ML21130A251: Difference between revisions
From kanterella
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:SECURITY-RELATED INFORMATION - | {{#Wiki_filter:SECURITY-RELATED INFORMATION - | ||
V/ITHHOLD UNDER 10 CFR 2.390 DRAWING | V/ITHHOLD UNDER 10 CFR 2.390 DRAWING 4OO3 OVERALL SITE AND VICINITY PLAN}} |
Latest revision as of 09:04, 29 November 2024
ML21130A251 | |
Person / Time | |
---|---|
Site: | Cooper |
Issue date: | 04/21/2021 |
From: | Nebraska Public Power District (NPPD) |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML21130A114 | List:
|
References | |
NLS2021013 | |
Download: ML21130A251 (1) | |
Similar Documents at Cooper | |
---|---|
Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML23129A4802023-04-20020 April 2023
[Table view]1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram Control Rod Drive Hydraulic System, Sheet 6 ML23129A2642023-04-20020 April 2023 1 to Updated Safety Analysis Report, Section I, Figures ML23129A4492023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 791E257, Revision N16, Sheet 3, Elementary Diagram Feedwater Control System ML23129A4962023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E222BB, Sheet 1, Reactor Protection System ML23129A4992023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram Control Rod Drive Hydraulic System, Sheet 1 ML23129A4932023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E727BB, Rev. 2, Sheet 3, Functional Control Diagram Recirculation Flow Control System ML23129A4952023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E222BB, Sheet 3, Reactor Protection System ML23129A4892023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E589BB, High Pressure Coolant Injection System Functional Control Diagram, Sheet 3 ML23129A4912023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E402BB, Rev. 6, Sheet 1, Functional Control Diagram Core Spray System ML23129A4862023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4259, Rev. 10, Sheet 1, Containment Vessel Penetration Location ML23129A4882023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4215, Rev. 3, Reactor Building Structural Shielding Blocks (HPCI Hatch) ML23129A4812023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E140BB, Rev. 10, Sheet 1, Functional Control Diagram Residual Heat Removal System ML23129A4832023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 919D690BC, Revision N01, Recirclulation Outlet Nozzle, Sheet 3 ML23129A4782023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing CNS-NBI-10, Revision N06, Reactor Water Level Indication Correlation ML23129A4522023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4003, Overall Site and Vicinity Plan, Withheld ML23129A4742023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing CNSMS43, Rev. 5, Leakage Paths from Outboard MSIVs ML23129A4762023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E148BB, Sheet 1, Process Diagram Reactor Water Clean-Up System ML23129A4712023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E719BC, Sheet 1, Process Diagram Reactor Core Isolation Coolant System ML23129A4732023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 731E611, Revision N04, Primary Steam Piping Nuclear Boiler Purchased Part, Sheet 1 ML23129A4652023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram Control Rod Drive Hydraulic System, Sheet 4 ML23129A4672023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 6000302, P & I Diagram Augmented Offgas System, Sheet 1 ML23129A4622023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing SAA085, Sheet 4, 20 X 5 MSIV Actuator ML23129A4642023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E149BB, Sheet 1, Functional Control Diagram Nuclear Boiler ML23129A4582023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E100, Sheet 1, Neutron Monitoring System Arrangement General Plant Document ML23129A4602023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E140BB, Rev. 10, Sheet 3, Functional Control Diagram Residual Heat Removal System ML23129A4552023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E720BB, Process Diagram High Pressure Coolant Injection System ML23129A4572023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing ILE70-3, Installation Details - Temperature Detectors for Nuclear Boiler System Leak Detection, Sheet 107E ML23129A4532023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4260, Sheet 2A, Containment Suppression Chamber Penetration Location ML23129A4482023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E517BC, Sheet 1, Functional Control Diagram Reactor Core Isolation Cooling System NLS2023022, 1 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107f, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection2023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107f, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection ML23129A4702023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E517BC, Functional Control Diagram Reactor Core Isolation Cooling System, Sheet 2 ML23129A4542023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E989, Power Range Monitoring Unit, Sheet 1 ML23129A4842023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Sheet 5, Functional Control Diagram Control Rod Drive Hydraulic System ML23129A5002023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 719E479BB, Process Radiation Monitoring System, Sheet 1 ML23129A5012023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 3058, DC One Line Diagram ML23129A4772023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Control Rod Drive Hydraulic System Sheet 7 ML23129A4922023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E223BB, Neutron Monitoring System, Sheet 1 ML23129A4612023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing NC29546, Transmission Line Routes ML23129A4852023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E805BA, Revision N01, Neutron Monitoring System Functional Control Diagram, Sheet 7 ML23129A4682023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4259, Sheet 1A, Containment Vessel Penetration Schedule ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report ML23129A4512023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E174BB, Sheet 1, ML23129A4692023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 791E257, General Electric, Sheet 4 ML23129A4982023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 919D690BC, Reactor Vessel, Sheet 5 ML23129A4942023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107c, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection ML23129A4902023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E140BB, Revision N05, Sheet 2, Fcd Residual Heat Removal System ML23129A4872023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E100, Neutron Monitoring, Sheet 2 ML23129A4822023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram, Control Rod Drive Hydraulic System, Sheet 2 ML23129A4792023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 3005, Sheet 4, Auxiliary One Line Diagram Motor Control Centers M, N, P, U, V, & W ML23129A4752023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E517BC, Reactor Core Isolation Cooling System Functional Control Diagram, Sheet 3 2023-04-20 Category:Drawing MONTHYEARML23129A4772023-04-20020 April 2023
[Table view]1 to Updated Safety Analysis Report, Drawing 729E471BB, Control Rod Drive Hydraulic System Sheet 7 ML23129A4472023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 80E1143, Revision N01, Fuel Storage Rack ML23129A2642023-04-20020 April 2023 1 to Updated Safety Analysis Report, Section I, Figures ML23129A4962023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E222BB, Sheet 1, Reactor Protection System ML23129A4952023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E222BB, Sheet 3, Reactor Protection System ML23129A4932023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E727BB, Rev. 2, Sheet 3, Functional Control Diagram Recirculation Flow Control System ML23129A4922023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E223BB, Neutron Monitoring System, Sheet 1 ML23129A4892023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E589BB, High Pressure Coolant Injection System Functional Control Diagram, Sheet 3 ML23129A4882023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4215, Rev. 3, Reactor Building Structural Shielding Blocks (HPCI Hatch) ML23129A4862023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4259, Rev. 10, Sheet 1, Containment Vessel Penetration Location ML23129A4852023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E805BA, Revision N01, Neutron Monitoring System Functional Control Diagram, Sheet 7 ML23129A4812023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E140BB, Rev. 10, Sheet 1, Functional Control Diagram Residual Heat Removal System ML23129A4802023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram Control Rod Drive Hydraulic System, Sheet 6 ML23129A4782023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing CNS-NBI-10, Revision N06, Reactor Water Level Indication Correlation ML23129A4492023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 791E257, Revision N16, Sheet 3, Elementary Diagram Feedwater Control System ML23129A4742023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing CNSMS43, Rev. 5, Leakage Paths from Outboard MSIVs ML23129A4732023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 731E611, Revision N04, Primary Steam Piping Nuclear Boiler Purchased Part, Sheet 1 ML23129A4702023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E517BC, Functional Control Diagram Reactor Core Isolation Cooling System, Sheet 2 ML23129A4722023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E727BB, Recirculation Flow Control System, Sheet 1 ML23129A4642023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E149BB, Sheet 1, Functional Control Diagram Nuclear Boiler ML23129A4662023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E197BB, Rev. 7, Sheet 6b, Reactor Recirculation Controller Configuration ML23129A4612023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing NC29546, Transmission Line Routes ML23129A4632023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 920D225BB, Revision N03, Standby Liquid Control System Functional Control Diagram, Sheet 1 ML23129A4572023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing ILE70-3, Installation Details - Temperature Detectors for Nuclear Boiler System Leak Detection, Sheet 107E ML23129A4592023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E923, Incore Startup Chamber Retract Mechanism (Field Installation) ML23129A4542023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E989, Power Range Monitoring Unit, Sheet 1 ML23129A4562023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 719E415BB, Nuclear Boiler, Sheet 1 ML23129A4512023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E174BB, Sheet 1, ML23129A4942023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107c, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection ML23129A4792023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 3005, Sheet 4, Auxiliary One Line Diagram Motor Control Centers M, N, P, U, V, & W ML23129A5012023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 3058, DC One Line Diagram ML23129A4692023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 791E257, General Electric, Sheet 4 ML23129A5002023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 719E479BB, Process Radiation Monitoring System, Sheet 1 ML23129A4902023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E140BB, Revision N05, Sheet 2, Fcd Residual Heat Removal System ML23129A4672023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 6000302, P & I Diagram Augmented Offgas System, Sheet 1 ML23129A4522023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4003, Overall Site and Vicinity Plan, Withheld ML23129A4762023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E148BB, Sheet 1, Process Diagram Reactor Water Clean-Up System ML23129A4842023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Sheet 5, Functional Control Diagram Control Rod Drive Hydraulic System ML23129A4482023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E517BC, Sheet 1, Functional Control Diagram Reactor Core Isolation Cooling System ML23129A4532023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4260, Sheet 2A, Containment Suppression Chamber Penetration Location ML23129A4822023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram, Control Rod Drive Hydraulic System, Sheet 2 ML23129A4982023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 919D690BC, Reactor Vessel, Sheet 5 NLS2023022, 1 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107f, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection2023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107f, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection ML23129A4992023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram Control Rod Drive Hydraulic System, Sheet 1 ML23129A4682023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4259, Sheet 1A, Containment Vessel Penetration Schedule ML23129A4602023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E140BB, Rev. 10, Sheet 3, Functional Control Diagram Residual Heat Removal System ML23129A4912023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E402BB, Rev. 6, Sheet 1, Functional Control Diagram Core Spray System ML23129A4832023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 919D690BC, Revision N01, Recirclulation Outlet Nozzle, Sheet 3 ML23129A4872023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E100, Neutron Monitoring, Sheet 2 ML23129A4752023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E517BC, Reactor Core Isolation Cooling System Functional Control Diagram, Sheet 3 2023-04-20 |
Text
SECURITY-RELATED INFORMATION -
V/ITHHOLD UNDER 10 CFR 2.390 DRAWING 4OO3 OVERALL SITE AND VICINITY PLAN
Retrieved from "https://kanterella.com/w/index.php?title=ML21130A251&oldid=3817092"