ML16127A502: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:TMI-1 UFSAR  APPENDIX 6B 6B-i REV. 20, APRIL 2010 
 
APPENDIX  6B 
 
TMI-1 UFSAR  APPENDIX 6B 6B-ii REV. 20, APRIL 2010  TABLE OF CONTENTS 
 
SECTION  TITLE  1.1 HYDRAULIC MODEL 1.2 REACTOR BUILDING DESIGN BASIS ACCIDENT 2.0 ENVIRONMENTAL QUALIFICATION PROGRAM 
 
==2.1 INTRODUCTION==
 
2.2 EQ ORGANIZATION  2.3 EQ MASTER LIST 2.4 ENVIRONMENTAL PARAMETERS 2.5 QUALIFICATION OF EQUIPMENT 
 
==3.0 REFERENCES==
 
TMI-1 UFSAR  APPENDIX 6B 6B-iii REV. 20, APRIL 2010  LIST OF TABLES TABLE TITLE 6B-1 Heat Transfer Coefficients Applied to the Reactor Coolant System and to the Reactor Building for LOCA analysis 6B-2 Engineered Safeguards Data
 
6B-3 Summary of Reactor Building LOCA Pressure Analysis  6B-4 Deleted
 
6B-5 Isotopic Core Inventory 6B-6 Assumptions Used In Development of LOCA Temperature Profile 6B-7 Assumptions Used in Development of RB MSLB Temperature Profile TMI-1 UFSAR  APPENDIX 6B 6B-iv REV. 20, APRIL 2010  LIST OF FIGURES FIGURE TITLE 6B-1 Loft Semiscale Blowdown Test No. 546 Vessel Pressure Vs Time (LOCA)  6B-2 Loft Test No. 546 Predicted Percent Mass Remaining Vs Time (LOCA)
 
6B-3 Envelope of Peak Reactor Building Pressure Versus Rupture Sizes With 3 Air Coolers Operating (LOCA)  6B-4 Reactor Building Pressure Versus Time for the DBA (LOCA) 8.5 FT2 Rupture with 3 Reactor Building Air Coolers 6B-5 Reactor Building Vapor and Sump Coolant Temperatures Versus Time for the DBA (LOCA) With 3 Reactor Building Air Coolers 6B-6 Reactor Building Energy Inventory Versus Time for the DBA (LOCA) with 3 Reactor Building Air Coolers  6B-7 Reactor Building Pressure Versus Time After Rupture (14.1 FT2 LOCA)  6B-8 Reactor Building Pressure Versus Time After Rupture (5.0 FT2 LOCA) 6B-9 Reactor Building Pressure Versus Time After Rupture (3.0 FT2 LOCA)  6B-10 Reactor Building Pressure Versus Time After Rupture (1.0 FT2 LOCA) 6B-11 Reactor Building Pressure Versus Time for the DBA (LOCA) With 2 Air Coolers and 1,500 GPM Spray 6B-12 Maximum Hot Spot Clad Temperature Vs Variable  Heat Transfer Coefficient After DNB for a 36 inch ID, Double-Ended, Hot Leg Pipe Rupture (LOCA) 6B-13 Reactor Building Vapor and Sump Coolant Temperatures Versus Time for the DBA (LOCA) with Two Reactor Building Air Coolers & 1500 GPM Sprays  6B-13A Deleted 6B-13B Deleted
 
6B-13C Deleted 6B-14 Deleted  6B-15  RB MSLB EQ Temperature Profile TMI-1 UFSAR  APPENDIX 6B 6B-v REV. 20, APRIL 2010  LIST OF FIGURES (cont'd)  FIGURE TITLE 6B-16  LOCA EQ Temperature Profile  6B-17  LOCA RB Pressure From EQ Model 6B-18  RB MSLB EQ Pressure Profile 6B-19  RB EQ Temperature Profile 6B-20  RB EQ Pressure Profile 
 
TMI-1 UFSAR  APPENDIX 6B 6B-i REV. 20, APRIL 2010 
 
APPENDIX  6B 
 
TMI-1 UFSAR  APPENDIX 6B 6B-ii REV. 20, APRIL 2010  TABLE OF CONTENTS 
 
SECTION  TITLE  1.1 HYDRAULIC MODEL 1.2 REACTOR BUILDING DESIGN BASIS ACCIDENT 2.0 ENVIRONMENTAL QUALIFICATION PROGRAM 
 
==2.1 INTRODUCTION==
 
2.2 EQ ORGANIZATION  2.3 EQ MASTER LIST 2.4 ENVIRONMENTAL PARAMETERS 2.5 QUALIFICATION OF EQUIPMENT 
 
==3.0 REFERENCES==
 
TMI-1 UFSAR  APPENDIX 6B 6B-iii REV. 20, APRIL 2010  LIST OF TABLES TABLE TITLE 6B-1 Heat Transfer Coefficients Applied to the Reactor Coolant System and to the Reactor Building for LOCA analysis 6B-2 Engineered Safeguards Data
 
6B-3 Summary of Reactor Building LOCA Pressure Analysis  6B-4 Deleted
 
6B-5 Isotopic Core Inventory 6B-6 Assumptions Used In Development of LOCA Temperature Profile 6B-7 Assumptions Used in Development of RB MSLB Temperature Profile TMI-1 UFSAR  APPENDIX 6B 6B-iv REV. 20, APRIL 2010  LIST OF FIGURES FIGURE TITLE 6B-1 Loft Semiscale Blowdown Test No. 546 Vessel Pressure Vs Time (LOCA)  6B-2 Loft Test No. 546 Predicted Percent Mass Remaining Vs Time (LOCA)
 
6B-3 Envelope of Peak Reactor Building Pressure Versus Rupture Sizes With 3 Air Coolers Operating (LOCA)  6B-4 Reactor Building Pressure Versus Time for the DBA (LOCA) 8.5 FT2 Rupture with 3 Reactor Building Air Coolers 6B-5 Reactor Building Vapor and Sump Coolant Temperatures Versus Time for the DBA (LOCA) With 3 Reactor Building Air Coolers 6B-6 Reactor Building Energy Inventory Versus Time for the DBA (LOCA) with 3 Reactor Building Air Coolers  6B-7 Reactor Building Pressure Versus Time After Rupture (14.1 FT2 LOCA)  6B-8 Reactor Building Pressure Versus Time After Rupture (5.0 FT2 LOCA) 6B-9 Reactor Building Pressure Versus Time After Rupture (3.0 FT2 LOCA)  6B-10 Reactor Building Pressure Versus Time After Rupture (1.0 FT2 LOCA) 6B-11 Reactor Building Pressure Versus Time for the DBA (LOCA) With 2 Air Coolers and 1,500 GPM Spray 6B-12 Maximum Hot Spot Clad Temperature Vs Variable  Heat Transfer Coefficient After DNB for a 36 inch ID, Double-Ended, Hot Leg Pipe Rupture (LOCA) 6B-13 Reactor Building Vapor and Sump Coolant Temperatures Versus Time for the DBA (LOCA) with Two Reactor Building Air Coolers & 1500 GPM Sprays  6B-13A Deleted 6B-13B Deleted
 
6B-13C Deleted 6B-14 Deleted  6B-15  RB MSLB EQ Temperature Profile TMI-1 UFSAR  APPENDIX 6B 6B-v REV. 20, APRIL 2010  LIST OF FIGURES (cont'd)  FIGURE TITLE 6B-16  LOCA EQ Temperature Profile  6B-17  LOCA RB Pressure From EQ Model 6B-18  RB MSLB EQ Pressure Profile 6B-19  RB EQ Temperature Profile 6B-20  RB EQ Pressure Profile}}

Revision as of 17:35, 28 May 2018

024_06 Appendix 06B Environmental QUALIFICATION-PT Parameters
ML16127A502
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 04/11/2016
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16127A520 List: ... further results
References
TMI-16-035
Download: ML16127A502 (38)


Text

TMI-1 UFSAR APPENDIX 6B 6B-i REV. 20, APRIL 2010

APPENDIX 6B

TMI-1 UFSAR APPENDIX 6B 6B-ii REV. 20, APRIL 2010 TABLE OF CONTENTS

SECTION TITLE 1.1 HYDRAULIC MODEL 1.2 REACTOR BUILDING DESIGN BASIS ACCIDENT 2.0 ENVIRONMENTAL QUALIFICATION PROGRAM

2.1 INTRODUCTION

2.2 EQ ORGANIZATION 2.3 EQ MASTER LIST 2.4 ENVIRONMENTAL PARAMETERS 2.5 QUALIFICATION OF EQUIPMENT

3.0 REFERENCES

TMI-1 UFSAR APPENDIX 6B 6B-iii REV. 20, APRIL 2010 LIST OF TABLES TABLE TITLE 6B-1 Heat Transfer Coefficients Applied to the Reactor Coolant System and to the Reactor Building for LOCA analysis 6B-2 Engineered Safeguards Data

6B-3 Summary of Reactor Building LOCA Pressure Analysis 6B-4 Deleted

6B-5 Isotopic Core Inventory 6B-6 Assumptions Used In Development of LOCA Temperature Profile 6B-7 Assumptions Used in Development of RB MSLB Temperature Profile TMI-1 UFSAR APPENDIX 6B 6B-iv REV. 20, APRIL 2010 LIST OF FIGURES FIGURE TITLE 6B-1 Loft Semiscale Blowdown Test No. 546 Vessel Pressure Vs Time (LOCA) 6B-2 Loft Test No. 546 Predicted Percent Mass Remaining Vs Time (LOCA)

6B-3 Envelope of Peak Reactor Building Pressure Versus Rupture Sizes With 3 Air Coolers Operating (LOCA) 6B-4 Reactor Building Pressure Versus Time for the DBA (LOCA) 8.5 FT2 Rupture with 3 Reactor Building Air Coolers 6B-5 Reactor Building Vapor and Sump Coolant Temperatures Versus Time for the DBA (LOCA) With 3 Reactor Building Air Coolers 6B-6 Reactor Building Energy Inventory Versus Time for the DBA (LOCA) with 3 Reactor Building Air Coolers 6B-7 Reactor Building Pressure Versus Time After Rupture (14.1 FT2 LOCA) 6B-8 Reactor Building Pressure Versus Time After Rupture (5.0 FT2 LOCA) 6B-9 Reactor Building Pressure Versus Time After Rupture (3.0 FT2 LOCA) 6B-10 Reactor Building Pressure Versus Time After Rupture (1.0 FT2 LOCA) 6B-11 Reactor Building Pressure Versus Time for the DBA (LOCA) With 2 Air Coolers and 1,500 GPM Spray 6B-12 Maximum Hot Spot Clad Temperature Vs Variable Heat Transfer Coefficient After DNB for a 36 inch ID, Double-Ended, Hot Leg Pipe Rupture (LOCA) 6B-13 Reactor Building Vapor and Sump Coolant Temperatures Versus Time for the DBA (LOCA) with Two Reactor Building Air Coolers & 1500 GPM Sprays 6B-13A Deleted 6B-13B Deleted

6B-13C Deleted 6B-14 Deleted 6B-15 RB MSLB EQ Temperature Profile TMI-1 UFSAR APPENDIX 6B 6B-v REV. 20, APRIL 2010 LIST OF FIGURES (cont'd) FIGURE TITLE 6B-16 LOCA EQ Temperature Profile 6B-17 LOCA RB Pressure From EQ Model 6B-18 RB MSLB EQ Pressure Profile 6B-19 RB EQ Temperature Profile 6B-20 RB EQ Pressure Profile

TMI-1 UFSAR APPENDIX 6B 6B-i REV. 20, APRIL 2010

APPENDIX 6B

TMI-1 UFSAR APPENDIX 6B 6B-ii REV. 20, APRIL 2010 TABLE OF CONTENTS

SECTION TITLE 1.1 HYDRAULIC MODEL 1.2 REACTOR BUILDING DESIGN BASIS ACCIDENT 2.0 ENVIRONMENTAL QUALIFICATION PROGRAM

2.1 INTRODUCTION

2.2 EQ ORGANIZATION 2.3 EQ MASTER LIST 2.4 ENVIRONMENTAL PARAMETERS 2.5 QUALIFICATION OF EQUIPMENT

3.0 REFERENCES

TMI-1 UFSAR APPENDIX 6B 6B-iii REV. 20, APRIL 2010 LIST OF TABLES TABLE TITLE 6B-1 Heat Transfer Coefficients Applied to the Reactor Coolant System and to the Reactor Building for LOCA analysis 6B-2 Engineered Safeguards Data

6B-3 Summary of Reactor Building LOCA Pressure Analysis 6B-4 Deleted

6B-5 Isotopic Core Inventory 6B-6 Assumptions Used In Development of LOCA Temperature Profile 6B-7 Assumptions Used in Development of RB MSLB Temperature Profile TMI-1 UFSAR APPENDIX 6B 6B-iv REV. 20, APRIL 2010 LIST OF FIGURES FIGURE TITLE 6B-1 Loft Semiscale Blowdown Test No. 546 Vessel Pressure Vs Time (LOCA) 6B-2 Loft Test No. 546 Predicted Percent Mass Remaining Vs Time (LOCA)

6B-3 Envelope of Peak Reactor Building Pressure Versus Rupture Sizes With 3 Air Coolers Operating (LOCA) 6B-4 Reactor Building Pressure Versus Time for the DBA (LOCA) 8.5 FT2 Rupture with 3 Reactor Building Air Coolers 6B-5 Reactor Building Vapor and Sump Coolant Temperatures Versus Time for the DBA (LOCA) With 3 Reactor Building Air Coolers 6B-6 Reactor Building Energy Inventory Versus Time for the DBA (LOCA) with 3 Reactor Building Air Coolers 6B-7 Reactor Building Pressure Versus Time After Rupture (14.1 FT2 LOCA) 6B-8 Reactor Building Pressure Versus Time After Rupture (5.0 FT2 LOCA) 6B-9 Reactor Building Pressure Versus Time After Rupture (3.0 FT2 LOCA) 6B-10 Reactor Building Pressure Versus Time After Rupture (1.0 FT2 LOCA) 6B-11 Reactor Building Pressure Versus Time for the DBA (LOCA) With 2 Air Coolers and 1,500 GPM Spray 6B-12 Maximum Hot Spot Clad Temperature Vs Variable Heat Transfer Coefficient After DNB for a 36 inch ID, Double-Ended, Hot Leg Pipe Rupture (LOCA) 6B-13 Reactor Building Vapor and Sump Coolant Temperatures Versus Time for the DBA (LOCA) with Two Reactor Building Air Coolers & 1500 GPM Sprays 6B-13A Deleted 6B-13B Deleted

6B-13C Deleted 6B-14 Deleted 6B-15 RB MSLB EQ Temperature Profile TMI-1 UFSAR APPENDIX 6B 6B-v REV. 20, APRIL 2010 LIST OF FIGURES (cont'd) FIGURE TITLE 6B-16 LOCA EQ Temperature Profile 6B-17 LOCA RB Pressure From EQ Model 6B-18 RB MSLB EQ Pressure Profile 6B-19 RB EQ Temperature Profile 6B-20 RB EQ Pressure Profile