ML13273A202: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 3
| page count = 3
}}
}}
=Text=
{{#Wiki_filter:vEntergyEntergy Nuclear Operations, Inc.600 Rocky Hill RoadPlymouth, MA 02360Pilgrim Nuclear Power StationSeptember 19, 2013U. S. Nuclear Regulatory Commission ATTN: Document Control DeskWashington, D.C. 20555-0001
==SUBJECT:==
Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power StationDocket No.: 50-293License No.: DPR-35Response to RIS 2013-06 "Preparation and Scheduling of OperatorLicensing Examinations" LETTER NUMBER: 2.13.077
==Dear Sir or Madam:==
On June 7, 2013, the NRC issued Regulatory Issue Summary (RIS) 2013-06, "Preparation andScheduling of Operator Licensing Examinations".
This RIS requested information from licensees regarding proposed licensed operatorexaminations schedules and estimated number of applicants in order to assist the NRC inplanning resources.
Accordingly, the requested information is provided on the enclosedNRC Form 536.There are no commitments contained in this letter.Please contact me at (508) 830-8403, if there are any questions regarding this subject.Sincerely, Joseph R.LynchManager, Licensing JRL/fm
==Enclosure:==
Completed NRC Form 536cc: Mr. William M. DeanRegional Administrator, Region 1U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100King of Prussia, PA 19406-2713 Senior Resident Inspector Pilgrim Nuclear Power StationýADC)
Enclosure to Pilgrim Letter 2.13.077Completed NRC Form 536(1 page)
NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES:
09/30(2014 (09-2011)
Estimated burden per response to comply with this voluntary information collection request 1hour. This information collection is used to plan budgets and resources for operatorexaminations.
Send comments regarding burden estimate to the Information Services BranchOPERATOR LICENSING (1.5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information andRegulatory
: Affairs, NEOB-1020Z (3150-0131),
Office ot Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required torespond to, the information collection.
FACILITY NRC REGIONPILGRIM NUCLEAR POWER STATION IA. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY 15 CY 16 CY 17 CY 18ESTIMATED NUMBER OFLICENSEE-PREPARED 0 0 1 0EXAMINATIONS ESTIMATED NUMBER OFNRC-PREPARED 0 0 0EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 15 CY 16 CY 17 CY 18NUMBER OF REACTOR 0 0 5 0OPERATORS NUMBER OF SENIOR REACTOROPERATORS
-INSTANT 6 0NUMBER OF SENIOR REACTOROPERATORS
-UPGRADE 0 0NUMBER OF SENIOR REACTOROPERATORS
-LIMITED 0PROPOSED DATESPRIMARY DATE N/A N/A 1/30/2017 N/AALTERNATE DATE N/A N/A 2/6/2017 N/AC. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULECY 15 CY 16PROPOSED
--_, --NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBERESTIMATED NUMBER OF 0 0 0 l1 0 0 0 0CANDIDATES NRC FORM 536 (09-2011)}}

Revision as of 02:01, 4 July 2018

Pilgrim, Response to RIS 2013-06, Preparation and Scheduling of Operator Licensing Examinations.
ML13273A202
Person / Time
Site: Pilgrim
Issue date: 09/19/2013
From: Lynch J R
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.13.077
Download: ML13273A202 (3)


Text

vEntergyEntergy Nuclear Operations, Inc.600 Rocky Hill RoadPlymouth, MA 02360Pilgrim Nuclear Power StationSeptember 19, 2013U. S. Nuclear Regulatory Commission ATTN: Document Control DeskWashington, D.C. 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power StationDocket No.: 50-293License No.: DPR-35Response to RIS 2013-06 "Preparation and Scheduling of OperatorLicensing Examinations" LETTER NUMBER: 2.13.077

Dear Sir or Madam:

On June 7, 2013, the NRC issued Regulatory Issue Summary (RIS) 2013-06, "Preparation andScheduling of Operator Licensing Examinations".

This RIS requested information from licensees regarding proposed licensed operatorexaminations schedules and estimated number of applicants in order to assist the NRC inplanning resources.

Accordingly, the requested information is provided on the enclosedNRC Form 536.There are no commitments contained in this letter.Please contact me at (508) 830-8403, if there are any questions regarding this subject.Sincerely, Joseph R.LynchManager, Licensing JRL/fm

Enclosure:

Completed NRC Form 536cc: Mr. William M. DeanRegional Administrator, Region 1U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100King of Prussia, PA 19406-2713 Senior Resident Inspector Pilgrim Nuclear Power StationýADC)

Enclosure to Pilgrim Letter 2.13.077Completed NRC Form 536(1 page)

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES:

09/30(2014 (09-2011)

Estimated burden per response to comply with this voluntary information collection request 1hour. This information collection is used to plan budgets and resources for operatorexaminations.

Send comments regarding burden estimate to the Information Services BranchOPERATOR LICENSING (1.5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information andRegulatory

Affairs, NEOB-1020Z (3150-0131),

Office ot Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required torespond to, the information collection.

FACILITY NRC REGIONPILGRIM NUCLEAR POWER STATION IA. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY 15 CY 16 CY 17 CY 18ESTIMATED NUMBER OFLICENSEE-PREPARED 0 0 1 0EXAMINATIONS ESTIMATED NUMBER OFNRC-PREPARED 0 0 0EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 15 CY 16 CY 17 CY 18NUMBER OF REACTOR 0 0 5 0OPERATORS NUMBER OF SENIOR REACTOROPERATORS

-INSTANT 6 0NUMBER OF SENIOR REACTOROPERATORS

-UPGRADE 0 0NUMBER OF SENIOR REACTOROPERATORS

-LIMITED 0PROPOSED DATESPRIMARY DATE N/A N/A 1/30/2017 N/AALTERNATE DATE N/A N/A 2/6/2017 N/AC. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULECY 15 CY 16PROPOSED

--_, --NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBERESTIMATED NUMBER OF 0 0 0 l1 0 0 0 0CANDIDATES NRC FORM 536 (09-2011)