ML21174A078: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:ILT 2104 Written Exam               ML21174A078
{{#Wiki_filter:ILT 2104 Written Exam 1
: 1. With respect to Recirc Pump power supplies, which ONE of the following completes the statement below?
1.
2B Recirc Pump is NORMALLY powered by               .
With respect to Recirc Pump power supplies, which ONE of the following completes the statement below?
Note: Unit Station Service Transformer (USST)
2B Recirc Pump is NORMALLY powered by Note: Unit Station Service Transformer (USST)
A. USST 2A B. USST 2B C. Start Bus 2A D. Start Bus 2B 1
A.
USST 2A B.
USST 2B C. Start Bus 2A D. Start Bus 2B ML21174A078


ILT 2104 Written Exam
ILT 2104 Written Exam 2
: 2. Unit 1 is operating at 100% Rated Thermal Power (RTP) when the following conditions occur:
2.
Unit 1 is operating at 100% Rated Thermal Power (RTP) when the following conditions occur:
1A Reactor Recirculation Pump trips The crew is executing the actions of 1-AOI-68-1, Recirc Pump Trip/Core Flow Decrease Which ONE of the following completes the statement below?
1A Reactor Recirculation Pump trips The crew is executing the actions of 1-AOI-68-1, Recirc Pump Trip/Core Flow Decrease Which ONE of the following completes the statement below?
Given the conditions above, the required action is to           .
Given the conditions above, the required action is to A. SCRAM the Reactor B. INSERT Control Rods to < 67.0% loadline C. INSERT Control Rods to < 74.0% loadline D. COMMENCE a normal Reactor Plant shut down
A. SCRAM the Reactor B. INSERT Control Rods to < 67.0% loadline C. INSERT Control Rods to < 74.0% loadline D. COMMENCE a normal Reactor Plant shut down 2


ILT 2104 Written Exam
ILT 2104 Written Exam 3
: 3. Unit 1 Anticipated Transient Without a SCRAM (ATWS) conditions exist with the following conditions:
3.
Unit 1 Anticipated Transient Without a SCRAM (ATWS) conditions exist with the following conditions:
1-EOI-1A, ATWS RPV Control is in progress Reactor Pressure is 950 psig 1-EOI Appendix-3A, SLC INJECTION in progress as indicated SLC SQUIB VALVE CONTINUITY LOST, (1-9-5B, WINDOW 20) alarms Given the conditions above, which ONE of the following completes the statement below regarding the status of the Standby Liquid Control (SLC) System?
1-EOI-1A, ATWS RPV Control is in progress Reactor Pressure is 950 psig 1-EOI Appendix-3A, SLC INJECTION in progress as indicated SLC SQUIB VALVE CONTINUITY LOST, (1-9-5B, WINDOW 20) alarms Given the conditions above, which ONE of the following completes the statement below regarding the status of the Standby Liquid Control (SLC) System?
SQUIB VALVE           (1)     has fired and SLC   (2)     injecting to the Reactor.
SQUIB VALVE (1) has fired and SLC (2) injecting to the Reactor.
A. (1) A (2) is B. (1) A (2) is NOT C. (1) B (2) is D. (1) B (2) is NOT 3
A. (1) A (2) is B. (1) A (2) is NOT C. (1) B (2) is D. (1) B (2) is NOT


ILT 2104 Written Exam
ILT 2104 Written Exam 4
: 4. Unit 1 is operating at 100% RTP with the following:
4.
Unit 1 is operating at 100% RTP with the following:
Which ONE of the following completes the statements below?
Which ONE of the following completes the statements below?
As a result of the above condition, indicated Main Generator Megawatts Electric (MWe) on Panel 1-9-5 will     (1) .
As a result of the above condition, indicated Main Generator Megawatts Electric (MWe) on Panel 1-9-5 will (1)
In accordance with the applicable Abnormal Operating Procedure (AOI), the correct Immediate Action is to reduce Reactor Power to less than or equal to     (2)     .
In accordance with the applicable Abnormal Operating Procedure (AOI), the correct Immediate Action is to reduce Reactor Power to less than or equal to (2)
A. (1) lower (2) 95%
A. (1) lower (2) 95%
B. (1) lower (2) 90%
B. (1) lower (2) 90%
C. (1) remain constant (2) 95%
C. (1) remain constant (2) 95%
D. (1) remain constant (2) 90%
D. (1) remain constant (2) 90%
4


ILT 2104 Written Exam
ILT 2104 Written Exam 5
: 5. Unit 2 was operating at 100% RTP when an event occurred, resulting in the following conditions:
5.
Unit 2 was operating at 100% RTP when an event occurred, resulting in the following conditions:
A manual Reactor SCRAM was inserted Reactor Water Level lowered to (-) 30 inches Drywell Pressure is 2.85 psig HPCI automatically initiated and is injecting to the Reactor at 5300 gpm Given the conditions above, which ONE of the following completes the statement below in accordance with 2-OI-73, High Pressure Coolant Injection System?
A manual Reactor SCRAM was inserted Reactor Water Level lowered to (-) 30 inches Drywell Pressure is 2.85 psig HPCI automatically initiated and is injecting to the Reactor at 5300 gpm Given the conditions above, which ONE of the following completes the statement below in accordance with 2-OI-73, High Pressure Coolant Injection System?
HPCI automatically initiated due to     (1)     and is injecting into (2)   Feedwater System line.
HPCI automatically initiated due to (1) and is injecting into (2)
A. (1) High Drywell Pressure (2) B B. (1) High Drywell Pressure (2) A C. (1) Low Reactor Water Level (2) B D. (1) Low Reactor Water Level (2) A 5
Feedwater System line.
A.
(1) High Drywell Pressure (2) B B.
(1) High Drywell Pressure (2) A C. (1) Low Reactor Water Level (2) B D. (1) Low Reactor Water Level (2) A


ILT 2104 Written Exam
ILT 2104 Written Exam 6
: 6. With regards to the Source Range Monitors (SRMs), which ONE of the following completes the statements below?
6.
To fully WITHDRAW the SRMs from the Core, the DRIVE OUT pushbutton is required to be     (1)   .
With regards to the Source Range Monitors (SRMs), which ONE of the following completes the statements below?
To fully INSERT the SRMs into the Core, the DRIVE IN pushbutton is required to be     (2)   .
To fully WITHDRAW the SRMs from the Core, the DRIVE OUT pushbutton is required to be (1)
A. (1) momentarily depressed and released due to a seal-in contact (2) momentarily depressed and released due to a seal-in contact B. (1) momentarily depressed and released due to a seal-in contact (2) continuously depressed and held for the entire length of travel C. (1) continuously depressed and held for the entire length of travel (2) momentarily depressed and released due to a seal-in contact D. (1) continuously depressed and held for the entire length of travel (2) continuously depressed and held for the entire length of travel 6
To fully INSERT the SRMs into the Core, the DRIVE IN pushbutton is required to be (2)
A. (1) momentarily depressed and released due to a seal-in contact (2) momentarily depressed and released due to a seal-in contact B. (1) momentarily depressed and released due to a seal-in contact (2) continuously depressed and held for the entire length of travel C. (1) continuously depressed and held for the entire length of travel (2) momentarily depressed and released due to a seal-in contact D. (1) continuously depressed and held for the entire length of travel (2) continuously depressed and held for the entire length of travel


ILT 2104 Written Exam
ILT 2104 Written Exam 7
: 7. The following conditions exist on Unit 2:
7.
The following conditions exist on Unit 2:
A LOCA is in progress Drywell Pressure is 2.2 psig and slowly rising Reactor Water Level is (-) 10 inches and slowly lowering Main Steam Tunnel Temperature is 180 &#xba;F and slowly rising Given the conditions above, which ONE of the following completes the statement below?
A LOCA is in progress Drywell Pressure is 2.2 psig and slowly rising Reactor Water Level is (-) 10 inches and slowly lowering Main Steam Tunnel Temperature is 180 &#xba;F and slowly rising Given the conditions above, which ONE of the following completes the statement below?
PCIS Groups that HAVE received an isolation signal include Groups           ,
PCIS Groups that HAVE received an isolation signal include Groups and 8.
and 8.
A. 1, 2 B. 1, 5 C. 2, 6 D. 4, 5
A. 1, 2 B. 1, 5 C. 2, 6 D. 4, 5 7


ILT 2104 Written Exam
ILT 2104 Written Exam 8
: 8. Unit 2 is operating at 100% RTP when a Loss of Offsite Power occurs.
8.
Unit 2 is operating at 100% RTP when a Loss of Offsite Power occurs.
Given the conditions above, which ONE of the following completes the statements below?
Given the conditions above, which ONE of the following completes the statements below?
The EDGs are required to start and tie onto their respective 4KV Shutdown Boards within     (1)   seconds.
The EDGs are required to start and tie onto their respective 4KV Shutdown Boards within (1) seconds.
The EECW Pumps will start       (2)   seconds after the EDGs re-energize the 4KV Shutdown Boards.
The EECW Pumps will start (2) seconds after the EDGs re-energize the 4KV Shutdown Boards.
A. (1) 5 (2) 10 B. (1) 5 (2) 14 C. (1) 10 (2) 10 D. (1) 10 (2) 14 8
A. (1) 5 (2) 10 B. (1) 5 (2) 14 C. (1) 10 (2) 10 D. (1) 10 (2) 14


ILT 2104 Written Exam
ILT 2104 Written Exam 9
: 9. 0-SR-3.8.1.1(D), Diesel Generator D Monthly Operability Test is in progress.
9.
0-SR-3.8.1.1(D), Diesel Generator D Monthly Operability Test is in progress.
Which ONE of the following completes the statement below?
Which ONE of the following completes the statement below?
Prior to paralleling D EDG with the D 4KV Shutdown Board, EDG frequency is adjusted so that the synchroscope rotates slowly in the   (1)     direction and EDG voltage is adjusted to be     (2)     Shutdown Board Voltage.
Prior to paralleling D EDG with the D 4KV Shutdown Board, EDG frequency is adjusted so that the synchroscope rotates slowly in the (1) direction and EDG voltage is adjusted to be (2)
A. (1) slow (2) above B. (1) slow (2) equal to C. (1) fast (2) above D. (1) fast (2) equal to 9
Shutdown Board Voltage.
A. (1) slow (2) above B. (1) slow (2) equal to C. (1) fast (2) above D. (1) fast (2) equal to


ILT 2104 Written Exam
ILT 2104 Written Exam 10 10.
: 10. A EDG has been started for testing and is being paralleled with Offsite Power in accordance with 0-OI-82, Standby Diesel Generator System.
A EDG has been started for testing and is being paralleled with Offsite Power in accordance with 0-OI-82, Standby Diesel Generator System.
Given the conditions above, which ONE of the following completes the statement below?
Given the conditions above, which ONE of the following completes the statement below?
Prior to closing the respective EDG output breaker, the DG Mode Select Switch will be placed in the     (1)   position to prevent EDG     (2)   .
Prior to closing the respective EDG output breaker, the DG Mode Select Switch will be placed in the (1) position to prevent EDG (2)
A. (1) Units in Parallel (2) overload B. (1) Units in Parallel (2) overspeed C. (1) Parallel with System (2) overload D. (1) Parallel with System (2) overspeed 10
A. (1) Units in Parallel (2) overload B. (1) Units in Parallel (2) overspeed C. (1) Parallel with System (2) overload D. (1) Parallel with System (2) overspeed


ILT 2104 Written Exam
ILT 2104 Written Exam 11 11.
: 11. Unit 1 is operating at 100% RTP.
Unit 1 is operating at 100% RTP.
In accordance with OPDP-1, Conduct of Operations, which ONE of the following completes the statement below?
In accordance with OPDP-1, Conduct of Operations, which ONE of the following completes the statement below?
The OATC is required to conduct a panel walkdown a MINIMUM of once every A. hour B. 2 hours C. 4 hours D. 6 hours 11
The OATC is required to conduct a panel walkdown a MINIMUM of once every A. hour B. 2 hours C. 4 hours D. 6 hours


ILT 2104 Written Exam
ILT 2104 Written Exam 12 12.
: 12. Unit 1 is operating at 100% Rated Thermal Power (RTP) with the following conditions:
Unit 1 is operating at 100% Rated Thermal Power (RTP) with the following conditions:
Loss of Offsite Power occurs A Emergency Diesel Generator (EDG) mechanically fails Subsequently:
Loss of Offsite Power occurs A Emergency Diesel Generator (EDG) mechanically fails Subsequently:
Loss of Coolant (LOCA) occurs Reactor Water Level is (-) 130 inches and lowering Drywell Pressure is 10 psig and rising Reactor Pressure is 600 psig and lowering Give the conditions above, which ONE of the following completes the statements below?
Loss of Coolant (LOCA) occurs Reactor Water Level is (-) 130 inches and lowering Drywell Pressure is 10 psig and rising Reactor Pressure is 600 psig and lowering Give the conditions above, which ONE of the following completes the statements below?
RHR Pump 1C         (1)   automatically start.
RHR Pump 1C (1) automatically start.
Core Spray Pump 1C       (2)     automatically start.
Core Spray Pump 1C (2) automatically start.
A. (1) will (2) will B. (1) will (2) will NOT C. (1) will NOT (2) will D. (1) will NOT (2) will NOT 12
A. (1) will (2) will B. (1) will (2) will NOT C. (1) will NOT (2) will D. (1) will NOT (2) will NOT


ILT 2104 Written Exam
ILT 2104 Written Exam 13 13.
: 13. Which ONE of the following completes the statement below in accordance with NOTE
Which ONE of the following completes the statement below in accordance with NOTE
    #1 from 3-EOI-1, RPV CONTROL?
#1 from 3-EOI-1, RPV CONTROL?
Following a Reactor SCRAM, the Unit 3 Reactor will remain subcritical WITHOUT boron under all conditions when __________.
Following a Reactor SCRAM, the Unit 3 Reactor will remain subcritical WITHOUT boron under all conditions when __________.
A. All Control Rods are at position 02 B. Reactor Power is on range 7 of the IRMs and lowering C. All Control Rods are inserted to or beyond position 00 except two that are fully withdrawn D. Any 19 Control Rods are at notch 02 with all other Control Rods fully inserted 13
A. All Control Rods are at position 02 B. Reactor Power is on range 7 of the IRMs and lowering C. All Control Rods are inserted to or beyond position 00 except two that are fully withdrawn D. Any 19 Control Rods are at notch 02 with all other Control Rods fully inserted


ILT 2104 Written Exam
ILT 2104 Written Exam 14 14.
: 14. Unit 2 is operating at 100% RTP when an inadvertent closure of ALL MSIVs occurs.
Unit 2 is operating at 100% RTP when an inadvertent closure of ALL MSIVs occurs.
Which ONE of the following completes the statement below?
Which ONE of the following completes the statement below?
Following the closure of the MSIVs, the digital Electro-Hydraulic Control (EHC) System will transfer to   (1)     Pressure Control at     (2)   .
Following the closure of the MSIVs, the digital Electro-Hydraulic Control (EHC) System will transfer to (1)
A. (1) Reactor (2) 700 psig B. (1) Reactor (2) 955 psig C. (1) Header (2) 700 psig D. (1) Header (2) 955 psig 14
Pressure Control at (2)
A. (1) Reactor (2) 700 psig B. (1) Reactor (2) 955 psig C. (1) Header (2) 700 psig D. (1) Header (2) 955 psig


ILT 2104 Written Exam
ILT 2104 Written Exam 15 15.
: 15. In accordance with Unit 2 ARPs, which ONE of the following, when alarming, requires that Operators ensure 2-FCV-66-28, OFFGAS SYSTEM ISOLATION VALVE, is CLOSED?
In accordance with Unit 2 ARPs, which ONE of the following, when alarming, requires that Operators ensure 2-FCV-66-28, OFFGAS SYSTEM ISOLATION VALVE, is CLOSED?
A.
A.
B.
B.
C.
C.
D.
D.
15


ILT 2104 Written Exam
ILT 2104 Written Exam 16 16.
: 16. Unit 2 is operating at 100% RTP.
Unit 2 is operating at 100% RTP.
Which ONE of the following completes the statements below?
Which ONE of the following completes the statements below?
In accordance with OPDP-1, Conduct of Operations, when a High Drywell Pressure condition exists and continues to rise, the Operators are required to FIRST manually (1)   .
In accordance with OPDP-1, Conduct of Operations, when a High Drywell Pressure condition exists and continues to rise, the Operators are required to FIRST manually (1)
In accordance with BFN-ODM-4.20, Strategies for Successful Transient Mitigation, when Drywell Pressure reaches 2.2 psig, the reason a manual Reactor SCRAM is inserted is that   (2)   .
In accordance with BFN-ODM-4.20, Strategies for Successful Transient Mitigation, when Drywell Pressure reaches 2.2 psig, the reason a manual Reactor SCRAM is inserted is that (2)
A. (1) trip the Main Turbine, THEN insert a Reactor SCRAM (2) a pre-determined trigger value has been reached B. (1) trip the Main Turbine, THEN insert a Reactor SCRAM (2) an automatic Reactor SCRAM should have occurred C. (1) insert a Reactor SCRAM, THEN trip the Main Turbine (2) a pre-determined trigger value has been reached D. (1) insert a Reactor SCRAM, THEN trip the Main Turbine (2) an automatic Reactor SCRAM should have occurred 16
A. (1) trip the Main Turbine, THEN insert a Reactor SCRAM (2) a pre-determined trigger value has been reached B. (1) trip the Main Turbine, THEN insert a Reactor SCRAM (2) an automatic Reactor SCRAM should have occurred C. (1) insert a Reactor SCRAM, THEN trip the Main Turbine (2) a pre-determined trigger value has been reached D. (1) insert a Reactor SCRAM, THEN trip the Main Turbine (2) an automatic Reactor SCRAM should have occurred


ILT 2104 Written Exam
ILT 2104 Written Exam 17 17.
: 17. Unit 2 is operating at 21% RTP, when the Main Turbine trips.
Unit 2 is operating at 21% RTP, when the Main Turbine trips.
Which ONE of the following completes the statements below?
Which ONE of the following completes the statements below?
Following a Main Turbine trip, the Extraction Non-Return Valves close in order to prevent Main Turbine     (1)     . As a result of this transient, the Reactor (2)     SCRAM.
Following a Main Turbine trip, the Extraction Non-Return Valves close in order to prevent Main Turbine (1)
A. (1) overspeed (2) will B. (1) overspeed (2) will NOT C. (1) overheating (2) will D. (1) overheating (2) will NOT 17
. As a result of this transient, the Reactor (2)
SCRAM.
A. (1) overspeed (2) will B. (1) overspeed (2) will NOT C. (1) overheating (2) will D. (1) overheating (2) will NOT


ILT 2104 Written Exam
ILT 2104 Written Exam 18 18.
: 18. Due to a fire on Unit 3, the Unit Operator is performing the Immediate Actions of 3-AOI-100-2, Control Room Abandonment and has reached the step to start the Unit 3 EDGs, when the following occurs:
Due to a fire on Unit 3, the Unit Operator is performing the Immediate Actions of 3-AOI-100-2, Control Room Abandonment and has reached the step to start the Unit 3 EDGs, when the following occurs:
PRIMARY CONTAINMENT N2 PRESSURE HIGH (3-9-3B, Window 10) alarms DRYWELL PRESSURE ABNORMAL (3-9-5B, Window 31) alarms Given the conditions above, which ONE of the following completes the statements below?
PRIMARY CONTAINMENT N2 PRESSURE HIGH (3-9-3B, Window 10) alarms DRYWELL PRESSURE ABNORMAL (3-9-5B, Window 31) alarms Given the conditions above, which ONE of the following completes the statements below?
AT THE MOMENT the above alarms are received, the Unit 3 EDGs           (1)     .
AT THE MOMENT the above alarms are received, the Unit 3 EDGs (1)
Reactor Water Level will be controlled at the Backup Control Panel using     (2) .
Reactor Water Level will be controlled at the Backup Control Panel using (2)
A. (1) must be manually started (2) High Pressure Coolant Injection (HPCI)
A. (1) must be manually started (2) High Pressure Coolant Injection (HPCI)
B. (1) must be manually started (2) Reactor Core Isolation Cooling (RCIC)
B. (1) must be manually started (2) Reactor Core Isolation Cooling (RCIC)
C. (1) will receive an automatic start signal (2) High Pressure Coolant Injection (HPCI)
C. (1) will receive an automatic start signal (2) High Pressure Coolant Injection (HPCI)
D. (1) will receive an automatic start signal (2) Reactor Core Isolation Cooling (RCIC) 18
D. (1) will receive an automatic start signal (2) Reactor Core Isolation Cooling (RCIC)
 
ILT 2104 Written Exam 19 19.
All three Units are operating at 100% RTP when the following conditions occur:
Emergency Equipment Cooling Water (EECW) Pump A3 is operating and subsequently trips EECW Pump C3 fails to start


ILT 2104 Written Exam
NO Operator actions have been taken Given the conditions above, which ONE of the following completes the statements below in accordance with 0-OI-67, Emergency Equipment Cooling Water System?
: 19. All three Units are operating at 100% RTP when the following conditions occur:
0-FCV-67-53, EECW SYSTEM BACKUP WATER SUPPLY VALVE to the Control Air Compressors will automatically open when Raw Cooling Water (RCW) Header Pressure lowers below the setpoint of (1)
Emergency Equipment Cooling Water (EECW) Pump A3 is operating and subsequently trips EECW Pump C3 fails to start NO Operator actions have been taken Given the conditions above, which ONE of the following completes the statements below in accordance with 0-OI-67, Emergency Equipment Cooling Water System?
EECW Pumps A3 and C3 supply the (2) header of the EECW System.
0-FCV-67-53, EECW SYSTEM BACKUP WATER SUPPLY VALVE to the Control Air Compressors will automatically open when Raw Cooling Water (RCW) Header Pressure lowers below the setpoint of     (1)   .
A. (1) 15 psig (2) North B. (1) 15 psig (2) South C. (1) 30 psig (2) North D. (1) 30 psig (2) South
EECW Pumps A3 and C3 supply the         (2)     header of the EECW System.
A. (1) 15 psig (2) North B. (1) 15 psig (2) South C. (1) 30 psig (2) North D. (1) 30 psig (2) South 19


ILT 2104 Written Exam
ILT 2104 Written Exam 20 20.
: 20. Unit 3 is in MODE 5 when a refueling accident results in the following:
Unit 3 is in MODE 5 when a refueling accident results in the following:
REFUELING ZONE EXHAUST RADIATION HIGH (3-9-3A, Window 34) alarms Given the conditions above, which ONE of the following completes the statement below that describes the Unit 3 Ventilation System response?
REFUELING ZONE EXHAUST RADIATION HIGH (3-9-3A, Window 34) alarms Given the conditions above, which ONE of the following completes the statement below that describes the Unit 3 Ventilation System response?
(1)     Zone Ventilation System(s) isolate(s) and   (2)     Zone dampers align to the Standby Gas Treatment System.
(1)
A. (1) ONLY the Refueling (2) ONLY the Refueling B. (1) ONLY the Refueling (2) BOTH the Refueling AND Reactor C. (1) The Refueling AND Reactor (2) ONLY the Refueling D. (1) The Refueling AND Reactor (2) BOTH the Refueling AND Reactor 20
Zone Ventilation System(s) isolate(s) and (2)
Zone dampers align to the Standby Gas Treatment System.
A. (1) ONLY the Refueling (2) ONLY the Refueling B. (1) ONLY the Refueling (2) BOTH the Refueling AND Reactor C. (1) The Refueling AND Reactor (2) ONLY the Refueling D. (1) The Refueling AND Reactor (2) BOTH the Refueling AND Reactor


ILT 2104 Written Exam
ILT 2104 Written Exam 21 21.
: 21. Unit 2 suffered a small break LOCA with the following conditions:
Unit 2 suffered a small break LOCA with the following conditions:
2-EOI-2 Primary Containment Control, Suppression Pool Temperature leg is being executed Suppression Pool Temperature is 190 &deg;F Given the conditions above, which ONE of the following completes the statement below?
2-EOI-2 Primary Containment Control, Suppression Pool Temperature leg is being executed Suppression Pool Temperature is 190 &deg;F Given the conditions above, which ONE of the following completes the statement below?
In accordance with EOI Curve 3, Heat Capacity Temp Limit (HCTL), action is REQUIRED if Reactor Pressure reaches         (1)   when Suppression Pool Level is     (2)   .
In accordance with EOI Curve 3, Heat Capacity Temp Limit (HCTL), action is REQUIRED if Reactor Pressure reaches (1) when Suppression Pool Level is (2)
[REFERENCE PROVIDED]
[REFERENCE PROVIDED]
A. (1) 500 psig (2) 17.5 feet B. (1) 500 psig (2) 16.5 feet C. (1) 700 psig (2) 17.5 feet D. (1) 700 psig (2) 16.5 feet 21
A. (1) 500 psig (2) 17.5 feet B. (1) 500 psig (2) 16.5 feet C. (1) 700 psig (2) 17.5 feet D. (1) 700 psig (2) 16.5 feet


ILT 2104 Written Exam
ILT 2104 Written Exam 22 22.
: 22. Regarding the power supplies to IRMs, which ONE of the following completes the statement below?
Regarding the power supplies to IRMs, which ONE of the following completes the statement below?
IRM Channels/Detectors __________.
IRM Channels/Detectors __________.
A. C and G are powered from A channel + 24VDC System; D and H are powered from B channel + 24VDC System B. D and H are powered from A channel + 24VDC System; C and G are powered from B channel + 24VDC System C. C and G are powered from Division I, 250 VDC System; D and H are powered from Division II, 250 VDC System D. D and H are powered from Division I, 250 VDC System; C and G are powered from Division II, 250 VDC System 22
A. C and G are powered from A channel + 24VDC System; D and H are powered from B channel + 24VDC System B. D and H are powered from A channel + 24VDC System; C and G are powered from B channel + 24VDC System C. C and G are powered from Division I, 250 VDC System; D and H are powered from Division II, 250 VDC System D. D and H are powered from Division I, 250 VDC System; C and G are powered from Division II, 250 VDC System


ILT 2104 Written Exam
ILT 2104 Written Exam 23 23.
: 23. A Unit 2 LOCA has occurred and resulted in the following conditions:
A Unit 2 LOCA has occurred and resulted in the following conditions:
2-PI-3-207A, REACTOR PRESSURE indicates 500 psig 2-LI-3-52 and 2-LI-3-62, RX WTR LEVEL ACCIDENT RANGE indicates
2-PI-3-207A, REACTOR PRESSURE indicates 500 psig 2-LI-3-52 and 2-LI-3-62, RX WTR LEVEL ACCIDENT RANGE indicates
(-) 220 inches Given the conditions above, which ONE of the following completes the statements below?
(-) 220 inches Given the conditions above, which ONE of the following completes the statements below?
Actual Reactor Water Level is     (1)   Top of Active Fuel (TAF).
Actual Reactor Water Level is (1)
To help ensure accurate Reactor Water Level can be reported, 2-LI-3-52 and 2-LI-3-62 require the use of correction curves due to being calibrated at   (2) .
Top of Active Fuel (TAF).
To help ensure accurate Reactor Water Level can be reported, 2-LI-3-52 and 2-LI-3-62 require the use of correction curves due to being calibrated at (2)
[REFERENCE PROVIDED]
[REFERENCE PROVIDED]
A. (1) above (2) 0 psig / 212 &deg;F B. (1) above (2) Normal Operating Pressure / Normal Operating Temperature C. (1) below (2) 0 psig / 212 &deg;F D. (1) below (2) Normal Operating Pressure / Normal Operating Temperature 23
A. (1) above (2) 0 psig / 212 &deg;F B. (1) above (2) Normal Operating Pressure / Normal Operating Temperature C. (1) below (2) 0 psig / 212 &deg;F D. (1) below (2) Normal Operating Pressure / Normal Operating Temperature


ILT 2104 Written Exam
ILT 2104 Written Exam 24 24.
: 24. Unit 3 is operating at 100% RTP, when a LOCA occurs with the following conditions:
Unit 3 is operating at 100% RTP, when a LOCA occurs with the following conditions:
REACTOR LEVEL LOW ADS BLOWDOWN PERMISSIVE (3-9-3C, Window 3) alarms DRYWELL PRESSURE APPROACHING SCRAM (3-9-3B, Window 30) alarms Manual Reactor SCRAM was inserted ADS BLOWDOWN HIGH DRYWELL PRESSURE SEAL-IN (3-9-3C, Window 33) alarms REACTOR WATER LOW-LOW-LOW ECCS/ESF INITIATE (3-9-3C, Window 28) alarms RHR Pumps are NOT available Core Sprays Pumps failed to AUTOMATICALLY start Given the conditions above, which ONE of the following completes the statement below?
REACTOR LEVEL LOW ADS BLOWDOWN PERMISSIVE (3-9-3C, Window 3) alarms DRYWELL PRESSURE APPROACHING SCRAM (3-9-3B, Window 30) alarms Manual Reactor SCRAM was inserted ADS BLOWDOWN HIGH DRYWELL PRESSURE SEAL-IN (3-9-3C, Window 33) alarms REACTOR WATER LOW-LOW-LOW ECCS/ESF INITIATE (3-9-3C, Window 28) alarms RHR Pumps are NOT available Core Sprays Pumps failed to AUTOMATICALLY start Given the conditions above, which ONE of the following completes the statement below?
In accordance with the given Alarm Response Procedures, the Automatic Depressurization System (ADS) will automatically initiate, when the Operator has manually started     (1) Core Spray Pumps and a MINIMUM of         (2)   has elapsed.
In accordance with the given Alarm Response Procedures, the Automatic Depressurization System (ADS) will automatically initiate, when the Operator has manually started (1)
A. (1) 3B AND 3C (2) 95 seconds B. (1) 3B AND 3C (2) 265 seconds C. (1) 3A AND 3B (2) 95 seconds D. (1) 3A AND 3B (2) 265 seconds 24
Core Spray Pumps and a MINIMUM of (2) has elapsed.
A. (1) 3B AND 3C (2) 95 seconds B. (1) 3B AND 3C (2) 265 seconds C. (1) 3A AND 3B (2) 95 seconds D. (1) 3A AND 3B (2) 265 seconds


ILT 2104 Written Exam
ILT 2104 Written Exam 25 25.
: 25. Unit 2 is at 85% Reactor Power when the following conditions occur:
Unit 2 is at 85% Reactor Power when the following conditions occur:
2-XR-66-20, OG FLOW TO SIX HOUR HOLDUP VOLUME, is 100 scfm and rising CONDENSER A, B, OR C VACUUM LOW (2-9-7B, Window 17) alarms Given the conditions above, which ONE of the following completes the statements below?
2-XR-66-20, OG FLOW TO SIX HOUR HOLDUP VOLUME, is 100 scfm and rising CONDENSER A, B, OR C VACUUM LOW (2-9-7B, Window 17) alarms Given the conditions above, which ONE of the following completes the statements below?
In accordance with the associated ARP, the probable cause for the conditions above is     (1)     .
In accordance with the associated ARP, the probable cause for the conditions above is (1)
In accordance with 2-AOI-47-3, Loss of Condenser Vacuum, the Unit Operator (UO) will be directed to     (2)     in an attempt to maintain Condenser Vacuum.
In accordance with 2-AOI-47-3, Loss of Condenser Vacuum, the Unit Operator (UO) will be directed to (2) in an attempt to maintain Condenser Vacuum.
Note: Steam Jet Air Ejector (SJAE)
Note: Steam Jet Air Ejector (SJAE)
A. (1) SJAE stalling (2) reduce Reactor Power B. (1) SJAE stalling (2) start a Mechanical Vacuum Pump C. (1) Main Condenser air in-leakage (2) reduce Reactor Power D. (1) Main Condenser air in-leakage (2) start a Mechanical Vacuum Pump 25
A. (1) SJAE stalling (2) reduce Reactor Power B. (1) SJAE stalling (2) start a Mechanical Vacuum Pump C. (1) Main Condenser air in-leakage (2) reduce Reactor Power D. (1) Main Condenser air in-leakage (2) start a Mechanical Vacuum Pump


ILT 2104 Written Exam
ILT 2104 Written Exam 26 26.
: 26. In order to minimize off-site radioactive release levels, which ONE of the following completes the statements below?
In order to minimize off-site radioactive release levels, which ONE of the following completes the statements below?
Standby Gas Treatment System carbon bed filters           (1)     designed to remove iodine.
Standby Gas Treatment System carbon bed filters (1) designed to remove iodine.
If required, ALL three trains of Standby Gas Treatment         (2)     be manually started from the Unit 3 Control Room.
If required, ALL three trains of Standby Gas Treatment (2) be manually started from the Unit 3 Control Room.
A. (1) are (2) can B. (1) are (2) can NOT C. (1) are NOT (2) can D. (1) are NOT (2) can NOT 26
A. (1) are (2) can B. (1) are (2) can NOT C. (1) are NOT (2) can D. (1) are NOT (2) can NOT


ILT 2104 Written Exam
ILT 2104 Written Exam 27 27.
: 27. Unit 1 is operating at 100% RTP. The Instrument Mechanics (IMs) are setting up to perform maintenance in the Auxiliary Instrument Room, when a PCIS Group 6 Isolation occurs.
Unit 1 is operating at 100% RTP. The Instrument Mechanics (IMs) are setting up to perform maintenance in the Auxiliary Instrument Room, when a PCIS Group 6 Isolation occurs.
Given the conditions above, which ONE of the following completes the statements below?
Given the conditions above, which ONE of the following completes the statements below?
The Drywell Blowers       (1)   running.
The Drywell Blowers (1) running.
The Drywell     (2)     be vented via the NORMAL vent path in accordance with 1-AOI-64-1, Drywell Pressure and/or Temperature High, or Excessive Leakage Into Drywell.
The Drywell (2) be vented via the NORMAL vent path in accordance with 1-AOI-64-1, Drywell Pressure and/or Temperature High, or Excessive Leakage Into Drywell.
A. (1) are (2) can B. (1) are (2) can NOT C. (1) are NOT (2) can D. (1) are NOT (2) can NOT 27
A. (1) are (2) can B. (1) are (2) can NOT C. (1) are NOT (2) can D. (1) are NOT (2) can NOT


ILT 2104 Written Exam
ILT 2104 Written Exam 28 28.
: 28. Which ONE of the following completes the statement below in accordance with EOI-3, Secondary Containment Control Program Manual?
Which ONE of the following completes the statement below in accordance with EOI-3, Secondary Containment Control Program Manual?
Emergency Depressurization is required when any Secondary Containment Temperature exceeds its MAXIMUM SAFE value in           (1)     area(s) to place the Primary System in its lowest energy state by rejecting heat to the     (2)     .
Emergency Depressurization is required when any Secondary Containment Temperature exceeds its MAXIMUM SAFE value in (1) area(s) to place the Primary System in its lowest energy state by rejecting heat to the (2)
A. (1) ONLY one (2) Main Condenser B. (1) ONLY one (2) Suppression Pool C. (1) two OR more (2) Main Condenser D. (1) two OR more (2) Suppression Pool 28
A. (1) ONLY one (2) Main Condenser B. (1) ONLY one (2) Suppression Pool C. (1) two OR more (2) Main Condenser D. (1) two OR more (2) Suppression Pool


ILT 2104 Written Exam
ILT 2104 Written Exam 29 29.
: 29. Which ONE of the following completes the statements below in accordance with EOI-3, Secondary Containment Control?
Which ONE of the following completes the statements below in accordance with EOI-3, Secondary Containment Control?
A Reactor Building Floor Drain Sump Water Level of 67 inches     (1)   require EOI-3 entry.
A Reactor Building Floor Drain Sump Water Level of 67 inches (1) require EOI-3 entry.
Given this condition, an alarm will FIRST be indicated in the (2)     Control Room.
Given this condition, an alarm will FIRST be indicated in the (2)
A. (1) does (2) Main B. (1) does (2) Radwaste C. (1) does NOT (2) Main D. (1) does NOT (2) Radwaste 29
Control Room.
A. (1) does (2) Main B. (1) does (2) Radwaste C. (1) does NOT (2) Main D. (1) does NOT (2) Radwaste


ILT 2104 Written Exam
ILT 2104 Written Exam 30 30.
: 30. Unit 1 was operating at 100% RTP when a LOCA occurred resulting in the following conditions:
Unit 1 was operating at 100% RTP when a LOCA occurred resulting in the following conditions:
Reactor Pressure is 400 psig Reactor Water Level is (-) 140 inches and slowly lowering Given the conditions above, which ONE of the following completes the statement below?
Reactor Pressure is 400 psig Reactor Water Level is (-) 140 inches and slowly lowering Given the conditions above, which ONE of the following completes the statement below?
1-FCV-74-52, RHR SYSTEM I LPCI OUTBOARD INJECTION VALVE is               (1)   ,
1-FCV-74-52, RHR SYSTEM I LPCI OUTBOARD INJECTION VALVE is (1) and 1-FCV-74-7, RHR SYSTEM I MINIMUM FLOW VALVE is (2)
and 1-FCV-74-7, RHR SYSTEM I MINIMUM FLOW VALVE is             (2)     .
A. (1) open (2) open B. (1) open (2) closed C. (1) closed (2) open D. (1) closed (2) closed
A. (1) open (2) open B. (1) open (2) closed C. (1) closed (2) open D. (1) closed (2) closed 30


ILT 2104 Written Exam
ILT 2104 Written Exam 31 31.
: 31. Which ONE of the following completes the statements below?
Which ONE of the following completes the statements below?
In accordance with 3-OI-73, High Pressure Coolant Injection System (HPCI), operating the HPCI Turbine below a MINIMUM of           (1)   should be minimized to prevent system damage.
In accordance with 3-OI-73, High Pressure Coolant Injection System (HPCI), operating the HPCI Turbine below a MINIMUM of (1) should be minimized to prevent system damage.
If HPCI trips on an overspeed condition with a valid initiation signal, the overspeed trip (2)     .
If HPCI trips on an overspeed condition with a valid initiation signal, the overspeed trip (2)
A. (1) 2100 rpm (2) will automatically reset B. (1) 2100 rpm (2) must be manually reset C. (1) 2400 rpm (2) will automatically reset D. (1) 2400 rpm (2) must be manually reset 31
A. (1) 2100 rpm (2) will automatically reset B. (1) 2100 rpm (2) must be manually reset C. (1) 2400 rpm (2) will automatically reset D. (1) 2400 rpm (2) must be manually reset


ILT 2104 Written Exam
ILT 2104 Written Exam 32 32.
: 32. Which ONE of the following completes the statements below in accordance with the associated ARP?
Which ONE of the following completes the statements below in accordance with the associated ARP?
CORE SPRAY SYSTEM II SPARGER BREAK (2-9-3F, Window 31)
CORE SPRAY SYSTEM II SPARGER BREAK (2-9-3F, Window 31)
Core Spray Sparger break detection is used to detect a possible Core Spray System piping break inside the Reactor Vessel,   (1)     to the Core Shroud.
Core Spray Sparger break detection is used to detect a possible Core Spray System piping break inside the Reactor Vessel, (1) to the Core Shroud.
Due to break detection instrumentation design, the given annunciator   (2)   be sealed in during normal cold shutdown conditions on a Unit.
Due to break detection instrumentation design, the given annunciator (2) be sealed in during normal cold shutdown conditions on a Unit.
A. (1) external (2) would B. (1) external (2) would NOT C. (1) internal (2) would D. (1) internal (2) would NOT 32
A. (1) external (2) would B. (1) external (2) would NOT C. (1) internal (2) would D. (1) internal (2) would NOT


ILT 2104 Written Exam
ILT 2104 Written Exam 33 33.
: 33. Unit 1 has suffered a loss of the Service Air System.
Unit 1 has suffered a loss of the Service Air System.
Given the condition above, which ONE of the following completes the statement below?
Given the condition above, which ONE of the following completes the statement below?
The loss of Service Air will           on the SLC System Storage Tank.
The loss of Service Air will on the SLC System Storage Tank.
A. have no effect B. cause a loss of level indication ONLY C. cause a loss of mixing capability ONLY D. cause a loss of level indication AND a loss of mixing capability 33
A. have no effect B. cause a loss of level indication ONLY C. cause a loss of mixing capability ONLY D. cause a loss of level indication AND a loss of mixing capability


ILT 2104 Written Exam
ILT 2104 Written Exam 34 34.
: 34. Unit 2 is operating at 100% RTP with the following conditions:
Unit 2 is operating at 100% RTP with the following conditions:
2A Reactor Protection System (RPS) Motor Generator (MG) trips REACTOR PROTECTION 120V POWER SYSTEM ABNORMAL (2-9-5B, Window 10) alarms Given the conditions above, which ONE of the following completes the statements below?
2A Reactor Protection System (RPS) Motor Generator (MG) trips REACTOR PROTECTION 120V POWER SYSTEM ABNORMAL (2-9-5B, Window 10) alarms Given the conditions above, which ONE of the following completes the statements below?
(1)       RPS logic channels are impacted. As a result, a (2)   occurs.
(1)
A. (1) A1 and A2 ONLY (2) Full SCRAM B. (1) A1 and A2 ONLY (2) Half-SCRAM ONLY C. (1) A1, A2 AND A3 (2) Full SCRAM D. (1) A1, A2 AND A3 (2) Half-SCRAM ONLY 34
RPS logic channels are impacted. As a result, a (2) occurs.
A. (1) A1 and A2 ONLY (2) Full SCRAM B. (1) A1 and A2 ONLY (2) Half-SCRAM ONLY C. (1) A1, A2 AND A3 (2) Full SCRAM D. (1) A1, A2 AND A3 (2) Half-SCRAM ONLY


ILT 2104 Written Exam
ILT 2104 Written Exam 35 35.
: 35. Unit 2 is in MODE 2 with the following conditions:
Unit 2 is in MODE 2 with the following conditions:
All IRMs are on Range 4 During Control Rod withdrawal the following IRM indications are noted:
All IRMs are on Range 4 During Control Rod withdrawal the following IRM indications are noted:
IRM E - 108/125 IRM F - 118/125 IRM H - 117/125 Given the conditions above, which ONE of the following describes the response of RPS and/or the Reactor Manual Control System (RMCS) to these conditions?
IRM E - 108/125 IRM F - 118/125 IRM H - 117/125 Given the conditions above, which ONE of the following describes the response of RPS and/or the Reactor Manual Control System (RMCS) to these conditions?
A. Full SCRAM B. Rod Block ONLY C. RPS A Rod Block and Half SCRAM D. RPS B Rod Block and Half SCRAM 35
A. Full SCRAM B. Rod Block ONLY C. RPS A Rod Block and Half SCRAM D. RPS B Rod Block and Half SCRAM


ILT 2104 Written Exam
ILT 2104 Written Exam 36 36.
: 36. Unit 2 is operating at 100% RTP under NORMAL conditions.
Unit 2 is operating at 100% RTP under NORMAL conditions.
Which ONE of the following completes the statement below?
Which ONE of the following completes the statement below?
Given the conditions above, Suppression Pool Water Level shall be greater than or equal to             in accordance with Technical Specification (Tech Spec) 3.6.2.2, Suppression Pool Water Level.
Given the conditions above, Suppression Pool Water Level shall be greater than or equal to in accordance with Technical Specification (Tech Spec) 3.6.2.2, Suppression Pool Water Level.
A. (-) 5.50 inches B. (-) 6.00 inches C. (-) 6.25 inches D. (-) 7.25 inches 36
A. (-) 5.50 inches B. (-) 6.00 inches C. (-) 6.25 inches D. (-) 7.25 inches


ILT 2104 Written Exam
ILT 2104 Written Exam 37 37.
: 37. Unit 1 is operating at 100% RTP with the following conditions:
Unit 1 is operating at 100% RTP with the following conditions:
APRM HIGH/INOP OR OPRM TRIP (1-9-5A, Window 25) alarms The Operator responds to find APRM 3 as indicated:
APRM HIGH/INOP OR OPRM TRIP (1-9-5A, Window 25) alarms The Operator responds to find APRM 3 as indicated:
In accordance with 1-OI-92B, Average Power Range Monitoring, which ONE of the following completes the statement below?
In accordance with 1-OI-92B, Average Power Range Monitoring, which ONE of the following completes the statement below?
Given the conditions above, a trip output is sent to (1)     of the Voter Logic Modules and APRM 3         (2)     be bypassed.
Given the conditions above, a trip output is sent to (1) of the Voter Logic Modules and APRM 3 (2) be bypassed.
A. (1) ALL (2) can B. (1) ALL (2) can NOT C. (1) ONLY 1 (2) can D. (1) ONLY 1 (2) can NOT 37
A. (1) ALL (2) can B. (1) ALL (2) can NOT C. (1) ONLY 1 (2) can D. (1) ONLY 1 (2) can NOT


ILT 2104 Written Exam
ILT 2104 Written Exam 38 38.
: 38. Which ONE of the following completes the statement below?
Which ONE of the following completes the statement below?
During accident conditions, 2-FSV-43-40, PASS SAMPLE RETURN INBOARD ISOLATION VALVE can be operated from the Main Control Room Panel 2     (1)     and   (2)     isolate on a PCIS Group 6 Isolation.
During accident conditions, 2-FSV-43-40, PASS SAMPLE RETURN INBOARD ISOLATION VALVE can be operated from the Main Control Room Panel 2 (1) and (2) isolate on a PCIS Group 6 Isolation.
Note: PCIS - Primary Containment Isolation System A. (1) 5 (2) will B. (1) 5 (2) will NOT C. (1) 54 (2) will D. (1) 54 (2) will NOT 38
Note: PCIS - Primary Containment Isolation System A.
(1) 5 (2) will B.
(1) 5 (2) will NOT C. (1) 54 (2) will D. (1) 54 (2) will NOT


ILT 2104 Written Exam
ILT 2104 Written Exam 39 39.
: 39. Unit 1 is operating at 100% RTP when a LOCA occurs in the Drywell, with the following conditions:
Unit 1 is operating at 100% RTP when a LOCA occurs in the Drywell, with the following conditions:
A manual Reactor SCRAM was inserted Primary Containment Isolation System (PCIS) Groups 2, 3, 6, and 8 have successfully isolated Given the conditions above, which ONE of the following completes the statements below?
A manual Reactor SCRAM was inserted Primary Containment Isolation System (PCIS) Groups 2, 3, 6, and 8 have successfully isolated Given the conditions above, which ONE of the following completes the statements below?
The Reactor Water Cleanup (RWCU) System isolated on       (1)     .
The Reactor Water Cleanup (RWCU) System isolated on (1)
As a result of the RWCU Group Isolation signal, 1-FCV-69-12, RWCU RETURN ISOLATION VALVE         (2)   automatically close.
As a result of the RWCU Group Isolation signal, 1-FCV-69-12, RWCU RETURN ISOLATION VALVE (2) automatically close.
A. (1) 2.45 psig Drywell Pressure (2) will B. (1) 2.45 psig Drywell Pressure (2) will NOT C. (1) (+) 2 inches Reactor Water Level (2) will D. (1) (+) 2 inches Reactor Water Level (2) will NOT 39
A. (1) 2.45 psig Drywell Pressure (2) will B. (1) 2.45 psig Drywell Pressure (2) will NOT C. (1) (+) 2 inches Reactor Water Level (2) will D. (1) (+) 2 inches Reactor Water Level (2) will NOT


ILT 2104 Written Exam
ILT 2104 Written Exam 40 40.
: 40. Unit 3 is operating at 100% RTP, when a fault occurs on the Unit 3 Main Transformer.
Unit 3 is operating at 100% RTP, when a fault occurs on the Unit 3 Main Transformer.
Given the conditions above, which ONE of the following correctly describes the transfer scheme for 4KV Unit Boards 3A and 3B?
Given the conditions above, which ONE of the following correctly describes the transfer scheme for 4KV Unit Boards 3A and 3B?
A. 4KV Unit Boards 3A AND 3B will remain de-energized until the alternate feeder breakers are MANUALLY closed.
A. 4KV Unit Boards 3A AND 3B will remain de-energized until the alternate feeder breakers are MANUALLY closed.
Line 280: Line 302:
C. 4KV Unit Boards 3A AND 3B will FAST transfer to alternate AND will AUTOMATICALLY transfer back to normal after power is restored.
C. 4KV Unit Boards 3A AND 3B will FAST transfer to alternate AND will AUTOMATICALLY transfer back to normal after power is restored.
D. 4KV Unit Boards 3A AND 3B will SLOW transfer to alternate AND must be MANUALLY transferred to normal after power is restored.
D. 4KV Unit Boards 3A AND 3B will SLOW transfer to alternate AND must be MANUALLY transferred to normal after power is restored.
40


ILT 2104 Written Exam
ILT 2104 Written Exam 41 41.
: 41. Which ONE of the following completes the statements below in accordance with 1-EOI Appendix-1D, Insert Control Rods Using Reactor Manual Control System?
Which ONE of the following completes the statements below in accordance with 1-EOI Appendix-1D, Insert Control Rods Using Reactor Manual Control System?
Rod Worth Minimizer (RWM)       (1)   required to be bypassed.
Rod Worth Minimizer (RWM) (1) required to be bypassed.
IF the Reactor SCRAM or ARI CANNOT be reset, THEN 1-SHV-085-586, CHARGING WATER ISOLATION VALVE is required to be         (2)     to manually drive Control Rods.
IF the Reactor SCRAM or ARI CANNOT be reset, THEN 1-SHV-085-586, CHARGING WATER ISOLATION VALVE is required to be (2) to manually drive Control Rods.
A. (1) is (2) CLOSED B. (1) is (2) OPEN C. (1) is NOT (2) CLOSED D. (1) is NOT (2) OPEN 41
A. (1) is (2) CLOSED B. (1) is (2) OPEN C. (1) is NOT (2) CLOSED D. (1) is NOT (2) OPEN


ILT 2104 Written Exam
ILT 2104 Written Exam 42 42.
: 42. In accordance with 0-OI-48, Integrated Computer System (ICS), which ONE of the following completes the statement below?
In accordance with 0-OI-48, Integrated Computer System (ICS), which ONE of the following completes the statement below?
The Safety Parameter Display System (SPDS) component of ICS         (1)   qualified as independent, decision-making instrumentation for operating the plant and will display parameters in     (2)   when the input data is BAD.
The Safety Parameter Display System (SPDS) component of ICS (1) qualified as independent, decision-making instrumentation for operating the plant and will display parameters in (2) when the input data is BAD.
A. (1) is (2) yellow B. (1) is (2) blue C. (1) is NOT (2) yellow D. (1) is NOT (2) blue 42
A. (1) is (2) yellow B. (1) is (2) blue C. (1) is NOT (2) yellow D. (1) is NOT (2) blue


ILT 2104 Written Exam
ILT 2104 Written Exam 43 43.
: 43. Unit 3 is operating at 100% RTP with the following conditions:
Unit 3 is operating at 100% RTP with the following conditions:
RECIRC DRIVE 3A DRIVE ALARM (3-9-4A, Window 32) alarms Given the conditions above, which ONE of the following completes the statements below in accordance with 3-OI-68, Reactor Recirculation System?
RECIRC DRIVE 3A DRIVE ALARM (3-9-4A, Window 32) alarms Given the conditions above, which ONE of the following completes the statements below in accordance with 3-OI-68, Reactor Recirculation System?
If the alarm is due to a power cell experiencing a Direct Current (DC) bus undervoltage, the Variable Frequency Drives (VFD) affected cell       (1)   bypass.
If the alarm is due to a power cell experiencing a Direct Current (DC) bus undervoltage, the Variable Frequency Drives (VFD) affected cell (1) bypass.
Once the respective cell is bypassed, the affected Recirc Pump will experience a speed drop of approximately       (2)     .
Once the respective cell is bypassed, the affected Recirc Pump will experience a speed drop of approximately (2)
A. (1) will automatically (2) 200 rpm B. (1) will automatically (2) 345 rpm C. (1) requires a manual (2) 200 rpm D. (1) requires a manual (2) 345 rpm 43
A. (1) will automatically (2) 200 rpm B. (1) will automatically (2) 345 rpm C. (1) requires a manual (2) 200 rpm D. (1) requires a manual (2) 345 rpm
 
ILT 2104 Written Exam 44 44.
Currently, Unit 2 is operating at 25% RTP when the following conditions occur:
REACTOR FEEDWATER CONTROL SYSTEM TROUBLE (2-9-6C, Window 28) alarms REACTOR WATER LEVEL ABNORMAL (2-9-5A, Window 8) alarms Reactor Feedwater Pump (RFPT) speeds are rising Reactor Water Level is rising at a rate of 3 inches per minute


ILT 2104 Written Exam
NO Operator actions have been taken Which ONE of the following completes the statements below?
: 44. Currently, Unit 2 is operating at 25% RTP when the following conditions occur:
Given the conditions above, 4 minutes later, the Main Turbine (1) automatically tripped.
REACTOR FEEDWATER CONTROL SYSTEM TROUBLE (2-9-6C, Window 28) alarms REACTOR WATER LEVEL ABNORMAL (2-9-5A, Window 8) alarms Reactor Feedwater Pump (RFPT) speeds are rising Reactor Water Level is rising at a rate of 3 inches per minute NO Operator actions have been taken Which ONE of the following completes the statements below?
The Reactor Water Level Instruments that cause the Main Turbine Trip are 2-LI (2)
Given the conditions above, 4 minutes later, the Main Turbine       (1) automatically tripped.
Note: 2-LI-3-203A-D, REACTOR WATER LEVEL NORMAL RANGE 2-LI-3-208A-D, REACTOR WATER LEVEL NARROW RANGE A. (1) has (2) 203A-D B. (1) has (2) 208A-D C. (1) has NOT (2) 203A-D D. (1) has NOT (2) 208A-D
The Reactor Water Level Instruments that cause the Main Turbine Trip are 2-LI     (2)   .
Note: 2-LI-3-203A-D, REACTOR WATER LEVEL NORMAL RANGE 2-LI-3-208A-D, REACTOR WATER LEVEL NARROW RANGE A. (1) has (2) 203A-D B. (1) has (2) 208A-D C. (1) has NOT (2) 203A-D D. (1) has NOT (2) 208A-D 44


ILT 2104 Written Exam
ILT 2104 Written Exam 45 45.
: 45. With respect to the MAXIMUM SAFE radiation value for Traversing Incore Probe (TIP),
With respect to the MAXIMUM SAFE radiation value for Traversing Incore Probe (TIP),
which ONE of the following completes the statements below?
which ONE of the following completes the statements below?
If the MAXIMUM SAFE value for 2-RI-90-22A, TIP ROOM EL 565 RX BLDG is reached during TIP operation with the probes outside their shields, then automatic withdrawal to the in-shield position     (1)   occur.
If the MAXIMUM SAFE value for 2-RI-90-22A, TIP ROOM EL 565 RX BLDG is reached during TIP operation with the probes outside their shields, then automatic withdrawal to the in-shield position (1) occur.
A Group 8 Isolation     (2)       directly caused by the TIP Room MAXIMUM SAFE Value.
A Group 8 Isolation (2) directly caused by the TIP Room MAXIMUM SAFE Value.
A. (1) will (2) is B. (1) will (2) is NOT C. (1) will NOT (2) is D. (1) will NOT (2) is NOT 45
A. (1) will (2) is B. (1) will (2) is NOT C. (1) will NOT (2) is D. (1) will NOT (2) is NOT


ILT 2104 Written Exam
ILT 2104 Written Exam 46 46.
: 46. Unit 1 is operating at 100% RTP with the following conditions:
Unit 1 is operating at 100% RTP with the following conditions:
ROD BLOCK MONITOR HIGH/INOP (1-9-5A, Window 24) alarms In accordance with 1-OI-92C, Rod Block Monitor, which ONE of the following completes the statement below?
ROD BLOCK MONITOR HIGH/INOP (1-9-5A, Window 24) alarms In accordance with 1-OI-92C, Rod Block Monitor, which ONE of the following completes the statement below?
The Rod Block Monitor (RBM) HIGH setpoint is     (1)     .
The Rod Block Monitor (RBM) HIGH setpoint is (1)
If the Panel 1-9-14 RBM Chassis Mode Switch is NOT in OPERATE, a Control Rod Block       (2)   occur.
If the Panel 1-9-14 RBM Chassis Mode Switch is NOT in OPERATE, a Control Rod Block (2) occur.
A. (1) 109.2%
A. (1) 109.2%
(2) will NOT B. (1) 109.2%
(2) will NOT B. (1) 109.2%
(2) will C. (1) 119%
(2) will C. (1) 119%
(2) will NOT D. (1) 119%
(2) will NOT D. (1) 119%
(2) will 46
(2) will


ILT 2104 Written Exam
ILT 2104 Written Exam 47 47.
: 47. Unit 2 was operating at 100% RTP when a LOCA occurred.
Unit 2 was operating at 100% RTP when a LOCA occurred.
Subsequently, All Drywell Sprays have failed 2-FCV-64-222, HARDENED CONTAINMENT VENT OUTBOARD VALVE, failed in the CLOSED position The preferred vent path is NOT available.
Subsequently, All Drywell Sprays have failed 2-FCV-64-222, HARDENED CONTAINMENT VENT OUTBOARD VALVE, failed in the CLOSED position The preferred vent path is NOT available.
Which ONE of the following completes the statement below?
Which ONE of the following completes the statement below?
In accordance with 2-EOI Appendix-13, Emergency Venting Primary Containment, the containment vent path will be from the   (1)     and Reactor Building ventilation ductwork failure     (2)   expected.
In accordance with 2-EOI Appendix-13, Emergency Venting Primary Containment, the containment vent path will be from the (1) and Reactor Building ventilation ductwork failure (2) expected.
A. (1) Drywell (2) is B. (1) Drywell (2) is NOT C. (1) Suppression Chamber (2) is D. (1) Suppression Chamber (2) is NOT 47
A. (1) Drywell (2) is B. (1) Drywell (2) is NOT C. (1) Suppression Chamber (2) is D. (1) Suppression Chamber (2) is NOT
 
ILT 2104 Written Exam 48 48.
The following conditions exist on Unit 3:
3-HS-99-5A-S1, REACTOR MODE SWITCH is in REFUEL


ILT 2104 Written Exam
ALL Control Rods are inserted The Refueling Bridge Operator grappled a fuel bundle and raised the grapple The fuel bundle was then moved towards the Reactor Core In accordance with 0-GOI-100-3A, Refueling Operations (In-Vessel Operations), which ONE of the following completes the statement below?
: 48. The following conditions exist on Unit 3:
Given the conditions above, as the Refueling Bridge moves towards the Reactor Core, it (1) the Core AND a Control Rod Block (2) occur.
3-HS-99-5A-S1, REACTOR MODE SWITCH is in REFUEL ALL Control Rods are inserted The Refueling Bridge Operator grappled a fuel bundle and raised the grapple The fuel bundle was then moved towards the Reactor Core In accordance with 0-GOI-100-3A, Refueling Operations (In-Vessel Operations), which ONE of the following completes the statement below?
A. (1) continues over (2) will B. (1) continues over (2) will NOT C. (1) stops before it reaches (2) will D. (1) stops before it reaches (2) will NOT
Given the conditions above, as the Refueling Bridge moves towards the Reactor Core, it     (1)     the Core AND a Control Rod Block     (2)   occur.
A. (1) continues over (2) will B. (1) continues over (2) will NOT C. (1) stops before it reaches (2) will D. (1) stops before it reaches (2) will NOT 48


ILT 2104 Written Exam
ILT 2104 Written Exam 49 49.
: 49. In accordance with 0-OI-57D, DC Electrical System, which ONE of the following completes the statements below concerning the 2B 250V Battery Charger?
In accordance with 0-OI-57D, DC Electrical System, which ONE of the following completes the statements below concerning the 2B 250V Battery Charger?
The 2B 250V Battery Charger       (1)     be aligned to supply Battery Board 5.
The 2B 250V Battery Charger (1) be aligned to supply Battery Board 5.
There is a/an       (2) interlock that prevents the 2B 250V Battery Charger from supplying more than one Battery Board at a time.
There is a/an (2) interlock that prevents the 2B 250V Battery Charger from supplying more than one Battery Board at a time.
A. (1) can (2) electrical B. (1) can (2) mechanical C. (1) can NOT (2) electrical D. (1) can NOT (2) mechanical 49
A. (1) can (2) electrical B. (1) can (2) mechanical C. (1) can NOT (2) electrical D. (1) can NOT (2) mechanical


ILT 2104 Written Exam
ILT 2104 Written Exam 50 50.
: 50. Unit 1 is operating at 100% RTP with the following conditions:
Unit 1 is operating at 100% RTP with the following conditions:
MAIN TURBINE VIBRATION HIGH (1-9-7B, Window 32) alarms The Balance of Plant Operator (BOP) observes vibration on Journal Bearing # 4 reading 8 mils and Journal Bearing # 5 at 7.5 mils BOTH Journal Bearing vibration levels are rising at a rate of 2 mils per minute Which ONE of the following completes the statement below?
MAIN TURBINE VIBRATION HIGH (1-9-7B, Window 32) alarms The Balance of Plant Operator (BOP) observes vibration on Journal Bearing # 4 reading 8 mils and Journal Bearing # 5 at 7.5 mils BOTH Journal Bearing vibration levels are rising at a rate of 2 mils per minute Which ONE of the following completes the statement below?
Given the conditions above, the EARLIEST time the Main Turbine MUST be tripped is
Given the conditions above, the EARLIEST time the Main Turbine MUST be tripped is
__________ in accordance with the associated ARP.
__________ in accordance with the associated ARP.
A. immediately B. in 2 minutes C. in 4 minutes D. in 15 minutes 50
A. immediately B. in 2 minutes C. in 4 minutes D. in 15 minutes


ILT 2104 Written Exam
ILT 2104 Written Exam 51 51.
: 51. Unit 1 is operating at 100% RTP with the following conditions:
Unit 1 is operating at 100% RTP with the following conditions:
BATTERY BOARD 1 BREAKER TRIPOUT OR GROUND (1-9-8C, Window 7) alarms 250V REACTOR MOV BOARD 1A UNDERVOLTAGE (1-9-8C, Window 4) alarms Battery Board 1, 250V RMOV Board 1A Normal Feeder Breaker tripped NO Operator actions have been taken Which ONE of the following completes the statement below in accordance with 1-AOI-57-11, Loss of Power to an ECCS ATU Panel / ECCS Inverter?
BATTERY BOARD 1 BREAKER TRIPOUT OR GROUND (1-9-8C, Window 7) alarms 250V REACTOR MOV BOARD 1A UNDERVOLTAGE (1-9-8C, Window 4) alarms Battery Board 1, 250V RMOV Board 1A Normal Feeder Breaker tripped
Given the conditions above, 250V DC RMOV Board 1A provides        (1)    to the respective ECCS Analog Trip Unit (ATU) AND        (2)    ECCS ATU is de-energized.
A. (1) ONLY one power source (2) Division I, Panel 1-9-81 B. (1) ONLY one power source (2) Division II, Panel 1-9-82 C. (1) BOTH the normal AND redundant power sources (2) Division I, Panel 1-9-81 D. (1) BOTH the normal AND redundant power sources (2) Division II, Panel 1-9-82 51


ILT 2104 Written Exam
NO Operator actions have been taken Which ONE of the following completes the statement below in accordance with 1-AOI-57-11, Loss of Power to an ECCS ATU Panel / ECCS Inverter?
: 52. Unit 2 is operating at 100% RTP when a Control Air leak develops, resulting in header pressure lowering to 25 psig.
Given the conditions above, 250V DC RMOV Board 1A provides (1) to the respective ECCS Analog Trip Unit (ATU) AND (2)
ECCS ATU is de-energized.
A. (1) ONLY one power source (2) Division I, Panel 1-9-81 B. (1) ONLY one power source (2) Division II, Panel 1-9-82 C. (1) BOTH the normal AND redundant power sources (2) Division I, Panel 1-9-81 D. (1) BOTH the normal AND redundant power sources (2) Division II, Panel 1-9-82
 
ILT 2104 Written Exam 52 52.
Unit 2 is operating at 100% RTP when a Control Air leak develops, resulting in header pressure lowering to 25 psig.
Given the condition above, which ONE of the following completes the statements below?
Given the condition above, which ONE of the following completes the statements below?
The     (1)   Main Steam Isolation Valves (MSIVs) are CLOSED.
The (1)
In accordance with 2-AOI-32-2, Loss of Control Air,   (2)   is aligned to re-open the MSIVs.
Main Steam Isolation Valves (MSIVs) are CLOSED.
In accordance with 2-AOI-32-2, Loss of Control Air, (2) is aligned to re-open the MSIVs.
A. (1) outboard (2) Drywell Control Air B. (1) outboard (2) Containment Atmosphere Dilution (CAD)
A. (1) outboard (2) Drywell Control Air B. (1) outboard (2) Containment Atmosphere Dilution (CAD)
C. (1) inboard (2) Drywell Control Air D. (1) inboard (2) Containment Atmosphere Dilution (CAD) 52
C. (1) inboard (2) Drywell Control Air D. (1) inboard (2) Containment Atmosphere Dilution (CAD)


ILT 2104 Written Exam
ILT 2104 Written Exam 53 53.
: 53. Unit 2 is in MODE 4 when the RHR Pump in service for Shutdown Cooling trips.
Unit 2 is in MODE 4 when the RHR Pump in service for Shutdown Cooling trips.
Subsequently, Shutdown Cooling flow is being restored to remove decay heat.
Subsequently, Shutdown Cooling flow is being restored to remove decay heat.
Which ONE of the following completes the statement below?
Which ONE of the following completes the statement below?
Given the conditions above, the MINIMUM required RHR Shutdown Cooling pump flowrate is __________ in accordance with 2-AOI-74-1, Loss of Shutdown Cooling.
Given the conditions above, the MINIMUM required RHR Shutdown Cooling pump flowrate is __________ in accordance with 2-AOI-74-1, Loss of Shutdown Cooling.
A. 1500 gpm B. 3500 gpm C. 6250 gpm D. 7000 gpm 53
A. 1500 gpm B. 3500 gpm C. 6250 gpm D. 7000 gpm


ILT 2104 Written Exam
ILT 2104 Written Exam 54 54.
: 54. Which ONE of the following completes the statement below?
Which ONE of the following completes the statement below?
When Drywell Temperature reaches       (1)     entry into EOI-2, Primary Containment Control is required.
When Drywell Temperature reaches (1) entry into EOI-2, Primary Containment Control is required.
In accordance with EOI-2, the Reactor is required to be SCRAMMED in preparation for spraying the Drywell before Drywell Temperature rises to     (2)   .
In accordance with EOI-2, the Reactor is required to be SCRAMMED in preparation for spraying the Drywell before Drywell Temperature rises to (2)
A. (1) 150 &#xba;F (2) 200 &#xba;F B. (1) 150 &#xba;F (2) 280 &#xba;F C. (1) 160 &#xba;F (2) 200 &#xba;F D. (1) 160 &#xba;F (2) 280 &#xba;F 54
A. (1) 150 &#xba;F (2) 200 &#xba;F B. (1) 150 &#xba;F (2) 280 &#xba;F C. (1) 160 &#xba;F (2) 200 &#xba;F D. (1) 160 &#xba;F (2) 280 &#xba;F


ILT 2104 Written Exam
ILT 2104 Written Exam 55 55.
: 55. In accordance with the EOI Appendices, which ONE of the following completes the statements below with respect to restoring Secondary Containment VENTILATION?
In accordance with the EOI Appendices, which ONE of the following completes the statements below with respect to restoring Secondary Containment VENTILATION?
High Radiation Isolation signals   (1)     be bypassed.
High Radiation Isolation signals (1) be bypassed.
Upon entering EOI-3, Secondary Containment Control, the respective ventilation isolations are bypassed to restore   (2)   .
Upon entering EOI-3, Secondary Containment Control, the respective ventilation isolations are bypassed to restore (2)
A. (1) can NOT (2) Reactor Zone Ventilation ONLY B. (1) can NOT (2) Reactor Zone Ventilation AND Refuel Zone Ventilation C. (1) can (2) Reactor Zone Ventilation ONLY D. (1) can (2) Reactor Zone Ventilation AND Refuel Zone Ventilation 55
A. (1) can NOT (2) Reactor Zone Ventilation ONLY B. (1) can NOT (2) Reactor Zone Ventilation AND Refuel Zone Ventilation C. (1) can (2) Reactor Zone Ventilation ONLY D. (1) can (2) Reactor Zone Ventilation AND Refuel Zone Ventilation


ILT 2104 Written Exam
ILT 2104 Written Exam 56 56.
: 56. Unit 1 is being shut down for an outage with the following conditions:
Unit 1 is being shut down for an outage with the following conditions:
1-HS-99-5A-S1, REACTOR MODE SWITCH is in SHUTDOWN Reactor Vessel Head Closure Bolts are still fully tensioned Residual Heat Removal (RHR) Loop I is in Shutdown Cooling Subsequently, a complete Loss of Shutdown Cooling occurs resulting in the following:
1-HS-99-5A-S1, REACTOR MODE SWITCH is in SHUTDOWN Reactor Vessel Head Closure Bolts are still fully tensioned Residual Heat Removal (RHR) Loop I is in Shutdown Cooling Subsequently, a complete Loss of Shutdown Cooling occurs resulting in the following:
Reactor Coolant TIME            Temperature (&deg;F) 0800                 110 &deg;F 0802                 114 &deg;F 0804                 118 &deg;F Given the conditions above, which ONE of the following completes the statements below?
TIME Reactor Coolant Temperature (&deg;F) 0800 110 &deg;F 0802 114 &deg;F 0804 118 &deg;F Given the conditions above, which ONE of the following completes the statements below?
The current Heatup Rate       (1)     within the limit specified in Tech Spec 3.4.9, RCS Pressure and Temperature Limits?
The current Heatup Rate (1) within the limit specified in Tech Spec 3.4.9, RCS Pressure and Temperature Limits?
Given that all other associated MODE requirements remain unchanged and based upon the constant trend     (2)   is the EARLIEST time that Unit 1 will enter MODE 3 due to the rising Reactor Coolant Temperature.
Given that all other associated MODE requirements remain unchanged and based upon the constant trend (2) is the EARLIEST time that Unit 1 will enter MODE 3 due to the rising Reactor Coolant Temperature.
A. (1) is (2) 0852 B. (1) is (2) 0845 C. (1) is NOT (2) 0852 D. (1) is NOT (2) 0845 56
A. (1) is (2) 0852 B. (1) is (2) 0845 C. (1) is NOT (2) 0852 D. (1) is NOT (2) 0845


ILT 2104 Written Exam
ILT 2104 Written Exam 57 57.
: 57. Unit 2 has experienced a loss of 250 VDC RMOV BOARD 2B.
Unit 2 has experienced a loss of 250 VDC RMOV BOARD 2B.
Which ONE of the following statements below describes the effect on the RCIC system?
Which ONE of the following statements below describes the effect on the RCIC system?
A. ONLY the RCIC Flow Controller would fail downscale.
A.
ONLY the RCIC Flow Controller would fail downscale.
B. RCIC will NOT automatically INITIATE upon a valid signal.
B. RCIC will NOT automatically INITIATE upon a valid signal.
C. RCIC will NOT automatically ISOLATE upon a valid signal.
C. RCIC will NOT automatically ISOLATE upon a valid signal.
D. RCIC will initiate upon a valid signal and ONLY trip on High Reactor Water Level.
D. RCIC will initiate upon a valid signal and ONLY trip on High Reactor Water Level.
57


ILT 2104 Written Exam
ILT 2104 Written Exam 58 58.
: 58. In accordance with 1-OI-1, Main Steam System, which ONE of the following completes the statement below?
In accordance with 1-OI-1, Main Steam System, which ONE of the following completes the statement below?
Main Steam Tunnel Temperature should NOT be allowed to exceed a MAXIMUM of (1)   ,    (2)   .
Main Steam Tunnel Temperature should NOT be allowed to exceed a MAXIMUM of (1)
A. (1) 170 &deg;F (2) to prevent MSIV isolation B. (1) 170 &deg;F (2) due to environmental qualification requirements C. (1) 189 &deg;F (2) to prevent MSIV isolation D. (1) 189 &deg;F (2) due to environmental qualification requirements 58
(2)
A. (1) 170 &deg;F (2) to prevent MSIV isolation B. (1) 170 &deg;F (2) due to environmental qualification requirements C. (1) 189 &deg;F (2) to prevent MSIV isolation D. (1) 189 &deg;F (2) due to environmental qualification requirements


ILT 2104 Written Exam
ILT 2104 Written Exam 59 59.
: 59. All three Units are operating at 100% RTP with the following conditions:
All three Units are operating at 100% RTP with the following conditions:
240V Lighting Board 2A is tagged out of service for scheduled work Electrical fault causes 240V Lighting Board 3B to de-energize Given the conditions above, which ONE of the following completes the statement below?
240V Lighting Board 2A is tagged out of service for scheduled work Electrical fault causes 240V Lighting Board 3B to de-energize Given the conditions above, which ONE of the following completes the statement below?
The Plant Preferred Motor Generator will start   (1)     and energize   (2) .
The Plant Preferred Motor Generator will start (1) and energize (2)
A. (1) immediately (2) ONLY Battery Board 2 Panel 14 B. (1) immediately (2) Panel 9-9 Cabinet 4 on ALL three Units C. (1) after a 6-second time delay (2) ONLY Battery Board 2 Panel 14 D. (1) after a 6-second time delay (2) Panel 9-9 Cabinet 4 on ALL three Units 59
A. (1) immediately (2) ONLY Battery Board 2 Panel 14 B. (1) immediately (2) Panel 9-9 Cabinet 4 on ALL three Units C. (1) after a 6-second time delay (2) ONLY Battery Board 2 Panel 14 D. (1) after a 6-second time delay (2) Panel 9-9 Cabinet 4 on ALL three Units


ILT 2104 Written Exam
ILT 2104 Written Exam 60 60.
: 60. Unit 1 is operating at 100% RTP when a Control Air leak develops, resulting in the following conditions:
Unit 1 is operating at 100% RTP when a Control Air leak develops, resulting in the following conditions:
CONTROL AIR DRYER DISCHARGE PRESSURE LOW (1-9-20, Window 32) alarms SERVICE AIR CROSSTIE VALVE OPEN (1-9-20, Window 30) alarms Control Air Pressure is currently 69 psig and slowly lowering Given the conditions above, which ONE of the following completes the statement below?
CONTROL AIR DRYER DISCHARGE PRESSURE LOW (1-9-20, Window 32) alarms SERVICE AIR CROSSTIE VALVE OPEN (1-9-20, Window 30) alarms Control Air Pressure is currently 69 psig and slowly lowering Given the conditions above, which ONE of the following completes the statement below?
0-FCV-33-1, SERVICE AIR CROSSTIE VALVE opened at                 (1) Control Air Pressure and a manual Reactor SCRAM             (2)     CURRENTLY required in accordance with 0-AOI-32-1, Loss of Control and Service Air Compressors.
0-FCV-33-1, SERVICE AIR CROSSTIE VALVE opened at (1)
A. (1) 70 psig (2) is B. (1) 70 psig (2) is NOT C. (1) 85 psig (2) is D. (1) 85 psig (2) is NOT 60
Control Air Pressure and a manual Reactor SCRAM (2)
CURRENTLY required in accordance with 0-AOI-32-1, Loss of Control and Service Air Compressors.
A. (1) 70 psig (2) is B. (1) 70 psig (2) is NOT C. (1) 85 psig (2) is D. (1) 85 psig (2) is NOT


ILT 2104 Written Exam
ILT 2104 Written Exam 61 61.
: 61. In accordance with 2-OI-27, Condenser Circulating Water (CCW) System, which ONE of the following completes the statements below?
In accordance with 2-OI-27, Condenser Circulating Water (CCW) System, which ONE of the following completes the statements below?
CCW Pump Discharge Valves         (1)   OPEN when its respective CCW Pump is started.
CCW Pump Discharge Valves (1)
If a CCW Pump is stopped or tripped when other CCW Pumps remain running, the associated CCW Pump Discharge Valves         (2)   CLOSE.
OPEN when its respective CCW Pump is started.
A. (1) automatically (2) automatically B. (1) automatically (2) must be manually taken to C. (1) must be manually taken to (2) automatically D. (1) must be manually taken to (2) must be manually taken to 61
If a CCW Pump is stopped or tripped when other CCW Pumps remain running, the associated CCW Pump Discharge Valves (2)
CLOSE.
A. (1) automatically (2) automatically B. (1) automatically (2) must be manually taken to C. (1) must be manually taken to (2) automatically D. (1) must be manually taken to (2) must be manually taken to


ILT 2104 Written Exam
ILT 2104 Written Exam 62 62.
: 62. A Reactor Startup is in progress on Unit 2 with Control Rod 30-31 selected.
A Reactor Startup is in progress on Unit 2 with Control Rod 30-31 selected.
In accordance with 2-OI-85, Control Rod Drive System, which ONE of the following completes the statements below?
In accordance with 2-OI-85, Control Rod Drive System, which ONE of the following completes the statements below?
A white light on     (1)   indicates that Control Rod 30-31 is selected.
A white light on (1) indicates that Control Rod 30-31 is selected.
If required, to de-select Control Rod 30-31, the OATC will     (2)   .
If required, to de-select Control Rod 30-31, the OATC will (2)
A. (1) the Control Rod Select Matrix ONLY (2) depress 2-XS-85-40, Control Rod 30-31 Select Switch B. (1) the Control Rod Select Matrix ONLY (2) cycle 2-HS-85-46, CRD Power Switch OFF and then ON C. (1) the Control Rod Select Matrix AND the Full Core Display (2) depress 2-XS-85-40, Control Rod 30-31 Select Switch D. (1) the Control Rod Select Matrix AND the Full Core Display (2) cycle 2-HS-85-46, CRD Power Switch OFF and then ON 62
A. (1) the Control Rod Select Matrix ONLY (2) depress 2-XS-85-40, Control Rod 30-31 Select Switch B. (1) the Control Rod Select Matrix ONLY (2) cycle 2-HS-85-46, CRD Power Switch OFF and then ON C. (1) the Control Rod Select Matrix AND the Full Core Display (2) depress 2-XS-85-40, Control Rod 30-31 Select Switch D.
(1) the Control Rod Select Matrix AND the Full Core Display (2) cycle 2-HS-85-46, CRD Power Switch OFF and then ON


ILT 2104 Written Exam
ILT 2104 Written Exam 63 63.
: 63. An event occurred, resulting in 0-RM-90-259A, CONTROL ROOM VENTILATION RADIATION MONITOR, failing UPSCALE and 0-RM-90-259B reading 120 counts per minute.
An event occurred, resulting in 0-RM-90-259A, CONTROL ROOM VENTILATION RADIATION MONITOR, failing UPSCALE and 0-RM-90-259B reading 120 counts per minute.
Which ONE of the following predicts how the Main Control Room ventilation systems will respond?
Which ONE of the following predicts how the Main Control Room ventilation systems will respond?
Note: Control Room Emergency Ventilation System (CREV)
Note: Control Room Emergency Ventilation System (CREV)
Line 439: Line 474:
C. ALL three Units Control Room Ventilation Systems isolate and ONLY the selected CREV fan auto starts.
C. ALL three Units Control Room Ventilation Systems isolate and ONLY the selected CREV fan auto starts.
D. ONLY Unit 1 and 2 Control Room Ventilation Systems isolate and ONLY the selected CREV fan auto starts.
D. ONLY Unit 1 and 2 Control Room Ventilation Systems isolate and ONLY the selected CREV fan auto starts.
63


ILT 2104 Written Exam
ILT 2104 Written Exam 64 64.
: 64. In accordance with Reactor Pressure Safety Limits, which ONE of the following completes the statements below?
In accordance with Reactor Pressure Safety Limits, which ONE of the following completes the statements below?
The Reactor Steam Dome Pressure Safety Limit is       (1)   .
The Reactor Steam Dome Pressure Safety Limit is (1)
If violated, the REQUIRED ACTION is to restore Reactor Steam Dome Pressure Safety Limit compliance and insert ALL insertable Control Rods within   (2) .
If violated, the REQUIRED ACTION is to restore Reactor Steam Dome Pressure Safety Limit compliance and insert ALL insertable Control Rods within (2)
A. (1) 1325 psig (2) 2 hours B. (1) 1325 psig (2) 10 hours C. (1) 1375 psig (2) 2 hours D. (1) 1375 psig (2) 10 hours 64
A. (1) 1325 psig (2) 2 hours B. (1) 1325 psig (2) 10 hours C. (1) 1375 psig (2) 2 hours D. (1) 1375 psig (2) 10 hours


ILT 2104 Written Exam
ILT 2104 Written Exam 65 65.
: 65. With respect to the Unit 3 Reactor Feedwater Control System (RFWCS), which ONE of the following completes the statements below.
With respect to the Unit 3 Reactor Feedwater Control System (RFWCS), which ONE of the following completes the statements below.
The normal power supply to the RFWCS Panel Display Station (PDS) on Panel 3-9-5 is     (1)   . If the normal power supply is lost to the PDS, RFWCS (2)   .
The normal power supply to the RFWCS Panel Display Station (PDS) on Panel 3-9-5 is (1)
A. (1) Unit Preferred (2) CONTINUES control at the last known Reactor Water Level setpoint B. (1) Unit Preferred (2) MUST be transferred to manual C. (1) Plant Preferred (2) CONTINUES control at the last known Reactor Water Level setpoint D. (1) Plant Preferred (2) MUST be transferred to manual 65
. If the normal power supply is lost to the PDS, RFWCS (2)
A. (1) Unit Preferred (2) CONTINUES control at the last known Reactor Water Level setpoint B. (1) Unit Preferred (2) MUST be transferred to manual C. (1) Plant Preferred (2) CONTINUES control at the last known Reactor Water Level setpoint D. (1) Plant Preferred (2) MUST be transferred to manual


ILT 2104 Written Exam
ILT 2104 Written Exam 66 66.
: 66. In accordance with BFN-ODM-4.5, Operator Aids and Operator Information Systems, which ONE of the following completes the statement below regarding system status?
In accordance with BFN-ODM-4.5, Operator Aids and Operator Information Systems, which ONE of the following completes the statement below regarding system status?
During a Main Control Room panel walk down, the Operator determines that a system is aligned correctly when the NORMALLY RUNNING pumps have a           (1)   red lens cover and the NORMALLY CLOSED valves have a         (2)   red lens cover.
During a Main Control Room panel walk down, the Operator determines that a system is aligned correctly when the NORMALLY RUNNING pumps have a (1) red lens cover and the NORMALLY CLOSED valves have a (2) red lens cover.
A. (1) clear (2) diffused B. (1) clear (2) clear C. (1) diffused (2) diffused D. (1) diffused (2) clear 66
A. (1) clear (2) diffused B. (1) clear (2) clear C. (1) diffused (2) diffused D. (1) diffused (2) clear


ILT 2104 Written Exam
ILT 2104 Written Exam 67 67.
: 67. Which ONE of the following sets of conditions satisfies the Tech Spec definition of MODE 2?
Which ONE of the following sets of conditions satisfies the Tech Spec definition of MODE 2?
A. A Reactor SCRAM has just occurred. The MODE SWITCH is in SHUTDOWN.
A. A Reactor SCRAM has just occurred. The MODE SWITCH is in SHUTDOWN.
Moderator Temperature is 480&#xba; F. The MSlVs are closed.
Moderator Temperature is 480&#xba; F. The MSlVs are closed.
Line 465: Line 500:
C. Preparations are in progress for a Reactor Startup. The MODE SWITCH is in SHUTDOWN. Moderator Temperature is 135&#xba; F. All Control Rods are fully inserted.
C. Preparations are in progress for a Reactor Startup. The MODE SWITCH is in SHUTDOWN. Moderator Temperature is 135&#xba; F. All Control Rods are fully inserted.
D. The Reactor is shutdown. The MODE SWITCH is in REFUEL. Moderator Temperature is 140&#xba; F. All Reactor Vessel Head Closure Bolts are NOT fully tensioned.
D. The Reactor is shutdown. The MODE SWITCH is in REFUEL. Moderator Temperature is 140&#xba; F. All Reactor Vessel Head Closure Bolts are NOT fully tensioned.
67


ILT 2104 Written Exam
ILT 2104 Written Exam 68 68.
: 68. Given the following drawing excerpt of Unit 2 RCIC Initiation Logic, which ONE of the following completes the statements below in accordance with 2-45E626-1, Wiring Diagram, RCIC System Schematic Diagram?
Given the following drawing excerpt of Unit 2 RCIC Initiation Logic, which ONE of the following completes the statements below in accordance with 2-45E626-1, Wiring Diagram, RCIC System Schematic Diagram?
The four primary contacts in the Reactor Vessel Low Water Level portion of the circuit are actuated directly by     (1)   System Relays.
The four primary contacts in the Reactor Vessel Low Water Level portion of the circuit are actuated directly by (1)
On a RCIC automatic initiation signal, if relay 13A-K3 fails to energize, the RCIC AUTO-INITIATE light, shown here, (2)     .
System Relays.
On a RCIC automatic initiation signal, if relay 13A-K3 fails to energize, the RCIC AUTO-INITIATE light, shown here, (2)
[SEE THE ATTACHED RCIC DRAWING, 2-45E626-1]
[SEE THE ATTACHED RCIC DRAWING, 2-45E626-1]
A. (1) RHR (2) will illuminate B. (1) RHR (2) will NOT be illuminated C. (1) RCIC (2) will illuminate D. (1) RCIC (2) will NOT be illuminated 68
A. (1) RHR (2) will illuminate B. (1) RHR (2) will NOT be illuminated C. (1) RCIC (2) will illuminate D. (1) RCIC (2) will NOT be illuminated


ILT 2104 Written Exam
ILT 2104 Written Exam 69 69.
: 69. Which ONE of the following meets the requirements to be considered an "Infrequently Performed Test or Evolution" (IPTE) per NPG-SPP-10.6, Infrequently Performed Test or Evolution?
Which ONE of the following meets the requirements to be considered an "Infrequently Performed Test or Evolution" (IPTE) per NPG-SPP-10.6, Infrequently Performed Test or Evolution?
A. 1-SR-3.5.1.7(COMP), HPCI Comprehensive Pump Test B. 2-SR-3.5.1.6(RHR I), Quarterly RHR System Rated Flow Test Loop I C. 0-SR-3.8.1.9(A), Diesel Generator A Emergency Unit 1 Load Acceptance Test D. 0-GOI-300-4, Switchyard Manual, Switching Order to remove the West Point 500KV line 69
A. 1-SR-3.5.1.7(COMP), HPCI Comprehensive Pump Test B. 2-SR-3.5.1.6(RHR I), Quarterly RHR System Rated Flow Test Loop I C. 0-SR-3.8.1.9(A), Diesel Generator A Emergency Unit 1 Load Acceptance Test D. 0-GOI-300-4, Switchyard Manual, Switching Order to remove the West Point 500KV line


ILT 2104 Written Exam
ILT 2104 Written Exam 70 70.
: 70. With respect to Area Radiation Monitors (ARMs), which ONE of the following completes the statements below?
With respect to Area Radiation Monitors (ARMs), which ONE of the following completes the statements below?
ARMs are individual detectors that provide indications and alarms in the Main Control Room (MCR) with an amber HIGH light that will FIRST illuminate when the MAXIMUM         (1)   radiation value has been reached.
ARMs are individual detectors that provide indications and alarms in the Main Control Room (MCR) with an amber HIGH light that will FIRST illuminate when the MAXIMUM (1) radiation value has been reached.
(2)     of the ARMs on MCR Panel 9-11 REQUIRE EOI entry.
(2) of the ARMs on MCR Panel 9-11 REQUIRE EOI entry.
A. (1) SAFE (2) All B. (1) SAFE (2) NOT all C. (1) NORMAL (2) All D. (1) NORMAL (2) NOT all 70
A. (1) SAFE (2) All B. (1) SAFE (2) NOT all C. (1) NORMAL (2) All D. (1) NORMAL (2) NOT all


ILT 2104 Written Exam
ILT 2104 Written Exam 71 71.
: 71. Which ONE of the following completes the statement below during an emergency?
Which ONE of the following completes the statement below during an emergency?
In accordance with EPIP-15, Emergency Exposure, Site Emergency Director (SED) must approve a worker exceeding an exposure GREATER than                 Total Effective Dose Equivalent (TEDE) to save a life or avoid extensive exposure to large populations.
In accordance with EPIP-15, Emergency Exposure, Site Emergency Director (SED) must approve a worker exceeding an exposure GREATER than Total Effective Dose Equivalent (TEDE) to save a life or avoid extensive exposure to large populations.
A. 2 rem B. 5 rem C. 10 rem D. 25 rem 71
A. 2 rem B. 5 rem C. 10 rem D. 25 rem


ILT 2104 Written Exam
ILT 2104 Written Exam 72 72.
: 72. Determine which ONE of the following indications would be observed for an Area Radiation Monitor (ARM) when the detector is SATURATED in a radiation field.
Determine which ONE of the following indications would be observed for an Area Radiation Monitor (ARM) when the detector is SATURATED in a radiation field.
A. The indicator remains upscale BUT all trips drop out.
A. The indicator remains upscale BUT all trips drop out.
B. The indicator drops downscale AND the trips drop out except for the downscale trip.
B. The indicator drops downscale AND the trips drop out except for the downscale trip.
C. The indicator remains upscale AND the upscale trip remains in due to the pegging circuit.
C. The indicator remains upscale AND the upscale trip remains in due to the pegging circuit.
D. The indicator drops downscale BUT the upscale trip remains in due to the pegging circuit.
D. The indicator drops downscale BUT the upscale trip remains in due to the pegging circuit.
72


ILT 2104 Written Exam
ILT 2104 Written Exam 73 73.
: 73. A fire has been reported in the Unit 1 Reactor Building and 0-AOI-26-1, Fire Response, has been entered.
A fire has been reported in the Unit 1 Reactor Building and 0-AOI-26-1, Fire Response, has been entered.
Which ONE of the following completes the statements below?
Which ONE of the following completes the statements below?
In accordance with the AOI, the AUOs will INITIALLY report to     (1)   .
In accordance with the AOI, the AUOs will INITIALLY report to (1)
If a Standby Gas Train is operated to remove smoke, that train     (2)   .
If a Standby Gas Train is operated to remove smoke, that train (2)
A. (1) their assigned Control Room (2) remains OPERABLE B. (1) their assigned Control Room (2) will be considered INOPERABLE C. (1) the Incident Commander for damper realignment (2) remains OPERABLE D. (1) the Incident Commander for damper realignment (2) will be considered INOPERABLE 73
A. (1) their assigned Control Room (2) remains OPERABLE B. (1) their assigned Control Room (2) will be considered INOPERABLE C. (1) the Incident Commander for damper realignment (2) remains OPERABLE D. (1) the Incident Commander for damper realignment (2) will be considered INOPERABLE


ILT 2104 Written Exam
ILT 2104 Written Exam 74 74.
: 74. An electrical fire is reported in A Diesel Generator room.
An electrical fire is reported in A Diesel Generator room.
Which ONE of the following completes the statement below in accordance with the Fire Protection Requirements Manual?
Which ONE of the following completes the statement below in accordance with the Fire Protection Requirements Manual?
The installed fire suppression system that is effective for this classification of fire and available in this room is __________.
The installed fire suppression system that is effective for this classification of fire and available in this room is __________.
A. Halon agent - Manual initiation ONLY B. Carbon Dioxide agent - Manual initiation ONLY C. Halon agent - Manual OR Automatic initiation D. Carbon Dioxide agent - Manual OR Automatic initiation 74
A. Halon agent - Manual initiation ONLY B. Carbon Dioxide agent - Manual initiation ONLY C. Halon agent - Manual OR Automatic initiation D. Carbon Dioxide agent - Manual OR Automatic initiation


ILT 2104 Written Exam
ILT 2104 Written Exam 75 75.
: 75. Unit 2 is operating at 100% RTP with the following conditions:
Unit 2 is operating at 100% RTP with the following conditions:
BATTERY BOARD 2 Volts (2-EI-57-37) indicates 245V DC BATTERY BOARD 2 Amps (2-EI-57-38) indicates
BATTERY BOARD 2 Volts (2-EI-57-37) indicates 245V DC BATTERY BOARD 2 Amps (2-EI-57-38) indicates
(+) 120 amps Which ONE of the following completes the statements below?
(+) 120 amps Which ONE of the following completes the statements below?
Battery #2 is currently   (1)   .
Battery #2 is currently (1)
Battery Board 2 Voltage     (2)     within the MINIMUM OPERATING voltage requirement specified in 0-OI-57D, DC Electrical System.
Battery Board 2 Voltage (2) within the MINIMUM OPERATING voltage requirement specified in 0-OI-57D, DC Electrical System.
A. (1) discharging (2) is B. (1) discharging (2) is NOT C. (1) being charged (2) is D. (1) being charged (2) is NOT 75
A. (1) discharging (2) is B. (1) discharging (2) is NOT C. (1) being charged (2) is D. (1) being charged (2) is NOT


BFN ILT 2104 RO References REFERENCE PROVIDED to candidate
RO-1 BFN ILT 2104 RO References REFERENCE PROVIDED to candidate 3.
: 3. Panel 1-9-5, 1-LI-63-1A, SLC Storage Tank Level and 1-PI-63-7A, SLC Pump Discharge Pressure and 1-HS-63-6A, SLC Pump 1A/1B Pump/light indications and 1-ZI-63-8A/B, SLC Valve A/B Continuity lights and 1-IL-63-11, SLC Flow light indication. SLC SQUIB VALVE CONTINUITY LOST, (1-9-5B, WINDOW 20)
Panel 1-9-5, 1-LI-63-1A, SLC Storage Tank Level and 1-PI-63-7A, SLC Pump Discharge Pressure and 1-HS-63-6A, SLC Pump 1A/1B Pump/light indications and 1-ZI-63-8A/B, SLC Valve A/B Continuity lights and 1-IL-63-11, SLC Flow light indication. SLC SQUIB VALVE CONTINUITY LOST, (1-9-5B, WINDOW 20)
: 4. 1-FMT-1-4, SRV TAILPIPE FLOW MONITOR DRAWING
: 4. 1-FMT-1-4, SRV TAILPIPE FLOW MONITOR DRAWING
: 18. PRIMARY CONTAINMENT N2 PRESSURE HIGH (3-9-3B, Window 10)
: 18. PRIMARY CONTAINMENT N2 PRESSURE HIGH (3-9-3B, Window 10)
Line 538: Line 572:
: 50. MAIN TURBINE VIBRATION HIGH (1-9-7B, Window 32)
: 50. MAIN TURBINE VIBRATION HIGH (1-9-7B, Window 32)
: 51. BATTERY BOARD 1 BREAKER TRIPOUT OR GROUND (1-9-8C, Window 7), 250V REACTOR MOV BOARD 1A UNDERVOLTAGE (1-9-8C, Window 4)
: 51. BATTERY BOARD 1 BREAKER TRIPOUT OR GROUND (1-9-8C, Window 7), 250V REACTOR MOV BOARD 1A UNDERVOLTAGE (1-9-8C, Window 4)
RO-1
 
RO-2
: 56. Reactor Coolant Temperature and Time Table
: 56. Reactor Coolant Temperature and Time Table
: 60. CONTROL AIR DRYER DISCH PRESSURE LOW (1-9-20B, Window 32), SERVICE AIR XTIE VLV OPEN (1-9-20B, Window 30)
: 60. CONTROL AIR DRYER DISCH PRESSURE LOW (1-9-20B, Window 32), SERVICE AIR XTIE VLV OPEN (1-9-20B, Window 30)
: 68. Excerpt from RCIC Drawing, 2-45E626-1, Panel 2-9-3 with 2-IL-71-52, RCIC Auto-Initiation light
: 68. Excerpt from RCIC Drawing, 2-45E626-1, Panel 2-9-3 with 2-IL-71-52, RCIC Auto-Initiation light
: 75. Panel 2-9-8, BATTERY BOARD 2 Volts (2-EI-57-37) and Amps (2-EI-57-38)
: 75. Panel 2-9-8, BATTERY BOARD 2 Volts (2-EI-57-37) and Amps (2-EI-57-38)
RO-2


Test: ..ICT 2/-e>y,zv/Zc                                       LXR*TEST'                         Name: _     - _...._l<~e         ....___,
Test:..ICT 2/-e>y,zv/Zc LXR*TEST' Response Form Class: _________
                                                                                                                                                  ;_I - -      _
LXR-20020 Side 1 Instructor:. ________
Class: _ _ _ _ _ _ _ _ __
READ CAREFULLY!
Response Form LXR-20020                        Signature: - - - - - , . - - - , - - - - - -
OK NOT OK
Instructor :._ _ _ _ _ _ _ __
-~
Side 1                        Date: _ _          ~S-- /~Z   ~O:: =--/=-zi>=----=-2_,_/_
~ Use No. 2 black pencil only.
READ CAREFULLY!                        ~ Use No. 2 black pencil only.                          ~ Do NOT make any stray marks on the page .
~ Mark responses darkly and fill completely.
OK    NOT OK
~ Erase unwanted marks clear!.
                                              ~ Mark responses darkly and fill completely.              ~ No credit will be given for improper marks .
Name:_
        *      -~
_...._l<~e
                  ...                          ~ Erase unwanted marks clear! .                          ~ If Side 2 is used , fill in ID on both sides.
....___,;I Signature: -----,.---,------
-***                                                  SECTION 1
Date: __ ~S--/~Z~O::=--/ =-z i>
                                                                                          --~*IL*~* -
=----=-2 _,_/ _  
T F                    T  F 1                        2                                3
~ Do NOT make any stray marks on the page.  
              @@@@@@@@                      1* &#xa9;&#xa9;               51 &#xa9;
~ No credit will be given for improper marks.  
* Q                     Q                           Q G)G)G)G)G)G)G)G)              2  * &#xa9;            s2 e &#xa9;@                  G) G) G) G) G)           G) G) G) G) G)                 G) G) G) G) G) 3 * &#xa9;&#xa9; 4 @. &#xa9;&#xa9; s3 &#xa9;
~ If Side 2 is used, fill in ID on both sides.
* s4 @@&#xa9; e
SECTION 1 --~
              &#xa9;&#xa9;&#xa9;&#xa9;&#xa9;&#xa9;&#xa9;&#xa9; s @e &#xa9;@
*IL*~*-
G)G)G)G)G)G)G)G)
&#xa9;&#xa9;&#xa9;&#xa9;&#xa9;&#xa9;&#xa9;&#xa9; (j)(j)(j)(j)(j)(j)(j)(j)
Version C1C2C3C4 G)
&#xa9;&#xa9;&#xa9;&#xa9;&#xa9;&#xa9;&#xa9;&#xa9;
@@@@@&#xa9;&#xa9;@
&#xa9;
@@&#xa9;@
(j)
CD CD CD CD CD CD CD CD Q)Q)Q)Q)Q)Q)Q)Q)
(0(0(0(0(0(0(0(0
&#xa9; G)G)G)G)G)G)G)
G) G) G) G) G) G) G) G)  
&#xa9;&#xa9;&#xa9;&#xa9;&#xa9;&#xa9;&#xa9;&#xa9; (j)(j)(j)(j)(j)(j)(j)(j)
LXR-20020 Rev. 08/2013 15450 T F 1* &#xa9;&#xa9; 2* &#xa9; 3* &#xa9;&#xa9; 4@. &#xa9;&#xa9; s @e &#xa9;@
6
6
* 1
* 1*
* ss @e &#xa9;@
a&#xa9;*
9@&#xa9;
* 10
* 11 * &#xa9;&#xa9; 12 e &#xa9; 13 &#xa9;
* 14
* 1s &#xa9;e 16
* 11 e &#xa9; 1s @e &#xa9;@
19
* 2o e &#xa9;&#xa9; 21
* 22. &#xa9;&#xa9; 23
* 24. &#xa9;&#xa9; 2s @ e @
26. &#xa9;&#xa9; 21 e &#xa9; 28 @&#xa9;
* 29 @e &#xa9; 30. &#xa9;&#xa9; 31
* 32. &#xa9;&#xa9; 33
* 34 @&#xa9;*
35 @&#xa9;*
36
* 37. &#xa9;&#xa9; 38
* 39
* 4o @e &#xa9;@
41. &#xa9;&#xa9; 42 @&#xa9;
* 43. &#xa9;&#xa9; 44 @&#xa9;
* 45 @&#xa9;*
46 * &#xa9; 47. &#xa9;&#xa9; 48. &#xa9;&#xa9; 49 @. &#xa9;&#xa9; so @e &#xa9;@
T F
51 &#xa9;
* s2 e &#xa9;@
s3 &#xa9;
* s4 @@&#xa9;e ss @e &#xa9;@
56
56
* s1 @e &#xa9;@
* s1 @e &#xa9;@
                                                                                              &#xa9;&#xa9;&#xa9;&#xa9;&#xa9;
ss @ e @
                                                                                                                        &#xa9;&#xa9;&#xa9;&#xa9;&#xa9;
59 @&#xa9;*
                                                                                                                                                        &#xa9;&#xa9;&#xa9;&#xa9;&#xa9;
60 @&#xa9;*
  --          (j)(j)(j)(j)(j)(j)(j)(j) a &#xa9;
61. &#xa9;&#xa9; 62 @&#xa9;
* 9 @&#xa9;
* 63
* ss @ e @
* 64. &#xa9;@
59 @&#xa9; *
6s e &#xa9;@
66 @&#xa9;
* 67 @. &#xa9;@
6s @e &#xa9;@
69
* 70 @&#xa9;
* 71 &#xa9;*
12
* 73 @.
&#xa9;@
74 @&#xa9;
* 7s @e &#xa9;@
76 e &#xa9;@
n &#xa9;e 1a e &#xa9;@
79
* so @e &#xa9;@
s1 @e &#xa9;@
82 @. &#xa9;@
83 @&#xa9;*
84 ~ * &#xa9; as &#xa9;
* 86 @&#xa9;*
87
* as * &#xa9;@
89. &#xa9;@
go @ e @
91
* 92. &#xa9;@
93
* 94
* gs @&#xa9; a 96
* 97. &#xa9;@
98. &#xa9;@
99 @&#xa9;
* 1oo @e &#xa9;@
1 4
7 10 Q
G) G)
&#xa9; &#xa9; (j) (j) 0 0 Q
G) G)
&#xa9; &#xa9; (j) (j) 0 0 Q
G) G)
&#xa9; &#xa9; (j) (j) 0 0 Q
G) G)
&#xa9; &#xa9; (j) (j) 0 0 Printed in U.SA Copyright &#xa9; 2010 LXR G) G) G)
&#xa9; &#xa9; &#xa9; (j) (j) (j) 0 0 0 G) G) G)
&#xa9; &#xa9; &#xa9; (j) (j) (j)
I 0 0 I
01 G) G) G)
&#xa9; &#xa9; &#xa9; (j) (j) (j)  
,g1I
'VI 0 0 0\\
G) G) G)
&#xa9; &#xa9; &#xa9; (j) (j) (j) 0 0 0 2
3 Q
Q G) G) G) G) G)
G) G) G) G) G)
&#xa9; &#xa9; &#xa9; &#xa9; &#xa9;  
&#xa9; &#xa9; &#xa9; &#xa9; &#xa9; (j) (j) (j) (j) (j)
(j) (j) (j) (j) (j) 1 @
0 0 0 0 0 0!0 0 0 8 5
6 I i Q
Q @!@ ([:
G) G) G) G) G)
G) G) G) G) CI:
(&#xa3;
<E
&#xa9; &#xa9; &#xa9; &#xa9; &#xa9;
&#xa9; &#xa9; &#xa9; &#xa9; G::
(&#xa3;
~
(j) (j) (j) (j) (j)
(j) (j) (j) (j) (j)
(j) (j) (j) (j) <i
([
Ci 0 0 0 0 0 0 0 0 0 G::
8 I 9 i
Q '
Q ([
G) G) G) G) G)
G) G) G) G) G::
<?::
~
&#xa9; &#xa9; &#xa9; &#xa9; &#xa9;
&#xa9; &#xa9; &#xa9; &#xa9; <I
('[
(&sect;::
(j) (j) (j) (j) (j)
(j) (j) (j) (j) (j)
(j) (j) (j) (j) (f__
([
0 0 0 0 0 0 0 0 0 ~
11 12 8
8 ([
G) G) G) G) G)
G) G) G) G) (&#xa3;
([
&#xa9; &#xa9; &#xa9; &#xa9; &#xa9;
&#xa9; &#xa9; &#xa9; &#xa9; ~
([
([
(j) (j) (j) (j) (j)
(j) (j) (j) (j) (j)
Version 10
(j) (j) (j) (j) (f e&:
* 11 * &#xa9;&#xa9; 60 @&#xa9;
0 0.0 0 0 0 0 0 0 f To reorder call: 843-520-299}}
* 61 . &#xa9;&#xa9; 0 0 0 0 0 0 0 0 0 0 1  @
0!0 0 0 8 C1C2C3C4 12  e &#xa9; 13 &#xa9;
* 14
* 1s &#xa9; e 62 @&#xa9;
* 63
* 64 . &#xa9;@
6s e &#xa9;@
4 Q
G) G) G) G) G) 5 Q
G) G) G) G) G) 6        I i
Q @!@  ([:
G) G) G) G) CI:
      -  G)                          16
* 66 @&#xa9; *                                                                      (&#xa3;
      - &#xa9;&#xa9;&#xa9;&#xa9;&#xa9;&#xa9;&#xa9;&#xa9;                            11  e &#xa9;            67 @. &#xa9;@                                                                      <E
      - @@@@@&#xa9;&#xa9;@                            1s @e &#xa9;@              6s @e &#xa9;@                  &#xa9;&#xa9;&#xa9;&#xa9;&#xa9;                    &#xa9;&#xa9;&#xa9;&#xa9;&#xa9;                          &#xa9; &#xa9; &#xa9; &#xa9; G::
      -  &#xa9;                          19
* 69  *                                                                      (&#xa3;
      -                            2o e &#xa9;&#xa9;              70 @&#xa9; *                                                                  ~
      - @@&#xa9;@                            21
* 71  &#xa9; *                  (j) (j) (j) (j) (j)      (j) (j) (j) (j) (j)            (j) (j) (j) (j) <i
      -                          (j) 22 . &#xa9;&#xa9;              12
* I                                    ([
      - CD CD CD CD CD CD CD CD            23
* 73 @ . &#xa9;@                      @:                                              Ci
      - Q)Q)Q)Q)Q)Q)Q)Q)                    24 . &#xa9;&#xa9;              74 @&#xa9;
* 0 0 0 0 01I              0 0 0 0 0                      0 0 0 0 G::
      -                              2s @ e @            7s @e &#xa9;@
      - (0(0(0(0(0(0(0(0                    26 . &#xa9;&#xa9;              76  e &#xa9;@                7                        8                      Ii 9
      - @@@@@@@@                            21  e &#xa9;            n &#xa9; e                    Q                    Q    '                      Q    ([
      -                              28 @&#xa9;
* 1a e &#xa9;@                  G) G) G) G) G)            G) G) G) G) G)                  G) G) G) G) G::
      - @@@@@@@@                            29 @e &#xa9;              79  *                                                                      <?::
      -                              30 . &#xa9;&#xa9;              so @e &#xa9;@                                                                  ~
      - @@@@@@@@                            31
* s1 @e &#xa9;@                  &#xa9;&#xa9; &#xa9; &#xa9; &#xa9;                  &#xa9;&#xa9;&#xa9;&#xa9;&#xa9;                          &#xa9; &#xa9; &#xa9; &#xa9; <I
      -                              32 . &#xa9;&#xa9;              82 @. &#xa9;@                                                                      ('[
      -                              33
* 83 @&#xa9; *                                                                      (&sect;::
      - &#xa9;                            34 @&#xa9;*              84 ~ * &#xa9;                  (j) (j) (j) (j) (j)      (j) (j) (j) (j) (j)            (j) (j) (j) (j) (f__
      - @@@@@@@@                            35 @&#xa9;
* as &#xa9; *                      .                                              ([
      -                              36
* 86 @&#xa9; *                      ,g1I    'VI                                      @::
      - @@@@@@@@                            37 . &#xa9;&#xa9;              87
* 0 0 0 0 0\                0 0 0 0 0                      0 0 0 0        ~
      -                              38
* as * &#xa9;@
      - G)G)G)G)G)G)G)                      39
* 89 . &#xa9;@                10                      11                              12
      -                              4o @e &#xa9;@              go @ e @                  Q                    8                          8    ([
      - @@@@@@                            41 . &#xa9;&#xa9;              91
* G) G) G) G) G)            G) G) G) G) G)                  G) G) G) G) (&#xa3;
      - G) G) G) G) G) G) G) G)              42 @&#xa9;
* 92 . &#xa9;@                                                                      ([
      -                              43 . &#xa9;&#xa9;              93  *                                                                      @:
      -                              44 @&#xa9;
* 94  *                  &#xa9;&#xa9;&#xa9;&#xa9;&#xa9;                    &#xa9;&#xa9;&#xa9;&#xa9;&#xa9;                          &#xa9;&#xa9;&#xa9;&#xa9;~
      - &#xa9;&#xa9;&#xa9;&#xa9;&#xa9;&#xa9;&#xa9;&#xa9;                            45 @&#xa9;
* gs @&#xa9; a                                                                      ([
      -                              46  * &#xa9;            96  *                                                                      ([
      -                              47 . &#xa9;&#xa9;              97 . &#xa9;@                  (j) (j) (j) (j) (j)      (j) (j) (j) (j) (j)            (j) (j) (j) (j) (f
      - (j)(j)(j)(j)(j)(j)(j)(j)            48 . &#xa9;&#xa9;              98 . &#xa9;@                                                                      @:
      -                              49 @. &#xa9;&#xa9;              99 @&#xa9;
* e&:
      -                              so @e &#xa9;@            1oo @e &#xa9;@                    0 0 0 0 0                0 0.0 0 0                       0 0 0 0 f LXR-20020  Rev. 08/2013 15450                        Printed in U.SA Copyright &#xa9; 2010 LXR                                        To reorder call: 843-520-299}}

Latest revision as of 08:23, 29 November 2024

301 Final RO Written Exam (2-Year Delayed Release)
ML21174A078
Person / Time
Site: Browns Ferry  
Issue date: 06/23/2021
From:
Tennessee Valley Authority
To:
Division of Reactor Safety II
References
Download: ML21174A078 (78)


Text

ILT 2104 Written Exam 1

1.

With respect to Recirc Pump power supplies, which ONE of the following completes the statement below?

2B Recirc Pump is NORMALLY powered by Note: Unit Station Service Transformer (USST)

A.

USST 2A B.

USST 2B C. Start Bus 2A D. Start Bus 2B ML21174A078

ILT 2104 Written Exam 2

2.

Unit 1 is operating at 100% Rated Thermal Power (RTP) when the following conditions occur:

1A Reactor Recirculation Pump trips The crew is executing the actions of 1-AOI-68-1, Recirc Pump Trip/Core Flow Decrease Which ONE of the following completes the statement below?

Given the conditions above, the required action is to A. SCRAM the Reactor B. INSERT Control Rods to < 67.0% loadline C. INSERT Control Rods to < 74.0% loadline D. COMMENCE a normal Reactor Plant shut down

ILT 2104 Written Exam 3

3.

Unit 1 Anticipated Transient Without a SCRAM (ATWS) conditions exist with the following conditions:

1-EOI-1A, ATWS RPV Control is in progress Reactor Pressure is 950 psig 1-EOI Appendix-3A, SLC INJECTION in progress as indicated SLC SQUIB VALVE CONTINUITY LOST, (1-9-5B, WINDOW 20) alarms Given the conditions above, which ONE of the following completes the statement below regarding the status of the Standby Liquid Control (SLC) System?

SQUIB VALVE (1) has fired and SLC (2) injecting to the Reactor.

A. (1) A (2) is B. (1) A (2) is NOT C. (1) B (2) is D. (1) B (2) is NOT

ILT 2104 Written Exam 4

4.

Unit 1 is operating at 100% RTP with the following:

Which ONE of the following completes the statements below?

As a result of the above condition, indicated Main Generator Megawatts Electric (MWe) on Panel 1-9-5 will (1)

In accordance with the applicable Abnormal Operating Procedure (AOI), the correct Immediate Action is to reduce Reactor Power to less than or equal to (2)

A. (1) lower (2) 95%

B. (1) lower (2) 90%

C. (1) remain constant (2) 95%

D. (1) remain constant (2) 90%

ILT 2104 Written Exam 5

5.

Unit 2 was operating at 100% RTP when an event occurred, resulting in the following conditions:

A manual Reactor SCRAM was inserted Reactor Water Level lowered to (-) 30 inches Drywell Pressure is 2.85 psig HPCI automatically initiated and is injecting to the Reactor at 5300 gpm Given the conditions above, which ONE of the following completes the statement below in accordance with 2-OI-73, High Pressure Coolant Injection System?

HPCI automatically initiated due to (1) and is injecting into (2)

Feedwater System line.

A.

(1) High Drywell Pressure (2) B B.

(1) High Drywell Pressure (2) A C. (1) Low Reactor Water Level (2) B D. (1) Low Reactor Water Level (2) A

ILT 2104 Written Exam 6

6.

With regards to the Source Range Monitors (SRMs), which ONE of the following completes the statements below?

To fully WITHDRAW the SRMs from the Core, the DRIVE OUT pushbutton is required to be (1)

To fully INSERT the SRMs into the Core, the DRIVE IN pushbutton is required to be (2)

A. (1) momentarily depressed and released due to a seal-in contact (2) momentarily depressed and released due to a seal-in contact B. (1) momentarily depressed and released due to a seal-in contact (2) continuously depressed and held for the entire length of travel C. (1) continuously depressed and held for the entire length of travel (2) momentarily depressed and released due to a seal-in contact D. (1) continuously depressed and held for the entire length of travel (2) continuously depressed and held for the entire length of travel

ILT 2104 Written Exam 7

7.

The following conditions exist on Unit 2:

A LOCA is in progress Drywell Pressure is 2.2 psig and slowly rising Reactor Water Level is (-) 10 inches and slowly lowering Main Steam Tunnel Temperature is 180 ºF and slowly rising Given the conditions above, which ONE of the following completes the statement below?

PCIS Groups that HAVE received an isolation signal include Groups and 8.

A. 1, 2 B. 1, 5 C. 2, 6 D. 4, 5

ILT 2104 Written Exam 8

8.

Unit 2 is operating at 100% RTP when a Loss of Offsite Power occurs.

Given the conditions above, which ONE of the following completes the statements below?

The EDGs are required to start and tie onto their respective 4KV Shutdown Boards within (1) seconds.

The EECW Pumps will start (2) seconds after the EDGs re-energize the 4KV Shutdown Boards.

A. (1) 5 (2) 10 B. (1) 5 (2) 14 C. (1) 10 (2) 10 D. (1) 10 (2) 14

ILT 2104 Written Exam 9

9.

0-SR-3.8.1.1(D), Diesel Generator D Monthly Operability Test is in progress.

Which ONE of the following completes the statement below?

Prior to paralleling D EDG with the D 4KV Shutdown Board, EDG frequency is adjusted so that the synchroscope rotates slowly in the (1) direction and EDG voltage is adjusted to be (2)

Shutdown Board Voltage.

A. (1) slow (2) above B. (1) slow (2) equal to C. (1) fast (2) above D. (1) fast (2) equal to

ILT 2104 Written Exam 10 10.

A EDG has been started for testing and is being paralleled with Offsite Power in accordance with 0-OI-82, Standby Diesel Generator System.

Given the conditions above, which ONE of the following completes the statement below?

Prior to closing the respective EDG output breaker, the DG Mode Select Switch will be placed in the (1) position to prevent EDG (2)

A. (1) Units in Parallel (2) overload B. (1) Units in Parallel (2) overspeed C. (1) Parallel with System (2) overload D. (1) Parallel with System (2) overspeed

ILT 2104 Written Exam 11 11.

Unit 1 is operating at 100% RTP.

In accordance with OPDP-1, Conduct of Operations, which ONE of the following completes the statement below?

The OATC is required to conduct a panel walkdown a MINIMUM of once every A. hour B. 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> C. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> D. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />

ILT 2104 Written Exam 12 12.

Unit 1 is operating at 100% Rated Thermal Power (RTP) with the following conditions:

Loss of Offsite Power occurs A Emergency Diesel Generator (EDG) mechanically fails Subsequently:

Loss of Coolant (LOCA) occurs Reactor Water Level is (-) 130 inches and lowering Drywell Pressure is 10 psig and rising Reactor Pressure is 600 psig and lowering Give the conditions above, which ONE of the following completes the statements below?

RHR Pump 1C (1) automatically start.

Core Spray Pump 1C (2) automatically start.

A. (1) will (2) will B. (1) will (2) will NOT C. (1) will NOT (2) will D. (1) will NOT (2) will NOT

ILT 2104 Written Exam 13 13.

Which ONE of the following completes the statement below in accordance with NOTE

  1. 1 from 3-EOI-1, RPV CONTROL?

Following a Reactor SCRAM, the Unit 3 Reactor will remain subcritical WITHOUT boron under all conditions when __________.

A. All Control Rods are at position 02 B. Reactor Power is on range 7 of the IRMs and lowering C. All Control Rods are inserted to or beyond position 00 except two that are fully withdrawn D. Any 19 Control Rods are at notch 02 with all other Control Rods fully inserted

ILT 2104 Written Exam 14 14.

Unit 2 is operating at 100% RTP when an inadvertent closure of ALL MSIVs occurs.

Which ONE of the following completes the statement below?

Following the closure of the MSIVs, the digital Electro-Hydraulic Control (EHC) System will transfer to (1)

Pressure Control at (2)

A. (1) Reactor (2) 700 psig B. (1) Reactor (2) 955 psig C. (1) Header (2) 700 psig D. (1) Header (2) 955 psig

ILT 2104 Written Exam 15 15.

In accordance with Unit 2 ARPs, which ONE of the following, when alarming, requires that Operators ensure 2-FCV-66-28, OFFGAS SYSTEM ISOLATION VALVE, is CLOSED?

A.

B.

C.

D.

ILT 2104 Written Exam 16 16.

Unit 2 is operating at 100% RTP.

Which ONE of the following completes the statements below?

In accordance with OPDP-1, Conduct of Operations, when a High Drywell Pressure condition exists and continues to rise, the Operators are required to FIRST manually (1)

In accordance with BFN-ODM-4.20, Strategies for Successful Transient Mitigation, when Drywell Pressure reaches 2.2 psig, the reason a manual Reactor SCRAM is inserted is that (2)

A. (1) trip the Main Turbine, THEN insert a Reactor SCRAM (2) a pre-determined trigger value has been reached B. (1) trip the Main Turbine, THEN insert a Reactor SCRAM (2) an automatic Reactor SCRAM should have occurred C. (1) insert a Reactor SCRAM, THEN trip the Main Turbine (2) a pre-determined trigger value has been reached D. (1) insert a Reactor SCRAM, THEN trip the Main Turbine (2) an automatic Reactor SCRAM should have occurred

ILT 2104 Written Exam 17 17.

Unit 2 is operating at 21% RTP, when the Main Turbine trips.

Which ONE of the following completes the statements below?

Following a Main Turbine trip, the Extraction Non-Return Valves close in order to prevent Main Turbine (1)

. As a result of this transient, the Reactor (2)

SCRAM.

A. (1) overspeed (2) will B. (1) overspeed (2) will NOT C. (1) overheating (2) will D. (1) overheating (2) will NOT

ILT 2104 Written Exam 18 18.

Due to a fire on Unit 3, the Unit Operator is performing the Immediate Actions of 3-AOI-100-2, Control Room Abandonment and has reached the step to start the Unit 3 EDGs, when the following occurs:

PRIMARY CONTAINMENT N2 PRESSURE HIGH (3-9-3B, Window 10) alarms DRYWELL PRESSURE ABNORMAL (3-9-5B, Window 31) alarms Given the conditions above, which ONE of the following completes the statements below?

AT THE MOMENT the above alarms are received, the Unit 3 EDGs (1)

Reactor Water Level will be controlled at the Backup Control Panel using (2)

A. (1) must be manually started (2) High Pressure Coolant Injection (HPCI)

B. (1) must be manually started (2) Reactor Core Isolation Cooling (RCIC)

C. (1) will receive an automatic start signal (2) High Pressure Coolant Injection (HPCI)

D. (1) will receive an automatic start signal (2) Reactor Core Isolation Cooling (RCIC)

ILT 2104 Written Exam 19 19.

All three Units are operating at 100% RTP when the following conditions occur:

Emergency Equipment Cooling Water (EECW) Pump A3 is operating and subsequently trips EECW Pump C3 fails to start

NO Operator actions have been taken Given the conditions above, which ONE of the following completes the statements below in accordance with 0-OI-67, Emergency Equipment Cooling Water System?

0-FCV-67-53, EECW SYSTEM BACKUP WATER SUPPLY VALVE to the Control Air Compressors will automatically open when Raw Cooling Water (RCW) Header Pressure lowers below the setpoint of (1)

EECW Pumps A3 and C3 supply the (2) header of the EECW System.

A. (1) 15 psig (2) North B. (1) 15 psig (2) South C. (1) 30 psig (2) North D. (1) 30 psig (2) South

ILT 2104 Written Exam 20 20.

Unit 3 is in MODE 5 when a refueling accident results in the following:

REFUELING ZONE EXHAUST RADIATION HIGH (3-9-3A, Window 34) alarms Given the conditions above, which ONE of the following completes the statement below that describes the Unit 3 Ventilation System response?

(1)

Zone Ventilation System(s) isolate(s) and (2)

Zone dampers align to the Standby Gas Treatment System.

A. (1) ONLY the Refueling (2) ONLY the Refueling B. (1) ONLY the Refueling (2) BOTH the Refueling AND Reactor C. (1) The Refueling AND Reactor (2) ONLY the Refueling D. (1) The Refueling AND Reactor (2) BOTH the Refueling AND Reactor

ILT 2104 Written Exam 21 21.

Unit 2 suffered a small break LOCA with the following conditions:

2-EOI-2 Primary Containment Control, Suppression Pool Temperature leg is being executed Suppression Pool Temperature is 190 °F Given the conditions above, which ONE of the following completes the statement below?

In accordance with EOI Curve 3, Heat Capacity Temp Limit (HCTL), action is REQUIRED if Reactor Pressure reaches (1) when Suppression Pool Level is (2)

[REFERENCE PROVIDED]

A. (1) 500 psig (2) 17.5 feet B. (1) 500 psig (2) 16.5 feet C. (1) 700 psig (2) 17.5 feet D. (1) 700 psig (2) 16.5 feet

ILT 2104 Written Exam 22 22.

Regarding the power supplies to IRMs, which ONE of the following completes the statement below?

IRM Channels/Detectors __________.

A. C and G are powered from A channel + 24VDC System; D and H are powered from B channel + 24VDC System B. D and H are powered from A channel + 24VDC System; C and G are powered from B channel + 24VDC System C. C and G are powered from Division I, 250 VDC System; D and H are powered from Division II, 250 VDC System D. D and H are powered from Division I, 250 VDC System; C and G are powered from Division II, 250 VDC System

ILT 2104 Written Exam 23 23.

A Unit 2 LOCA has occurred and resulted in the following conditions:

2-PI-3-207A, REACTOR PRESSURE indicates 500 psig 2-LI-3-52 and 2-LI-3-62, RX WTR LEVEL ACCIDENT RANGE indicates

(-) 220 inches Given the conditions above, which ONE of the following completes the statements below?

Actual Reactor Water Level is (1)

Top of Active Fuel (TAF).

To help ensure accurate Reactor Water Level can be reported, 2-LI-3-52 and 2-LI-3-62 require the use of correction curves due to being calibrated at (2)

[REFERENCE PROVIDED]

A. (1) above (2) 0 psig / 212 °F B. (1) above (2) Normal Operating Pressure / Normal Operating Temperature C. (1) below (2) 0 psig / 212 °F D. (1) below (2) Normal Operating Pressure / Normal Operating Temperature

ILT 2104 Written Exam 24 24.

Unit 3 is operating at 100% RTP, when a LOCA occurs with the following conditions:

REACTOR LEVEL LOW ADS BLOWDOWN PERMISSIVE (3-9-3C, Window 3) alarms DRYWELL PRESSURE APPROACHING SCRAM (3-9-3B, Window 30) alarms Manual Reactor SCRAM was inserted ADS BLOWDOWN HIGH DRYWELL PRESSURE SEAL-IN (3-9-3C, Window 33) alarms REACTOR WATER LOW-LOW-LOW ECCS/ESF INITIATE (3-9-3C, Window 28) alarms RHR Pumps are NOT available Core Sprays Pumps failed to AUTOMATICALLY start Given the conditions above, which ONE of the following completes the statement below?

In accordance with the given Alarm Response Procedures, the Automatic Depressurization System (ADS) will automatically initiate, when the Operator has manually started (1)

Core Spray Pumps and a MINIMUM of (2) has elapsed.

A. (1) 3B AND 3C (2) 95 seconds B. (1) 3B AND 3C (2) 265 seconds C. (1) 3A AND 3B (2) 95 seconds D. (1) 3A AND 3B (2) 265 seconds

ILT 2104 Written Exam 25 25.

Unit 2 is at 85% Reactor Power when the following conditions occur:

2-XR-66-20, OG FLOW TO SIX HOUR HOLDUP VOLUME, is 100 scfm and rising CONDENSER A, B, OR C VACUUM LOW (2-9-7B, Window 17) alarms Given the conditions above, which ONE of the following completes the statements below?

In accordance with the associated ARP, the probable cause for the conditions above is (1)

In accordance with 2-AOI-47-3, Loss of Condenser Vacuum, the Unit Operator (UO) will be directed to (2) in an attempt to maintain Condenser Vacuum.

Note: Steam Jet Air Ejector (SJAE)

A. (1) SJAE stalling (2) reduce Reactor Power B. (1) SJAE stalling (2) start a Mechanical Vacuum Pump C. (1) Main Condenser air in-leakage (2) reduce Reactor Power D. (1) Main Condenser air in-leakage (2) start a Mechanical Vacuum Pump

ILT 2104 Written Exam 26 26.

In order to minimize off-site radioactive release levels, which ONE of the following completes the statements below?

Standby Gas Treatment System carbon bed filters (1) designed to remove iodine.

If required, ALL three trains of Standby Gas Treatment (2) be manually started from the Unit 3 Control Room.

A. (1) are (2) can B. (1) are (2) can NOT C. (1) are NOT (2) can D. (1) are NOT (2) can NOT

ILT 2104 Written Exam 27 27.

Unit 1 is operating at 100% RTP. The Instrument Mechanics (IMs) are setting up to perform maintenance in the Auxiliary Instrument Room, when a PCIS Group 6 Isolation occurs.

Given the conditions above, which ONE of the following completes the statements below?

The Drywell Blowers (1) running.

The Drywell (2) be vented via the NORMAL vent path in accordance with 1-AOI-64-1, Drywell Pressure and/or Temperature High, or Excessive Leakage Into Drywell.

A. (1) are (2) can B. (1) are (2) can NOT C. (1) are NOT (2) can D. (1) are NOT (2) can NOT

ILT 2104 Written Exam 28 28.

Which ONE of the following completes the statement below in accordance with EOI-3, Secondary Containment Control Program Manual?

Emergency Depressurization is required when any Secondary Containment Temperature exceeds its MAXIMUM SAFE value in (1) area(s) to place the Primary System in its lowest energy state by rejecting heat to the (2)

A. (1) ONLY one (2) Main Condenser B. (1) ONLY one (2) Suppression Pool C. (1) two OR more (2) Main Condenser D. (1) two OR more (2) Suppression Pool

ILT 2104 Written Exam 29 29.

Which ONE of the following completes the statements below in accordance with EOI-3, Secondary Containment Control?

A Reactor Building Floor Drain Sump Water Level of 67 inches (1) require EOI-3 entry.

Given this condition, an alarm will FIRST be indicated in the (2)

Control Room.

A. (1) does (2) Main B. (1) does (2) Radwaste C. (1) does NOT (2) Main D. (1) does NOT (2) Radwaste

ILT 2104 Written Exam 30 30.

Unit 1 was operating at 100% RTP when a LOCA occurred resulting in the following conditions:

Reactor Pressure is 400 psig Reactor Water Level is (-) 140 inches and slowly lowering Given the conditions above, which ONE of the following completes the statement below?

1-FCV-74-52, RHR SYSTEM I LPCI OUTBOARD INJECTION VALVE is (1) and 1-FCV-74-7, RHR SYSTEM I MINIMUM FLOW VALVE is (2)

A. (1) open (2) open B. (1) open (2) closed C. (1) closed (2) open D. (1) closed (2) closed

ILT 2104 Written Exam 31 31.

Which ONE of the following completes the statements below?

In accordance with 3-OI-73, High Pressure Coolant Injection System (HPCI), operating the HPCI Turbine below a MINIMUM of (1) should be minimized to prevent system damage.

If HPCI trips on an overspeed condition with a valid initiation signal, the overspeed trip (2)

A. (1) 2100 rpm (2) will automatically reset B. (1) 2100 rpm (2) must be manually reset C. (1) 2400 rpm (2) will automatically reset D. (1) 2400 rpm (2) must be manually reset

ILT 2104 Written Exam 32 32.

Which ONE of the following completes the statements below in accordance with the associated ARP?

CORE SPRAY SYSTEM II SPARGER BREAK (2-9-3F, Window 31)

Core Spray Sparger break detection is used to detect a possible Core Spray System piping break inside the Reactor Vessel, (1) to the Core Shroud.

Due to break detection instrumentation design, the given annunciator (2) be sealed in during normal cold shutdown conditions on a Unit.

A. (1) external (2) would B. (1) external (2) would NOT C. (1) internal (2) would D. (1) internal (2) would NOT

ILT 2104 Written Exam 33 33.

Unit 1 has suffered a loss of the Service Air System.

Given the condition above, which ONE of the following completes the statement below?

The loss of Service Air will on the SLC System Storage Tank.

A. have no effect B. cause a loss of level indication ONLY C. cause a loss of mixing capability ONLY D. cause a loss of level indication AND a loss of mixing capability

ILT 2104 Written Exam 34 34.

Unit 2 is operating at 100% RTP with the following conditions:

2A Reactor Protection System (RPS) Motor Generator (MG) trips REACTOR PROTECTION 120V POWER SYSTEM ABNORMAL (2-9-5B, Window 10) alarms Given the conditions above, which ONE of the following completes the statements below?

(1)

RPS logic channels are impacted. As a result, a (2) occurs.

A. (1) A1 and A2 ONLY (2) Full SCRAM B. (1) A1 and A2 ONLY (2) Half-SCRAM ONLY C. (1) A1, A2 AND A3 (2) Full SCRAM D. (1) A1, A2 AND A3 (2) Half-SCRAM ONLY

ILT 2104 Written Exam 35 35.

Unit 2 is in MODE 2 with the following conditions:

All IRMs are on Range 4 During Control Rod withdrawal the following IRM indications are noted:

IRM E - 108/125 IRM F - 118/125 IRM H - 117/125 Given the conditions above, which ONE of the following describes the response of RPS and/or the Reactor Manual Control System (RMCS) to these conditions?

A. Full SCRAM B. Rod Block ONLY C. RPS A Rod Block and Half SCRAM D. RPS B Rod Block and Half SCRAM

ILT 2104 Written Exam 36 36.

Unit 2 is operating at 100% RTP under NORMAL conditions.

Which ONE of the following completes the statement below?

Given the conditions above, Suppression Pool Water Level shall be greater than or equal to in accordance with Technical Specification (Tech Spec) 3.6.2.2, Suppression Pool Water Level.

A. (-) 5.50 inches B. (-) 6.00 inches C. (-) 6.25 inches D. (-) 7.25 inches

ILT 2104 Written Exam 37 37.

Unit 1 is operating at 100% RTP with the following conditions:

APRM HIGH/INOP OR OPRM TRIP (1-9-5A, Window 25) alarms The Operator responds to find APRM 3 as indicated:

In accordance with 1-OI-92B, Average Power Range Monitoring, which ONE of the following completes the statement below?

Given the conditions above, a trip output is sent to (1) of the Voter Logic Modules and APRM 3 (2) be bypassed.

A. (1) ALL (2) can B. (1) ALL (2) can NOT C. (1) ONLY 1 (2) can D. (1) ONLY 1 (2) can NOT

ILT 2104 Written Exam 38 38.

Which ONE of the following completes the statement below?

During accident conditions, 2-FSV-43-40, PASS SAMPLE RETURN INBOARD ISOLATION VALVE can be operated from the Main Control Room Panel 2 (1) and (2) isolate on a PCIS Group 6 Isolation.

Note: PCIS - Primary Containment Isolation System A.

(1) 5 (2) will B.

(1) 5 (2) will NOT C. (1) 54 (2) will D. (1) 54 (2) will NOT

ILT 2104 Written Exam 39 39.

Unit 1 is operating at 100% RTP when a LOCA occurs in the Drywell, with the following conditions:

A manual Reactor SCRAM was inserted Primary Containment Isolation System (PCIS) Groups 2, 3, 6, and 8 have successfully isolated Given the conditions above, which ONE of the following completes the statements below?

The Reactor Water Cleanup (RWCU) System isolated on (1)

As a result of the RWCU Group Isolation signal, 1-FCV-69-12, RWCU RETURN ISOLATION VALVE (2) automatically close.

A. (1) 2.45 psig Drywell Pressure (2) will B. (1) 2.45 psig Drywell Pressure (2) will NOT C. (1) (+) 2 inches Reactor Water Level (2) will D. (1) (+) 2 inches Reactor Water Level (2) will NOT

ILT 2104 Written Exam 40 40.

Unit 3 is operating at 100% RTP, when a fault occurs on the Unit 3 Main Transformer.

Given the conditions above, which ONE of the following correctly describes the transfer scheme for 4KV Unit Boards 3A and 3B?

A. 4KV Unit Boards 3A AND 3B will remain de-energized until the alternate feeder breakers are MANUALLY closed.

B. 4KV Unit Boards 3A AND 3B will FAST transfer to alternate AND must be MANUALLY transferred to normal after power is restored.

C. 4KV Unit Boards 3A AND 3B will FAST transfer to alternate AND will AUTOMATICALLY transfer back to normal after power is restored.

D. 4KV Unit Boards 3A AND 3B will SLOW transfer to alternate AND must be MANUALLY transferred to normal after power is restored.

ILT 2104 Written Exam 41 41.

Which ONE of the following completes the statements below in accordance with 1-EOI Appendix-1D, Insert Control Rods Using Reactor Manual Control System?

Rod Worth Minimizer (RWM) (1) required to be bypassed.

IF the Reactor SCRAM or ARI CANNOT be reset, THEN 1-SHV-085-586, CHARGING WATER ISOLATION VALVE is required to be (2) to manually drive Control Rods.

A. (1) is (2) CLOSED B. (1) is (2) OPEN C. (1) is NOT (2) CLOSED D. (1) is NOT (2) OPEN

ILT 2104 Written Exam 42 42.

In accordance with 0-OI-48, Integrated Computer System (ICS), which ONE of the following completes the statement below?

The Safety Parameter Display System (SPDS) component of ICS (1) qualified as independent, decision-making instrumentation for operating the plant and will display parameters in (2) when the input data is BAD.

A. (1) is (2) yellow B. (1) is (2) blue C. (1) is NOT (2) yellow D. (1) is NOT (2) blue

ILT 2104 Written Exam 43 43.

Unit 3 is operating at 100% RTP with the following conditions:

RECIRC DRIVE 3A DRIVE ALARM (3-9-4A, Window 32) alarms Given the conditions above, which ONE of the following completes the statements below in accordance with 3-OI-68, Reactor Recirculation System?

If the alarm is due to a power cell experiencing a Direct Current (DC) bus undervoltage, the Variable Frequency Drives (VFD) affected cell (1) bypass.

Once the respective cell is bypassed, the affected Recirc Pump will experience a speed drop of approximately (2)

A. (1) will automatically (2) 200 rpm B. (1) will automatically (2) 345 rpm C. (1) requires a manual (2) 200 rpm D. (1) requires a manual (2) 345 rpm

ILT 2104 Written Exam 44 44.

Currently, Unit 2 is operating at 25% RTP when the following conditions occur:

REACTOR FEEDWATER CONTROL SYSTEM TROUBLE (2-9-6C, Window 28) alarms REACTOR WATER LEVEL ABNORMAL (2-9-5A, Window 8) alarms Reactor Feedwater Pump (RFPT) speeds are rising Reactor Water Level is rising at a rate of 3 inches per minute

NO Operator actions have been taken Which ONE of the following completes the statements below?

Given the conditions above, 4 minutes later, the Main Turbine (1) automatically tripped.

The Reactor Water Level Instruments that cause the Main Turbine Trip are 2-LI (2)

Note: 2-LI-3-203A-D, REACTOR WATER LEVEL NORMAL RANGE 2-LI-3-208A-D, REACTOR WATER LEVEL NARROW RANGE A. (1) has (2) 203A-D B. (1) has (2) 208A-D C. (1) has NOT (2) 203A-D D. (1) has NOT (2) 208A-D

ILT 2104 Written Exam 45 45.

With respect to the MAXIMUM SAFE radiation value for Traversing Incore Probe (TIP),

which ONE of the following completes the statements below?

If the MAXIMUM SAFE value for 2-RI-90-22A, TIP ROOM EL 565 RX BLDG is reached during TIP operation with the probes outside their shields, then automatic withdrawal to the in-shield position (1) occur.

A Group 8 Isolation (2) directly caused by the TIP Room MAXIMUM SAFE Value.

A. (1) will (2) is B. (1) will (2) is NOT C. (1) will NOT (2) is D. (1) will NOT (2) is NOT

ILT 2104 Written Exam 46 46.

Unit 1 is operating at 100% RTP with the following conditions:

ROD BLOCK MONITOR HIGH/INOP (1-9-5A, Window 24) alarms In accordance with 1-OI-92C, Rod Block Monitor, which ONE of the following completes the statement below?

The Rod Block Monitor (RBM) HIGH setpoint is (1)

If the Panel 1-9-14 RBM Chassis Mode Switch is NOT in OPERATE, a Control Rod Block (2) occur.

A. (1) 109.2%

(2) will NOT B. (1) 109.2%

(2) will C. (1) 119%

(2) will NOT D. (1) 119%

(2) will

ILT 2104 Written Exam 47 47.

Unit 2 was operating at 100% RTP when a LOCA occurred.

Subsequently, All Drywell Sprays have failed 2-FCV-64-222, HARDENED CONTAINMENT VENT OUTBOARD VALVE, failed in the CLOSED position The preferred vent path is NOT available.

Which ONE of the following completes the statement below?

In accordance with 2-EOI Appendix-13, Emergency Venting Primary Containment, the containment vent path will be from the (1) and Reactor Building ventilation ductwork failure (2) expected.

A. (1) Drywell (2) is B. (1) Drywell (2) is NOT C. (1) Suppression Chamber (2) is D. (1) Suppression Chamber (2) is NOT

ILT 2104 Written Exam 48 48.

The following conditions exist on Unit 3:

3-HS-99-5A-S1, REACTOR MODE SWITCH is in REFUEL

ALL Control Rods are inserted The Refueling Bridge Operator grappled a fuel bundle and raised the grapple The fuel bundle was then moved towards the Reactor Core In accordance with 0-GOI-100-3A, Refueling Operations (In-Vessel Operations), which ONE of the following completes the statement below?

Given the conditions above, as the Refueling Bridge moves towards the Reactor Core, it (1) the Core AND a Control Rod Block (2) occur.

A. (1) continues over (2) will B. (1) continues over (2) will NOT C. (1) stops before it reaches (2) will D. (1) stops before it reaches (2) will NOT

ILT 2104 Written Exam 49 49.

In accordance with 0-OI-57D, DC Electrical System, which ONE of the following completes the statements below concerning the 2B 250V Battery Charger?

The 2B 250V Battery Charger (1) be aligned to supply Battery Board 5.

There is a/an (2) interlock that prevents the 2B 250V Battery Charger from supplying more than one Battery Board at a time.

A. (1) can (2) electrical B. (1) can (2) mechanical C. (1) can NOT (2) electrical D. (1) can NOT (2) mechanical

ILT 2104 Written Exam 50 50.

Unit 1 is operating at 100% RTP with the following conditions:

MAIN TURBINE VIBRATION HIGH (1-9-7B, Window 32) alarms The Balance of Plant Operator (BOP) observes vibration on Journal Bearing # 4 reading 8 mils and Journal Bearing # 5 at 7.5 mils BOTH Journal Bearing vibration levels are rising at a rate of 2 mils per minute Which ONE of the following completes the statement below?

Given the conditions above, the EARLIEST time the Main Turbine MUST be tripped is

__________ in accordance with the associated ARP.

A. immediately B. in 2 minutes C. in 4 minutes D. in 15 minutes

ILT 2104 Written Exam 51 51.

Unit 1 is operating at 100% RTP with the following conditions:

BATTERY BOARD 1 BREAKER TRIPOUT OR GROUND (1-9-8C, Window 7) alarms 250V REACTOR MOV BOARD 1A UNDERVOLTAGE (1-9-8C, Window 4) alarms Battery Board 1, 250V RMOV Board 1A Normal Feeder Breaker tripped

NO Operator actions have been taken Which ONE of the following completes the statement below in accordance with 1-AOI-57-11, Loss of Power to an ECCS ATU Panel / ECCS Inverter?

Given the conditions above, 250V DC RMOV Board 1A provides (1) to the respective ECCS Analog Trip Unit (ATU) AND (2)

ECCS ATU is de-energized.

A. (1) ONLY one power source (2) Division I, Panel 1-9-81 B. (1) ONLY one power source (2) Division II, Panel 1-9-82 C. (1) BOTH the normal AND redundant power sources (2) Division I, Panel 1-9-81 D. (1) BOTH the normal AND redundant power sources (2) Division II, Panel 1-9-82

ILT 2104 Written Exam 52 52.

Unit 2 is operating at 100% RTP when a Control Air leak develops, resulting in header pressure lowering to 25 psig.

Given the condition above, which ONE of the following completes the statements below?

The (1)

Main Steam Isolation Valves (MSIVs) are CLOSED.

In accordance with 2-AOI-32-2, Loss of Control Air, (2) is aligned to re-open the MSIVs.

A. (1) outboard (2) Drywell Control Air B. (1) outboard (2) Containment Atmosphere Dilution (CAD)

C. (1) inboard (2) Drywell Control Air D. (1) inboard (2) Containment Atmosphere Dilution (CAD)

ILT 2104 Written Exam 53 53.

Unit 2 is in MODE 4 when the RHR Pump in service for Shutdown Cooling trips.

Subsequently, Shutdown Cooling flow is being restored to remove decay heat.

Which ONE of the following completes the statement below?

Given the conditions above, the MINIMUM required RHR Shutdown Cooling pump flowrate is __________ in accordance with 2-AOI-74-1, Loss of Shutdown Cooling.

A. 1500 gpm B. 3500 gpm C. 6250 gpm D. 7000 gpm

ILT 2104 Written Exam 54 54.

Which ONE of the following completes the statement below?

When Drywell Temperature reaches (1) entry into EOI-2, Primary Containment Control is required.

In accordance with EOI-2, the Reactor is required to be SCRAMMED in preparation for spraying the Drywell before Drywell Temperature rises to (2)

A. (1) 150 ºF (2) 200 ºF B. (1) 150 ºF (2) 280 ºF C. (1) 160 ºF (2) 200 ºF D. (1) 160 ºF (2) 280 ºF

ILT 2104 Written Exam 55 55.

In accordance with the EOI Appendices, which ONE of the following completes the statements below with respect to restoring Secondary Containment VENTILATION?

High Radiation Isolation signals (1) be bypassed.

Upon entering EOI-3, Secondary Containment Control, the respective ventilation isolations are bypassed to restore (2)

A. (1) can NOT (2) Reactor Zone Ventilation ONLY B. (1) can NOT (2) Reactor Zone Ventilation AND Refuel Zone Ventilation C. (1) can (2) Reactor Zone Ventilation ONLY D. (1) can (2) Reactor Zone Ventilation AND Refuel Zone Ventilation

ILT 2104 Written Exam 56 56.

Unit 1 is being shut down for an outage with the following conditions:

1-HS-99-5A-S1, REACTOR MODE SWITCH is in SHUTDOWN Reactor Vessel Head Closure Bolts are still fully tensioned Residual Heat Removal (RHR) Loop I is in Shutdown Cooling Subsequently, a complete Loss of Shutdown Cooling occurs resulting in the following:

TIME Reactor Coolant Temperature (°F) 0800 110 °F 0802 114 °F 0804 118 °F Given the conditions above, which ONE of the following completes the statements below?

The current Heatup Rate (1) within the limit specified in Tech Spec 3.4.9, RCS Pressure and Temperature Limits?

Given that all other associated MODE requirements remain unchanged and based upon the constant trend (2) is the EARLIEST time that Unit 1 will enter MODE 3 due to the rising Reactor Coolant Temperature.

A. (1) is (2) 0852 B. (1) is (2) 0845 C. (1) is NOT (2) 0852 D. (1) is NOT (2) 0845

ILT 2104 Written Exam 57 57.

Unit 2 has experienced a loss of 250 VDC RMOV BOARD 2B.

Which ONE of the following statements below describes the effect on the RCIC system?

A.

ONLY the RCIC Flow Controller would fail downscale.

B. RCIC will NOT automatically INITIATE upon a valid signal.

C. RCIC will NOT automatically ISOLATE upon a valid signal.

D. RCIC will initiate upon a valid signal and ONLY trip on High Reactor Water Level.

ILT 2104 Written Exam 58 58.

In accordance with 1-OI-1, Main Steam System, which ONE of the following completes the statement below?

Main Steam Tunnel Temperature should NOT be allowed to exceed a MAXIMUM of (1)

(2)

A. (1) 170 °F (2) to prevent MSIV isolation B. (1) 170 °F (2) due to environmental qualification requirements C. (1) 189 °F (2) to prevent MSIV isolation D. (1) 189 °F (2) due to environmental qualification requirements

ILT 2104 Written Exam 59 59.

All three Units are operating at 100% RTP with the following conditions:

240V Lighting Board 2A is tagged out of service for scheduled work Electrical fault causes 240V Lighting Board 3B to de-energize Given the conditions above, which ONE of the following completes the statement below?

The Plant Preferred Motor Generator will start (1) and energize (2)

A. (1) immediately (2) ONLY Battery Board 2 Panel 14 B. (1) immediately (2) Panel 9-9 Cabinet 4 on ALL three Units C. (1) after a 6-second time delay (2) ONLY Battery Board 2 Panel 14 D. (1) after a 6-second time delay (2) Panel 9-9 Cabinet 4 on ALL three Units

ILT 2104 Written Exam 60 60.

Unit 1 is operating at 100% RTP when a Control Air leak develops, resulting in the following conditions:

CONTROL AIR DRYER DISCHARGE PRESSURE LOW (1-9-20, Window 32) alarms SERVICE AIR CROSSTIE VALVE OPEN (1-9-20, Window 30) alarms Control Air Pressure is currently 69 psig and slowly lowering Given the conditions above, which ONE of the following completes the statement below?

0-FCV-33-1, SERVICE AIR CROSSTIE VALVE opened at (1)

Control Air Pressure and a manual Reactor SCRAM (2)

CURRENTLY required in accordance with 0-AOI-32-1, Loss of Control and Service Air Compressors.

A. (1) 70 psig (2) is B. (1) 70 psig (2) is NOT C. (1) 85 psig (2) is D. (1) 85 psig (2) is NOT

ILT 2104 Written Exam 61 61.

In accordance with 2-OI-27, Condenser Circulating Water (CCW) System, which ONE of the following completes the statements below?

CCW Pump Discharge Valves (1)

OPEN when its respective CCW Pump is started.

If a CCW Pump is stopped or tripped when other CCW Pumps remain running, the associated CCW Pump Discharge Valves (2)

CLOSE.

A. (1) automatically (2) automatically B. (1) automatically (2) must be manually taken to C. (1) must be manually taken to (2) automatically D. (1) must be manually taken to (2) must be manually taken to

ILT 2104 Written Exam 62 62.

A Reactor Startup is in progress on Unit 2 with Control Rod 30-31 selected.

In accordance with 2-OI-85, Control Rod Drive System, which ONE of the following completes the statements below?

A white light on (1) indicates that Control Rod 30-31 is selected.

If required, to de-select Control Rod 30-31, the OATC will (2)

A. (1) the Control Rod Select Matrix ONLY (2) depress 2-XS-85-40, Control Rod 30-31 Select Switch B. (1) the Control Rod Select Matrix ONLY (2) cycle 2-HS-85-46, CRD Power Switch OFF and then ON C. (1) the Control Rod Select Matrix AND the Full Core Display (2) depress 2-XS-85-40, Control Rod 30-31 Select Switch D.

(1) the Control Rod Select Matrix AND the Full Core Display (2) cycle 2-HS-85-46, CRD Power Switch OFF and then ON

ILT 2104 Written Exam 63 63.

An event occurred, resulting in 0-RM-90-259A, CONTROL ROOM VENTILATION RADIATION MONITOR, failing UPSCALE and 0-RM-90-259B reading 120 counts per minute.

Which ONE of the following predicts how the Main Control Room ventilation systems will respond?

Note: Control Room Emergency Ventilation System (CREV)

A. NO Control Room Ventilation isolation; NEITHER CREV fan auto starts.

B. ALL three Units Control Room Ventilation Systems isolate and BOTH CREV fans auto start.

C. ALL three Units Control Room Ventilation Systems isolate and ONLY the selected CREV fan auto starts.

D. ONLY Unit 1 and 2 Control Room Ventilation Systems isolate and ONLY the selected CREV fan auto starts.

ILT 2104 Written Exam 64 64.

In accordance with Reactor Pressure Safety Limits, which ONE of the following completes the statements below?

The Reactor Steam Dome Pressure Safety Limit is (1)

If violated, the REQUIRED ACTION is to restore Reactor Steam Dome Pressure Safety Limit compliance and insert ALL insertable Control Rods within (2)

A. (1) 1325 psig (2) 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> B. (1) 1325 psig (2) 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> C. (1) 1375 psig (2) 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> D. (1) 1375 psig (2) 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />

ILT 2104 Written Exam 65 65.

With respect to the Unit 3 Reactor Feedwater Control System (RFWCS), which ONE of the following completes the statements below.

The normal power supply to the RFWCS Panel Display Station (PDS) on Panel 3-9-5 is (1)

. If the normal power supply is lost to the PDS, RFWCS (2)

A. (1) Unit Preferred (2) CONTINUES control at the last known Reactor Water Level setpoint B. (1) Unit Preferred (2) MUST be transferred to manual C. (1) Plant Preferred (2) CONTINUES control at the last known Reactor Water Level setpoint D. (1) Plant Preferred (2) MUST be transferred to manual

ILT 2104 Written Exam 66 66.

In accordance with BFN-ODM-4.5, Operator Aids and Operator Information Systems, which ONE of the following completes the statement below regarding system status?

During a Main Control Room panel walk down, the Operator determines that a system is aligned correctly when the NORMALLY RUNNING pumps have a (1) red lens cover and the NORMALLY CLOSED valves have a (2) red lens cover.

A. (1) clear (2) diffused B. (1) clear (2) clear C. (1) diffused (2) diffused D. (1) diffused (2) clear

ILT 2104 Written Exam 67 67.

Which ONE of the following sets of conditions satisfies the Tech Spec definition of MODE 2?

A. A Reactor SCRAM has just occurred. The MODE SWITCH is in SHUTDOWN.

Moderator Temperature is 480º F. The MSlVs are closed.

B. The Reactor is shutdown. The MODE SWITCH is in START&HOT STBY.

Moderator Temperature is 180º F. All Control Rods are fully inserted.

C. Preparations are in progress for a Reactor Startup. The MODE SWITCH is in SHUTDOWN. Moderator Temperature is 135º F. All Control Rods are fully inserted.

D. The Reactor is shutdown. The MODE SWITCH is in REFUEL. Moderator Temperature is 140º F. All Reactor Vessel Head Closure Bolts are NOT fully tensioned.

ILT 2104 Written Exam 68 68.

Given the following drawing excerpt of Unit 2 RCIC Initiation Logic, which ONE of the following completes the statements below in accordance with 2-45E626-1, Wiring Diagram, RCIC System Schematic Diagram?

The four primary contacts in the Reactor Vessel Low Water Level portion of the circuit are actuated directly by (1)

System Relays.

On a RCIC automatic initiation signal, if relay 13A-K3 fails to energize, the RCIC AUTO-INITIATE light, shown here, (2)

[SEE THE ATTACHED RCIC DRAWING, 2-45E626-1]

A. (1) RHR (2) will illuminate B. (1) RHR (2) will NOT be illuminated C. (1) RCIC (2) will illuminate D. (1) RCIC (2) will NOT be illuminated

ILT 2104 Written Exam 69 69.

Which ONE of the following meets the requirements to be considered an "Infrequently Performed Test or Evolution" (IPTE) per NPG-SPP-10.6, Infrequently Performed Test or Evolution?

A. 1-SR-3.5.1.7(COMP), HPCI Comprehensive Pump Test B. 2-SR-3.5.1.6(RHR I), Quarterly RHR System Rated Flow Test Loop I C. 0-SR-3.8.1.9(A), Diesel Generator A Emergency Unit 1 Load Acceptance Test D. 0-GOI-300-4, Switchyard Manual, Switching Order to remove the West Point 500KV line

ILT 2104 Written Exam 70 70.

With respect to Area Radiation Monitors (ARMs), which ONE of the following completes the statements below?

ARMs are individual detectors that provide indications and alarms in the Main Control Room (MCR) with an amber HIGH light that will FIRST illuminate when the MAXIMUM (1) radiation value has been reached.

(2) of the ARMs on MCR Panel 9-11 REQUIRE EOI entry.

A. (1) SAFE (2) All B. (1) SAFE (2) NOT all C. (1) NORMAL (2) All D. (1) NORMAL (2) NOT all

ILT 2104 Written Exam 71 71.

Which ONE of the following completes the statement below during an emergency?

In accordance with EPIP-15, Emergency Exposure, Site Emergency Director (SED) must approve a worker exceeding an exposure GREATER than Total Effective Dose Equivalent (TEDE) to save a life or avoid extensive exposure to large populations.

A. 2 rem B. 5 rem C. 10 rem D. 25 rem

ILT 2104 Written Exam 72 72.

Determine which ONE of the following indications would be observed for an Area Radiation Monitor (ARM) when the detector is SATURATED in a radiation field.

A. The indicator remains upscale BUT all trips drop out.

B. The indicator drops downscale AND the trips drop out except for the downscale trip.

C. The indicator remains upscale AND the upscale trip remains in due to the pegging circuit.

D. The indicator drops downscale BUT the upscale trip remains in due to the pegging circuit.

ILT 2104 Written Exam 73 73.

A fire has been reported in the Unit 1 Reactor Building and 0-AOI-26-1, Fire Response, has been entered.

Which ONE of the following completes the statements below?

In accordance with the AOI, the AUOs will INITIALLY report to (1)

If a Standby Gas Train is operated to remove smoke, that train (2)

A. (1) their assigned Control Room (2) remains OPERABLE B. (1) their assigned Control Room (2) will be considered INOPERABLE C. (1) the Incident Commander for damper realignment (2) remains OPERABLE D. (1) the Incident Commander for damper realignment (2) will be considered INOPERABLE

ILT 2104 Written Exam 74 74.

An electrical fire is reported in A Diesel Generator room.

Which ONE of the following completes the statement below in accordance with the Fire Protection Requirements Manual?

The installed fire suppression system that is effective for this classification of fire and available in this room is __________.

A. Halon agent - Manual initiation ONLY B. Carbon Dioxide agent - Manual initiation ONLY C. Halon agent - Manual OR Automatic initiation D. Carbon Dioxide agent - Manual OR Automatic initiation

ILT 2104 Written Exam 75 75.

Unit 2 is operating at 100% RTP with the following conditions:

BATTERY BOARD 2 Volts (2-EI-57-37) indicates 245V DC BATTERY BOARD 2 Amps (2-EI-57-38) indicates

(+) 120 amps Which ONE of the following completes the statements below?

Battery #2 is currently (1)

Battery Board 2 Voltage (2) within the MINIMUM OPERATING voltage requirement specified in 0-OI-57D, DC Electrical System.

A. (1) discharging (2) is B. (1) discharging (2) is NOT C. (1) being charged (2) is D. (1) being charged (2) is NOT

RO-1 BFN ILT 2104 RO References REFERENCE PROVIDED to candidate 3.

Panel 1-9-5, 1-LI-63-1A, SLC Storage Tank Level and 1-PI-63-7A, SLC Pump Discharge Pressure and 1-HS-63-6A, SLC Pump 1A/1B Pump/light indications and 1-ZI-63-8A/B, SLC Valve A/B Continuity lights and 1-IL-63-11, SLC Flow light indication. SLC SQUIB VALVE CONTINUITY LOST, (1-9-5B, WINDOW 20)

4. 1-FMT-1-4, SRV TAILPIPE FLOW MONITOR DRAWING
18. PRIMARY CONTAINMENT N2 PRESSURE HIGH (3-9-3B, Window 10)

DRYWELL PRESSURE ABNORMAL (3-9-5B, Window 31)

20. REFUELING ZONE EXHAUST RADIATION HIGH (3-9-3A, Window 34)
21. 2-EOI-2, Curve 3 - Heat Capacity Temperature Limit
23. 2-LI-3-52 & 62 CORRECTION CURVES, PIP 95-64 (without legend)
24. REACTOR LEVEL LOW ADS BLOWDOWN PERMISSIVE (3-9-3C, Window 3),

DRYWELL PRESSURE APPROACHING SCRAM (3-9-3B, Window 30), ADS BLOWDOWN HIGH DRYWELL PRESSURE SEAL-IN (3-9-3C, Window 33), RX WTR LOW-LOW-LOW ECCS/ESF INITIATE (3-9-3C, Window 28)

25. CONDENSER A, B, OR C VACUUM LOW (2-9-7B, Window 17)
32. CORE SPRAY SYSTEM II SPARGER BREAK (2-9-3F, Window 31)
34. REACTOR PROT 120V PWR SYS ABNORMAL (2-9-5B, Window 10)
37. APRM HIGH/INOP OR OPRM TRIP (1-9-5A, Window 25), APRM 3 drawer screen indication for INOP STATUS
43. RECIRC DRIVE 3A DRIVE ALARM (3-ARP-9-4A, Window 32)
44. REACTOR FEEDWATER CONTROL SYSTEM TROUBLE (2-9-6C, Window 28),

REACTOR WATER LEVEL ABNORMAL (2-9-5A, Window 8)

46. ROD BLOCK MONITOR HIGH/INOP (1-9-5A, Window 24)
50. MAIN TURBINE VIBRATION HIGH (1-9-7B, Window 32)
51. BATTERY BOARD 1 BREAKER TRIPOUT OR GROUND (1-9-8C, Window 7), 250V REACTOR MOV BOARD 1A UNDERVOLTAGE (1-9-8C, Window 4)

RO-2

56. Reactor Coolant Temperature and Time Table
60. CONTROL AIR DRYER DISCH PRESSURE LOW (1-9-20B, Window 32), SERVICE AIR XTIE VLV OPEN (1-9-20B, Window 30)
68. Excerpt from RCIC Drawing, 2-45E626-1, Panel 2-9-3 with 2-IL-71-52, RCIC Auto-Initiation light
75. Panel 2-9-8, BATTERY BOARD 2 Volts (2-EI-57-37) and Amps (2-EI-57-38)

Test:..ICT 2/-e>y,zv/Zc LXR*TEST' Response Form Class: _________

LXR-20020 Side 1 Instructor:. ________

READ CAREFULLY!

OK NOT OK

-~

~ Use No. 2 black pencil only.

~ Mark responses darkly and fill completely.

~ Erase unwanted marks clear!.

Name:_

_...._l<~e

....___,;I Signature: -----,.---,------

Date: __ ~S--/~Z~O::=--/ =-z i>

=----=-2 _,_/ _

~ Do NOT make any stray marks on the page.

~ No credit will be given for improper marks.

~ If Side 2 is used, fill in ID on both sides.

SECTION 1 --~

  • IL*~*-

G)G)G)G)G)G)G)G)

©©©©©©©© (j)(j)(j)(j)(j)(j)(j)(j)

Version C1C2C3C4 G)

©©©©©©©©

@@@@@©©@

©

@@©@

(j)

CD CD CD CD CD CD CD CD Q)Q)Q)Q)Q)Q)Q)Q)

(0(0(0(0(0(0(0(0

© G)G)G)G)G)G)G)

G) G) G) G) G) G) G) G)

©©©©©©©© (j)(j)(j)(j)(j)(j)(j)(j)

LXR-20020 Rev. 08/2013 15450 T F 1* ©© 2* © 3* ©© 4@. ©© s @e ©@

6

  • 1*

a©*

9@©

  • 10
  • 11 * ©© 12 e © 13 ©
  • 14
  • 1s ©e 16
  • 11 e © 1s @e ©@

19

  • 2o e ©© 21
  • 22. ©© 23
  • 24. ©© 2s @ e @

26. ©© 21 e © 28 @©

  • 29 @e © 30. ©© 31
  • 32. ©© 33
  • 34 @©*

35 @©*

36

  • 37. ©© 38
  • 39
  • 4o @e ©@

41. ©© 42 @©

  • 43. ©© 44 @©
  • 45 @©*

46 * © 47. ©© 48. ©© 49 @. ©© so @e ©@

T F

51 ©

  • s2 e ©@

s3 ©

  • s4 @@©e ss @e ©@

56

  • s1 @e ©@

ss @ e @

59 @©*

60 @©*

61. ©© 62 @©

  • 63
  • 64. ©@

6s e ©@

66 @©

  • 67 @. ©@

6s @e ©@

69

  • 70 @©
  • 71 ©*

12

  • 73 @.

©@

74 @©

  • 7s @e ©@

76 e ©@

n ©e 1a e ©@

79

  • so @e ©@

s1 @e ©@

82 @. ©@

83 @©*

84 ~ * © as ©

  • 86 @©*

87

  • as * ©@

89. ©@

go @ e @

91

  • 92. ©@

93

  • 94
  • gs @© a 96
  • 97. ©@

98. ©@

99 @©

  • 1oo @e ©@

1 4

7 10 Q

G) G)

© © (j) (j) 0 0 Q

G) G)

© © (j) (j) 0 0 Q

G) G)

© © (j) (j) 0 0 Q

G) G)

© © (j) (j) 0 0 Printed in U.SA Copyright © 2010 LXR G) G) G)

© © © (j) (j) (j) 0 0 0 G) G) G)

© © © (j) (j) (j)

I 0 0 I

01 G) G) G)

© © © (j) (j) (j)

,g1I

'VI 0 0 0\\

G) G) G)

© © © (j) (j) (j) 0 0 0 2

3 Q

Q G) G) G) G) G)

G) G) G) G) G)

© © © © ©

© © © © © (j) (j) (j) (j) (j)

(j) (j) (j) (j) (j) 1 @

0 0 0 0 0 0!0 0 0 8 5

6 I i Q

Q @!@ ([:

G) G) G) G) G)

G) G) G) G) CI:

<E

© © © © ©

© © © © G::

~

(j) (j) (j) (j) (j)

(j) (j) (j) (j) <i

([

Ci 0 0 0 0 0 0 0 0 0 G::

8 I 9 i

Q '

Q ([

G) G) G) G) G)

G) G) G) G) G::

<?::

~

© © © © ©

© © © © <I

('[

(§::

(j) (j) (j) (j) (j)

(j) (j) (j) (j) (f__

([

0 0 0 0 0 0 0 0 0 ~

11 12 8

8 ([

G) G) G) G) G)

G) G) G) G) (£

([

© © © © ©

© © © © ~

([

([

(j) (j) (j) (j) (j)

(j) (j) (j) (j) (f e&:

0 0.0 0 0 0 0 0 0 f To reorder call: 843-520-299