MONTHYEARLR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0033, Core Operating Limits Report Cycle 272023-04-26026 April 2023 Core Operating Limits Report Cycle 27 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 LR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0095, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 20222022-12-20020 December 2022 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2022 LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0092, Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG2022-12-0909 December 2022 Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments LR-N22-0084, Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095)2022-11-17017 November 2022 Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095) LR-N22-0090, Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem2022-11-10010 November 2022 Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem LR-N22-0065, Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations2022-09-27027 September 2022 Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations LR-N22-0074, Emergency Plan Evacuation Time Estimate2022-09-15015 September 2022 Emergency Plan Evacuation Time Estimate LR-N22-0066, License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM)2022-08-31031 August 2022 License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM) LR-N22-0063, Spent Fuel Cask Registration2022-08-10010 August 2022 Spent Fuel Cask Registration LR-N22-0068, In-Service Inspection Activities - 90-Day Report2022-08-10010 August 2022 In-Service Inspection Activities - 90-Day Report LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature2022-08-0707 August 2022 License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature LR-N22-0062, Spent Fuel Cask Registration2022-07-21021 July 2022 Spent Fuel Cask Registration LR-N22-0006, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2022-06-29029 June 2022 License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report2022-06-22022 June 2022 License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report LR-N22-0044, Emergency Plan Document Revisions Implemented November, 20212022-05-19019 May 2022 Emergency Plan Document Revisions Implemented November, 2021 LR-N22-0043, Core Operating Limits Report - Cycle 292022-05-0909 May 2022 Core Operating Limits Report - Cycle 29 LR-N22-0041, 2021 Annual Radioactive Effluent Release Report (Rerr)2022-04-28028 April 2022 2021 Annual Radioactive Effluent Release Report (Rerr) LR-N22-0040, 2021 Annual Radiological Environmental Operating Report2022-04-28028 April 2022 2021 Annual Radiological Environmental Operating Report LR-N22-0039, Emergency Plan Document Revisions Implemented March 24, 20222022-04-21021 April 2022 Emergency Plan Document Revisions Implemented March 24, 2022 LR-N21-0052, Request for Relief from ASME Code Defect Removal for Service Water Buried Piping2022-04-0707 April 2022 Request for Relief from ASME Code Defect Removal for Service Water Buried Piping LR-N22-0023, Guarantees of Payment of Deferred Premiums2022-03-21021 March 2022 Guarantees of Payment of Deferred Premiums LR-N22-0022, Response to Request for Additional Information Relief Request S1-14R-210, Alternative Examination of Welds2022-03-21021 March 2022 Response to Request for Additional Information Relief Request S1-14R-210, Alternative Examination of Welds LR-N22-0017, Submittal of 2021 Annual Report of Fitness for Duty (FFD) Performance Data2022-02-25025 February 2022 Submittal of 2021 Annual Report of Fitness for Duty (FFD) Performance Data LR-N22-0016, Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility2022-02-24024 February 2022 Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility LR-N22-0013, In-Service Inspection Activities - 90-Day Report2022-02-10010 February 2022 In-Service Inspection Activities - 90-Day Report LR-N22-0007, Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs2022-01-0505 January 2022 Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs LR-N21-0061, Annual Report of Specific Activity Analysis - TS 6.9.1.5c2021-12-0909 December 2021 Annual Report of Specific Activity Analysis - TS 6.9.1.5c LR-N21-0083, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2021 & 30 Day Report for Salem Unit 2 Upflow Conversion2021-11-24024 November 2021 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2021 & 30 Day Report for Salem Unit 2 Upflow Conversion LR-N21-0078, Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-11-18018 November 2021 Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0066, Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations2021-11-10010 November 2021 Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations 2023-09-08
[Table view] |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge;; NJ 08038-0236 MAR 0 4 2015 LR-N15-0053 FOL 2. C. 21 u.-s. tuclear Reguiatory Commission ATTN: Document Control Desk Salem Generatina Station. Unit 1 ,
Rene\tved Facility Operating License No. DRP-70 NRG Docket No. 50-272 .
Subject:
License Renewal Commitment Implementation in accordance vvith the renevved facility operating license condition 2.C.21, "DC:Ct:!
I VLV i"\i i\.IU"'ear
\.ii i i /"" sh!!
Lit-V i!ClU "'a'$e t Pi.
lh \.I- '"'O'"e i samio ifJi'I..# in UI -1<!.,o Ui Iv!no+ Bt. -!! pon+ u*el P""O!
o *_,;;\, ;:, l v i vv
- t. '"all itf, by the end of 2013, and one core sample in the east wallwhere there have been indications of borated water ingress thmugh the concrete, by the end of 2015. The core samples (east and west walls) will expose the rebar, which wiil be examined for signs of corrosion. Any sample showing signs of concrete degradation and/or rebar corrosion will be entered into the licensee's corrective action program for further evaluation. PSEG Nuclear LLC shall submit a report in accordance with 10 CFR 50A no tater than three mn,...
ViiU +hc '"'fter. a
-Ci.! '"'"C"J * !. nip
[__-.Cl.!.
C:"'ffi l\....r l;S taven r _i On +h,... L !.'C-.. r"'<::.
![_ I 1ltS rr.f"Omm
't i'C:'Y': _ __ l _!Cl ' '-"ll O""'c
'"'nd'.:l+*I it-Y-, Ci. i.U..,,.t
...,,. .L a
'"'n"
..u..y 0. rlrli+;,.,.,...
,.., 'l.d ..UlilUU.a ...., l planned actions; J1 The attached document contains the summary of the results, recommendations, and any additional planned actions for the second of the tvvo required core san1pies as stated in the license condition 2.C.21.
There are no new commitments in this letter.
S;n I! * *"e'"e1" v l 1y, f:1p Salem Site Vice President Attachments ( 1)
DocLnuent Control Desk PQn?
! --_,#
LR-N 15-0053 D. Dnrrrian Admini;;tratnr
...... _ _ !f - ., - - - -- ,,._ ....., .... ._._ - R""'aion 1
!f
"'"4'....., -
C Sanders1 Licensing Project fvlanager - Saiern P.
- i=:..,..,.""'v
!Hh y, US" .... "1'!;"\.
RC .._.;;' Se:nr --- Hh ..... Re:den+
- .... ; -_a lrsn.::.
-*rL!_ ,....+or
! - S::.'
....,;;. ..-.
1 C!..,1I P,
- "4!*"1Uit1n =!a, 1-=, i\/
HH::;-.= =, i\11nru:).r ll' 1 K1trAi1 1f i
=e-.* -=v. U: I ...iiAr
..... =--=
nnirtArir1n
-: -!*! ;_.-= l!a ::J T. Cachaza1 Salem CorrirAtroerit Coordinator L Marabella, Corporate Cornrnitrnent Coordinator
LR-N15-0053 Attachment 1 Findings of Salem Generating Station Unit 1 Core Bore of Spent Fuel Pool East Wall
rage 1 LR-t15=0053 Findings of Salem Generating Station Unit 1 Core Bore of Spent Fuel Poot East
\.fi.i-iii Yifd.H On December 8, 2014., the Sal*em Generating Station {Salem-) rernoved a 5-in long by 4-License Condition addition, rebar
\A/as exposed to check for corrosion. The specific,License Condition is repeated beio\N for reference.
PE_G-_ -! u_:= r:le_f bb'\.Jr ! b#l>H I\.-
ljtB :i..:-e nna #;;.#';..@...... .;%n =n tb.F;;.
Y!f!_ Yi ir L =!! Yl!;i, ! pit;IL 1= §.#'O. f:oi::a
_ _ - - - U_!ii pool west walij by the end of 20131 and one core sample in the east
=--I!! =,,_ L.. .- &ba,:;$= L...-.=ffe;:. b.Aa_-=-- !-.=5:;.-.... .=. ! -=-- ...... -..1:. L-.-A. ...J: -=-.4=--= !-=--= .......
W!t wner- iJJie nav oJi iilYitions OT DVf"l:Y wae-r
..... =-
i1,91e5
through th concrete; by the end of 2015= The core san-1p!es (east n"""- w;;i%ffe';;. ... .:' ...... !l#<o\ -:..:.; .... ;sl --U'o;;%- .g.h#!i. ...... b#i;; r ;.4L..;_.,.,,.,h " .::. llat k;.,,. '*,...,. m=n-sJ IY W§L i!L f;AiJ- " 1- 'writ\:?_ wu M A!'LH-Y !Y!!
IO.
-- J sigf1s of corrosion.. Any sample showing sigt1s of concrete degradation and/or rebar corrosion wiii- be entered- into the licensee's corrective action program for furuer evaluation PSEG tuciear LLC shall submit a report in accordance with 10 CFR 50:4 no later than three months a!ier each sampe is taken on the results, recon1n1endations; and any additional planned actions ..
The foilovving findings are related to the second core sample taken frorn the East \l\/all prior to the end of 2015.
Concrete Gore Exan1irtation inforrnationj dated October 25, 201 D related to Structures fv1onitoring associated vvith the Salei11 f\i*Liclear Generating Station; Units 1 and 2 License Rene¥val Application1 dated Decen1iJer 14, 2010 (ADAfv1S i\ccesson f-O fv1L103540120)1 PSEG proposed to perforrn a petrographic e:Kaminatio n of a shal!ovv core sainple approximately 4 inches deep to confirrr1 that tt1e co n cre te is in good condition.
The foHovving. discussions vvere extracted from a detailed report prepared by f\APR
-vU-';.'!io- inP ....... {l:fµfr.::.
\ ,.._,.1....,.; ....n
,Aflritµ 11::1. :
r-""""* \iiPR
.,..i ;"JC ::i.1:r = ,, ,,Ai;;:
nr-i-YAC!
'J.----v1dt.. -...., in t R.crlrHi'
- '""'f-"'"'"'1;. Nr1 n1r1A_()Li?_1P.
J ":I._ ._; v- ._ J=...v t U si. P-
.__,. _ .,r- ,! lJn
- ,,i,t...
- 1 Fuei Handling Bt1ilcHt1g - Evaluation of Concrete Core and* E x posed Reinforcernent frorn East VVaU1 d ated February 27, 2015).
As per PSEG Letter No. LR-10-0414, the location of the SFP East \/Vali core Vias in the vicinity of the construction joint The core san1ple \AJas shipped to the Babcock &
U\li'Lu I v,.. hhu r*- Tpchn-*'orn r:n ... r fr><HAf\ .i:o p +ro""r"'h*c ---,.. , * .... ti-r. Tn' '"'a m vv n.....vA LiH..Alu "'IHU 1 ...... c l. \OVVJ 1--- e L bf af.-1H ,, VAdHLk:L .. U!L it; - j P e trr1nrt1hr l.1"V::::; ui"" ==-' frflYYi r:nnf
- ¥1:: ..,,. .. _.. .... T
., t;:if
,-....,. . oAA!:lrrh
&"_...., _ """' 'V* * !l
.... . ..-. Ttinn
! --l.***;:,, I=.-I-V i rr:rKT-)
\.... . .,. "" * " 1 \n'Jho" vminAri tnt=::i \,,;
ti" s :* _.-"'"- n* =-- "' ,_
-..-..
Ur SOPlt""11 t..,.; d11µ -- -,.., -VH rr-m +h-"" U\IAt tut:: V'f!I..,....
\j\ l#"v,!i VVOh in 'J(\1 q h* &-la-'""""'
-t-f......
\..a
\11.:::.
.... . t.-- thA DV'- R\1\/ t.lif\i h.vi 1 to f;Qrfor-
.h ,..,., ..,, .:0--i:fJE"lv if"
....,....,.""' ,,, _.n,,;' ** -
F examination of the East \tVaU core sample.
A summary of the petrography exan-iination results are provided belo\AJ.
Page2 LR-N15-0053
.. The leng th of the core sam pl e was approximately 5 inches . One end had a flat, formed surface (wa!! face on buried soii side), and the other end had a partia!iy
£10"',..,.
J!l!J ed
. urfa,..
v- - **\!**"' 1"'1-om 12L- *
"" ,... ,,.,_ nc:+,.u*,-.+1" 1u- 1$;_...t on ; ,.. irt 1""*""'*y\ ' 3"'*-i
.. JVuh.r\ T
""" """"-t1= :::i !jv f!apcu-"' / fr"'tUfP<i Ql,;. uu.:: 1 *rface
...
caused by removal of the core sample.
" The visual examinations were performed fo!iow i n g the guidelines of ASTM C856.
" The coarse a n d fine aggregates were judged to be of very goo d quality.
.. The concrete is in good conditi o n . The cement paste did not exhibit any features that '\Nou!d indicate that it had been affected by chemical attack (i.e., softening,
.....,. aa' d;<;:;nr tionr
"'4" or dic;i.n h *tinn'/""
h,,.._ .._:-Ui!.-:i.r-
- There was a slight yellow/orange discoloration within 1 mm of the construction joint, which was attributed to carbonation of the floor slab surface during original construction. It did not appear to be a ny form of aging degradation of the concrete.
"' The core sample contained a narrow crack (Le., maximum width of 0.05 mm) that l*nU:t:tea'
... !Cl"' at... thA- -" l o-meo' I f "Onc;i.t-ur.i.:r;n
! . -yi.0;,l inin""
uLl.Ua.l .]'¥"-=-:- q; 1rf- and eAt--**-v
=-L -*=-Vt:: **
v+Anriad* a p p I-oxim;::i f;:;lu ".{
i--**,,- !=;
v .. -v inches toward the wall end. It passed around the coarse agg regate , indicating it likeiy occurred during the eariy life of the structure.
- Several air voids entrapped in the concrete core were filled or lined with white ernna
- v-11
- C:l.y n1 ri"'n u .....,. ,... o dt<;:
--* ._..
..,...
1 h:::.
'"'""pnc;:;ifq
.....,,. u ...... --*
\AJl:nc v:: ....,. lv* nI. ota.. ni*;70,...J
--*;;;;i Y &..-U.. Th;:;;
=- =-* ...... rv o .,<;!;
- ..no d""'n-rltion vsi-..... - .. il of the concrete due to the air voids or secondary deposits. The concrete represented by th e core sections is well consolidated concrete and has a total entrapped air void content estimated at 1 to 2 percent.
Based on the resul ts of the petro graphic examination, the concrete sample did not exhibit any signs of degradation related to ingress of borated water and, therefore, no impact on the structural perforroance of the Unit 1 Fuel Handling Building due to ieakage of SFP bo rated water.
Exposed Rebar Examination In add ition to the core sample, Salem excavated a small area of the East Wall, adjacent to the concrete core sample, in the vicinity of the lateral construction joint to expose a portion of the re info rc i ng steel rebar. The excavation area was approximately 4 inches
' " . . ' I ., .._. r oy .q. mcnes and exposea one \ 1) secuon m re.b ar.
The excavation exposed a length of approximately 4 inches of the steel rebar. A visual examination of the expo s ed rebar was performed. it appeared to be in excellent condition with no visibie signs of corrosion of the steei rebar.
Page 3 Summarv The remova.i and exarnination of the c-0re sar1p*le i*n* the Unit 1 Spent FLJel Poot East
\tVa.U d id not shovv any indications of concrete degradation due to bo rate d \n1ater u1gress through the concrete ;.L\iso1 the exposed rebar did not shov; signs of aging=related corrosion.
There Viere no reco11n1endations or additioi1al .. r, ..; larH1ed actions resuitina fron1 the
'"'
exan1ination. of the. secon.d SFP concrete core sai11ple The 2015 actions required the Saiem Unit 1 OperaUng License tPR-70j License Condition 2C(2 1) are cornpleted.
In conclusion, vvith ti1e subn1ittal of this letter, and our pre*vious letter, LR-N13-0263 (fo,.DAN1S J.\.ccession to. fv.1L*1.33178684)1 dated- tovetnber 12, 20131 discussirig the
\/Vest V\laU Core Sample results1 PSEG t1as fLtUy satisfied the Salen1 Unit 1 Operating Lcet1se NPR-70., License Conaiuon 2.C(21)