{{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2  Facility: Clinton Power Station Date of Examination: 8/18/2015  Exam Level:  RO   SRO-I  SRO-U  Operating Test No.: 2015-302  Control Room Systems: *8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code* Safety Function a. CRD / Control Rod Scram Time Testing Restoration A,N,S 1 b. RHR / Initiate Low Pressure ECCS System and Maximize Injection A,D,EN,L,S 2 c. MTG / Turbine On Line Tests A,D,P,S 3 d. HPCS / Perform a HPCS Pump Operability Test A,D,EN,S 4 e. CRVICS / Manually Perform a Group 1 Isolation A,D,EN,L,S 5 f. RPS / Perform a Manual SCRAM Functional/SDV Hi Level Bypass Test D,P,S 7 g. VC / Startup the Control Room Ventilation System (VC) in the Hi Radiation Mode D,EN,S 9 h. n/a n/a n/a In-Plant Systems * (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i. ELEC / Manual Transfer of Distribution Load Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter D,P,R 6 j. LPCI / RSP-Div 2 LPCI Operation E,L,N,R 7 k. IAS / Place an IA Ring Header Auto Isolation Valve into Service D,E,R 8
{{#Wiki_filter:ES-301 Control Room/In
* All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
-Plant Systems Outline Form ES-301-2  Facility: Clinton Power Station Date of Examination: 8/18/2015  Exam Level:  RO SRO-I  SRO-U  Operating Test No.: 2015-302  Control Room Systems
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A) (P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3   
: *8 for RO; 7 for SRO
  < 9 / < 8 / < 4  > 1 / > 1 / > 1  > 1 /    > 1  /  > 1 (control room system)  > 1 / > 1 / > 1  > 2 / > 2 / > 1  < 3 / < 3 / < 2 (randomly selected) > 1 / > 1 / > 1  ES-301, Page 23 of 27}}
-I; 2 or 3 for SRO
-U System / JPM Title Type Code*
Safety Function a. CRD / Control Rod Scram Time Testing Restoration A,N,S 1 b. RHR / Initiate Low Pressure ECCS System and Maximize Injection A,D,EN,L,S 2 c. MTG / Turbine On Line Tests A,D,P,S 3 d. HPCS / Perform a HPCS Pump Operability Test A,D,EN,S 4 e. CRVICS / Manually Perform a Group 1 Isolation A,D,EN,L,S 5 f. RPS / Perform a Manual SCRAM Functional/SDV Hi Level Bypass Test D,P,S 7 g. VC / Startup the Control Room Ventilation System (
VC) in the Hi Radiation Mode D,EN,S 9 h. n/a n/a n/a In-Plant Systems
* (3 for RO); (3 for SRO
-I); (3 or 2 for SRO
-U) i. ELEC / Manual Transfer of Distribution Load Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter D,P,R 6 j. LPCI / RSP-Div 2 LPCI Operation E,L,N,R 7 k. IAS / Place an IA Ring Header Auto Isolation Valve into Service D,E,R 8
* All RO and SRO
-I control room (and in
-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in
-plant systems and functions may overlap those tested in the control room.
* Type Codes Criteria for RO / SRO
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
-plant (EN)gineered safety feature
 
(L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3   
  < 9 / < 8 / < 4  > 1 / > 1 / > 1  > 1 /    > 1  /  > 1 (control room system
)  > 1 / > 1 / > 1  > 2 / > 2 / > 1  < 3 / < 3 / < 2 (randomly selected)
  > 1 / > 1 / > 1  ES-301, Page 23 of 27}}

Revision as of 21:26, 30 June 2018

2015 Clinton Power Station Initial License Examination Form ES-301-2
ML15217A236
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/19/2015
From: McNeil D R
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML15216A597 List:
References
Download: ML15217A236 (1)


Text

ES-301 Control Room/In

-Plant Systems Outline Form ES-301-2 Facility: Clinton Power Station Date of Examination: 8/18/2015 Exam Level: RO SRO-I SRO-U Operating Test No.: 2015-302 Control Room Systems

*8 for RO; 7 for SRO

-I; 2 or 3 for SRO

-U System / JPM Title Type Code*

Safety Function a. CRD / Control Rod Scram Time Testing Restoration A,N,S 1 b. RHR / Initiate Low Pressure ECCS System and Maximize Injection A,D,EN,L,S 2 c. MTG / Turbine On Line Tests A,D,P,S 3 d. HPCS / Perform a HPCS Pump Operability Test A,D,EN,S 4 e. CRVICS / Manually Perform a Group 1 Isolation A,D,EN,L,S 5 f. RPS / Perform a Manual SCRAM Functional/SDV Hi Level Bypass Test D,P,S 7 g. VC / Startup the Control Room Ventilation System (

VC) in the Hi Radiation Mode D,EN,S 9 h. n/a n/a n/a In-Plant Systems

-I); (3 or 2 for SRO

-U) i. ELEC / Manual Transfer of Distribution Load Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter D,P,R 6 j. LPCI / RSP-Div 2 LPCI Operation E,L,N,R 7 k. IAS / Place an IA Ring Header Auto Isolation Valve into Service D,E,R 8

-I control room (and in

-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in

-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO

-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in

-plant (EN)gineered safety feature

(L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3

< 9 / < 8 / < 4 > 1 / > 1 / > 1 > 1 / > 1 / > 1 (control room system

) > 1 / > 1 / > 1 > 2 / > 2 / > 1 < 3 / < 3 / < 2 (randomly selected)

> 1 / > 1 / > 1 ES-301, Page 23 of 27