ML17004A177: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:January 4, 2017  Mr. Ken J. Peters, Senior Vice President  
{{#Wiki_filter:January 4, 2017  
   Mr. Ken J. Peters, Senior Vice President  
 
   and Chief Nuclear Officer  
   and Chief Nuclear Officer  
Attention:  Regulatory Affairs  
Attention:  Regulatory Affairs  
TEX Operations Company LLC  
TEX Operations Company LLC  
P.O. Box 1002 Glen Rose, TX  76043
P.O. Box 1002 Glen Rose, TX  76043  
SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT - NOTIFICATION OF NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION (05000445/2017001 AND 05000446/2017001) AND REQUEST FOR INFORMATION  Dear Mr. Peters: 
   
   
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff will conduct a triennial heat sink performance inspection at your Comanche Peak Nuclear
SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT - NOTIFICATION OF NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION (05000445/2017001
Power Plant, Units 1 and 2, from January 30, 2017, through February 3, 2017. The inspection will consist of two reactor inspectors from the NRC's Region IV office for one weekThe inspection will be conducted in accordance with NRC Inspection Procedure 71111.07, "Heat Sink Performance."
AND 05000446/2017001)
  AND REQUEST FOR INFORMATION
Dear Mr. Peters:  
 
   
   
Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff.  In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.   
The purpose of this letter is to notify you that
Please note that the documents are requested to be provided by January 23, 2017.  We request that during the on-site inspection week you ensure that copies of analyses, evaluations, or documentation regarding the implementation and maintenance of your heat exchanger program are available.  Of specific interest are those documents that establish that your heat exchanger program satisfies NRC regulatory requirements and conforms to applicable NRC guidance.  Also, appropriate personnel knowledgeable of safety-related heat exchangers should be  
U.S. Nuclear Regulatory Commission (NRC) staff will conduct a triennial heat sink performance inspection at your Comanche Peak Nuclear
Power Plant, Units 1 and 2, from January 30, 2017, through February 3, 2017.  The inspection will consist of two reactor inspectors from the NRC's Region IV office for one week.  The inspection will be conducted in accordance with NRC Inspection Procedure 71111.07, "Heat
Sink Performance."
 
Experience has shown that this  
inspection is resource intens
ive both for the NRC inspectors and your staff.  In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.   
Please note that the documents are requested to be provided by January 23, 2017.  We request that during the on-site inspection week you ensure that copies of analyses, evaluations, or documentation regarding the implementation and m
aintenance of your heat exchanger program are available.  Of specific interest are those documents that establish that your heat exchanger  
program satisfies NRC regulatory requirement
s and conforms to applicable NRC guidance.  Also, appropriate personnel knowledgeable of safety-related heat exchangers should be  
available to support the inspector at the site during the inspection.  
available to support the inspector at the site during the inspection.  
   
   
We have discussed the schedule for this inspection activity with your staff and understand that our regulatory contact for this inspection will be Gary Merka of your licensing organization.  If there are any questions about this inspection or the material requested, please contact the  
We have discussed the schedule for this inspection activity with your staff and understand that our regulatory contact for this inspection will be Gary Merka of your licensing organization.  If there are any questions about this inspection or the material requested, please contact the  
inspector, Jonathan Braisted, by telephone at 817-200-1194 or by e-mail at  
inspector, Jonathan Braisted, by telephone at 817-200-1194 or by e-mail at  
Jonathan.Braisted@nrc.gov.  
Jonathan.Braisted@nrc.gov.  
  This letter does not contain new or amended information collection requirements subject  to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information  
  This letter does not contain new or amended information collection requirements subject  to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information  
collection requirements were approved by the Office of Management and Budget, control  
collection requirements were approved by the Office of Management and Budget, control  
number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to  UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511   
number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to  
K. Peters 2  respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control  
  UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511   
K. Peters 2  
  respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control  
 
number.  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of  
number.  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of  
this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  Sincerely,  /RA/   
 
this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
  Sincerely,  
   /RA/   
  Thomas R. Farnholtz, Chief  Engineering Branch 1  
  Thomas R. Farnholtz, Chief  Engineering Branch 1  
  Division of Reactor Safety  
  Division of Reactor Safety  
  Docket Nos. 50-445 and 50-446 License Nos. NPF-87 and NPF-89  
  Docket Nos. 50-445 and 50-446 License Nos. NPF-87 and NPF-89  
   
   
Enclosure:   
Enclosure:   
Triennial Heat Sink Performance   
Triennial Heat Sink Performance   
   Inspection Request for Information  cc:  Electronic Distribution  
   Inspection Request for Information  
  cc:  Electronic Distribution  
 
   
   
    
    


   ML17004A177  SUNSI Review By:  JBraisted ADAMS  Yes    No  Publicly Available  Non-Publicly Available  Non-Sensitive  Sensitive Keyword: NRC-002 OFFICE RI:EB1 C:EB1      NAME JBraisted TFarnholtz      SIGNATURE /RA/ /RA/      DATE 1/4/17 1/4/17       
   ML17004A177  SUNSI Review By:  JBraisted  
   Enclosure Request for Information Triennial Heat Sink Performance Inspection  Comanche Peak Nuclear Power Plant   
ADAMS  Yes    No  Publicly Available  Non-Publicly Available  Non-Sensitive  Sensitive Keyword: NRC-002 OFFICE RI:EB1 C:EB1      NAME JBraisted TFarnholtz      SIGNATURE /RA/ /RA/      DATE 1/4/17 1/4/17       
   Enclosure  
Request for Information  
Triennial Heat Sink Performance Inspection  Comanche Peak Nuclear Power Plant  
    
Inspection Reports:  05000445/2017001 and 05000446/2017001  
Inspection Reports:  05000445/2017001 and 05000446/2017001  
   
   
Inspection Dates:  January 30, 2017, through February 3, 2017  
Inspection Dates:  January 30, 2017, through February 3, 2017  
  Inspection Procedure:  IP 71111.07, Triennial Heat Sink Performance   
 
Inspectors:  J. Braisted, Reactor Inspector C. Smith, Reactor Inspector   Information Requested for the In-Office Preparation Week The following information should be sent to the Region IV office in hard copy or electronic  
  Inspection Procedure:  IP 71111.07, Triennial Heat Sink Performance  
format (Certrec IMS preferred), to the attention of Jonathan Braisted, by January 16, 2017.  The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the on-site inspection week.  We also request  
   
Inspectors:  J. Braisted, Reactor Inspector C. Smith, Reactor Inspector
  Information Requested for the In-Office Preparation Week
  The following information should be sent to the Region IV office in hard copy or electronic  
format (Certrec IMS preferred), to the attention of Jonathan Braisted, by January 16, 2017.  The inspector will select specific items from t
he information requested below and then request from your staff additional documents needed during the on-site inspection week.  We also request  
that you categorize the documents in your response with the numbered list below.  Please provide requested documentation electronically if possible.  If requested documents are large  
that you categorize the documents in your response with the numbered list below.  Please provide requested documentation electronically if possible.  If requested documents are large  
and only hard copy formats are available, please inform the inspector, and provide subject documentation during the first day of the on-site inspection.  If you have any questions regarding this information request, please call the lead inspector as soon as possible.   
and only hard copy formats are available, please inform the inspector, and provide subject documentation during the first day of the on-site inspection.  If you have any questions regarding this information request, please call the lead inspector as soon as possible.  
   
The following heat exchangers/heat sinks have been selected for inspection:  
The following heat exchangers/heat sinks have been selected for inspection:  
  * Ultimate Heat Sink  * Residual Heat Removal Heat Exchanger 2-01  * Component Cooling Water Heat Exchanger 2-01  * Safety Chilled Water System Centrifugal Chiller 2-05  For all Generic Letter 89-13 exchangers:  1. List of corrective action program documents (with a short description) associated with Generic Letter 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat  
 
  * Ultimate Heat Sink  
  * Residual Heat Removal Heat Exchanger 2-01  
  * Component Cooling Water Heat Exchanger 2-01  
  * Safety Chilled Water System Centrifugal Chiller 2-05  
  For all Generic Letter 89-13 exchangers
:  1. List of corrective action program documents (with a short description) associated with Generic Letter 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat  
 
exchanger cavitation, or heat exchanger testing, in the previous three years  
exchanger cavitation, or heat exchanger testing, in the previous three years  
  2. System health report(s) and maintenance rule system notebooks for all the Generic Letter 89-13 heat exchangers   3. Copy of any self-assessments done on any Generic Letter 89-13 heat exchangers in the previous three years  
 
  2. System health report(s) and maintenance rule system notebooks for all the Generic  
Letter 89-13 heat exchangers
3. Copy of any self-assessments done on any Generic Letter 89-13 heat exchangers in the  
previous three years
 
   - 2 -  4. Copies of any heat exchanger program procedure and procedures developed to implement the recommendations of Generic Letter 89-13 (e.g., the Generic Letter 89-13  
   - 2 -  4. Copies of any heat exchanger program procedure and procedures developed to implement the recommendations of Generic Letter 89-13 (e.g., the Generic Letter 89-13  
Heat Exchanger Program description)   5. Copies of any commitments to the Generic Letter 89-13 program  6. Schedule of any work to be performed on the selected samples during the inspection  For the specific heat exchangers selected:  Testing Documents  7. Copies of the two most recently completed tests confirming thermal performance for those heat exchangers which are performance tested   8. Instrument uncertainties of the instruments used during testing  9. Copy of any operability determinations or other documentation of degradation associated with the heat exchangers or the systems that support the operation for the  
Heat Exchanger Program description)
selected heat exchangers   10. Documents that show the as-found results are recorded, evaluated, and appropriately dispositioned such that the as-left condition is acceptable  Cleaning Documents  11. The cleaning and inspection maintenance schedule for each heat exchanger for the next five years   12. Copy of the document describing the inspection results for the last two cleaning and inspection activities completed on each heat exchanger   13. Cleaning procedures with acceptance criteria for the selected heat exchangers  14. Copies of the documents that verify the structural integrity of the heat exchanger, (e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection results)   15. Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers   Design Documents  16. Copies of the design basis documents and applicable pages from the updated final safety analysis report and technical specifications for the selected heat exchangers   17. Provide a list of calculations with a description which currently apply to each heat exchanger   
5. Copies of any commitments to the Generic Letter 89-13 program  
  6. Schedule of any work to be performed on the selected samples during the inspection  
  For the specific heat exchangers selected:  
  Testing Documents  
  7. Copies of the two most recently completed tests confirming thermal performance for those heat exchangers which are performance tested
8. Instrument uncertainties of the instruments used during testing  
  9. Copy of any operability determinations or other documentation of degradation associated with the heat exchangers or the systems that support the operation for the  
selected heat exchangers
10. Documents that show the as-found results are recorded, evaluated, and appropriately dispositioned such that the as-left condition is acceptable  
  Cleaning Documents  
  11. The cleaning and inspection maintenance schedule for each heat exchanger for the next  
five years
12. Copy of the document describing the inspection results for the last two cleaning and inspection activities completed on each heat exchanger
13. Cleaning procedures with acceptance criteria for the selected heat exchangers  
  14. Copies of the documents that verify the structural integrity of the heat exchanger,  
(e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection results)
15. Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers
Design Documents  
  16. Copies of the design basis documents and applicable pages from the updated final safety analysis report and technical specifications for the selected heat exchangers
17. Provide a list of calculations with a description which currently apply to each heat
exchanger 
 
 
  - 3 -  18. Copies of vendor manuals and data sheets and design basis data for the selected heat
exchangers 
19. Copy of the calculation which establishes the limiting (maximum) design basis heat load which is required to be removed by each of these heat exchangers 
20. Copy of the calculation which correlates surveillance testing results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test
acceptance criteria)
21. Copy of the calculations or documents which evaluate the potential for water hammer or excessive tube vibration in the heat exchanger or associated piping 
22. Copy of the document which identifies the current number of tubes in service for each heat exchanger and the supporting calculation which establishes the maximum number of tubes which can be plugged in each heat exchanger
23. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each heat exchanger
  For the ultimate heat sink or safety-related service water system: 
24. Dam inspections that monitor the integrity of the ultimate heat sink (if applicable)
25. Copies of calculations and surveillances that determine the ultimate heat sink reservoir capacity and heat transfer capability (if applicable)
26. Copies of any design changes performed on the ultimate heat sink or safety-related service water system 
27. Copies of procedures for a loss of ultimate heat sink or safety-related service water system  28. Copies of inspections and/or maintenance related to macrofouling (silt, mussel shells, debris, etc.) and aquatic life
29. Copies of inspections and/or maintenance-related to preventing biotic fouling 
30. Copies of procedures and/or test results to survey or monitor interface valves between the safety-related section of the service water system and the nonsafety-related section 
31. Copy of the most recent service water flow balance test results, both as-found and as-
left  32. History of any thru-wall pipe leaks on the safety-related service water system  
    
    
  - 3 -  18. Copies of vendor manuals and data sheets and design basis data for the selected heat exchangers  19. Copy of the calculation which establishes the limiting (maximum) design basis heat load which is required to be removed by each of these heat exchangers  20. Copy of the calculation which correlates surveillance testing results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test
acceptance criteria)  21. Copy of the calculations or documents which evaluate the potential for water hammer or excessive tube vibration in the heat exchanger or associated piping  22. Copy of the document which identifies the current number of tubes in service for each heat exchanger and the supporting calculation which establishes the maximum number of tubes which can be plugged in each heat exchanger  23. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each heat exchanger  For the ultimate heat sink or safety-related service water system:  24. Dam inspections that monitor the integrity of the ultimate heat sink (if applicable)  25. Copies of calculations and surveillances that determine the ultimate heat sink reservoir capacity and heat transfer capability (if applicable)  26. Copies of any design changes performed on the ultimate heat sink or safety-related service water system  27. Copies of procedures for a loss of ultimate heat sink or safety-related service water system  28. Copies of inspections and/or maintenance related to macrofouling (silt, mussel shells, debris, etc.) and aquatic life  29. Copies of inspections and/or maintenance-related to preventing biotic fouling  30. Copies of procedures and/or test results to survey or monitor interface valves between the safety-related section of the service water system and the nonsafety-related section  31. Copy of the most recent service water flow balance test results, both as-found and as-left  32. History of any thru-wall pipe leaks on the safety-related service water system   
    
    
   - 4 -  Inspector Contact Information:  
   - 4 -  Inspector Contact Information:  
  Jonathan Braisted  Chris Smith Reactor Inspector  Reactor Inspector  
  Jonathan Braisted  Chris Smith Reactor Inspector  Reactor Inspector  
817-200-1194    817-200-1095  
817-200-1194    817-200-1095  
Jonathan.Braisted@nrc.gov  Chris.Smith@nrc.gov  
Jonathan.Braisted@nrc.gov  Chris.Smith@nrc.gov  
Mailing Address:
   
   
Mailing Address: 
U.S. NRC, Region IV  
U.S. NRC, Region IV  
Attn:  Jonathan Braisted 1600 East Lamar Blvd. Arlington, TX 76011-4511
Attn:  Jonathan Braisted
1600 East Lamar Blvd. Arlington, TX 76011-4511
}}
}}

Revision as of 00:18, 30 June 2018

Comanche Peak Nuclear Power Plant - Notification of NRC Triennial Heat Sink Performance Inspection (05000445/2017001 and 05000446/2017001) and Request for Information
ML17004A177
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/04/2017
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Peters K J
TEX Operations Company
References
IR 2017001
Download: ML17004A177 (7)


See also: IR 05000445/2017001

Text

January 4, 2017

Mr. Ken J. Peters, Senior Vice President

and Chief Nuclear Officer

Attention: Regulatory Affairs

TEX Operations Company LLC

P.O. Box 1002 Glen Rose, TX 76043

SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT - NOTIFICATION OF NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION (05000445/2017001

AND 05000446/2017001)

AND REQUEST FOR INFORMATION

Dear Mr. Peters:

The purpose of this letter is to notify you that

U.S. Nuclear Regulatory Commission (NRC) staff will conduct a triennial heat sink performance inspection at your Comanche Peak Nuclear

Power Plant, Units 1 and 2, from January 30, 2017, through February 3, 2017. The inspection will consist of two reactor inspectors from the NRC's Region IV office for one week. The inspection will be conducted in accordance with NRC Inspection Procedure 71111.07, "Heat

Sink Performance."

Experience has shown that this

inspection is resource intens

ive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.

Please note that the documents are requested to be provided by January 23, 2017. We request that during the on-site inspection week you ensure that copies of analyses, evaluations, or documentation regarding the implementation and m

aintenance of your heat exchanger program are available. Of specific interest are those documents that establish that your heat exchanger

program satisfies NRC regulatory requirement

s and conforms to applicable NRC guidance. Also, appropriate personnel knowledgeable of safety-related heat exchangers should be

available to support the inspector at the site during the inspection.

We have discussed the schedule for this inspection activity with your staff and understand that our regulatory contact for this inspection will be Gary Merka of your licensing organization. If there are any questions about this inspection or the material requested, please contact the

inspector, Jonathan Braisted, by telephone at 817-200-1194 or by e-mail at

Jonathan.Braisted@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511

K. Peters 2

respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control

number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of

this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief Engineering Branch 1

Division of Reactor Safety

Docket Nos. 50-445 and 50-446 License Nos. NPF-87 and NPF-89

Enclosure:

Triennial Heat Sink Performance

Inspection Request for Information

cc: Electronic Distribution

ML17004A177 SUNSI Review By: JBraisted

ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE RI:EB1 C:EB1 NAME JBraisted TFarnholtz SIGNATURE /RA/ /RA/ DATE 1/4/17 1/4/17

Enclosure

Request for Information

Triennial Heat Sink Performance Inspection Comanche Peak Nuclear Power Plant

Inspection Reports: 05000445/2017001 and 05000446/2017001

Inspection Dates: January 30, 2017, through February 3, 2017

Inspection Procedure: IP 71111.07, Triennial Heat Sink Performance

Inspectors: J. Braisted, Reactor Inspector C. Smith, Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (Certrec IMS preferred), to the attention of Jonathan Braisted, by January 16, 2017. The inspector will select specific items from t

he information requested below and then request from your staff additional documents needed during the on-site inspection week. We also request

that you categorize the documents in your response with the numbered list below. Please provide requested documentation electronically if possible. If requested documents are large

and only hard copy formats are available, please inform the inspector, and provide subject documentation during the first day of the on-site inspection. If you have any questions regarding this information request, please call the lead inspector as soon as possible.

The following heat exchangers/heat sinks have been selected for inspection:

  • Component Cooling Water Heat Exchanger 2-01
  • Safety Chilled Water System Centrifugal Chiller 2-05

For all Generic Letter 89-13 exchangers

1. List of corrective action program documents (with a short description) associated with Generic Letter 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat

exchanger cavitation, or heat exchanger testing, in the previous three years

2. System health report(s) and maintenance rule system notebooks for all the Generic

Letter 89-13 heat exchangers

3. Copy of any self-assessments done on any Generic Letter 89-13 heat exchangers in the

previous three years

- 2 - 4. Copies of any heat exchanger program procedure and procedures developed to implement the recommendations of Generic Letter 89-13 (e.g., the Generic Letter 89-13

Heat Exchanger Program description)

5. Copies of any commitments to the Generic Letter 89-13 program

6. Schedule of any work to be performed on the selected samples during the inspection

For the specific heat exchangers selected:

Testing Documents

7. Copies of the two most recently completed tests confirming thermal performance for those heat exchangers which are performance tested

8. Instrument uncertainties of the instruments used during testing

9. Copy of any operability determinations or other documentation of degradation associated with the heat exchangers or the systems that support the operation for the

selected heat exchangers

10. Documents that show the as-found results are recorded, evaluated, and appropriately dispositioned such that the as-left condition is acceptable

Cleaning Documents

11. The cleaning and inspection maintenance schedule for each heat exchanger for the next

five years

12. Copy of the document describing the inspection results for the last two cleaning and inspection activities completed on each heat exchanger

13. Cleaning procedures with acceptance criteria for the selected heat exchangers

14. Copies of the documents that verify the structural integrity of the heat exchanger,

(e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection results)

15. Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers

Design Documents

16. Copies of the design basis documents and applicable pages from the updated final safety analysis report and technical specifications for the selected heat exchangers

17. Provide a list of calculations with a description which currently apply to each heat

exchanger

- 3 - 18. Copies of vendor manuals and data sheets and design basis data for the selected heat

exchangers

19. Copy of the calculation which establishes the limiting (maximum) design basis heat load which is required to be removed by each of these heat exchangers

20. Copy of the calculation which correlates surveillance testing results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test

acceptance criteria)

21. Copy of the calculations or documents which evaluate the potential for water hammer or excessive tube vibration in the heat exchanger or associated piping

22. Copy of the document which identifies the current number of tubes in service for each heat exchanger and the supporting calculation which establishes the maximum number of tubes which can be plugged in each heat exchanger

23. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each heat exchanger

For the ultimate heat sink or safety-related service water system:

24. Dam inspections that monitor the integrity of the ultimate heat sink (if applicable)

25. Copies of calculations and surveillances that determine the ultimate heat sink reservoir capacity and heat transfer capability (if applicable)

26. Copies of any design changes performed on the ultimate heat sink or safety-related service water system

27. Copies of procedures for a loss of ultimate heat sink or safety-related service water system 28. Copies of inspections and/or maintenance related to macrofouling (silt, mussel shells, debris, etc.) and aquatic life

29. Copies of inspections and/or maintenance-related to preventing biotic fouling

30. Copies of procedures and/or test results to survey or monitor interface valves between the safety-related section of the service water system and the nonsafety-related section

31. Copy of the most recent service water flow balance test results, both as-found and as-

left 32. History of any thru-wall pipe leaks on the safety-related service water system

- 4 - Inspector Contact Information:

Jonathan Braisted Chris Smith Reactor Inspector Reactor Inspector

817-200-1194 817-200-1095

Jonathan.Braisted@nrc.gov Chris.Smith@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Jonathan Braisted

1600 East Lamar Blvd. Arlington, TX 76011-4511