{{#Wiki_filter:*Exe on GeGeorge GellrichExeon Generation() Site Vice PresidentCalvert Cliffs Nuclear Power Plant1650 Calvert Cliffs ParkwayLusby, MD 20657410 495 5200 Office717 497 3463 Mobilewww.exeloncorp.comgeorge.gellrich@exeloncorp.comJune 13, 2014U. S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, DC 20555Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2Renewed Facility Operating License Nos. DPR-53 and DPR-69NRC Docket Nos. 50-317 and 50-318
{{#Wiki_filter:*Exe on GeGeorge GellrichExeon Generation()
Site Vice President Calvert Cliffs Nuclear Power Plant1650 Calvert Cliffs ParkwayLusby, MD 20657410 495 5200 Office717 497 3463 Mobilewww.exeloncorp.com george.gellrich@exeloncorp.com June 13, 2014U. S. Nuclear Regulatory Commission ATTN: Document Control DeskWashington, DC 20555Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2Renewed Facility Operating License Nos. DPR-53 and DPR-69NRC Docket Nos. 50-317 and 50-318


==Subject:==
==Subject:==
Supplemental Information Regarding License Amendment Request to AdoptTSTF-426-A
Supplemental Information Regarding License Amendment Request to AdoptTSTF-426-A


==Reference:==
==Reference:==
: 1. Letter from Mr. G. H. Gellrich (CCNPP) to Document Control Desk (NRC),dated November 13, 2013, Application for Technical SpecificationImprovement to Adopt TSTF-426-A, Revision 5, "Revise of Add Actions toPreclude Entry into LCO 3.0.3 -RITSTF Initiatives 6b and 6c"In Reference 1, Calvert Cliffs Nuclear Power Plant, LLC submitted a license amendmentrequest to modify the Technical Specification requirements to adopt the changes described inTechnical Specification Task Force (TSTF)-426-A, Revision 5, "Revise of Add Actions toPreclude Entry into LCO 3.0.3 -RITSTF Initiatives 6b and 6c." Supplemental information isneeded for completion of the Nuclear Regulatory Commission review of the requestedamendment. Attachment (1) provides corrected inserts for Technical Specification 3.6.6 and3.7.8. Additionally, corrected Technical Specification Bases insert B 3.7.8.1 is also provided inAttachment (1). Please replace the affected inserts in Reference 1 with the attached inserts.We apologize for any inconvenience.This supplemental information does not change the No Significant Hazards Determinationprovided in Reference 1. No regulatory commitments are contained in this letter.Should you have questions regarding this matter, please contact Mr. Douglas E. Lauver,Regulatory Assurance Manager, at (410) 495-5219.A 00 Document Control DeskJune 13, 2014Page 2I declare under penalty of perjury that the foregoing is true and correct. Executed on June 13,2014.Respectfully,George H. Ge richSite Vice PresidentExelon Generation Company, LLCGHG/PSF/bjd
: 1. Letter from Mr. G. H. Gellrich (CCNPP) to Document Control Desk (NRC),dated November 13, 2013, Application for Technical Specification Improvement to Adopt TSTF-426-A, Revision 5, "Revise of Add Actions toPreclude Entry into LCO 3.0.3 -RITSTF Initiatives 6b and 6c"In Reference 1, Calvert Cliffs Nuclear Power Plant, LLC submitted a license amendment request to modify the Technical Specification requirements to adopt the changes described inTechnical Specification Task Force (TSTF)-426-A, Revision 5, "Revise of Add Actions toPreclude Entry into LCO 3.0.3 -RITSTF Initiatives 6b and 6c." Supplemental information isneeded for completion of the Nuclear Regulatory Commission review of the requested amendment.
Attachment (1) provides corrected inserts for Technical Specification 3.6.6 and3.7.8. Additionally, corrected Technical Specification Bases insert B 3.7.8.1 is also provided inAttachment (1). Please replace the affected inserts in Reference 1 with the attached inserts.We apologize for any inconvenience.
This supplemental information does not change the No Significant Hazards Determination provided in Reference  
: 1. No regulatory commitments are contained in this letter.Should you have questions regarding this matter, please contact Mr. Douglas E. Lauver,Regulatory Assurance  
: Manager, at (410) 495-5219.
A 00 Document Control DeskJune 13, 2014Page 2I declare under penalty of perjury that the foregoing is true and correct.
Executed on June 13,2014.Respectfully, George H. Ge richSite Vice President Exelon Generation  
: Company, LLCGHG/PSF/bjd


==Attachment:==
==Attachment:==
(1) Revised Inserts 3.6.6, 3.7.8 and B 3.7.8.1cc: CCNPP Project Manager, NRC CCNPP Resident Inspector, NRCRegion 1 Administrator, NRC S. Gray, DNR ATTACHMENT (1)REVISED INSERTS 3.6.6, 3.7.8 AND B 3.7.8.1Calvert Cliffs Nuclear Power PlantJune 13, 2014 Insert 3.6.6C. -NOTE -Not applicable whensecond contai nmentspray trainintentionally madeinoperable.Two containment spraytrains inoperable.C.1ANDC.2Verify LCO 3.7.8,"CREVS," is met.1 hour24 hoursRestore at least onecontainment spraytrain to OPERABLEstatus.Insert 3.7.8F. --------NOTE------Not applicable whensecond CREVS trainintentionally madeinoperable.F.1Initiate action toimplement mitigatingactions.ANDF.2Two CREVS trainsinoperable in MODE2, 3, or 4 forreasons other thanCondition D.Verify LCO 3.4.15,"RCS SpecificActivity," is met.Immediately1 hour24 hours1,ANDF.3Restore at least oneCREVS train toOPERABLE status.Insert B 3.7.8 11.1 and 1.2If the inoperable CREVs or Control Room boundary cannot be restored to OPERABLE statuswithin the associated Completion Time in MODE 1, 2, 3, or 4, the unit must be placed in a modethat minimizes the accident risk. To achieve this status the unit must be placed in at leastMODE 3 within six hours and in MODE 5 within 36 hours. The allowed Completion Times arereasonable, based on operating experience, to reach the required unit conditions from full powerconditions in an orderly manner and without challenging unit systems.}}
 
(1) Revised Inserts 3.6.6, 3.7.8 and B 3.7.8.1cc: CCNPP Project Manager, NRC CCNPP Resident Inspector, NRCRegion 1 Administrator, NRC S. Gray, DNR ATTACHMENT (1)REVISED INSERTS 3.6.6, 3.7.8 AND B 3.7.8.1Calvert Cliffs Nuclear Power PlantJune 13, 2014 Insert 3.6.6C. -NOTE -Not applicable whensecond contai nmentspray trainintentionally madeinoperable.
Two containment spraytrains inoperable.
C.1ANDC.2Verify LCO 3.7.8,"CREVS,"
is met.1 hour24 hoursRestore at least onecontainment spraytrain to OPERABLEstatus.Insert 3.7.8F. --------NOTE------
Not applicable whensecond CREVS trainintentionally madeinoperable.
F.1Initiate action toimplement mitigating actions.ANDF.2Two CREVS trainsinoperable in MODE2, 3, or 4 forreasons other thanCondition D.Verify LCO 3.4.15,"RCS SpecificActivity,"
is met.Immediately 1 hour24 hours1,ANDF.3Restore at least oneCREVS train toOPERABLE status.Insert B 3.7.8 11.1 and 1.2If the inoperable CREVs or Control Room boundary cannot be restored to OPERABLE statuswithin the associated Completion Time in MODE 1, 2, 3, or 4, the unit must be placed in a modethat minimizes the accident risk. To achieve this status the unit must be placed in at leastMODE 3 within six hours and in MODE 5 within 36 hours. The allowed Completion Times arereasonable, based on operating experience, to reach the required unit conditions from full powerconditions in an orderly manner and without challenging unit systems.}}

Revision as of 14:34, 1 July 2018

Supplemental Information Regarding License Amendment Request to Adopt TSTF-426-A
ML14169A032
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 06/13/2014
From: Gellrich G H
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML14169A032 (4)


Text

  • Exe on GeGeorge GellrichExeon Generation()

Site Vice President Calvert Cliffs Nuclear Power Plant1650 Calvert Cliffs ParkwayLusby, MD 20657410 495 5200 Office717 497 3463 Mobilewww.exeloncorp.com george.gellrich@exeloncorp.com June 13, 2014U. S. Nuclear Regulatory Commission ATTN: Document Control DeskWashington, DC 20555Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2Renewed Facility Operating License Nos. DPR-53 and DPR-69NRC Docket Nos. 50-317 and 50-318

Subject:

Supplemental Information Regarding License Amendment Request to AdoptTSTF-426-A

Reference:

1. Letter from Mr. G. H. Gellrich (CCNPP) to Document Control Desk (NRC),dated November 13, 2013, Application for Technical Specification Improvement to Adopt TSTF-426-A, Revision 5, "Revise of Add Actions toPreclude Entry into LCO 3.0.3 -RITSTF Initiatives 6b and 6c"In Reference 1, Calvert Cliffs Nuclear Power Plant, LLC submitted a license amendment request to modify the Technical Specification requirements to adopt the changes described inTechnical Specification Task Force (TSTF)-426-A, Revision 5, "Revise of Add Actions toPreclude Entry into LCO 3.0.3 -RITSTF Initiatives 6b and 6c." Supplemental information isneeded for completion of the Nuclear Regulatory Commission review of the requested amendment.

Attachment (1) provides corrected inserts for Technical Specification 3.6.6 and3.7.8. Additionally, corrected Technical Specification Bases insert B 3.7.8.1 is also provided inAttachment (1). Please replace the affected inserts in Reference 1 with the attached inserts.We apologize for any inconvenience.

This supplemental information does not change the No Significant Hazards Determination provided in Reference

1. No regulatory commitments are contained in this letter.Should you have questions regarding this matter, please contact Mr. Douglas E. Lauver,Regulatory Assurance
Manager, at (410) 495-5219.

A 00 Document Control DeskJune 13, 2014Page 2I declare under penalty of perjury that the foregoing is true and correct.

Executed on June 13,2014.Respectfully, George H. Ge richSite Vice President Exelon Generation

Company, LLCGHG/PSF/bjd

Attachment:

(1) Revised Inserts 3.6.6, 3.7.8 and B 3.7.8.1cc: CCNPP Project Manager, NRC CCNPP Resident Inspector, NRCRegion 1 Administrator, NRC S. Gray, DNR ATTACHMENT (1)REVISED INSERTS 3.6.6, 3.7.8 AND B 3.7.8.1Calvert Cliffs Nuclear Power PlantJune 13, 2014 Insert 3.6.6C. -NOTE -Not applicable whensecond contai nmentspray trainintentionally madeinoperable.

Two containment spraytrains inoperable.

C.1ANDC.2Verify LCO 3.7.8,"CREVS,"

is met.1 hour24 hoursRestore at least onecontainment spraytrain to OPERABLEstatus.Insert 3.7.8F. --------NOTE------

Not applicable whensecond CREVS trainintentionally madeinoperable.

F.1Initiate action toimplement mitigating actions.ANDF.2Two CREVS trainsinoperable in MODE2, 3, or 4 forreasons other thanCondition D.Verify LCO 3.4.15,"RCS SpecificActivity,"

is met.Immediately 1 hour24 hours1,ANDF.3Restore at least oneCREVS train toOPERABLE status.Insert B 3.7.8 11.1 and 1.2If the inoperable CREVs or Control Room boundary cannot be restored to OPERABLE statuswithin the associated Completion Time in MODE 1, 2, 3, or 4, the unit must be placed in a modethat minimizes the accident risk. To achieve this status the unit must be placed in at leastMODE 3 within six hours and in MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times arereasonable, based on operating experience, to reach the required unit conditions from full powerconditions in an orderly manner and without challenging unit systems.