ML15236A058: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 13: Line 13:
| document type = Letter
| document type = Letter
| page count = 4
| page count = 4
| project = TAC:MF6126, TAC:MF6126
| project = TAC:MF6126
| stage = Other
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Robert Braun President and Chief Nuclear Officer PSEG Nuclear LLC -N09 P.O. Box 236 Hancocks Bridge, NJ 08038 September 15, 2015 SUBJECT: SALEM NUCLEAR GENERATING STATION, UNIT NO. 1 -LICENSE RENEWAL COMMITMENT IMPLEMENTATION TO RENEWED FACILITY OPERATING LICENSE CONDITION 2.C.21 (TAC NO. MF6126) Dear Mr. Braun: By letter dated March 4, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15069A110), PSEG Nuclear LLC (PSEG or the licensee) submitted a letter in accordance with the Renewed Facility Operating License (RFOL) Condition 2.C.21 for Salem Nuclear Generating Station, Unit No. 1 (Salem). The RFOL for Salem was issued on June 30, 2011 (ADAMS Accession No. ML 11166A135). RFOL Condition 2.C.21 states: PSEG Nuclear LLC shall take one core sample in the Unit 1 spent fuel pool west wall, by the end of 2013, and one core sample in the east wall where there have been indications of borated water ingress through the concrete, by the end of 2015. The core samples (east and west walls) will expose the rebar, which will be examined for signs of corrosion. Any sample showing signs of concrete degradation and/or rebar corrosion will be entered into the licensee's corrective action program for further evaluation. PSEG Nuclear LLC shall submit a report in accordance with 10 CFR 50.4 no later than three months after each sample is taken on the results, recommendations, and any additional planned actions. In its letter dated March 4, 2015, PSEG outlined the results of petrographic examination findings from the east wall concrete core bore, as well as findings from visual examinations of the reinforcement for corrosion. PSEG provided the results of the examination findings from the west wall concrete bore in a letter dated November 12, 2013 (ADAMS Accession No. ML 13317B684). The U.S. Nuclear Regulatory Commission (NRC) staff's evaluation of the condition of the west wall bored concrete and the exposed steel reinforcement was addressed previously by a letter dated May 8, 2014(ML14100A180). According to the March 4, 2015, letter, PSEG obtained a 5-inch (12.7 centimer (cm)) long by 4-inch (10.2 cm) diameter core bore from the Salem spent fuel pool (SFP) east wall in the vicinity of the construction joint. PSEG stated that the petrographic examination was visual and in accordance with American Society for Testing and Materials C856. The sample obtained demonstrated that the extracted concrete is in good condition and the cement paste was unaffected by chemical attacks, showing no signs of softening, degradation, or dissolution. The slightly yellow/orange discoloration that was observed within 0.039 inch (1-mm) of the R. Braun -2-construction joint was attributed by PSEG to carbonation of the floor slab surface during original construction. PSEG stated that petrographic examination did not identify any signs of degradation related to ingress of borated water through the concrete. PSEG concluded that the structural performance of the Salem fuel handling building has not been impacted due to leakage of SFP borated water. In addition to the core sample, PSEG excavated a small area of the east wall in the vicinity of the lateral construction joint to expose and assess the condition of a portion of the reinforcing steel. PSEG stated that the exposed reinforcement steel had no visible signs of corrosion. The licensee summarized the findings for concrete and rebar examination by stating, in part, that, "[t]he removal and examination of the core sample in the Unit 1 spent fuel pool east wall did not show any indications of concrete degradation due to borated water ingress through the concrete. Also, the exposed rebar did not show signs of aging-related corrosion." NRC staff reviewed the licensee's letter dated March 4, 2015, documenting its 2015 actions and results related to RFOL Condition 2.C.21. The NRC staff noted that the petrographic examinations of the concrete showed that it is in good condition with no signs of degradation related to chemical attacks due to borated water leakage. The staff also noted that the licensee's visual examination of the exposed reinforcing steel did not show signs of degradation due to corrosion. Based on its review of the licensee's examination of the concrete core bore sample and steel reinforcement on the Salem SFP east wall, the NRC staff finds that this examination provides reasonable assurance that the examined materials are in good condition. Further, there are no findings of significance that have a bearing on the aging management of concrete or reinforcing steel for further evaluation. Based on its review, the NRC staff concludes that the licensee has provided the required information and completed the actions required by RFOL Condition 2.C.21 for 2015. This completes the NRC's staff review of TAC No. MF6126.
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Robert Braun President and Chief Nuclear Officer PSEG Nuclear LLC -N09 P.O. Box 236 Hancocks Bridge, NJ 08038 September 15, 2015  
R. Braun -3 -If you have any questions concerning this matter, please contact me at 301-415-1603 or Carleen.Parker@nrc.gov. Docket No. 50-272 cc: Distribution via Listserv Sincerely, II -*-*-1 . Cv.1L ) \ c./"' ____ _ Carleen J. Parkir, reject Manager Plant nch 1-2 Division of Oper 1ng Reactor Licensing Office of Nuclear Reactor Regulation R. Braun -3-If you have any questions concerning this matter, please contact me at 301-415-1603 or Carleen.Parker@nrc.gov. Docket No. 50-272 cc: Distribution via Listserv DISTRIBUTION: PUBLIC LPL 1-2 R/F RidsNrrDorlLpl1-2 Resource RidsNrrLALRonewicz Resource RidsNrrDlrRasb Resource KMorganButler, OEDO Sincerely, IRA/ Carleen J. Parker, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsRgn1 MailCenter Resource RidsACRS_MailCTR Resource RidsRgn1 MailCenter Resource RidsNrrPMSalem Resource JLopez, NRR ADAMS A ccess1on N ML 15236A058 o.: *b d t d 8/06/2015 1y memo a e OFFICE DORL/LPLl-2/PM DORL/LPLl-2/LA DLR/RASB/BC DORL/LPLl-2/BC DORL/LPLl-2/PM NAME CParker LRonewicz BWittick* DBroaddus CParker DATE 8/24/2015 8/25/2015 8/06/2015 9/15/2015 9/15/2015 OFFICIAL RECORD COPY   
 
==SUBJECT:==
SALEM NUCLEAR GENERATING STATION, UNIT NO. 1 -LICENSE RENEWAL COMMITMENT IMPLEMENTATION TO RENEWED FACILITY OPERATING LICENSE CONDITION 2.C.21 (TAC NO. MF6126)  
 
==Dear Mr. Braun:==
By letter dated March 4, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15069A110), PSEG Nuclear LLC (PSEG or the licensee) submitted a letter in accordance with the Renewed Facility Operating License (RFOL) Condition 2.C.21 for Salem Nuclear Generating Station, Unit No. 1 (Salem). The RFOL for Salem was issued on June 30, 2011 (ADAMS Accession No. ML 11166A135). RFOL Condition 2.C.21 states: PSEG Nuclear LLC shall take one core sample in the Unit 1 spent fuel pool west wall, by the end of 2013, and one core sample in the east wall where there have been indications of borated water ingress through the concrete, by the end of 2015. The core samples (east and west walls) will expose the rebar, which will be examined for signs of corrosion. Any sample showing signs of concrete degradation and/or rebar corrosion will be entered into the licensee's corrective action program for further evaluation. PSEG Nuclear LLC shall submit a report in accordance with 10 CFR 50.4 no later than three months after each sample is taken on the results, recommendations, and any additional planned actions. In its letter dated March 4, 2015, PSEG outlined the results of petrographic examination findings from the east wall concrete core bore, as well as findings from visual examinations of the reinforcement for corrosion. PSEG provided the results of the examination findings from the west wall concrete bore in a letter dated November 12, 2013 (ADAMS Accession No. ML 13317B684). The U.S. Nuclear Regulatory Commission (NRC) staff's evaluation of the condition of the west wall bored concrete and the exposed steel reinforcement was addressed previously by a letter dated May 8, 2014(ML14100A180). According to the March 4, 2015, letter, PSEG obtained a 5-inch (12.7 centimer (cm)) long by 4-inch (10.2 cm) diameter core bore from the Salem spent fuel pool (SFP) east wall in the vicinity of the construction joint. PSEG stated that the petrographic examination was visual and in accordance with American Society for Testing and Materials C856. The sample obtained demonstrated that the extracted concrete is in good condition and the cement paste was unaffected by chemical attacks, showing no signs of softening, degradation, or dissolution. The slightly yellow/orange discoloration that was observed within 0.039 inch (1-mm) of the R. Braun construction joint was attributed by PSEG to carbonation of the floor slab surface during original construction. PSEG stated that petrographic examination did not identify any signs of degradation related to ingress of borated water through the concrete. PSEG concluded that the structural performance of the Salem fuel handling building has not been impacted due to leakage of SFP borated water. In addition to the core sample, PSEG excavated a small area of the east wall in the vicinity of the lateral construction joint to expose and assess the condition of a portion of the reinforcing steel. PSEG stated that the exposed reinforcement steel had no visible signs of corrosion. The licensee summarized the findings for concrete and rebar examination by stating, in part, that, "[t]he removal and examination of the core sample in the Unit 1 spent fuel pool east wall did not show any indications of concrete degradation due to borated water ingress through the concrete. Also, the exposed rebar did not show signs of aging-related corrosion." NRC staff reviewed the licensee's letter dated March 4, 2015, documenting its 2015 actions and results related to RFOL Condition 2.C.21. The NRC staff noted that the petrographic examinations of the concrete showed that it is in good condition with no signs of degradation related to chemical attacks due to borated water leakage. The staff also noted that the licensee's visual examination of the exposed reinforcing steel did not show signs of degradation due to corrosion. Based on its review of the licensee's examination of the concrete core bore sample and steel reinforcement on the Salem SFP east wall, the NRC staff finds that this examination provides reasonable assurance that the examined materials are in good condition. Further, there are no findings of significance that have a bearing on the aging management of concrete or reinforcing steel for further evaluation. Based on its review, the NRC staff concludes that the licensee has provided the required information and completed the actions required by RFOL Condition 2.C.21 for 2015. This completes the NRC's staff review of TAC No. MF6126.
R. Braun If you have any questions concerning this matter, please contact me at 301-415-1603 or Carleen.Parker@nrc.gov. Docket No. 50-272 cc: Distribution via Listserv Sincerely, II -*-*-1 . Cv.1L ) \ c./"' ____ _ Carleen J. Parkir, reject Manager Plant nch 1-2 Division of Oper 1ng Reactor Licensing Office of Nuclear Reactor Regulation R. Braun If you have any questions concerning this matter, please contact me at 301-415-1603 or Carleen.Parker@nrc.gov. Docket No. 50-272 cc: Distribution via Listserv DISTRIBUTION: PUBLIC LPL 1-2 R/F RidsNrrDorlLpl1-2 Resource RidsNrrLALRonewicz Resource RidsNrrDlrRasb Resource KMorganButler, OEDO Sincerely, IRA/ Carleen J. Parker, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsRgn1 MailCenter Resource RidsACRS_MailCTR Resource RidsRgn1 MailCenter Resource RidsNrrPMSalem Resource JLopez, NRR ADAMS A ccess1on N ML 15236A058 o.: *b d t d 8/06/2015 1y memo a e OFFICE DORL/LPLl-2/PM DORL/LPLl-2/LA DLR/RASB/BC DORL/LPLl-2/BC DORL/LPLl-2/PM NAME CParker LRonewicz BWittick* DBroaddus CParker DATE 8/24/2015 8/25/2015 8/06/2015 9/15/2015 9/15/2015 OFFICIAL RECORD COPY   
}}
}}

Revision as of 05:29, 5 April 2018

Salem Nuclear Generating Station, Unit 1 - License Renewal Commitment Implementation to Renewed Facility Operating License Condition 2.C.21 (TAC MF6126)
ML15236A058
Person / Time
Site: Salem PSEG icon.png
Issue date: 09/15/2015
From: Carleen Parker
Plant Licensing Branch 1
To: Braun R
Public Service Enterprise Group
Parker C J, NRR/DORL/LPLI-2, 415-1603
References
TAC MF6126
Download: ML15236A058 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Robert Braun President and Chief Nuclear Officer PSEG Nuclear LLC -N09 P.O. Box 236 Hancocks Bridge, NJ 08038 September 15, 2015

SUBJECT:

SALEM NUCLEAR GENERATING STATION, UNIT NO. 1 -LICENSE RENEWAL COMMITMENT IMPLEMENTATION TO RENEWED FACILITY OPERATING LICENSE CONDITION 2.C.21 (TAC NO. MF6126)

Dear Mr. Braun:

By letter dated March 4, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15069A110), PSEG Nuclear LLC (PSEG or the licensee) submitted a letter in accordance with the Renewed Facility Operating License (RFOL) Condition 2.C.21 for Salem Nuclear Generating Station, Unit No. 1 (Salem). The RFOL for Salem was issued on June 30, 2011 (ADAMS Accession No. ML 11166A135). RFOL Condition 2.C.21 states: PSEG Nuclear LLC shall take one core sample in the Unit 1 spent fuel pool west wall, by the end of 2013, and one core sample in the east wall where there have been indications of borated water ingress through the concrete, by the end of 2015. The core samples (east and west walls) will expose the rebar, which will be examined for signs of corrosion. Any sample showing signs of concrete degradation and/or rebar corrosion will be entered into the licensee's corrective action program for further evaluation. PSEG Nuclear LLC shall submit a report in accordance with 10 CFR 50.4 no later than three months after each sample is taken on the results, recommendations, and any additional planned actions. In its letter dated March 4, 2015, PSEG outlined the results of petrographic examination findings from the east wall concrete core bore, as well as findings from visual examinations of the reinforcement for corrosion. PSEG provided the results of the examination findings from the west wall concrete bore in a letter dated November 12, 2013 (ADAMS Accession No. ML 13317B684). The U.S. Nuclear Regulatory Commission (NRC) staff's evaluation of the condition of the west wall bored concrete and the exposed steel reinforcement was addressed previously by a letter dated May 8, 2014(ML14100A180). According to the March 4, 2015, letter, PSEG obtained a 5-inch (12.7 centimer (cm)) long by 4-inch (10.2 cm) diameter core bore from the Salem spent fuel pool (SFP) east wall in the vicinity of the construction joint. PSEG stated that the petrographic examination was visual and in accordance with American Society for Testing and Materials C856. The sample obtained demonstrated that the extracted concrete is in good condition and the cement paste was unaffected by chemical attacks, showing no signs of softening, degradation, or dissolution. The slightly yellow/orange discoloration that was observed within 0.039 inch (1-mm) of the R. Braun construction joint was attributed by PSEG to carbonation of the floor slab surface during original construction. PSEG stated that petrographic examination did not identify any signs of degradation related to ingress of borated water through the concrete. PSEG concluded that the structural performance of the Salem fuel handling building has not been impacted due to leakage of SFP borated water. In addition to the core sample, PSEG excavated a small area of the east wall in the vicinity of the lateral construction joint to expose and assess the condition of a portion of the reinforcing steel. PSEG stated that the exposed reinforcement steel had no visible signs of corrosion. The licensee summarized the findings for concrete and rebar examination by stating, in part, that, "[t]he removal and examination of the core sample in the Unit 1 spent fuel pool east wall did not show any indications of concrete degradation due to borated water ingress through the concrete. Also, the exposed rebar did not show signs of aging-related corrosion." NRC staff reviewed the licensee's letter dated March 4, 2015, documenting its 2015 actions and results related to RFOL Condition 2.C.21. The NRC staff noted that the petrographic examinations of the concrete showed that it is in good condition with no signs of degradation related to chemical attacks due to borated water leakage. The staff also noted that the licensee's visual examination of the exposed reinforcing steel did not show signs of degradation due to corrosion. Based on its review of the licensee's examination of the concrete core bore sample and steel reinforcement on the Salem SFP east wall, the NRC staff finds that this examination provides reasonable assurance that the examined materials are in good condition. Further, there are no findings of significance that have a bearing on the aging management of concrete or reinforcing steel for further evaluation. Based on its review, the NRC staff concludes that the licensee has provided the required information and completed the actions required by RFOL Condition 2.C.21 for 2015. This completes the NRC's staff review of TAC No. MF6126.

R. Braun If you have any questions concerning this matter, please contact me at 301-415-1603 or Carleen.Parker@nrc.gov. Docket No. 50-272 cc: Distribution via Listserv Sincerely, II -*-*-1 . Cv.1L ) \ c./"' ____ _ Carleen J. Parkir, reject Manager Plant nch 1-2 Division of Oper 1ng Reactor Licensing Office of Nuclear Reactor Regulation R. Braun If you have any questions concerning this matter, please contact me at 301-415-1603 or Carleen.Parker@nrc.gov. Docket No. 50-272 cc: Distribution via Listserv DISTRIBUTION: PUBLIC LPL 1-2 R/F RidsNrrDorlLpl1-2 Resource RidsNrrLALRonewicz Resource RidsNrrDlrRasb Resource KMorganButler, OEDO Sincerely, IRA/ Carleen J. Parker, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsRgn1 MailCenter Resource RidsACRS_MailCTR Resource RidsRgn1 MailCenter Resource RidsNrrPMSalem Resource JLopez, NRR ADAMS A ccess1on N ML 15236A058 o.: *b d t d 8/06/2015 1y memo a e OFFICE DORL/LPLl-2/PM DORL/LPLl-2/LA DLR/RASB/BC DORL/LPLl-2/BC DORL/LPLl-2/PM NAME CParker LRonewicz BWittick* DBroaddus CParker DATE 8/24/2015 8/25/2015 8/06/2015 9/15/2015 9/15/2015 OFFICIAL RECORD COPY