ENS 57988: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 28: Line 28:
175 Freight Rd 175  
175 Freight Rd 175  
Rocky Mount, NC 27804
Rocky Mount, NC 27804
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20251016en.html#en57988
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20251017en.html#en57988
}}
}}


{{ENS-Nav}}
{{ENS-Nav}}

Latest revision as of 06:20, 17 October 2025

ENS 57988 +/-
Where
Engine Systems, Inc
Rocky Mount, North Carolina (NRC Region 1)
Organization: Engine Systems, Inc
Reporting
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect
Time - Person (Reporting Time:+1182.1 h49.254 days <br />7.036 weeks <br />1.619 months <br />)
Opened: Dan Roberts
10:06 Oct 15, 2025
NRC Officer: Ernest West
Last Updated: Oct 15, 2025
57988 - NRC Website