ML14301A034: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 1
| page count = 1
}}
}}
=Text=
{{#Wiki_filter:PRELIMINARY NOTIFICATION - REGION III  October 27, 2014  PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE - PNO-III-14-009A  This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. Some of the information may not yet be fully verified or evaluated and is basically all that is known by the Region III staff on this date. Facility Perry Nuclear Power Plant FirstEnergy Nuclear Operating Company Perry, OH Docket No.:  05000440 License No.:  NPF-58 Licensee Emergency Classification      Notification of Unusual Event      Alert      Site Area Emergency      General Emergency  X  Not Applicable
==SUBJECT:==
UPDATE TO UNPLANNED SHUTDOWN GREATER THAN 72 HOURS DUE TO A LOSS OF FEEDWATER  This Preliminary Notification provides an update to PNO-III-14-009 for a shutdown of greater than 72 hours of Perry following an automatic scram from 100 percent power on October 20, 2014. The scram occurred, as designed, following the unexpected shutdown of the main feedwater pumps. The licensee was shifting the electrical power supply of a nonsafety-related component when the pumps shut down.
The licensee investigated the cause of the shutdown of the main feedwater pumps and did not conclusively identify a human error or failed component. The licensee did, however, re-align equipment to bypass the nonsafety-related component involved with the loss of the pumps. The licensee restarted the reactor on October 25 and connected the generator to the offsite electrical distribution grid on October 26. The resident inspectors observed portions of these activities.
The State of Ohio has been notified. This preliminary notification is issued for information only.
The information presented herein has been discussed with the licensee, and is current as of 11:55 a.m. EDT on October 27, 2014. ADAMS Accession Number:  ML14301A034
Contact: Michael Kunowski 630-829-9618 michael.kunowski@nrc.gov}}

Revision as of 10:56, 26 June 2018

PNO-lll-14-009A Update to Unplanned Shutdown Greater than 72 Hours Due to a Loss of Feedwater
ML14301A034
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/27/2014
From: Kunowski M A
NRC/RGN-II/DRP/RPB5
To:
References
PNO-lll-14-009A
Download: ML14301A034 (1)


Text

PRELIMINARY NOTIFICATION - REGION III October 27, 2014 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE - PNO-III-14-009A This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. Some of the information may not yet be fully verified or evaluated and is basically all that is known by the Region III staff on this date. Facility Perry Nuclear Power Plant FirstEnergy Nuclear Operating Company Perry, OH Docket No.: 05000440 License No.: NPF-58 Licensee Emergency Classification Notification of Unusual Event Alert Site Area Emergency General Emergency X Not Applicable

SUBJECT:

UPDATE TO UNPLANNED SHUTDOWN GREATER THAN 72 HOURS DUE TO A LOSS OF FEEDWATER This Preliminary Notification provides an update to PNO-III-14-009 for a shutdown of greater than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of Perry following an automatic scram from 100 percent power on October 20, 2014. The scram occurred, as designed, following the unexpected shutdown of the main feedwater pumps. The licensee was shifting the electrical power supply of a nonsafety-related component when the pumps shut down.

The licensee investigated the cause of the shutdown of the main feedwater pumps and did not conclusively identify a human error or failed component. The licensee did, however, re-align equipment to bypass the nonsafety-related component involved with the loss of the pumps. The licensee restarted the reactor on October 25 and connected the generator to the offsite electrical distribution grid on October 26. The resident inspectors observed portions of these activities.

The State of Ohio has been notified. This preliminary notification is issued for information only.

The information presented herein has been discussed with the licensee, and is current as of 11:55 a.m. EDT on October 27, 2014. ADAMS Accession Number: ML14301A034

Contact: Michael Kunowski 630-829-9618 michael.kunowski@nrc.gov