to signal noise.03/07117 9255 63 11 Instrumentation Scram prior to reaching criticality due to signal noise.03/08117 9256 63 12 Instrumentation Short period Scram twice just after reaching criticality due to signal noise.03116117 9260 63 17 Instrumentation Operator manually scrammed reactor due to erratic indication on shim safety blade#2 05/04117 9287 63 46 Operator Operator inadvertently initiated a manual rundown.05117117 9292 63 52 Instrumentation Instrument rack 4 UPS pertibation caused loss of flow auto scram 05118117 9293 63 54 Instrumentation Instrument rack 4 UPS failure caused loss of flow auto scram 06129117 9314 63 77 Instrumentation Scram while raising blade 1, prior to reaching criticality due to signal noise.

ENCLOSURE 3 MAINTENANCE OPERATIONS Technical Specification 6.7.1.3 requires a listing of the major maintenance operations performed in the 2016-2017 reporting period including their impact upon the safe operation of the reactor and the reasons for the corrective maintenance.

The new stack radiation monitor was installed.

The new monitor is a significant upgrade and has the latest technology and far more capabilities than the old monitor.The current plan is that it will be placed in service as the primary stack monitor as soon as it has been made capable of indicating in the control room and the old monitor will continue to be maintained as a backup for as long as it continues to remain functional.

The Inlet Temperature Scram was implemented to comply with the new RINSe Technical Specifications that were approved as part of the re-licensing effort.

ENCLOSURE 4 FACILITY CHANGES-10CFR50.59 REVIEW Technical Specification 6.7.1.4 requires that we provide a listing and description of any 10 CFR 50.59 evaluations conducted during the 2016-2017 reporting period.A 10 CFR 50.59 evaluation was performed on the following facility changes:*New stack radiation monitor*Inlet Temperature Scram implemented, Outlet Temperature Scram eliminated to comply with the new TS requirements.

  • Area Radiation Monitor upgrade.Note: This screened out as no review required, however, at the last NRC inspection visit, it was strongly recommended that we do a review.After completing the review, a conference call was held to try to understand why we were asked to complete a review on something that clearly screened out as no review required.After coming to a better understanding of the configuration and operation of our facility, it was agreed that a review was not necessary or required.All three of these 50.59 reviews are attached.

ENCLOSURE 5 RADIOLOGICAL CONTROLS 1.Environmental Surveys outside the Facility-Technical Specification 6.7.1.6 Quarterly TLD1 badges are deployed outside the reactor building in three separate locations.

The quarterly doses in units of mrem are shown in the table below.LOCATION 3 rd QTR 4 th QTR 1 st QTR 2 nd QTR2016201620172017 Northeast Wall 8 4 a 16 Demineralizer Door 53 59 75 390 Heat Exchanger Door 26 39 53 171 The general public does not frequent these locations and therefore occupancy factors may be used to approximate annual dose.The allowable annual external dose must be below 100 mrem per year.Assuming that the maximum time that a member of the general public would be present in one of these locations is 10 minutes per day, an occupancy factor of 0.025 can be used to obtain the annual dose that would be received by a member of the general public, in any of these areas.The annual dose at the Northeast Wall, Demineralizer and Heat Exchanger Doors is dependent on the operations schedule of the reactor.Ignoring the fact that the dose rate is not present 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day, and applying the occupancy factor of 0.025 2 , the annual dose that would be receive by an individual in the demineralizer room would be 14.43 mrem.The dose received at the Heat Exchanger Door would be 7.23 mrem.The annual dose received at the Northeast wall would be 0.7 mrem.The variations from quarter to quarter and from previous reports are also due in part to movements of items within the reactor building during the fiscal year and varying use of the different irradiation facilities.

2.Annual Exposures Exceeding 500 mrem for facility members, 100 mrem for non-staff members or 10 mrem for members of the general public-Technical Specification 6.7.1.7 There were no personnel exposures greater than Technical Specification 6.7.1.7.requirements.

lThermoluminescent Dosimeter; Mirion Technology reads the dosimeters at minimum of 1 mrem.2 Occupancy factor was changed from 0.01 to 0.025.0.01 was derived using occupancy factor and use factor (it was assumed that the reactor is not running 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> every day).We will use 0.025, from NCRP 147 for Outdoors, unattended parking lots, attics, stairways, unattended elevators, janitor's closets.0.025 is more conservative number than 0.01.

3.Radioactive Effluents-Technical Specification 6.7.1.5 A.Individual gaseous effluent concentrations for each reactor operation are recorded on the Monthly Information Sheets (Form NSC-78).The concentration of radioactive materials in the effluent released from the facility exhaust stacks shall not exceed 1 E+05 times concentrations specified in 1 OCFR20, Appendix B, Table II, when averaged overtimeperiods permitted by 1 OCFR20.3 Gamma spectroscopy of stack gas samples has shown that the principal gaseous effluent is Argon-41.The maximum concentration for this principle contaminant permitted under Technical Specifications is 1 E-8 IJCi/cc x1 E+5=1 E-3 IJCi/cc.Average concentrations released during the year were less than 0.0683 of the limit.The total Argon-41 release during the reporting period was 149.54 curies.The calculated effective dose equivalent for this release is 3 mrem/year (COMPLY Code).The Comply Code report is attached.B.Liquid effluent concentrations released to the environment are documented on the Sewer Discharge Report (NSC-09).Each release was approved prior to discharge with its pH being within the acceptable range and with the sum of the fractions of the respective radioisotopes per month being below the discharge limit of 1.For the reporting period, the total volume of discharge was 1.84E7 ml.The isotopes and their relative activities discharged are given below.Radioisotope Total Activity Discharged (microcuries)

H-3 1720.1 C-14 60.15 Pb-214 2.86 Bi-214 5.58 K-40 34.56 3 Technical Specifications, Section 3.7.2.1 Attachment B 10 CFR 50.59 Review NSC-51 Date: Title: 1/27/17 Approved By: Stack Monitor Upgrade Michael J.Davis As an attachment to this form, provide a written description of the proposed modification, the purpose for making the modification, and a justification for the answer to each of the following questions:

1.Does the change require a change to the Technical Specifications of the R-95 License?YN A review of the RINSe Technical Specifications indicates that: A.Section 3.7.1.1 Whenever the following operations are in progress:*The reactor is operating.

  • Irradiated fuel handling is in progress.*Experiment handling is in progress for an experiment that has a significant fission product, or gaseous effluent activation product inventory.
  • Any work on the core or control rods that could cause a reactivity change of more than 0.60%.l\k/k is in progress.*Any experiment movement that could cause a reactivity change of more than 0.60%.l\k/k is in progress.3.7.1.1.1 A minimum of one radiation monitor that is capable of warning personnel of high radiation levels in the confinement gaseous and particulate effluent (Table 3.2, Required Radiation Monitors, lines 1.1 and 1.2)shall be operating.

3.7.1.1.2 If the detector described in specification 3.7.1.1.1 fails during operation, within one hour, place in service a suitable alternative air monitor or begin an hourly grab sample analysis (grab sample analysis applies to particulate only)in lieu of having a functioning monitor.B.Section 3.7.1.2 3.7.1.2.1 The stack gaseous monitor shall alarm when radiation levels of the stack gas are 2.5 times normal levels, or greater.

3.7.1.2.2 The stack particulate monitor shall alarm when radiation levels of the stack particulates are 2 times normal levels, or greater.C.Section 3.7 Table 3-2 Required Radiation Monitors 3.2.1 Required Radiation Monitors Line Description Maximum Minimum Function Operating#Set Point Required Mode 1.1 Confinement 2.5 times 1 Indication and As per Building Exhaust normal alarm both 3.7.1.1.1 Stack Gaseous locally and in control room 1.2 Confinement 2 times 1 Indication and As per Building Exhaust normal alarm both 3.7.1.1.1 Stack Particulate locally and in control room The new stack monitor is capable of fulfilling all of the monitoring and alarm capabilities required by the Technical Specifications.

Consequently, this change does not require a change to the Technical Specifications of the R-95 License.2.Could the change result in more than a minimal increase in the frequency of occurrence of an accident that has been previously evaluated in the SAR?YN This change involves replacing a radiation monitoring instrument which is not associated with any of the reactor safety systems and does not have any effect on reactor operation.

Consequently, this change will not increase the frequency of occurrence of an accident that has been previously evaluated in the SAR.3.Could the change result in more than a minimal increase in the likelihood of occurrence of a malfunction of a structure, system, or component that is important to safety and evaluated in the SAR?YN This change involves replacing a radiation monitoring instrument which is not associated with any of the reactor safety systems and does not have any effect on reactor operation.

Consequently, this change will not increase the likelihood of occurrence of a malfunction of a structure, system, or component that is important to safety and evaluated in the SAR.4.Could the change result in more than a minimal increase in the consequences of an accident that is evaluated in the SAR?YN This change involves replacing a radiation monitoring instrument which is not associated with any of the reactor safety systems and does not have any effect on reactor operation.

Consequently, this change will not increase the consequences of an accident that is evaluated in the SAR.5.Could the change result in more than a minimal increase in the consequences of a malfunction of a structure, system, or component that is important to safety and evaluated in the SAR?Y N This change involves replacing a radiation monitoring instrument which is not associated with any of the reactor safety systems and does not have any effect on reactor operation.

Consequently, this change will not result in an increase in the consequences of a malfunction of a structure, system, or component that is important to safety and evaluated in the SAR.6.Could the change result in creating the possibility of an accident of a different type than the accidents that have been evaluated in the SAR?y N This change involves replacing a radiation monitoring instrument which is not associated with any of the reactor safety systems and does not have any effect on reactor operation.

Consequently, this change will not result in creating the possibility of an accident of a different type than the accidents that have been evaluated in the SAR.7.Could the change result in creating the possibility for a malfunction of a structure, system, or component that is important to safety, with a different result than predicted in the SAR?Y N This change involves replacing a radiation monitoring instrument which is not associated with any of the reactor safety systems and does not have any effect on reactor operation.

Consequently, this change will not result in creating the possibility of a malfunction of a structure, system, or component that is important to safety, with a different result than predicted in the SAR.8.Could the change result in a design basis limit for a fission product barrier as described in the SAR being altered or exceeded?y N This change involves replacing a radiation monitoring instrument which is not part of any fission product barrier.Consequently, this change will not result in a design basis limit for a fission product barrier as described in the SAR being altered or exceeded.9.Could the change result in a departure from a method of evaluation used in the SAR for establishing the design bases for the facility?Y N This change involves replacing a radiation monitoring instrument which was not used in the SAR as a method of evaluation for establishing the design bases for the facility.Consequently, this change will not result in a departure from a method of evaluation used in the SAR for establishing the design bases for the facility.If the answer to any of these questions is yes, then an NRC approved license amendment pursuant to 10 CFR 50.90 shall be obtained before the modification is implemented.

Attachment B 10 CFR 50.59 Review NSC-51 Date: Title: 3/1/17 Approved By: Area Radiation Monitor Upgrade Michael J.Davis As an attachment to this form, provide a written description of the proposed modification, the purpose for making the modification, and a justification for the answer to each of the following questions:

1.Does the change require a change to the Technical Specifications of the R-95 License?YN A review of the RINSC Technical Specifications indicates that: A.Section 3.7.1.1.3 This specification requires that a minimum of one gamma sensitive radiation monitor that is capable of warning personnel of high radiation levels shall be on the main floor of the Confinement Building and over the pool when the reactor is operating.

The new monitors are both gamma and neutron sensitive, and will be maintained on the main floor and at the pool top.B.Section3.7.1.2.3 This specification requires that the area radiation monitors shall alarm when radiation levels are 2 times normal levels, or greater.The new monitors have alarming capability, and will be set to alarm when radiation levels are 2 times normal levels, or greater.C.Sections 4.7.1.1.1 and 4.7.1.1.2 This specification requires that the area radiation monitors on the main floor of the Confinement Building and over the pool are verified to be operable each day prior to the reactor being started up from the shutdown condition, and after the channel has been repaired.This schedule will be maintained.

D.Sections 4.7.1.2.1 and 4.7.1.2.2 This specification requires that the area radiation monitors on the main floor of the Confinement Building and over the pool shall be channel calibrated and channel tested annually.Thisschedule will be maintained.

Consequently, this change does not require a change to the Technical Specifications of the R-95 License.

2.Could the change result in more than a minimal increase in the frequency of occurrence of an accident that has been previously evaluated in the SAR?YN This change involves replacing radiation monitoring instruments which are not associated with any of the reactor safety systems and does not have any affect on reactor operation.

Consequently, this change will not increase the frequency of occurrence of an accident that has been previously evaluated in the SAR.3.Could the change result in more than a minimal increase in the likelihood of occurrence of a malfunction of a structure, system, or component that is important to safety and evaluated in the SAR?YN This change involves replacing radiation monitoring instruments which are not associated with any of the reactor safety systems and does not have any affect on reactor operation.

Consequently, this change will not increase the likelihood of occurrence of a malfunction of a structure, system, or component that is important to safety and evaluated in the SAR.4.Could the change result in more than a minimal increase in the consequences of an accident that is evaluated in the SAR?YN This change involves replacing radiation monitoring instruments which are not associated with any of the reactor safety systems and does not have any affect on reactor operation.

Consequently, this change will not increase the consequences of an accident that is evaluated in the SAR.5.Could the change result in more than a minimal increase in the consequences of a malfunction of a structure, system, or component that is important to safety and evaluated in the SAR?YN This change involves replacing radiation monitoring instruments which are not associated with any of the reactor safety systems and does not have any affect on reactor operation.

Consequently, this change will not result in an increase in the consequences of a malfunction of a structure, system, or component that is important to safety and evaluated in the SAR.6.Could the change result in creating the possibility of an accident of a different type than the accidents that have been evaluated in the SAR?YN This change involves replacing radiation monitoring instruments which are not associated with any of the reactor safety systems and does not have any affect on reactor operation.

Consequently, this change will not result in creating the possibility of an accident of a different type than the accidents that have been evaluated in the SAR.

7.Could the change result in creating the possibility for a malfunction of a structure, system, or component that is important to safety, with a different result than predicted in the SAR?Y N This change involves replacing radiation monitoring instruments which are not associated with any of the reactor safety systems and does not have any affect on reactor operation.

Consequently, this change will not result in creating the possibility of a malfunction of a structure, system, or component that is important to safety, with a different result than predicted in the SAR.8.Could the change result in a design basis limit for a fission product barrier as described in the SAR being altered or exceeded?Y N This change involves replacing radiation monitoring instruments which are not part of any fission product barrier.Consequently, this change will not result in a design basis limit for a fission product barrier as described in the SAR being altered or exceeded.9.Could the change result in a departure from a method of evaluation used in the SAR for establishing the design bases for the facility?Y N This change involves replacing radiation monitoring instruments which are not used in the SAR as a method of evaluation for establishing the design bases for the facility.Consequently, this change will not result in a departure from a method of evaluation used in the SAR for establishing the design bases for the facility.If the answer to any of these questions is yes, then an NRC approved license amendment pursuant to 10 CFR 50.90 shall be obtained before the modification is implemented.

Attachment B 10 CFR 50.59 Review NSC-51 Date:___------'-1.:.....:/1'-='0.:.....:/1:....:....7 Ap proved By: Michael J.Davis Title: 170110 Coolant Temperature Scram Set Point Change As an attachment to this form, provide a written description of the proposed modification, the purpose for making the modification, and a justification for the answer to each of the following questions:

1.Does the change require a change to the Technical Specifications of the R-95 License?YN This modification involves implementing a change in the facility Technical Specifications so that cooling system temperature scram set points are consistent with new specifications.

The new settings are: Indicator Function Required Actual Set Point Set Point Pool Temperature Scram 127 F 126 F Inlet Temperature Alarm None 115 F Inlet Temperature Scram 122 F 119 F Outlet Temperature Alarm None 126 F 2.Could the change result in more than a minimal increase in the frequency of occurrence of an accident that has been previously evaluated in the SAR?YN This modification has no impact on reactor operation, or anything that could cause an accident.It is strictly a slight change in the cooling system temperature alarm and scram set points.3.Could the change result in more than a minimal increase in the likelihood of occurrence of a malfunction of a structure, system, or component that is important to safety and evaluated in the SAR?YN This modification has no impact on the ability of the temperature system displays, and their associated relays from functioning.

4.Could the change result in more than a minimal increase in the consequences of an accident that is evaluated in the SAR?YN The new Safety Analysis shows that these changes in temperature set points will have no significant increase in the consequences of an accident that has been evaluated in the SAR.

5.Could the change result in more than a minimal increase in the consequences of a malfunction of a structure, system, or component that is important to safety and evaluated in the SAR?YN The new Safety Analysis shows that these changes in temperature set points will have no significant increase in the consequences of a malfunction of a structure, system, or component that is important to safety and evaluated in the SAR.6.Could the change result in creating the possibility of an accident of a different type than the accidents that have been evaluated in the SAR?YN This modification is simply a set point change and has no impact on any type of accident other than those involving overheating the fuel cladding, which have been evaluated in the SAR.7.Could the change result in creating the possibility for a malfunction of a structure, system, or component that is important to safety, with a different resultthanpredicted in the SAR?YN This modification has no impact on structure, system, or component malfunctions.

8.Could the change result in a design basis limit for a fission product barrier as described in the SAR being altered or exceeded?y N This modification has no impact on design basis limits for fission product barriers as described in the SAR.9.Could the change result in a departure from a method of evaluation used in the SAR for establishing the design bases for the facility?YN This modification cannot result in a departure from a method of evaluation used in the SAR for establishing the design bases for the facility.If the answer to any of these questions is yes, then an NRC approved license amendment pursuant to 10 CFR 50.90 shall be obtained before the modification is implemented.

2017 Ar-41 release COMPLY: Vl.7.40 CFR Part 61 National Emission Standards for Hazardous Air Pollutants REPORT ON COMPLIANCE WITH 7/12/2017 9:40 THE CLEAN AIR ACT LIMITS FOR RADIONUCLIDE EMISSIONS FROM THE COMPLY CODE-Vl.7.Prepared by: RI Atomic Energy Commission RI Nuclear Science Center 16 Reactor Road)Narragansett)

RI 02882 Sangho Nam 401-874-2600 Prepared for: u.S.Environmental Protection Agency Office of Radiation and Indoor Air Washington)

DC 20460 Page 1 2017 Ar-41 release COMPLY: V1.7.2017 Ar-41 Realse Report SCREENING LEVEL 4 DATA ENTERED: Release Rate Nuclide (curies/YEAR)

AR-41 1.495E+02 Release height 35 meters.Building height 18 meters.7/12/2017 9:40 The source and receptor are not on the same building.Building width 18 meters.Building length 20 meters.STACK DISTANCES)

FILE: stack data 100.dat Distance DIR (meters)---------N 100.0 NNE 100.0 NE 100.0 ENE 100.0 E 100.0 Page 2 2017 Ar-41 release ESE 100.0 SE 100.0 SSE 100.0 S 100.0 SSW 100.0 SW 100.0 WSW 100.0 W 100.0 WNW 100.0 NW 100.0 NNW 100.0 COMPLY: V1.7.WINDROSE DATA)FILE: 2016 wind rose data 2m.dat Source of wind rose data: 2016 Wind rose data Dates of coverage: 1954-1994 Wind rose location: Narragansett)

RI Distance to facility: 155 m Percent calm: 0.05 Wind Speed FROM Frequency (meters/s)


N 0.062 2.00 NNE 0.058 2.00 NE 0.044 2.00 ENE 0.013 2.00 E 0.012 2.00 ESE 0.013 2.00 SE 0.058 2.00 SSE 0.049 2.00 S 0.058 2.00 SSW 0.084 2.00 SW 0.105 2.00 WSW 0.064 2.00 W 0.068 2.00 WNW 0.095 2.00 NW 0.104 2.00 NNW 0.068 2.00 Distance from the SOURCE to the FARM producing VEGETABLES is 100 meters.Page 3 7/12/2017 9:40 2017 Ar-41 release Distance from the SOURCE to the FARM producing MILK is 100 meters.Distance from the SOURCE to the FARM producing MEAT is 100 meters.NOTES: The receptor exposed to the highest concentration is located 100.meters from the source in the NE sector.He gets his VEGETABLES from a farm located 100.meters from the source in the NE sector.He gets his MEAT from a farm located 100.meters from the source in the NE sector.He gets his MILK from a farm located 100.meters from the source in the NE sector.Input parameters outside the"normal" range: COMPLY: Vl.7.Windrose wind frequency is unusually LOW.RESULTS: 7/12/2017 9:40 Effective dose equivalent:

      • Comply at level 4.This facility is in COMPLIANCE.

3.0 mrem/yr.It mayor may not be EXEMPT from reporting to the EPA.You may contact your regional EPA office for more information.

END OF COMPLIANCE REPORT**********

Page 4