IR 05000327/2013406: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter: OFFICIAL USE ONLY August 9, 2013 Mr. Joseph Vice President, Nuclear Licensing Tennessee Valley Authority
[[Issue date::August 9, 2013]]


Mr. Joseph Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801
1101 Market Street, LP 3D-C  


SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000327/2013406 AND 05000328/2013406
Chattanooga, TN 37402-2801
 
SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000327/2013406 AND  
 
05000328/2013406


==Dear Mr. Shea:==
==Dear Mr. Shea:==
On June 27, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a material control and accounting inspection at Sequoyah Nuclear Plant, Units 1 and 2. The enclosed inspection report documents the inspection results discussed on June 27, 2013 with Mr. J. Carlin and other members of his staff.
On June 27, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a material control and accounting inspection at Sequoyah Nuclear Plant, Units 1 and 2. The enclosed inspection report documents the inspection results discussed on June 27, 2013 with Mr. J. Carlin and other members of his staff.


This inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings were identified.
This inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
Based on the results of this inspection, no findings were identified.


In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
 
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
 
In accordance with 10 CFR 2.390(b)(1)(ii), t he NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC P ublic Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).


Should you have any questions concerning this letter, please contact us.
Should you have any questions concerning this letter, please contact us.


Sincerely,/RA/ Scott M. Shaeffer, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket No.: 50-327, 50-328 License No.: DPR-77, DPR-79  
Sincerely,/RA/ Scott M. Shaeffer, Chief Reactor Projects Branch 6 Division of Reactor Projects  
 
Docket No.: 50-327, 50-328 License No.: DPR-77, DPR-79  


===Enclosure:===
===Enclosure:===
Line 44: Line 53:
Supplemental Information  
Supplemental Information  


cc w/encl: (See page 3)
cc w/encl: (See page 3)  
 
_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE Via email Via email SMS /RA/ JDH /RA/ NAME WDeschaine GSmith SShaeffer JHamman DATE 08/08/2013 08/08/2013 09/09/2013 09/09/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/o encl:
via ListServ Letter to Joseph from Scott Shaeffer dated August 9, 2013
 
SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000327/2013406 AND
 
05000328/2013406
 
Distribution w/encl
: C. Evans, RII L. Douglas, RII OE Mail
 
B. Westreich, NSIR E. McNiel, NSIR RIDSNRRDIRS R. Pascarelli, NRR RidsNrrPMSequoyah Resource
}}
}}

Revision as of 14:10, 4 July 2018

IR 05000327-13-406 and IR 05000328/13-406, Sequoyah Nuclear Plant, Material Control and Accounting Inspection Report (OUO Removed)
ML13221A237
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/09/2013
From: Shaeffer S M
Reactor Projects Region 2 Branch 6
To: Shea J W
Tennessee Valley Authority
References
IR-13-406
Download: ML13221A237 (5)


Text

OFFICIAL USE ONLY August 9, 2013 Mr. Joseph Vice President, Nuclear Licensing Tennessee Valley Authority

1101 Market Street, LP 3D-C

Chattanooga, TN 37402-2801

SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000327/2013406 AND

05000328/2013406

Dear Mr. Shea:

On June 27, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a material control and accounting inspection at Sequoyah Nuclear Plant, Units 1 and 2. The enclosed inspection report documents the inspection results discussed on June 27, 2013 with Mr. J. Carlin and other members of his staff.

This inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), t he NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC P ublic Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Should you have any questions concerning this letter, please contact us.

Sincerely,/RA/ Scott M. Shaeffer, Chief Reactor Projects Branch 6 Division of Reactor Projects

Docket No.: 50-327, 50-328 License No.: DPR-77, DPR-79

Enclosure:

NRC Material Control and Accounting Inspection Report 05000327/2013406 and 05000328/2013406

w/Attachment:

Supplemental Information

cc w/encl: (See page 3)

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE Via email Via email SMS /RA/ JDH /RA/ NAME WDeschaine GSmith SShaeffer JHamman DATE 08/08/2013 08/08/2013 09/09/2013 09/09/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/o encl:

via ListServ Letter to Joseph from Scott Shaeffer dated August 9, 2013

SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000327/2013406 AND

05000328/2013406

Distribution w/encl

C. Evans, RII L. Douglas, RII OE Mail

B. Westreich, NSIR E. McNiel, NSIR RIDSNRRDIRS R. Pascarelli, NRR RidsNrrPMSequoyah Resource