{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 16, 2017  
[[Issue date::March 16, 2017]]


Mr. David Vice President Southern Nuclear Operating Company, Inc.
Mr. David Vice President  
 
Southern Nuclear Operating Company, Inc.


Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513
Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513


SUBJECT: EDWIN I. HATCH NUCLEAR PLANT - NRC CYBER SECURITY FOLLOW UP INSPECTION (INSPECTION REPORT 05000321/2017405 and 05000366/2017405)
SUBJECT: EDWIN I. HATCH NUCLEAR PLANT - NRC CYBER SECURITY FOLLOW UP INSPECTION (INSPECTION REPORT 05000321/2017405 and 05000366/2017405
)


==Dear Mr. Vineyard:==
==Dear Mr. Vineyard:==
On February 3, 2017, the U.S. Nuclear Regulatory Commission (USNRC) completed a cyber security follow up inspection utilizing inspection procedure 71152, "Problem Identification and Resolution (PI&R) for the Edwin I. Hatch Nuclear Plant, Units 1 & 2. These inspection activities were conducted at your Southern Nuclear Corporate (SNC) Office, Birmingham, AL and in-office review in Atlanta, GA. On March 11, 2017 the NRC inspectors discussed the results of this inspection with Mr. S. Baskin and other members of your staff. The enclosed inspection report documents the inspection results.
On February 3, 2017, the U.S. Nuclear Regulatory Commission (USNRC) completed a cyber security follow up inspection utilizing inspection procedure 71152, "Problem Identification and Resolution (PI&R) for the Edwin I. Hatch Nuclear Plant, Units 1 & 2. These inspection activities were conducted at your Southern Nuclear Corporate (SNC) Office, Birmingham, AL and in-office review in Atlanta, GA. On March 11, 2017 the NRC inspectors discussed the results of this inspection with Mr. S. Baskin and other members of your staff. The enclosed inspection report documents the inspection results.


The NRC inspection team reviewed applicable corrective actions and artifacts generated by your staff to correct deficiencies identified during the Interim Cyber Security Milestone 1 - 7 inspections. Based on the inspection sample, the NRC has determined that completed or planned corrective actions were sufficient to address the performance that led to the findings associated with implementing the Cyber Security Plan (CSP). No findings of more than minor significance were identified. This letter will be made available for public inspection and copying at http://www.nrc.gov/ reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
The NRC inspection team reviewed applicable corrective actions and artifacts generated by your staff to correct deficiencies identified during the Interim Cyber Security Milestone 1 - 7 inspections. Based on the inspection sample, the NRC has determined that completed or planned corrective actions were sufficient to address the performance that led to the findings associated with implementing the Cyber Security Plan (CSP).
 
No findings of more than minor significance were identified. This letter will be made available for public inspection and copying at http://www.nrc.gov/
reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."


However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).


Sincerely,/RA/
Sincerely,/RA/
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos.: 50-321, 50-366 License Nos.: DPR-57 and NPF-5  
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety
 
Docket Nos.: 50-321, 50-366 License Nos.: DPR-57 and NPF-5  


===Enclosure:===
===Enclosure:===
Line 41: Line 48:


===w/Attachment:===
===w/Attachment:===
Supplemental Information (OUO) cc: (See page 3) cc: Stephen P. McGavin Southern Nuclear Operating Co., Inc.
Supplemental Information (OUO)
cc: (See page 3) cc: Stephen P. McGavin Southern Nuclear Operating Co., Inc.
 
40 Inverness Center Parkway
 
Bin B042 Birmingham, AL 35242
 
Michael P. Long, Fleet Nuclear Security Operations Manager


40 Inverness Center Parkway Bin B042 Birmingham, AL 35242 Michael P. Long, Fleet Nuclear Security Operations Manager Southern Nuclear Operating Co., Inc.
Southern Nuclear Operating Co., Inc.


40 Iverness Center Parkway Bin B042 Birmingham, AL 35242  
40 Iverness Center Parkway Bin B042 Birmingham, AL 35242  


Lisa B. Hogg Fleet Security Project Manager Southern Nuclear Operating Co., Inc. 40 Inverness Center Parkway BIN B042 Birmingham, AL 35242  
Lisa B. Hogg  
 
Fleet Security Project Manager  
 
Southern Nuclear Operating Co., Inc.
 
40 Inverness Center Parkway BIN B042  
 
Birmingham, AL 35242  
 
Steven M. Shipman Southern Nuclear Operating Co., Inc.
 
40 Iverness Center Parkway


Steven M. Shipman Southern Nuclear Operating Co., Inc. 40 Iverness Center Parkway Birmingham, AL 35201-1295  
Birmingham, AL 35201-1295  


_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:DRP SIGNATURE RJF2 MJS6 SMS SRS5 NAME RFANNER MSINGLETARY SSHAEFFER SSANDAL DATE 3/14/2015 3/15/2017 3/16/2017 3/15/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:DRP SIGNATURE RJF2 MJS6 SMS SRS5 NAME RFANNER MSINGLETARY SSHAEFFER SSANDAL DATE 3/14/2015 3/15/2017 3/16/2017 3/15/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
}}
}}

Revision as of 22:05, 29 June 2018

Edwin I. Hatch Nuclear Plant - NRC Cyber Security Follow Up Inspection (Inspection Report 05000321/2017405 and 05000366/2017405) - Letter Only
ML17081A502
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/16/2017
From: Shaeffer S M
NRC/RGN-II/DRS/EB2
To: Vineyard D R
Southern Nuclear Operating Co
References
IR 2017405
Download: ML17081A502 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 16, 2017

Mr. David Vice President

Southern Nuclear Operating Company, Inc.

Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513

SUBJECT: EDWIN I. HATCH NUCLEAR PLANT - NRC CYBER SECURITY FOLLOW UP INSPECTION (INSPECTION REPORT 05000321/2017405 and 05000366/2017405

)

Dear Mr. Vineyard:

On February 3, 2017, the U.S. Nuclear Regulatory Commission (USNRC) completed a cyber security follow up inspection utilizing inspection procedure 71152, "Problem Identification and Resolution (PI&R) for the Edwin I. Hatch Nuclear Plant, Units 1 & 2. These inspection activities were conducted at your Southern Nuclear Corporate (SNC) Office, Birmingham, AL and in-office review in Atlanta, GA. On March 11, 2017 the NRC inspectors discussed the results of this inspection with Mr. S. Baskin and other members of your staff. The enclosed inspection report documents the inspection results.

The NRC inspection team reviewed applicable corrective actions and artifacts generated by your staff to correct deficiencies identified during the Interim Cyber Security Milestone 1 - 7 inspections. Based on the inspection sample, the NRC has determined that completed or planned corrective actions were sufficient to address the performance that led to the findings associated with implementing the Cyber Security Plan (CSP).

No findings of more than minor significance were identified. This letter will be made available for public inspection and copying at http://www.nrc.gov/

reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,/RA/

Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety

Docket Nos.: 50-321, 50-366 License Nos.: DPR-57 and NPF-5

Enclosure:

Inspection Reports 05000321/2017405 and 05000366/2017405

w/Attachment:

Supplemental Information (OUO)

cc: (See page 3) cc: Stephen P. McGavin Southern Nuclear Operating Co., Inc.

40 Inverness Center Parkway

Bin B042 Birmingham, AL 35242

Michael P. Long, Fleet Nuclear Security Operations Manager

Southern Nuclear Operating Co., Inc.

40 Iverness Center Parkway Bin B042 Birmingham, AL 35242

Lisa B. Hogg

Fleet Security Project Manager

Southern Nuclear Operating Co., Inc.

40 Inverness Center Parkway BIN B042

Birmingham, AL 35242

Steven M. Shipman Southern Nuclear Operating Co., Inc.

40 Iverness Center Parkway

Birmingham, AL 35201-1295

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:DRP SIGNATURE RJF2 MJS6 SMS SRS5 NAME RFANNER MSINGLETARY SSHAEFFER SSANDAL DATE 3/14/2015 3/15/2017 3/16/2017 3/15/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO