{{#Wiki_filter:' EnteigyEntergy Operations, Inc.River Bend Station5485 U.S. Highway 61 NSt. Francisville, LA 70775December 8, 2015RBG-47634U.S. Nuclear Regulatory CommissionATTN: Document Control Desk11555 Rockville PikeRockville, MD 20852
 
==Subject:==
 
==References:==
High-frequency SUpplement to Seismic Hazard Screening Report, Response NRCRequest for Information Pursuant to 10 CER 50.54(f) Regarding Recommendation 2.1 ofthe Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentRiver Bend Station -Unit 1Docket No. 50-458License No. NPF-471. NRC Letter, Request for Information Pursuant to Title 10 of the Code of FederalRegulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-TermTask Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12,"20112, ADAMS Accession Number M/L12053A340*2.: NRC Letter, Electric Power *Research Institute Report 3002000704, "SeismicEvaluation GuidanCe: Augmented Approach for the Resolution of Fukushima Near-TermTask Force Recommendation 2.1: Seismic," as an Acceptable Alternative to the March12, 2012, Information Request for Seismic Reevaluations, dated May 7, 2013, ADAMSAccession Number ML 131 06A3313. NEI Letter, Final Draft of Industry Seismic Evaluation Guidance (EPRI 1025287),dated November 27, 2012, ADAMS Accession Number ML12333A168 andML1 2333A1 704. NRC Letter, Endorsement of Electric Power Research Institute Final Draft Report1025287, "Seismic Evaluation Guidance", dated February 15, 2013, ADAMS AccessionNumber ML1 231 9A0745. Entergy letter dated March 26, 2014, Seismic Hazard Reevaluations and ScreeningReport (ML 14091A429)6. NRC Letter, Screening and Prioritization Results regarding information pursuant toTitle 10 of the Code of Federal Regulations 50.54(f) regarding Seismic HazardReevaluations for Recommendation 2.1 of the Near-Term Task Force Reviews ofInsights from the Fukushima Dai-ichi accident, dated May 9, 2014, (ML14111A147)7. NEI Letter, Request for NRC Endorsement of High Frequency Program: ApplicationGuidance for Functional Confirmation and Fragility Evaluation (EPRI 3002004396), datedJuly 30, 20158. NRC letter dated September 15, 2015, Endorsement of Electric Power ResearchInstitute Final Draft Report 3002004396, "High Frequency Program: Application GuidanceFor Functional Confirmation And Fragility"' (ML1 521 8A569) / p RBG-47634December 8, 2015Page 2 of 3
 
==Dear Sir or Madam:==
On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued a Request for Information per 10CFR 50.54(f) (Reference 1) to all power reactor licensees. The required response section of Enclosure 1indicated that licensees should provide a seismic hazard evaluation and screening report within 1 .5 yearsfrom the date of the letter for central and eastern United States (CEUS) nuclear power plants. By NRCletter dated May 7, 2013 (Reference 2), the date to submit the report was extended to March 31, 2014.By letter dated May 9, 2014 (Reference 6), the NRC transmitted the results of the screening andprioritization review of the seismic hazards reevaluation submittal for River Bend Station (RBS)(Reference4). In accordance with the screening, prioritization, and implementation details report (SPID) andaugmented approach guidance (References 2, 3 and 4), the reevaluated seismic hazard is used todetermine if additional seismic risk evaluations are warranted for a plant. Specifically, the reevaluatedhorizontal ground motion response spectrum (GMRS) at the control point elevation is compared to theexisting safe shutdown earthquake (SSE) or Individual Plant Examination for External Events (IPEEE)High Capacity Low Probability of Failure (HCLPF) Spectrum (IHS) to determine if a plant is required toperform a high-frequency confirmation. As noted in the May 9, 2014 letter, River Bend Station is toconduct a limited scope high-frequency confirmation.Within the May 9, 2014 letter (Reference 6), NRC acknowledged that these limited scope evaluations willrequire additional development of the assessment process. By Reference 7, Nuclear Energy Institute(NEI) submitted an Electric Power Research Institute (EPRI) report entitled "High Frequency Program:Application Guidance for Functional Confirmation and Fragility Evaluation" (EPRI 3002004396) for NRCreview and endorsement. NRC endorsement was provided by Reference 8.The high-frequency confirmation for RBS shows that the high-frequency spectral accelerations of thecontrol point GMRS above 10Hz are within the limits identified in Section 3.1.1 of Reference 6 (less thanor equal to 0.2g). Therefore, no additional evaluation is necessary. The attachment to this letter providesthe SSE (or IHS) and GMRS information from Reference 5.This transmittal completes commitments from Reference 4. This letter contains no new regulatorycommitments. Should you have any questions regarding this submittal, please contact Joey Clark at 225-381-4177.I declare Under penalty of perjury that the foregoing is true and correct. Executed on December 8, 2015.Sincerely,Sergio VazquezDirector -Engineering
 
==Attachment:==
High-frequency Confirmation for RBScc: U. S. Nuclear Regulatory CommissionRegion IV1600 East Lamar Blvd.Arlington, TX 76011-4511 RBG-47634December 8, 2015Page 3 of 3NRC Sr. Resident InspectorP. O. Box 1050St. Francisville, LA 70775Central Records ClerkPublic Utility 'Commission of Texas1701 N. Congress Ave.Austin, TX 78711-3326Department of Environmental QualityOffice of Environmental ComplianceRadiological Emergency Planning and Response SectionJi Young WileyP.O. Box 4312Baton Rouge, LA 70821-4312*U. S. Nuclear Regulatory CommissioniAttn: Steven S. Koenick:'-Mail Stop 8BlA11555 Rockville Pike:-.Rockville, MD 20852-2738 Attachment to RBG-47634Page 1 of 1High-frequency Confirmato for R8S(Reference Figure 3-2 in EPRI (lf!
' EnteigyEntergy Operations, Inc.River Bend Station5485 U.S. Highway 61 NSt. Francisville, LA 70775December 8, 2015RBG-47634U.S. Nuclear Regulatory CommissionATTN: Document Control Desk11555 Rockville PikeRockville, MD 20852
 
==Subject:==
 
==References:==
High-frequency SUpplement to Seismic Hazard Screening Report, Response NRCRequest for Information Pursuant to 10 CER 50.54(f) Regarding Recommendation 2.1 ofthe Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentRiver Bend Station -Unit 1Docket No. 50-458License No. NPF-471. NRC Letter, Request for Information Pursuant to Title 10 of the Code of FederalRegulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-TermTask Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12,"20112, ADAMS Accession Number M/L12053A340*2.: NRC Letter, Electric Power *Research Institute Report 3002000704, "SeismicEvaluation GuidanCe: Augmented Approach for the Resolution of Fukushima Near-TermTask Force Recommendation 2.1: Seismic," as an Acceptable Alternative to the March12, 2012, Information Request for Seismic Reevaluations, dated May 7, 2013, ADAMSAccession Number ML 131 06A3313. NEI Letter, Final Draft of Industry Seismic Evaluation Guidance (EPRI 1025287),dated November 27, 2012, ADAMS Accession Number ML12333A168 andML1 2333A1 704. NRC Letter, Endorsement of Electric Power Research Institute Final Draft Report1025287, "Seismic Evaluation Guidance", dated February 15, 2013, ADAMS AccessionNumber ML1 231 9A0745. Entergy letter dated March 26, 2014, Seismic Hazard Reevaluations and ScreeningReport (ML 14091A429)6. NRC Letter, Screening and Prioritization Results regarding information pursuant toTitle 10 of the Code of Federal Regulations 50.54(f) regarding Seismic HazardReevaluations for Recommendation 2.1 of the Near-Term Task Force Reviews ofInsights from the Fukushima Dai-ichi accident, dated May 9, 2014, (ML14111A147)7. NEI Letter, Request for NRC Endorsement of High Frequency Program: ApplicationGuidance for Functional Confirmation and Fragility Evaluation (EPRI 3002004396), datedJuly 30, 20158. NRC letter dated September 15, 2015, Endorsement of Electric Power ResearchInstitute Final Draft Report 3002004396, "High Frequency Program: Application GuidanceFor Functional Confirmation And Fragility"' (ML1 521 8A569) / p RBG-47634December 8, 2015Page 2 of 3
 
==Dear Sir or Madam:==
On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued a Request for Information per 10CFR 50.54(f) (Reference 1) to all power reactor licensees. The required response section of Enclosure 1indicated that licensees should provide a seismic hazard evaluation and screening report within 1 .5 yearsfrom the date of the letter for central and eastern United States (CEUS) nuclear power plants. By NRCletter dated May 7, 2013 (Reference 2), the date to submit the report was extended to March 31, 2014.By letter dated May 9, 2014 (Reference 6), the NRC transmitted the results of the screening andprioritization review of the seismic hazards reevaluation submittal for River Bend Station (RBS)(Reference4). In accordance with the screening, prioritization, and implementation details report (SPID) andaugmented approach guidance (References 2, 3 and 4), the reevaluated seismic hazard is used todetermine if additional seismic risk evaluations are warranted for a plant. Specifically, the reevaluatedhorizontal ground motion response spectrum (GMRS) at the control point elevation is compared to theexisting safe shutdown earthquake (SSE) or Individual Plant Examination for External Events (IPEEE)High Capacity Low Probability of Failure (HCLPF) Spectrum (IHS) to determine if a plant is required toperform a high-frequency confirmation. As noted in the May 9, 2014 letter, River Bend Station is toconduct a limited scope high-frequency confirmation.Within the May 9, 2014 letter (Reference 6), NRC acknowledged that these limited scope evaluations willrequire additional development of the assessment process. By Reference 7, Nuclear Energy Institute(NEI) submitted an Electric Power Research Institute (EPRI) report entitled "High Frequency Program:Application Guidance for Functional Confirmation and Fragility Evaluation" (EPRI 3002004396) for NRCreview and endorsement. NRC endorsement was provided by Reference 8.The high-frequency confirmation for RBS shows that the high-frequency spectral accelerations of thecontrol point GMRS above 10Hz are within the limits identified in Section 3.1.1 of Reference 6 (less thanor equal to 0.2g). Therefore, no additional evaluation is necessary. The attachment to this letter providesthe SSE (or IHS) and GMRS information from Reference 5.This transmittal completes commitments from Reference 4. This letter contains no new regulatorycommitments. Should you have any questions regarding this submittal, please contact Joey Clark at 225-381-4177.I declare Under penalty of perjury that the foregoing is true and correct. Executed on December 8, 2015.Sincerely,Sergio VazquezDirector -Engineering
 
==Attachment:==
High-frequency Confirmation for RBScc: U. S. Nuclear Regulatory CommissionRegion IV1600 East Lamar Blvd.Arlington, TX 76011-4511 RBG-47634December 8, 2015Page 3 of 3NRC Sr. Resident InspectorP. O. Box 1050St. Francisville, LA 70775Central Records ClerkPublic Utility 'Commission of Texas1701 N. Congress Ave.Austin, TX 78711-3326Department of Environmental QualityOffice of Environmental ComplianceRadiological Emergency Planning and Response SectionJi Young WileyP.O. Box 4312Baton Rouge, LA 70821-4312*U. S. Nuclear Regulatory CommissioniAttn: Steven S. Koenick:'-Mail Stop 8BlA11555 Rockville Pike:-.Rockville, MD 20852-2738 Attachment to RBG-47634Page 1 of 1High-frequency Confirmato for R8S(Reference Figure 3-2 in EPRI (lf!}}

Revision as of 01:28, 29 May 2018

River Bend, Unit 1 - High-frequency Supplement to Seismic Hazard Screening Report, Response NRC Request for Information Pursuant to 10CER50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima
ML16005A088
Person / Time
Site: River Bend Entergy icon.png
Issue date: 12/08/2015
From: Vazquez S
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RBG-47634
Download: ML16005A088 (4)


Text

' EnteigyEntergy Operations, Inc.River Bend Station5485 U.S. Highway 61 NSt. Francisville, LA 70775December 8, 2015RBG-47634U.S. Nuclear Regulatory CommissionATTN: Document Control Desk11555 Rockville PikeRockville, MD 20852

Subject:

References:

High-frequency SUpplement to Seismic Hazard Screening Report, Response NRCRequest for Information Pursuant to 10 CER 50.54(f) Regarding Recommendation 2.1 ofthe Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentRiver Bend Station -Unit 1Docket No. 50-458License No. NPF-471. NRC Letter, Request for Information Pursuant to Title 10 of the Code of FederalRegulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-TermTask Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12,"20112, ADAMS Accession Number M/L12053A340*2.: NRC Letter, Electric Power *Research Institute Report 3002000704, "SeismicEvaluation GuidanCe: Augmented Approach for the Resolution of Fukushima Near-TermTask Force Recommendation 2.1: Seismic," as an Acceptable Alternative to the March12, 2012, Information Request for Seismic Reevaluations, dated May 7, 2013, ADAMSAccession Number ML 131 06A3313. NEI Letter, Final Draft of Industry Seismic Evaluation Guidance (EPRI 1025287),dated November 27, 2012, ADAMS Accession Number ML12333A168 andML1 2333A1 704. NRC Letter, Endorsement of Electric Power Research Institute Final Draft Report1025287, "Seismic Evaluation Guidance", dated February 15, 2013, ADAMS AccessionNumber ML1 231 9A0745. Entergy letter dated March 26, 2014, Seismic Hazard Reevaluations and ScreeningReport (ML 14091A429)6. NRC Letter, Screening and Prioritization Results regarding information pursuant toTitle 10 of the Code of Federal Regulations 50.54(f) regarding Seismic HazardReevaluations for Recommendation 2.1 of the Near-Term Task Force Reviews ofInsights from the Fukushima Dai-ichi accident, dated May 9, 2014, (ML14111A147)7. NEI Letter, Request for NRC Endorsement of High Frequency Program: ApplicationGuidance for Functional Confirmation and Fragility Evaluation (EPRI 3002004396), datedJuly 30, 20158. NRC letter dated September 15, 2015, Endorsement of Electric Power ResearchInstitute Final Draft Report 3002004396, "High Frequency Program: Application GuidanceFor Functional Confirmation And Fragility"' (ML1 521 8A569) / p RBG-47634December 8, 2015Page 2 of 3

Dear Sir or Madam:

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued a Request for Information per 10CFR 50.54(f) (Reference 1) to all power reactor licensees. The required response section of Enclosure 1indicated that licensees should provide a seismic hazard evaluation and screening report within 1 .5 yearsfrom the date of the letter for central and eastern United States (CEUS) nuclear power plants. By NRCletter dated May 7, 2013 (Reference 2), the date to submit the report was extended to March 31, 2014.By letter dated May 9, 2014 (Reference 6), the NRC transmitted the results of the screening andprioritization review of the seismic hazards reevaluation submittal for River Bend Station (RBS)(Reference4). In accordance with the screening, prioritization, and implementation details report (SPID) andaugmented approach guidance (References 2, 3 and 4), the reevaluated seismic hazard is used todetermine if additional seismic risk evaluations are warranted for a plant. Specifically, the reevaluatedhorizontal ground motion response spectrum (GMRS) at the control point elevation is compared to theexisting safe shutdown earthquake (SSE) or Individual Plant Examination for External Events (IPEEE)High Capacity Low Probability of Failure (HCLPF) Spectrum (IHS) to determine if a plant is required toperform a high-frequency confirmation. As noted in the May 9, 2014 letter, River Bend Station is toconduct a limited scope high-frequency confirmation.Within the May 9, 2014 letter (Reference 6), NRC acknowledged that these limited scope evaluations willrequire additional development of the assessment process. By Reference 7, Nuclear Energy Institute(NEI) submitted an Electric Power Research Institute (EPRI) report entitled "High Frequency Program:Application Guidance for Functional Confirmation and Fragility Evaluation" (EPRI 3002004396) for NRCreview and endorsement. NRC endorsement was provided by Reference 8.The high-frequency confirmation for RBS shows that the high-frequency spectral accelerations of thecontrol point GMRS above 10Hz are within the limits identified in Section 3.1.1 of Reference 6 (less thanor equal to 0.2g). Therefore, no additional evaluation is necessary. The attachment to this letter providesthe SSE (or IHS) and GMRS information from Reference 5.This transmittal completes commitments from Reference 4. This letter contains no new regulatorycommitments. Should you have any questions regarding this submittal, please contact Joey Clark at 225-381-4177.I declare Under penalty of perjury that the foregoing is true and correct. Executed on December 8, 2015.Sincerely,Sergio VazquezDirector -Engineering

Attachment:

High-frequency Confirmation for RBScc: U. S. Nuclear Regulatory CommissionRegion IV1600 East Lamar Blvd.Arlington, TX 76011-4511 RBG-47634December 8, 2015Page 3 of 3NRC Sr. Resident InspectorP. O. Box 1050St. Francisville, LA 70775Central Records ClerkPublic Utility 'Commission of Texas1701 N. Congress Ave.Austin, TX 78711-3326Department of Environmental QualityOffice of Environmental ComplianceRadiological Emergency Planning and Response SectionJi Young WileyP.O. Box 4312Baton Rouge, LA 70821-4312*U. S. Nuclear Regulatory CommissioniAttn: Steven S. Koenick:'-Mail Stop 8BlA11555 Rockville Pike:-.Rockville, MD 20852-2738 Attachment to RBG-47634Page 1 of 1High-frequency Confirmato for R8S(Reference Figure 3-2 in EPRI (lf!

' EnteigyEntergy Operations, Inc.River Bend Station5485 U.S. Highway 61 NSt. Francisville, LA 70775December 8, 2015RBG-47634U.S. Nuclear Regulatory CommissionATTN: Document Control Desk11555 Rockville PikeRockville, MD 20852

Subject:

References:

High-frequency SUpplement to Seismic Hazard Screening Report, Response NRCRequest for Information Pursuant to 10 CER 50.54(f) Regarding Recommendation 2.1 ofthe Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentRiver Bend Station -Unit 1Docket No. 50-458License No. NPF-471. NRC Letter, Request for Information Pursuant to Title 10 of the Code of FederalRegulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-TermTask Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12,"20112, ADAMS Accession Number M/L12053A340*2.: NRC Letter, Electric Power *Research Institute Report 3002000704, "SeismicEvaluation GuidanCe: Augmented Approach for the Resolution of Fukushima Near-TermTask Force Recommendation 2.1: Seismic," as an Acceptable Alternative to the March12, 2012, Information Request for Seismic Reevaluations, dated May 7, 2013, ADAMSAccession Number ML 131 06A3313. NEI Letter, Final Draft of Industry Seismic Evaluation Guidance (EPRI 1025287),dated November 27, 2012, ADAMS Accession Number ML12333A168 andML1 2333A1 704. NRC Letter, Endorsement of Electric Power Research Institute Final Draft Report1025287, "Seismic Evaluation Guidance", dated February 15, 2013, ADAMS AccessionNumber ML1 231 9A0745. Entergy letter dated March 26, 2014, Seismic Hazard Reevaluations and ScreeningReport (ML 14091A429)6. NRC Letter, Screening and Prioritization Results regarding information pursuant toTitle 10 of the Code of Federal Regulations 50.54(f) regarding Seismic HazardReevaluations for Recommendation 2.1 of the Near-Term Task Force Reviews ofInsights from the Fukushima Dai-ichi accident, dated May 9, 2014, (ML14111A147)7. NEI Letter, Request for NRC Endorsement of High Frequency Program: ApplicationGuidance for Functional Confirmation and Fragility Evaluation (EPRI 3002004396), datedJuly 30, 20158. NRC letter dated September 15, 2015, Endorsement of Electric Power ResearchInstitute Final Draft Report 3002004396, "High Frequency Program: Application GuidanceFor Functional Confirmation And Fragility"' (ML1 521 8A569) / p RBG-47634December 8, 2015Page 2 of 3

Dear Sir or Madam:

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued a Request for Information per 10CFR 50.54(f) (Reference 1) to all power reactor licensees. The required response section of Enclosure 1indicated that licensees should provide a seismic hazard evaluation and screening report within 1 .5 yearsfrom the date of the letter for central and eastern United States (CEUS) nuclear power plants. By NRCletter dated May 7, 2013 (Reference 2), the date to submit the report was extended to March 31, 2014.By letter dated May 9, 2014 (Reference 6), the NRC transmitted the results of the screening andprioritization review of the seismic hazards reevaluation submittal for River Bend Station (RBS)(Reference4). In accordance with the screening, prioritization, and implementation details report (SPID) andaugmented approach guidance (References 2, 3 and 4), the reevaluated seismic hazard is used todetermine if additional seismic risk evaluations are warranted for a plant. Specifically, the reevaluatedhorizontal ground motion response spectrum (GMRS) at the control point elevation is compared to theexisting safe shutdown earthquake (SSE) or Individual Plant Examination for External Events (IPEEE)High Capacity Low Probability of Failure (HCLPF) Spectrum (IHS) to determine if a plant is required toperform a high-frequency confirmation. As noted in the May 9, 2014 letter, River Bend Station is toconduct a limited scope high-frequency confirmation.Within the May 9, 2014 letter (Reference 6), NRC acknowledged that these limited scope evaluations willrequire additional development of the assessment process. By Reference 7, Nuclear Energy Institute(NEI) submitted an Electric Power Research Institute (EPRI) report entitled "High Frequency Program:Application Guidance for Functional Confirmation and Fragility Evaluation" (EPRI 3002004396) for NRCreview and endorsement. NRC endorsement was provided by Reference 8.The high-frequency confirmation for RBS shows that the high-frequency spectral accelerations of thecontrol point GMRS above 10Hz are within the limits identified in Section 3.1.1 of Reference 6 (less thanor equal to 0.2g). Therefore, no additional evaluation is necessary. The attachment to this letter providesthe SSE (or IHS) and GMRS information from Reference 5.This transmittal completes commitments from Reference 4. This letter contains no new regulatorycommitments. Should you have any questions regarding this submittal, please contact Joey Clark at 225-381-4177.I declare Under penalty of perjury that the foregoing is true and correct. Executed on December 8, 2015.Sincerely,Sergio VazquezDirector -Engineering

Attachment:

High-frequency Confirmation for RBScc: U. S. Nuclear Regulatory CommissionRegion IV1600 East Lamar Blvd.Arlington, TX 76011-4511 RBG-47634December 8, 2015Page 3 of 3NRC Sr. Resident InspectorP. O. Box 1050St. Francisville, LA 70775Central Records ClerkPublic Utility 'Commission of Texas1701 N. Congress Ave.Austin, TX 78711-3326Department of Environmental QualityOffice of Environmental ComplianceRadiological Emergency Planning and Response SectionJi Young WileyP.O. Box 4312Baton Rouge, LA 70821-4312*U. S. Nuclear Regulatory CommissioniAttn: Steven S. Koenick:'-Mail Stop 8BlA11555 Rockville Pike:-.Rockville, MD 20852-2738 Attachment to RBG-47634Page 1 of 1High-frequency Confirmato for R8S(Reference Figure 3-2 in EPRI (lf!