|
|
Line 14: |
Line 14: |
| | page count = 14 | | | page count = 14 |
| | project = CAC:MF8522, CAC:MF8521 | | | project = CAC:MF8522, CAC:MF8521 |
| | stage = Other | | | stage = Meeting |
| }} | | }} |
|
| |
|
Revision as of 01:39, 13 April 2018
Letter Sequence Meeting |
---|
|
|
MONTHYEARML16307A4902016-10-25025 October 2016 Presentation Slides from Public Meeting Calvert Cliffs GSI-191 Resolution Update Project stage: Meeting ML16328A2832016-11-18018 November 2016 Supplemental Presentation Slides for 10/25/2016 Public Meeting Via E-mail from K.Greene to R.Guzman Calvert Cliffs GSI-191 Resolution Update Project stage: Request ML16328A3472016-11-23023 November 2016 Memo to File: E-mail from R.Guzman to E.Villar Regarding Meeting Summary of Calvert Cliffs Nuclear Power Plant Units 1 and 2 - GSI-191 Resolution on 10/25/16 Project stage: Meeting ML17249A3202017-09-18018 September 2017 Summary of Meeting with Exelon Generation Company, LLC, on Planned Submittal of Risk-Informed License Amendment and Exemption Requests Concerning Resolution of Generic Issue 191 Project stage: Meeting ML18136A4932018-05-16016 May 2018 Licensee'S Slides for Pre-Application Meeting W/Exelon Re Planned GSI-191 LAR for Calvert Cliffs (L-2016-LRM-0001) Project stage: Meeting ML18198A2922018-05-16016 May 2018, 17 May 2018, 18 July 2018 May 21, 2018, Meeting with Exelon Generation Company, LLC, on Planned Submittal of Risk-Informed License Amendment and Exemption Requests Concerning Resolution of Generic Issue 191 (EPID L-2016-LRM-0001 Project stage: Request ML18197A2392018-06-19019 June 2018, 21 June 2018, 20 July 2018 Summary of June 21, 2018 Meeting with Exelon Generation Company, LLC Project stage: Request ML18171A0842018-06-21021 June 2018 GSI-191 Program Use of Risk Metrics for Containment Sump Tech Spec Operability Determination June 21, 2018 Public Meeting Slides (MF8521, MF8522; L-2016-LRM-0001) Project stage: Meeting ML18201A4062018-06-21021 June 2018 Plants, Units 1 and 2 - Exelon'S Response to NRC Questions Project stage: Other ML18197A4362018-07-18018 July 2018 May 21, 2018, Summary of Meeting with Exelon Generation Company, LLC, on Planned Submittal of Risk-Informed License Amendment and Exemption Requests Concerning Resolution of Generic Issue 191 Project stage: Meeting ML18197A2292018-07-20020 July 2018 Summary of Meeting with Exelon Generation Company, Llc, on Planned Submittal of Risk Informed License Amendment and Exemption Requests Concerning Resolution of Generic Issue 191 (CAC Nos. MF8521 and MF8522; EPID L-2016-LRM-0001) Project stage: Meeting 2018-05-16
[Table View] |
|
---|
Category:Slides and Viewgraphs
MONTHYEARML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML22124A1492022-05-10010 May 2022 (Ccnpp) Control Element Assembly (CEA) Recovery Time Improvement Project LAR Pre-Submittal Non-Proprietary (Public) ML22124A1482022-05-10010 May 2022 (Ccnpp) Control Element Assembly (CEA) Recovery Time Improvement Project LAR Pre-Submittal Redacted (Public) ML22013A3942022-01-13013 January 2022 Presentation Information for Pre-Submittal Meeting Regarding Relief Request to Use the Carbon Fiber Reinforced Polymer (Cfrp) Composite System ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21162A3322021-06-11011 June 2021 BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs ML21144A0172021-05-24024 May 2021 Spent Fuel Pool Cooling - Shutdown Cooling Licensing Design Basis License Amendment Request Pre-Submittal Meeting ML21134A0162021-05-24024 May 2021 Spent Fuel Pool Cooling - Shutdown Cooling Licensing Design Basis License Amendment Request - NRC Pre-submittal Meeting Telecon May 24, 2021 (EPID L-2021-LRM-0051) (Slides) ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20246G8772020-09-0303 September 2020 Licensee'S Presentation for September 3, 2020 Public Telephone Conference ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20163A6542020-06-18018 June 2020 2020 NRC Annual Assessment Webinar Presentation - Pennsylvania and Maryland Facilities (Beaver Valley, Calvert Cliffs, Limerick, Peach Bottom, Susquehanna) ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20168A3192020-06-15015 June 2020 Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation ML19246B7162019-08-29029 August 2019 Meeting Between NRC and Exelon Regarding Calvert Cliffs-2 LAR to Use Framatome ATF LTAs ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18276A0712018-10-0404 October 2018 Exelon'S Presentation for October 4, 2018 Public Pre-Submittal Meeting on Planned Calvert Cliffs 10CFR50.69 LAR ML18171A0842018-06-21021 June 2018 GSI-191 Program Use of Risk Metrics for Containment Sump Tech Spec Operability Determination June 21, 2018 Public Meeting Slides (MF8521, MF8522; L-2016-LRM-0001) ML18136A4932018-05-16016 May 2018 Licensee'S Slides for Pre-Application Meeting W/Exelon Re Planned GSI-191 LAR for Calvert Cliffs (L-2016-LRM-0001) ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML16328A2832016-11-18018 November 2016 Supplemental Presentation Slides for 10/25/2016 Public Meeting Via E-mail from K.Greene to R.Guzman Calvert Cliffs GSI-191 Resolution Update ML16307A4902016-10-25025 October 2016 Presentation Slides from Public Meeting Calvert Cliffs GSI-191 Resolution Update ML16274A0012016-09-30030 September 2016 PWR MSIP Analysis and Measurements ML16242A1782016-09-0101 September 2016 Presentation Slides from Public Meeting Regarding Calvert Cliffs GSI-191 Resolution Update ML16198A0012016-07-18018 July 2016 Presentation Slides from Public Meeting Regarding Calvert Cliffs GSI-191 Resolution Update ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML15321A3702015-12-0101 December 2015 GSI-191 Program Strainer Head Loss Testing and Option 2b Closure Approach ML15308A1072015-11-0505 November 2015 TSTF-505 LAR - NRC Pre-Submittal, November 5, 2015 Meeting Slides ML15279A4992015-10-0808 October 2015 October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application ML15282A0832015-10-0808 October 2015 October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application - Final ML15222A5472015-08-31031 August 2015 GSI 191 Program Chemical Effects Testing Update Option 2b Closure Approach ML15152A0822015-06-0404 June 2015 Presentation for the June 4, 2015 Public Meeting Regarding the National Fire Protection Association Standard 805 License Amendment Request ML14230A9132014-08-18018 August 2014 Enclosure - Fuel Performance and Cask Internals - July 17, 2014, Summary of Meeting with Exelon Corporation to Discuss Request for Additional Information No. 4 to the Calvert Cliffs ISFSI License Renewal Application (Docket No. 72-08) TAC L ML14230A9112014-08-18018 August 2014 Enclosure - Example AMP - July 17, 2014, Summary of Meeting with Exelon Corporation to Discuss Request for Additional Information No. 4 to the Calvert Cliffs ISFSI License Renewal Application (Docket No. 72-08) TAC L24475 2024-05-16
[Table view] |
Text
Calvert Cliffs GSI-191 ProgramThermal Hydraulic Analysis of Containment Response and Acceptable Head Loss Test SelectionOctober 25, 2016 AgendaIntroductions Objectives for MeetingThermal Hydraulic Analysis of ContainmentDemonstrate that one CS pump will be secured prior to the onset of chemical precipitationContainment pressure reduces to 2.8 psig prior to containment pool reducing to 140°FAcceptable Strainer Head Loss TestIdentify chemical effects head loss test applicable simplified risk-informed approachStaff Questions & ConcernsSchedule for Future Periodic Meetings Calvert Cliffs Option 2b Refined Closure Plan1 CCNPP AttendeesJake Smith Director Site EngineeringJohn Haydin M&CU Engineering ManagerAndre Drake Lead Responsible Engineer GSI-191Craig Sellers Project Manager GSI-191Eric Federline Project SupportCalvert Cliffs Option 2b Refined Closure Plan2 Thermal Hydraulic Analysis of ContainmentInvestigate Sump Temperature and Containment PressureLarge Break LOCA EventsCooldown Scenarios2 Containment Spray Pump + 2 Containment Air CoolersSlower Cooldown2 Containment Spray Pumps + 4 Containment Air Coolers Rapid CooldownIn all cases, pool temperature > 140°F when containment pressure reduces to 2.8 psigOne Containment Spray Pump secured at containment pressure < 2.8 psigChemical precipitants remain soluble until pool temperature reduces to 140°FCold Leg Break, Max SI, Max Instrument Uncertainty, pool = 138.8°F @ 2.48 psigCold Leg Break produces 10% to 20% less precipitateCalvert Cliffs Option 2b Refined Closure Plan3 Thermal Hydraulic Analysis Results2 CS pumps + 2 CACsHot Leg BreakTime to 140°F = 108.3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />sTime to 2.8 psig = 47.2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />sTime to secure pump = 61.1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />sPressure @ 140°F = 1.98 psigCold Leg BreakTime to 140°F = 77.8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />sTime to 2.8 psig = 63.9 hour1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br />sTime to secure pump = 13.9 hour1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br />sPressure @ 140°F = 2.58 psigCalvert Cliffs Option 2b Refined Closure Plan42 CS pumps + 4 CACsHot Leg BreakTime to 140°F = 86.1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />sTime to 2.8 psig = 23.6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />sTime to secure pump = 62.5 hour5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />sPressure @ 140°F = 1.95 psigCold Leg BreakTime to 140°F = 50.0 hour0 days <br />0 hours <br />0 weeks <br />0 months <br />sTime to 2.8 psig = 38.9 hour1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br />sTime to secure pump = 11.1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />sPressure @ 140°F = 2.63 psig Thermal Hydraulic Response After CS Pump TripContainment Spray primary heat removal for containment poolPressure and Temperature increase after pump tripPressure increase can auto restart CS pumpEOPs being revised to prevent auto restart of CS pumpCalvert Cliffs Option 2b Refined Closure Plan50.00.51.01.52.02.53.03.54.04.55.0101001000Containment Pressure (psig)Time (hr)CL Slower CooldownHL Slower CooldownCL Rapid CooldownHL Rapid Cooldown110120130140150160170101001000Sump Water Temperature (F)Time (hr)CL Slower CooldownHL Slower CooldownCL Rapid CooldownHL Rapid Cooldown 2010 Head Loss Testing Test 5Calvert Cliffs Option 2b Refined Closure Plan6CCNPP performed a sequence of strainer head loss tests in 2010 with varying, scaled debris loadsTest 5 is most appropriate test to use to define critical break size Largest amount of fiber fines with maximum head loss below acceptance criteria of 1.99 ft H20 when chemical precipitates formTest 5 Corresponding Plant Quantity Debris Loads211 lbsNUKON Fines542 lbsThermal Wrap Fines29 lbsGeneric Fiberglass43 lbsTemp-Mat206 lbsEpoxy Chips2269 lbsParticulate (modeled using silicon carbide)54.1 lbs of WCAP-16530 NaAlSi3O8 Head Loss Plot Test 5Calvert Cliffs Option 2b Refined Closure Plan7Non-Chemical Head LossChemical Effects Head Loss 2010 Testing Flow Rates2010 testing program added fibrous, particulate, and coating chip debris at scaled design plant flow rate of 5000 gpmDuring and after addition of chemical precipitates, flow was lowered to scaled flow rate of 2400 gpm (assumed 1 CS pump and 1 HPSI pump)Maximum recirculation flow rate at on-set of chemical effects could be as high as 2900 gpm (1 CS pump and 2 HPSI pumps)Flow sweeps performed at the end of each testTest flow rate varied from scaled plant values of ~600 gpm to ~6000 gpm, holding for 10 minutes at various incrementsCalvert Cliffs Option 2b Refined Closure Plan8 2010 Test 5 Flow Sweep DataCalvert Cliffs Option 2b Refined Closure Plan9Note Plot Shows Corresponding Plant Flow Rates used in Test Scaling Test 5 Head Loss Using Flow Sweep Data -PreliminaryDuring test, break-through occurred in debris bed as chemical precipitates were introducedIncrease maximum head loss recorded in Test 5 (1.21 feet) by ratio of flow rate increase from 2400 gpm to 2900 gpmThis is more conservative the scaling using ration of head loss increase from flow sweepsCalvert Cliffs Option 2b Refined Closure Plan10 Test 5 Flow Sweep Results -PreliminaryLinearly interpolate head loss 2900 gpm / 2400 gpm = 21% increase Maximum total head loss including clean strainer head loss:(1.21 ft
- 1.21) + 0.288 ft = 1.75 ftBelow acceptance criteria of 1.99 ft(limiting failure mode of CCNPP strainer is dearation)Calvert Cliffs Option 2b Refined Closure Plan11 Questions/ConcernsJointly Review Issues, Questions, and Concerns for Future CommunicationCalvert Cliffs Option 2b Refined Closure Plan12 Next StepsFinalize Update of CalculationsPresent Formal Risk-Informed GSI-191 Analysis and ResultsDesire Next Meeting 4Q 2016Calvert Cliffs Option 2b Refined Closure Plan13