| {{#Wiki_filter:ENCLOSURE 1 CONTAINS PROPRIETARY INFORMATIONWITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390XceI Energy°Monticello Nuclear Generating Plant2807 W County Rd 75Monticello, MN 55362February 29, 2016L-MT- 16-01010 CFR 50.90U.S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, DC 20555-0001Monticello Nuclear Generating PlantDocket 50-263Renewed License No. DPR-22License Amendment Request for AREVA Extended Flow WindowSupplement to Disposition Chancqes to Non-Limitinq Transient Analyses(TAC No. MF5002) | | {{#Wiki_filter:ENCLOSURE 1 CONTAINS PROPRIETARY INFORMATION WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390XceI Energy°Monticello Nuclear Generating Plant2807 W County Rd 75Monticello, MN 55362February 29, 2016L-MT- 16-01010 CFR 50.90U.S. Nuclear Regulatory Commission ATTN: Document Control DeskWashington, DC 20555-0001 Monticello Nuclear Generating PlantDocket 50-263Renewed License No. DPR-22License Amendment Request for AREVA Extended Flow WindowSupplement to Disposition Chancqes to Non-Limitinq Transient Analyses(TAC No. MF5002) |
|
| |
|
| ==References:== | | ==References:== |
| : 1) Letter from Karen D. Fili (NSPM), to Document Control Desk (NRC),"License Amendment Request for AREVA Extended Flow Window,"L-MT-14-044, dated October 3, 2014 (ADAMS Accession No.ML14283A1 25)2) Letter from Peter A. Gardner (NSPM) to Document Control Desk(NRC), "License Amendment Request for ARE VA Extended FlowWindow Supplement to Respond to NRC Staff Questions (TAC No.MF5002)," L-MT-15-065, dated September 29, 2015 (ADAMSAccession No. ML15274A473)3) Letter from Peter A. Gardner (NSPM) to Document Control Desk(NRC), "License Amendment Request for AREVA Extended FlowWindow Supplement to Provide Revised Analysis of AnticipatedTransient Without Scram Instability (TAC No. MF5002)," L-MT-15-081,dated December 8, 2015 (ADAMS Accession No. ML15345A407)In Reference 1, Northern States Power Company, a Minnesota corporation (NSPM)doing business as Xcel Energy, requested approval of an amendment to the MonticelloNuclear Generating Plant (MNGP) Renewed Operating License (OL) and TechnicalSpecifications (TS). The proposed change would revise the MNGP TS and wouldapprove certain analytical methods that together would support operation in theexpanded power-flow operating domain described as the Extended Flow Window(EFW). The purpose of the requested amendment is to transition from the GeneralElectric -Hitachi methodology called Maximum Extended Load Line Limit Analysis Plus(MELLLA+) to the AREVA methodology called EFW. | | : 1) Letter from Karen D. Fili (NSPM), to Document Control Desk (NRC),"License Amendment Request for AREVA Extended Flow Window,"L-MT-14-044, dated October 3, 2014 (ADAMS Accession No.ML14283A1 25)2) Letter from Peter A. Gardner (NSPM) to Document Control Desk(NRC), "License Amendment Request for ARE VA Extended FlowWindow Supplement to Respond to NRC Staff Questions (TAC No.MF5002)," |
| Document Control DeskPage 2In Reference 2, NSPM provided early identification of errors in AREVA's core depletioncode MICROBURN-B2, and the potential effect on the safety analyses under NRCreview. Subsequently, in Reference 3, NSPM described the effect of those errors onthe limitingq transient analyses; providing revised results for the Anticipated TransientWithout Scram -Instability (ATWS-I) analysis. Reference 3 stated that the effect of theMICROBURN-B2 errors on non-limitinq transient analyses would be managed under theAREVA and NSPM corrective action programs. After discussion with NRC Staff onNovember 24, 2015 and February 3, 2016, NSPM is addressing the non-limitingtransient analyses as described below.* Unmitigqated ATWS-I Analysis. While evaluating the MICROBURN-B2 errors undertheir corrective action program, AREVA identified a nominally adverse impact on the"'unmitigated" case that is described in Sections 4 and 5 of ATWS-l Report ANP-3284Revision 0. That report was submitted as Enclosure 9 to the LAR (Reference 1).Rather than revising the analysis of the unmitigated case and reissuing ANP-3284,NSPM is deleting the unmitigated case in its entirety. In effect, the unmitigated case issuperseded by the mitigated case that was submitted with Reference 2 and revised withReference 3. As stated in ANP-3435 Revision 1:"The analysis of Anticipated Transient Without Scram -Instability (ATWVSi)described herein should be recognized as the licensee's analysis of recordsupporting the proposed amendment to allow operation in the EFW domain."Hereby, NSPM considers the unmitigated ATWS-I case described in Sections 4 and 5of ANP-3284 Revision 0 to be superseded by the mitigated ATWS-l case described byANP-3435 Revision 1.* Control Rod Withdrawal Event (CRWE) Transient Analysis and Average PowerRangqe Monitor (APRM) Sigqnal Reduction. While evaluating the MICROBURN-B2 errorsunder their corrective action program, AREVA also identified nominal impacts on theresults for the CRWE transient analysis and the relative value of APRM signal reductionthat were originally provided in Report ANP-3295 Revision 2. ANP-3295 Revision 2was provided as Enclosure 11 to the LAR (Reference 1). The corrected results for theCRWE transient analysis and APRM signal reduction are provided in Revision 3 toAN P-3295.Thus, Enclosure 1 provides AREVA Report ANP-3295P, Revision 3. Enclosure 1 sproprietary to AREVA. Enclosure 2 provides the non-proprietary AREVA Report ANP-3295NP, Revision 3.Enclosure 3 provides an affidavit executed to support withholding Enclosure 1 frompublic disclosure. Enclosure I contains proprietary information as defined by 10 CFR2.390. The affidavit sets forth the basis on which the information may be withheld frompublic disclosure by the NRC and addresses with specificity the considerations listed in10 CFR 2.390(b)(4). Accordingly, NSPM respectfully requests that the AREVAproprietary information in Enclosure 1 be withheld from public disclosure in accordance Document Control DeskPage 3with 10 CFR 2.390(a)4, as authorized by 10 CFR 9.17(a)4. Correspondence withrespect to the copyright or proprietary aspects of the AREVA information in Enclosure 1or the supporting AREVA affidavit in Enclosure 3 should be addressed to Mr. AlanMeginnis, Manager- Product Licensing, AREVA Inc., 2101 Horn Rapids Road,Richiand, Washington 99354.The information offered herein does not affect the conclusions of the No SignificantHazards Consideration and the Environmental Consideration evaluations provided inthe Reference 1 license amendment request.In accordance with 10 CFR 50.91(b), a copy of this application supplement is beingprovided to the designated Minnesota Official without enclosures.If there are any questions or if additional information is needed, please contact GlennAdams at 612-330-6777.Summary of CommitmentsThis letter makes no new commitments and no revisions to existing commitments.I declare under penalty of perjury that the foregoing is true and correct.Executed on: February 29, 2016Peter A.GadeSite Vice PresidentMonticello Nuclear Generating PlantNorthern States Power Company-MinnesotaEnclosures (3)cc: Administrator, Region Ill, USNRCProject Manager, Monticello Nuclear Generating Plant, USNRCResident Inspector, Monticello Nuclear Generating Plant, USNRCMinnesota Department of Commerce (w/o enclosures) | | L-MT-15-065, dated September 29, 2015 (ADAMSAccession No. ML15274A473) |
| L-MT-1 6-010Enclosure 3ARE VA Affidavit3 pages follow AFFIDAVITCOMMONWEALTH OF VIRGINIA )) s.,CITY OF LYNCHBURG )1. My name is Morris Byram. I am Manager, Product Licensing, for AREVA Inc.(ARE VA) and as such I am authorized to execute this Affidavit.2. I am familiar with the criteria applied by AREVA to determine whether certainAREVA information is proprietary. I am familiar with the policies established byAREVA to ensure the proper application of these criteria.3. I am familiar with the ARE VA information contained in the topical reportANP-3295P, Revision 3, "Monticello Licensing Analysis For EFW (EPUIMELLLA+)," datedFebruary, 2016, and referred to herein as "Document." Information contained in this Documenthas been classified by AREVA as proprietary in accordance with the policies established byAREVA Inc. for the control and protection of proprietary and confidential information.4. Th~is Document contains information of a proprietary and confidential natureand is of the type customarily held in confidence by AREVA and not made available to thepublic. Based on my experience, I am aware that other companies regard information of thekind contained in this Document as proprietary and confidential.5. This Document has been made available to the U.S. Nuclear RegulatoryCommission in confidence with the request that the information contained in this Document bewithheldl from public disclosure. The request for withholding of proprietary information is made inaccordance with 10 CFR 2.390. The information for which withholding from disclosure is requested qualifies under 10 CFR 2.390(a)(4) "Trade secrets and commercial or financialinformation."6. The following criteria are customarily applied by AREVA to determine whetherinformation should be classified as proprietary:-(a) The information reveals details of ARE VA's research and development plansand programs or their results.(b) Use of the information by a competitor would permit the competitor tosignificantly reduce its expenditures, in time or resources, to design, produce,or market a similar product or service.(c) The information includes test data or analytical techniques concerning aprocess, methodology, or component, the application of which results in acompetitive advantage for ARE VA.(d) The information reveals certain distinguishing aspects of a process,methodology, or component, the exclusive use of which provides acompetitive advantage for ARE VA in product optimization or marketability.(e) The information is vital to a competitive advantage held by AREVA, would behelpful to competitors to AREVA, and would likely cause substantial harm tothe competitive position of AREVA.The information in this Document is considered proprietary for the reasons set forth inparagraphs 6(b), 6(c), and 6(d) above.7. In accordance with AREVA's policies governing the protection and control ofinformation, proprietary information contained in this Document has been made available, on alimited basis, to others outside AREVA only as required and under suitable agreement providingfor nondisclosure and limited use of the information.8. AREVA policy requires that proprietary information be kept in a secured file orarea and distributed on a need-to-know basis. | | : 3) Letter from Peter A. Gardner (NSPM) to Document Control Desk(NRC), "License Amendment Request for AREVA Extended FlowWindow Supplement to Provide Revised Analysis of Anticipated Transient Without Scram Instability (TAC No. MF5002)," |
| : 9. The foregoing statements are true and correct to the best of my knowledge,information, and belief.SUBSCRIBED before me this ________day of _______ _______ _______ , 2016.Sherry L. McFaden .NOTARY PUBLIC, COMMONWEALTH'oF VIRGINIAMY COMMISSION EXPIRES: 10/31/18Reg. # 7079129~~Notary PMbfcCom, al~Ot 81, 2018 QF021 2, Revision 5 (FP-SC-RSI-04)Pae1oIPage 1 of 1Xcel Energy@SH{IPP1NG DOCUMJENTNORTHERN STATES POWER -MND/B/A Xcel EnergyMonticello Nuclear Plant, 2807 W Hwy. 75, Monticello, MN 55362Date: 2/29/2016Shipping DocumentTracking Number:Ship To:USNRC11555 Rockville PikeRockville, MD 20852-2738Attention Of: Doc ControlCarrier: UPS -Standard Overnight RMA No:Pro I Tracking No: P0 I Contract No:Packaging: Number of Packages: 1 Weight:Dangerous Goodsl UN/NA No: ..Insurance Est. ValueReason for Shipment: Overnight Shipment to USNRCMelody Imholte -Please ensure tracking number is communicated to me -melody.imholte@xenuclear.com-Item° No. Qty. Unit Description Catalog IDIQ1 Env Submittal to NRC L-MT-16-O10By si S p *ng e'o Urecc gto the best of your knowledge, that the mat nal le ng shipped is incornp/i nce with Xce xergy Corporate Policies. Please print and sign your name legibly.SWlP Making Shipment: 3'/I / '4.Received By: .Date:For wi!l-call use only"Use of this form as a procedural aid does not require retention as a quality record.}} | | L-MT-15-081, dated December 8, 2015 (ADAMS Accession No. ML15345A407) |
| | In Reference 1, Northern States Power Company, a Minnesota corporation (NSPM)doing business as Xcel Energy, requested approval of an amendment to the Monticello Nuclear Generating Plant (MNGP) Renewed Operating License (OL) and Technical Specifications (TS). The proposed change would revise the MNGP TS and wouldapprove certain analytical methods that together would support operation in theexpanded power-flow operating domain described as the Extended Flow Window(EFW). The purpose of the requested amendment is to transition from the GeneralElectric |
| | -Hitachi methodology called Maximum Extended Load Line Limit Analysis Plus(MELLLA+) |
| | to the AREVA methodology called EFW. |
| | Document Control DeskPage 2In Reference 2, NSPM provided early identification of errors in AREVA's core depletion code MICROBURN-B2, and the potential effect on the safety analyses under NRCreview. Subsequently, in Reference 3, NSPM described the effect of those errors onthe limitingq transient analyses; providing revised results for the Anticipated Transient Without Scram -Instability (ATWS-I) analysis. |
| | Reference 3 stated that the effect of theMICROBURN-B2 errors on non-limitinq transient analyses would be managed under theAREVA and NSPM corrective action programs. |
| | After discussion with NRC Staff onNovember 24, 2015 and February 3, 2016, NSPM is addressing the non-limiting transient analyses as described below.* Unmitigqated ATWS-I Analysis. |
| | While evaluating the MICROBURN-B2 errors undertheir corrective action program, AREVA identified a nominally adverse impact on the"'unmitigated" case that is described in Sections 4 and 5 of ATWS-l Report ANP-3284Revision |
| | : 0. That report was submitted as Enclosure 9 to the LAR (Reference 1).Rather than revising the analysis of the unmitigated case and reissuing ANP-3284, NSPM is deleting the unmitigated case in its entirety. |
| | In effect, the unmitigated case issuperseded by the mitigated case that was submitted with Reference 2 and revised withReference |
| | : 3. As stated in ANP-3435 Revision 1:"The analysis of Anticipated Transient Without Scram -Instability (ATWVSi)described herein should be recognized as the licensee's analysis of recordsupporting the proposed amendment to allow operation in the EFW domain."Hereby, NSPM considers the unmitigated ATWS-I case described in Sections 4 and 5of ANP-3284 Revision 0 to be superseded by the mitigated ATWS-l case described byANP-3435 Revision 1.* Control Rod Withdrawal Event (CRWE) Transient Analysis and Average PowerRangqe Monitor (APRM) Sigqnal Reduction. |
| | While evaluating the MICROBURN-B2 errorsunder their corrective action program, AREVA also identified nominal impacts on theresults for the CRWE transient analysis and the relative value of APRM signal reduction that were originally provided in Report ANP-3295 Revision |
| | : 2. ANP-3295 Revision 2was provided as Enclosure 11 to the LAR (Reference 1). The corrected results for theCRWE transient analysis and APRM signal reduction are provided in Revision 3 toAN P-3295.Thus, Enclosure 1 provides AREVA Report ANP-3295P, Revision |
| | : 3. Enclosure 1 sproprietary to AREVA. Enclosure 2 provides the non-proprietary AREVA Report ANP-3295NP, Revision 3.Enclosure 3 provides an affidavit executed to support withholding Enclosure 1 frompublic disclosure. |
| | Enclosure I contains proprietary information as defined by 10 CFR2.390. The affidavit sets forth the basis on which the information may be withheld frompublic disclosure by the NRC and addresses with specificity the considerations listed in10 CFR 2.390(b)(4). |
| | Accordingly, NSPM respectfully requests that the AREVAproprietary information in Enclosure 1 be withheld from public disclosure in accordance Document Control DeskPage 3with 10 CFR 2.390(a)4, as authorized by 10 CFR 9.17(a)4. |
| | Correspondence withrespect to the copyright or proprietary aspects of the AREVA information in Enclosure 1or the supporting AREVA affidavit in Enclosure 3 should be addressed to Mr. AlanMeginnis, Manager-Product Licensing, AREVA Inc., 2101 Horn Rapids Road,Richiand, Washington 99354.The information offered herein does not affect the conclusions of the No Significant Hazards Consideration and the Environmental Consideration evaluations provided inthe Reference 1 license amendment request.In accordance with 10 CFR 50.91(b), |
| | a copy of this application supplement is beingprovided to the designated Minnesota Official without enclosures. |
| | If there are any questions or if additional information is needed, please contact GlennAdams at 612-330-6777. |
| | Summary of Commitments This letter makes no new commitments and no revisions to existing commitments. |
| | I declare under penalty of perjury that the foregoing is true and correct.Executed on: February 29, 2016Peter A.GadeSite Vice President Monticello Nuclear Generating PlantNorthern States Power Company-Minnesota Enclosures (3)cc: Administrator, Region Ill, USNRCProject Manager, Monticello Nuclear Generating Plant, USNRCResident Inspector, Monticello Nuclear Generating Plant, USNRCMinnesota Department of Commerce (w/o enclosures) |
| | L-MT-1 6-010Enclosure 3ARE VA Affidavit 3 pages follow AFFIDAVIT COMMONWEALTH OF VIRGINIA |
| | )) s.,CITY OF LYNCHBURG |
| | )1. My name is Morris Byram. I am Manager, Product Licensing, for AREVA Inc.(ARE VA) and as such I am authorized to execute this Affidavit. |
| | : 2. I am familiar with the criteria applied by AREVA to determine whether certainAREVA information is proprietary. |
| | I am familiar with the policies established byAREVA to ensure the proper application of these criteria. |
| | : 3. I am familiar with the ARE VA information contained in the topical reportANP-3295P, Revision 3, "Monticello Licensing Analysis For EFW (EPUIMELLLA+)," |
| | datedFebruary, 2016, and referred to herein as "Document." |
| | Information contained in this Documenthas been classified by AREVA as proprietary in accordance with the policies established byAREVA Inc. for the control and protection of proprietary and confidential information. |
| | : 4. Th~is Document contains information of a proprietary and confidential natureand is of the type customarily held in confidence by AREVA and not made available to thepublic. Based on my experience, I am aware that other companies regard information of thekind contained in this Document as proprietary and confidential. |
| | : 5. This Document has been made available to the U.S. Nuclear Regulatory Commission in confidence with the request that the information contained in this Document bewithheldl from public disclosure. |
| | The request for withholding of proprietary information is made inaccordance with 10 CFR 2.390. The information for which withholding from disclosure is requested qualifies under 10 CFR 2.390(a)(4) |
| | "Trade secrets and commercial or financial information." |
| | : 6. The following criteria are customarily applied by AREVA to determine whetherinformation should be classified as proprietary: |
| | -(a) The information reveals details of ARE VA's research and development plansand programs or their results.(b) Use of the information by a competitor would permit the competitor tosignificantly reduce its expenditures, in time or resources, to design, produce,or market a similar product or service.(c) The information includes test data or analytical techniques concerning |
| | : aprocess, methodology, or component, the application of which results in acompetitive advantage for ARE VA.(d) The information reveals certain distinguishing aspects of a process,methodology, or component, the exclusive use of which provides acompetitive advantage for ARE VA in product optimization or marketability. |
| | (e) The information is vital to a competitive advantage held by AREVA, would behelpful to competitors to AREVA, and would likely cause substantial harm tothe competitive position of AREVA.The information in this Document is considered proprietary for the reasons set forth inparagraphs 6(b), 6(c), and 6(d) above.7. In accordance with AREVA's policies governing the protection and control ofinformation, proprietary information contained in this Document has been made available, on alimited basis, to others outside AREVA only as required and under suitable agreement providing for nondisclosure and limited use of the information. |
| | : 8. AREVA policy requires that proprietary information be kept in a secured file orarea and distributed on a need-to-know basis. |
| | : 9. The foregoing statements are true and correct to the best of my knowledge, information, and belief.SUBSCRIBED before me this ________day of _______ _______ _______ , 2016.Sherry L. McFaden .NOTARY PUBLIC, COMMONWEALTH'oF VIRGINIAMY COMMISSION EXPIRES: |
| | 10/31/18Reg. # 7079129~~Notary |
| | : PMbfcCom, al~Ot 81, 2018 QF021 2, Revision 5 (FP-SC-RSI-04)Pae1oI Page 1 of 1Xcel Energy@SH{IPP1NG DOCUMJENT NORTHERN STATES POWER -MND/B/A Xcel EnergyMonticello Nuclear Plant, 2807 W Hwy. 75, Monticello, MN 55362Date: 2/29/2016 Shipping DocumentTracking Number:Ship To:USNRC11555 Rockville PikeRockville, MD 20852-2738 Attention Of: Doc ControlCarrier: |
| | UPS -Standard Overnight RMA No:Pro I Tracking No: P0 I Contract No:Packaging: |
| | Number of Packages: |
| | 1 Weight:Dangerous Goodsl UN/NA No: ..Insurance Est. ValueReason for Shipment: |
| | Overnight Shipment to USNRCMelody Imholte -Please ensure tracking number is communicated to me -melody.imholte@xenuclear.com |
| | -Item° No. Qty. Unit Description Catalog IDIQ1 Env Submittal to NRC L-MT-16-O10 By si S p *ng e'o Urecc gto the best of your knowledge, that the mat nal le ng shipped is incornp/i nce with Xce xergy Corporate Policies. |
| | Please print and sign your name legibly.SWlP Making Shipment: |
| | 3'/I / '4.Received By: .Date:For wi!l-call use only"Use of this form as a procedural aid does not require retention as a quality record.}} |
Letter Sequence Supplement |
---|
|
|
MONTHYEARML15022A1652015-01-0909 January 2015 License Amendment Request for Areva Extended Flow Window Supplement to Respond to NRC Staff Questions Project stage: Supplement ML15030A0092015-01-28028 January 2015 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance Review for License Amendment Request Transition to Areva Extended Flow Window Methodology Project stage: Acceptance Review ML15195A4472015-08-0505 August 2015 Summary of Public Meeting with Xcel Energy and Areva to Discuss Changes to the Proposed Technical Specifications and COLR in Support of the Areva Extended Flow Window License Amendment Request Project stage: Meeting L-MT-15-057, License Amendment Request for Areva Extended Flow Window Supplement to Respond to NRC Staff Questions2015-08-26026 August 2015 License Amendment Request for Areva Extended Flow Window Supplement to Respond to NRC Staff Questions Project stage: Supplement ML15140A1242015-09-28028 September 2015 Request for Withholding Information from Public Disclosure from Areva Inc. Associated with the Areva Extended Flow Window License Amendment Request Project stage: Withholding Request Acceptance ML15140A1472015-09-28028 September 2015 Request for Withholding Information from Public Disclosure (GE-Hitachi LLC) Associated with the Areva Extended Flow Window License Amendment Request Project stage: Withholding Request Acceptance ML15274A4732015-09-29029 September 2015 License Amendment Request for Areva Extended Flow Window Supplement to Respond to NRC Staff Questions Project stage: Supplement L-MT-15-065, Enclosure 8, Areva Report ANP-3424NP, Revision 1 to Areva Responses to RAI from Scvb on MNGP EFW LAR (Non-Proprietary) and Enclosure 9, Areva Affidavits2015-09-29029 September 2015 Enclosure 8, Areva Report ANP-3424NP, Revision 1 to Areva Responses to RAI from Scvb on MNGP EFW LAR (Non-Proprietary) and Enclosure 9, Areva Affidavits Project stage: Response to RAI ML15274A4752015-09-29029 September 2015 Enclosure 6, Areva Report ANP-3435NP, Revision 0 to Are VA Responses to RAI-8 and RAI-32 from Srxb and Snpb on MNGP EFW LAR (Non-Proprietary) Project stage: Response to RAI ML15274A4742015-09-29029 September 2015 Enclosure 4, Engineering Evaluation, EC 25987, Calculation Framework for the Extended Flow Window Stability (Efws) Setpoints Project stage: Other L-MT-15-081, ANP-3435NP, Revision 1, Areva Responses to RAI-8 and RAI-32 from Srxb and Snpb on MNGP EFW Lar.2015-12-0808 December 2015 ANP-3435NP, Revision 1, Areva Responses to RAI-8 and RAI-32 from Srxb and Snpb on MNGP EFW Lar. Project stage: Response to RAI ML15345A4072015-12-0808 December 2015 License Amendment Request for Areva Extended Flow Window, Supplement to Provide Revised Analysis of Anticipated Transient Without Scram Instability Project stage: Supplement ML16063A0332016-02-29029 February 2016 License Amendment Request for Areva Extended Flow Window Supplement to Disposition Changes to Non-Limiting Transient Analyses Project stage: Supplement L-MT-16-017, Revised Commitment to Reconcile Analysis of Bypass Voiding for Transition to Areva Analysis Methodology2016-04-29029 April 2016 Revised Commitment to Reconcile Analysis of Bypass Voiding for Transition to Areva Analysis Methodology Project stage: Other ML16221A2742016-07-31031 July 2016 ANP-3435NP, Revision 2, Areva Responses to RAI-8 and RAI-32 from Srxb and Snpb on MNGP EFW Lar. Project stage: Response to RAI L-MT-16-037, ANP-3284NP, Revision 1, Results of Analysis and Benchmarking of Methods for Monticello ATWS-I.2016-07-31031 July 2016 ANP-3284NP, Revision 1, Results of Analysis and Benchmarking of Methods for Monticello ATWS-I. Project stage: Other ML16221A2752016-07-31031 July 2016 ANP-3274NP, Revision 2, Analytical Methods for Monticello ATWS-I. Project stage: Other ML16221A2732016-08-0404 August 2016 License Amendment Request for Areva Extended Flow Window Supplement to Provide Revised Analysis of Anticipated Transient Without Scram Instability Project stage: Supplement L-MT-16-041, License Amendment Request for Areva Extended Flow Window Supplement to Address Power Distribution Uncertainties2016-09-14014 September 2016 License Amendment Request for Areva Extended Flow Window Supplement to Address Power Distribution Uncertainties Project stage: Supplement L-MT-16-049, License Amendment Request for Areva Extended Flow Window Supplement to Revise the Applicability of a Topical Report Limitation2016-09-28028 September 2016 License Amendment Request for Areva Extended Flow Window Supplement to Revise the Applicability of a Topical Report Limitation Project stage: Supplement 2015-09-29
[Table View] |
|
---|
Category:Letter
MONTHYEARML24283A1192024-10-28028 October 2024 Letter to Shawn Hafen, Re Monticello Subsequent License Renewal Schedule Change L-MT-24-038, Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI2024-10-15015 October 2024 Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI ML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 ML24199A1752024-10-0101 October 2024 Issuance of Amendment No. 212 Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 IR 05000263/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000263/2024011 L-MT-24-025, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2024-09-26026 September 2024 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements L-MT-24-029, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI2024-09-13013 September 2024 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI IR 05000263/20240052024-08-30030 August 2024 Updated Inspection Plan and Follow-Up Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2024005) L-MT-24-028, Response to RCI for RR-017 ISI Impracticality2024-08-28028 August 2024 Response to RCI for RR-017 ISI Impracticality ML24222A1822024-08-27027 August 2024 – Proposed Alternative Request VR-09 to the Inservice Testing Requirements of the ASME OM Code for Main Steam Safety Relief Valves 05000263/LER-2024-002, Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure2024-08-27027 August 2024 Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure IR 05000263/20244202024-08-21021 August 2024 Security Baseline Inspection Report 05000263/2024420 - Cover Letter IR 05000263/20240022024-08-14014 August 2024 Integrated Inspection Report 05000263/2024002 ML24218A2282024-08-0505 August 2024 Request for Confirmation of Information for Relief Request RR-017, Inservice Inspection Impracticality During the Fifth Ten-Year Interval ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24215A2992024-07-23023 July 2024 Minnesota State Historic Preservation Office Comments on Monticello SLR Draft EIS ML24198A2372024-07-18018 July 2024 Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Monticello Nuclear Generating Plant L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24164A2402024-06-10010 June 2024 Minnesota State Historic Preservation Office- Comments on Draft Monticello SLR Draft EIS L-MT-24-019, Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii)2024-06-10010 June 2024 Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii) L-MT-24-017, Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-01602024-06-0404 June 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-0160 ML24137A2792024-06-0303 June 2024 Audit Summary for License Amendment Request to Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A1782024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-MT-24-015, Response to Request for Additional Information - Alternative Request VR-09 for OMN-172024-05-16016 May 2024 Response to Request for Additional Information - Alternative Request VR-09 for OMN-17 L-MT-24-013, 2023 Annual Radiological Environmental Operating Report2024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report ML24135A1902024-05-14014 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report IR 05000263/20240102024-05-13013 May 2024 Age-Related Degrading Inspection Report 05000263/2024010 ML24128A0042024-05-0909 May 2024 Letter to Minnesota State Historic Preservation Office- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renewal Application ML24127A1472024-05-0909 May 2024 Letter to Mille Lacs Band- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renew. Application L-MT-24-016, 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2024-05-0808 May 2024 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance IR 05000263/20240012024-04-29029 April 2024 Plan - Integrated Inspection Report 05000263/2024001 ML24115A2902024-04-25025 April 2024 Sec106 Tribal, Jackson-Street, Lonna-Spirit Lake Nation ML24115A2872024-04-25025 April 2024 Sec106 Tribal, Dupuis, Kevin-Fond Du Lac Band of Lake Superior Chippewa ML24115A2932024-04-25025 April 2024 Sec106 Tribal, Johnson, Grant-Prairie Island Indian Community ML24115A3062024-04-25025 April 2024 Sec106 Tribal, Wassana, Reggie-Cheyenne and Arapaho Tribes 05000263/LER-2024-001, Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component2024-04-25025 April 2024 Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component ML24115A3032024-04-25025 April 2024 Sec106 Tribal, Taylor, Louis-Lac Courte Oreilles Band of Lake Superior Chippewa Indians ML24115A3002024-04-25025 April 2024 Sec106 Tribal, Rhodd, Timothy-Iowa Tribe of Kansas and Nebraska ML24115A2972024-04-25025 April 2024 Sec106 Tribal, Miller, Cole-Shakopee Mdewakanton Sioux Community ML24115A2962024-04-25025 April 2024 Sec106 Tribal, Larsen, Robert-Lower Sioux Indian Community ML24115A2952024-04-25025 April 2024 Sec106 Tribal, Kakkak, Gena-Menominee Indian Tribe of Wisconsin ML24115A2982024-04-25025 April 2024 Sec106 Tribal, Reider, Anthony-Flandreau Santee Sioux Tribe ML24115A2912024-04-25025 April 2024 Sec106 Tribal, Jacskon, Sr., Faron-Leech Lake Band of Ojibwe ML24115A3052024-04-25025 April 2024 Sec106 Tribal, Vanzile, Jr., Robert-Sokaogon Chippewa Community ML24115A2992024-04-25025 April 2024 Sec106 Tribal, Renville, J. Garret-Sisseton Wahpeton Oyate of the Lake Travers Reservation ML24115A3022024-04-25025 April 2024 Sec106 Tribal, Stiffarm, Jeffrey-Fort Belknap Indian Community ML24115A3072024-04-25025 April 2024 Sec106 Tribal, Williams, Jr., James-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24115A2892024-04-25025 April 2024 Sec106 Tribal, Fowler, Thomas-St. Croix Chippewa of Wisconsin 2024-09-26
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24199A1752024-10-0101 October 2024 Issuance of Amendment No. 212 Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 ML23262B2272023-09-21021 September 2023 September 21, 2023, Pre-Submittal Meeting on License Amendment Request to Revise PTLR to Incorporate New Surveillance Capsule Data (EPID L-2023-LRM-0070) (Slides) ML22357A1002023-03-31031 March 2023 And Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendments Standard Emergency Plan and Consolidated Emergency Operations Facility ML23012A1562023-01-13013 January 2023 Issuance of Amendment No. 210 Re Revised Methodologies for Determining the Core Operating Limits (EPID L-2021-LLA-0144) - Non-proprietary ML22318A2152022-12-27027 December 2022 Issuance of Amendment No. 209 Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank ML22308A1962022-11-10010 November 2022 Regulatory Audit Report Regarding License Amendment Request to Transition to Atrium 11 Fuel ML22264A1062022-10-31031 October 2022 Issuance of Amendment No. 208 Residual Heat Removal Drywell Spray Header and Nozzle Surveillance Frequency ML22208A2192022-08-0303 August 2022 Summary of July 25, 2022, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to the Amendment to Adopt Advanced Framatome Inc. Methodology for Determining Core Operating Limits for Monticello Plant ML21223A2802021-10-15015 October 2021 Issuance of Amendment No. 207 Adoption of TSTF-564 Safety Limit MCPR ML21148A2742021-07-12012 July 2021 Issuance of Amendment No. 206 TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML20352A3492021-01-0808 January 2021 Issuance of Amendment No. 205, Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-582, RPV WIC Enhancements, and TSTF-583-T, TSTF-582 Diesel Generator Variation ML20210M0142020-09-0808 September 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Nos. 204, 231, and 219 TSTF-529 Clarify Use and Application Rules ML20153A8042020-07-31031 July 2020 Co. - Issuance of Amendments Revising Emergency Action RA3 ML19176A4212019-08-29029 August 2019 Issuance of Amendment No. 203 Adoption of 10 CFR 50.69 ML19162A0932019-07-30030 July 2019 Issuance of Amendment No, 202 Regarding Deletion of the Note Associated with Technical Specification 3.5.1., Erccs - Operating ML19074A2692019-04-22022 April 2019 Non-Proprietary - Issuance of Amendment Revision to Technical Specifications 2.1.2 Safety Limit Minimum Critical Power Ratio ML19065A2002019-03-11011 March 2019 Correction to License Amendment No. 200 Related to Adoption of TSTF-425, Relocated Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML19007A0902019-01-28028 January 2019 Issuance of Amendment Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control-RITSTF Initiative 5B ML18291B2142018-11-26026 November 2018 Issuance of Amendment Adoption of TSTF-551 Revise Secondary Containment Surveillance Requirements ML18250A0752018-10-29029 October 2018 Issuance of Amendment Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control ML17345A0462018-03-0606 March 2018 Issuance of Amendment No. 197 to Adopt Changes to the Emergency Plan (CAC No. MF9560; EPID L-2017-LLA-0184) ML17310B2392017-11-28028 November 2017 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Unit Staff Qualifications (CAC Nos. MF9545, MF9546, and MF9547; EPID L-2017-LLA-0195) ML17172A4312017-06-23023 June 2017 Correction of Amendment No. 194, Issuance of Amendment to Adopt F Tstf 545, Revision 3, Ts Inservice Testing Program Removal & Clarify Sr Usage Rule Application to Section 5.5 Testing ML17123A3212017-06-16016 June 2017 Issuance of Amendment Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing ML17103A2352017-04-25025 April 2017 Issuance of Amendment Technical Specification 5.5.11 Primary Containment Leakage Rate Testing Program ML17013A4352017-02-27027 February 2017 Issuance of Amendment Revision to Technical Specification Surveillance Requirement 3.8.4.2 ML17054C3942017-02-23023 February 2017 Non-Proprietary Issuance of Amendment Extended Flow Window ML16196A3032016-08-0101 August 2016 Issuance of Amendment Technical Specifications Surveillance Requirement 3.5.1.3 B to Correct Alternative Nitrogen System Pressure (Cac. No. MF6704) ML16125A1652016-06-21021 June 2016 Issuance of Amendment Technical Specifications Task Force (TSTF) Standard Technical Specifications (STS) Change Traveler TSTF-523, Revision 2 Generic Letter 2008-01, Managing Gas Accumulation ML16063A0332016-02-29029 February 2016 License Amendment Request for Areva Extended Flow Window Supplement to Disposition Changes to Non-Limiting Transient Analyses ML15072A1412015-06-0505 June 2015 Issuance of Amendment No. 188 Regarding Transition to Areva Atrium 10XM Fuel and Areva Safety Analysis Methods ML14323A0332015-01-0808 January 2015 Issuance of Amendment No. 187 Regarding Revision to TS 5.5.11 for Drywell Personnel Airlock Leakage Rate Testing ML14239A2572014-11-28028 November 2014 and Prairie Island Nuclear Generation Plant, Units 1 and 2 - Issuance of License Amendments Regarding Cyber Security Plan Implementation Schedule Milestones ML14281A3182014-11-25025 November 2014 Issuance of Amendment Regarding Reduction in Steam Dome Pressure Safety Limit ML14246A4492014-11-0303 November 2014 Issuance of Amendment to Revise TS 3.5.1, ECCS - Operating ML14196A3282014-10-31031 October 2014 Issuance of Amendment to Change the Site Emergency Plan to Remove the Radwaste Operator as One of the 60-Minute Responders Specified in the Site Emergency Plan ML15160A2072014-10-24024 October 2014 Redacted, Issuance of Amendment No. 182 to Revise the Technical Specifications to Support Fuel Storage System Changes ML14058A8252014-05-0202 May 2014 Issuance of Amendment No. 181 to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML14035A2482014-03-28028 March 2014 Issuance of Amendment No. 180 to Implement Maximum Extended Load Line Limit Analysis Plus (Mellla+) Operating Domain ML14027A2322014-02-28028 February 2014 Issuance of Amendment No. 179 to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs ML13218A0612014-01-28028 January 2014 Issuance of Amendment No. 178 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML13274A1732014-01-28028 January 2014 Issuance of License Amendment No. 177 to Renewed Facility Operating License Emergency Plan Change ML13316B2982013-12-0909 December 2013 Issuance of Amendment No. 176 to Renewed Facility Operating License Regarding Extended Power Uprate ML13168A3732013-08-28028 August 2013 Issuance of Amendment No. 175 to Make Minor Corrections and Editorial Changes, Clarify Fuel Storage Capacity, and Remove Obsolete Information ML13168A2192013-08-0909 August 2013 Issuance of Amendment No. 174 to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities ML13168A0252013-07-15015 July 2013 Issuance of Amendment No. 173 to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-476, Revision 1, Improved BPWS Control Rod Insertion Process (NEDO-33091) ML13025A1552013-02-27027 February 2013 Issuance of License Amendment No. 172 to Revise and Relocate Pressure Temperature Curves to a Pressure-Temperature Limits Report ML12339A0352013-01-25025 January 2013 Issuance of License Amendment No. 171 Regarding Restoration Period Before Declaring Average Power Range Monitors Inoperable When Surveillance Requirement 3.3.1.1.2 Is Not Met ML12220A2802012-09-0707 September 2012 Issuance of Amendment No. 170 Regarding Automatic Depressurization System Bypass Timer ML12216A2692012-08-27027 August 2012 Issuance of Amendment No. 169 Regarding the Licensing Basis of the 1AR Transformer 2024-10-01
[Table view] |
Text
ENCLOSURE 1 CONTAINS PROPRIETARY INFORMATION WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390XceI Energy°Monticello Nuclear Generating Plant2807 W County Rd 75Monticello, MN 55362February 29, 2016L-MT- 16-01010 CFR 50.90U.S. Nuclear Regulatory Commission ATTN: Document Control DeskWashington, DC 20555-0001 Monticello Nuclear Generating PlantDocket 50-263Renewed License No. DPR-22License Amendment Request for AREVA Extended Flow WindowSupplement to Disposition Chancqes to Non-Limitinq Transient Analyses(TAC No. MF5002)
References:
- 1) Letter from Karen D. Fili (NSPM), to Document Control Desk (NRC),"License Amendment Request for AREVA Extended Flow Window,"L-MT-14-044, dated October 3, 2014 (ADAMS Accession No.ML14283A1 25)2) Letter from Peter A. Gardner (NSPM) to Document Control Desk(NRC), "License Amendment Request for ARE VA Extended FlowWindow Supplement to Respond to NRC Staff Questions (TAC No.MF5002),"
L-MT-15-065, dated September 29, 2015 (ADAMSAccession No. ML15274A473)
- 3) Letter from Peter A. Gardner (NSPM) to Document Control Desk(NRC), "License Amendment Request for AREVA Extended FlowWindow Supplement to Provide Revised Analysis of Anticipated Transient Without Scram Instability (TAC No. MF5002),"
L-MT-15-081, dated December 8, 2015 (ADAMS Accession No. ML15345A407)
In Reference 1, Northern States Power Company, a Minnesota corporation (NSPM)doing business as Xcel Energy, requested approval of an amendment to the Monticello Nuclear Generating Plant (MNGP) Renewed Operating License (OL) and Technical Specifications (TS). The proposed change would revise the MNGP TS and wouldapprove certain analytical methods that together would support operation in theexpanded power-flow operating domain described as the Extended Flow Window(EFW). The purpose of the requested amendment is to transition from the GeneralElectric
-Hitachi methodology called Maximum Extended Load Line Limit Analysis Plus(MELLLA+)
to the AREVA methodology called EFW.
Document Control DeskPage 2In Reference 2, NSPM provided early identification of errors in AREVA's core depletion code MICROBURN-B2, and the potential effect on the safety analyses under NRCreview. Subsequently, in Reference 3, NSPM described the effect of those errors onthe limitingq transient analyses; providing revised results for the Anticipated Transient Without Scram -Instability (ATWS-I) analysis.
Reference 3 stated that the effect of theMICROBURN-B2 errors on non-limitinq transient analyses would be managed under theAREVA and NSPM corrective action programs.
After discussion with NRC Staff onNovember 24, 2015 and February 3, 2016, NSPM is addressing the non-limiting transient analyses as described below.* Unmitigqated ATWS-I Analysis.
While evaluating the MICROBURN-B2 errors undertheir corrective action program, AREVA identified a nominally adverse impact on the"'unmitigated" case that is described in Sections 4 and 5 of ATWS-l Report ANP-3284Revision
- 0. That report was submitted as Enclosure 9 to the LAR (Reference 1).Rather than revising the analysis of the unmitigated case and reissuing ANP-3284, NSPM is deleting the unmitigated case in its entirety.
In effect, the unmitigated case issuperseded by the mitigated case that was submitted with Reference 2 and revised withReference
- 3. As stated in ANP-3435 Revision 1:"The analysis of Anticipated Transient Without Scram -Instability (ATWVSi)described herein should be recognized as the licensee's analysis of recordsupporting the proposed amendment to allow operation in the EFW domain."Hereby, NSPM considers the unmitigated ATWS-I case described in Sections 4 and 5of ANP-3284 Revision 0 to be superseded by the mitigated ATWS-l case described byANP-3435 Revision 1.* Control Rod Withdrawal Event (CRWE) Transient Analysis and Average PowerRangqe Monitor (APRM) Sigqnal Reduction.
While evaluating the MICROBURN-B2 errorsunder their corrective action program, AREVA also identified nominal impacts on theresults for the CRWE transient analysis and the relative value of APRM signal reduction that were originally provided in Report ANP-3295 Revision
- 2. ANP-3295 Revision 2was provided as Enclosure 11 to the LAR (Reference 1). The corrected results for theCRWE transient analysis and APRM signal reduction are provided in Revision 3 toAN P-3295.Thus, Enclosure 1 provides AREVA Report ANP-3295P, Revision
- 3. Enclosure 1 sproprietary to AREVA. Enclosure 2 provides the non-proprietary AREVA Report ANP-3295NP, Revision 3.Enclosure 3 provides an affidavit executed to support withholding Enclosure 1 frompublic disclosure.
Enclosure I contains proprietary information as defined by 10 CFR2.390. The affidavit sets forth the basis on which the information may be withheld frompublic disclosure by the NRC and addresses with specificity the considerations listed in10 CFR 2.390(b)(4).
Accordingly, NSPM respectfully requests that the AREVAproprietary information in Enclosure 1 be withheld from public disclosure in accordance Document Control DeskPage 3with 10 CFR 2.390(a)4, as authorized by 10 CFR 9.17(a)4.
Correspondence withrespect to the copyright or proprietary aspects of the AREVA information in Enclosure 1or the supporting AREVA affidavit in Enclosure 3 should be addressed to Mr. AlanMeginnis, Manager-Product Licensing, AREVA Inc., 2101 Horn Rapids Road,Richiand, Washington 99354.The information offered herein does not affect the conclusions of the No Significant Hazards Consideration and the Environmental Consideration evaluations provided inthe Reference 1 license amendment request.In accordance with 10 CFR 50.91(b),
a copy of this application supplement is beingprovided to the designated Minnesota Official without enclosures.
If there are any questions or if additional information is needed, please contact GlennAdams at 612-330-6777.
Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.
I declare under penalty of perjury that the foregoing is true and correct.Executed on: February 29, 2016Peter A.GadeSite Vice President Monticello Nuclear Generating PlantNorthern States Power Company-Minnesota Enclosures (3)cc: Administrator, Region Ill, USNRCProject Manager, Monticello Nuclear Generating Plant, USNRCResident Inspector, Monticello Nuclear Generating Plant, USNRCMinnesota Department of Commerce (w/o enclosures)
L-MT-1 6-010Enclosure 3ARE VA Affidavit 3 pages follow AFFIDAVIT COMMONWEALTH OF VIRGINIA
)) s.,CITY OF LYNCHBURG
)1. My name is Morris Byram. I am Manager, Product Licensing, for AREVA Inc.(ARE VA) and as such I am authorized to execute this Affidavit.
- 2. I am familiar with the criteria applied by AREVA to determine whether certainAREVA information is proprietary.
I am familiar with the policies established byAREVA to ensure the proper application of these criteria.
- 3. I am familiar with the ARE VA information contained in the topical reportANP-3295P, Revision 3, "Monticello Licensing Analysis For EFW (EPUIMELLLA+),"
datedFebruary, 2016, and referred to herein as "Document."
Information contained in this Documenthas been classified by AREVA as proprietary in accordance with the policies established byAREVA Inc. for the control and protection of proprietary and confidential information.
- 4. Th~is Document contains information of a proprietary and confidential natureand is of the type customarily held in confidence by AREVA and not made available to thepublic. Based on my experience, I am aware that other companies regard information of thekind contained in this Document as proprietary and confidential.
- 5. This Document has been made available to the U.S. Nuclear Regulatory Commission in confidence with the request that the information contained in this Document bewithheldl from public disclosure.
The request for withholding of proprietary information is made inaccordance with 10 CFR 2.390. The information for which withholding from disclosure is requested qualifies under 10 CFR 2.390(a)(4)
"Trade secrets and commercial or financial information."
- 6. The following criteria are customarily applied by AREVA to determine whetherinformation should be classified as proprietary:
-(a) The information reveals details of ARE VA's research and development plansand programs or their results.(b) Use of the information by a competitor would permit the competitor tosignificantly reduce its expenditures, in time or resources, to design, produce,or market a similar product or service.(c) The information includes test data or analytical techniques concerning
- aprocess, methodology, or component, the application of which results in acompetitive advantage for ARE VA.(d) The information reveals certain distinguishing aspects of a process,methodology, or component, the exclusive use of which provides acompetitive advantage for ARE VA in product optimization or marketability.
(e) The information is vital to a competitive advantage held by AREVA, would behelpful to competitors to AREVA, and would likely cause substantial harm tothe competitive position of AREVA.The information in this Document is considered proprietary for the reasons set forth inparagraphs 6(b), 6(c), and 6(d) above.7. In accordance with AREVA's policies governing the protection and control ofinformation, proprietary information contained in this Document has been made available, on alimited basis, to others outside AREVA only as required and under suitable agreement providing for nondisclosure and limited use of the information.
- 8. AREVA policy requires that proprietary information be kept in a secured file orarea and distributed on a need-to-know basis.
- 9. The foregoing statements are true and correct to the best of my knowledge, information, and belief.SUBSCRIBED before me this ________day of _______ _______ _______ , 2016.Sherry L. McFaden .NOTARY PUBLIC, COMMONWEALTH'oF VIRGINIAMY COMMISSION EXPIRES:
10/31/18Reg. # 7079129~~Notary
- PMbfcCom, al~Ot 81, 2018 QF021 2, Revision 5 (FP-SC-RSI-04)Pae1oI Page 1 of 1Xcel Energy@SH{IPP1NG DOCUMJENT NORTHERN STATES POWER -MND/B/A Xcel EnergyMonticello Nuclear Plant, 2807 W Hwy. 75, Monticello, MN 55362Date: 2/29/2016 Shipping DocumentTracking Number:Ship To:USNRC11555 Rockville PikeRockville, MD 20852-2738 Attention Of: Doc ControlCarrier:
UPS -Standard Overnight RMA No:Pro I Tracking No: P0 I Contract No:Packaging:
Number of Packages:
1 Weight:Dangerous Goodsl UN/NA No: ..Insurance Est. ValueReason for Shipment:
Overnight Shipment to USNRCMelody Imholte -Please ensure tracking number is communicated to me -melody.imholte@xenuclear.com
-Item° No. Qty. Unit Description Catalog IDIQ1 Env Submittal to NRC L-MT-16-O10 By si S p *ng e'o Urecc gto the best of your knowledge, that the mat nal le ng shipped is incornp/i nce with Xce xergy Corporate Policies.
Please print and sign your name legibly.SWlP Making Shipment: