ML23164A029: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:PROCEDURE REVIEW FORM (PRF) 1.0   Initiation Initiator:   Joseph Fortman                                                   Date: 05/1812023             Procedure Dept:           EP Document #: EIP-ZZ-00240 Addendum G                                             New Rev. #         015
{{#Wiki_filter:PROCEDURE REVIEW FORM (PRF) 1.0 Initiation Initiator: Joseph Fortman Date: 05/1812023 Procedure Dept:
EP Document #: EIP-ZZ-00240 Addendum G New Rev. #
015


==Title:==
==Title:==
ChemistryCoordinator                         Checklist Level of Use:         EjContinuous                     Reference             Infonnation         UMultiple             LN/A 2A)     Reason for Change/Description of Change (List commitments, CRs, eB Change Recjuests, OERs, Plant Mods etc. and record numbers here.)
ChemistryCoordinator Checklist Level of Use:
CR202301425           Page 6 & 7, Operations, Step 6, 8, and 1 1 were reordered to better match the potential event progression Continued: [1 3.0. Documcnt Disposition LiTemp Change                     DNew I)ocument                   LiMajor Revision         Minor Revision         flCancellation LI Administrative Correction DepL Head or [)csignatcd Approver required for Adrninisttative Corrections (Signature/PIN/Date) no other signatures regttired 4.0     Interim Approval (Thrnp. Change Only)                             Temp. Change #:                       Expiration Date:
EjContinuous Reference Infonnation UMultiple LN/A 2A)
CbgrnzantSUpc.L visot tSignatui c/P1N/Dat.)                                         SRO (Sign iturc/PIN/D itc)
Reason for Change/Description of Change (List commitments, CRs, eB Change Recjuests, OERs, Plant Mods etc. and record numbers here.)
CR202301425 Page 6 & 7, Operations, Step 6, 8, and 1 1 were reordered to better match the potential event progression 3.0.
Documcnt Disposition LiTemp Change DNew I)ocument LiMajor Revision Minor Revision flCancellation LIAdministrative Correction DepL Head or [)csignatcd Approver required for Adrninisttative Corrections (Signature/PIN/Date) no other signatures regttired 4.0 Interim Approval (Thrnp. Change Only)
Temp. Change #:
Expiration Date:
CbgrnzantSUpc.L visot tSignatui c/P1N/Dat.)
SRO (Sign iturc/PIN/D itc)


==5.0 Comments==
==5.0 Comments==
Continued:
Continued:
6.0     Reviews and Signatures (NOT Revieies Required             Dept             PIN                                                                   Date          CA0139 Attached Preparer                 EP       j 14588                                                                     18/2023              N/A Technical Review                 EP           I 4588                                                             05/1 8/2023          LI Yes        No 1 ehrncal Review             CfEb\ ,                                                                           c/:%il;&s                Yes No Addl Review                 f 3O                                                                             3/:3/3                DYes jNo AddI Review                                                                                                                         LIYes LINo D Additional Reviews (See Attached CAOI39forrns).                               Number ofadditional CAOI39s:               .      ,
6.0 Reviews and Signatures (NOT Revieies Required Dept PIN Preparer EP j 14588 Technical Review EP I 4588 1 ehrncal Review CfEb\\,
Type                     Coordinator   - PIN                 Sijitature                 Date           CA0139 Attached DVahdation                                                                                                                               Yes   LI No 50.59 Review CA25 1 0                    L1CA25 1 1          LICA251 2 I,tii (Dept. Head or Designated Approver) Is a Change Management Plan required? EYes No (IF YES, attach CA277% or CA2774)
Addl Review f 3O AddI Review DAdditional Reviews (See Attached CAOI39forrns).
Is a Cross-Disciplinary review required? EYes LINo 7O     Approval (Either approvttt must be qicati/led as PA T/APVR or PA T/G4PR in QttnhWaster)
Number ofadditional CAOI39s:
Senior Director Nuclear Operations Approval (per APA-ZZ-OO1O1)                           ORC is required in accordance with APA-ZZOOO91 Department iiel Final Review and Approval                                           ()RU Meeting: J Q       ,
Type Coordinator - PIN Sijitature Date CA0139 Attached DVahdation Yes LI No (Dept. Head or Designated Approver) Is a Change Management Plan required?
_p                             IL 3 Dept. Head or Designated Approver rJ2Y/           3                 (f1%t               &vt I 0 I            I Senior Director Nuclear Operations
EYes No (IF YES, attach CA277% or CA2774)
                                                                                                                                                \
Is a Cross-Disciplinary review required? EYes LINo 7O Approval (Either approvttt must be qicati/led as PA T/APVR or PA T/G4PR in QttnhWaster)
(Signature/PIN/Date)                                             \             (Signature/PIN/Date)
Senior Director Nuclear Operations Approval (per APA-ZZ-OO1O1)
N()1e PUge 2 provides iflsttLfCliOflV to COtflf)/tO this/birn ant may he discarded A1900001, 2, 5, 35 A210.0062, 65, 69; M190.000I
ORC is required in accordance with APA-ZZOOO91 Department iiel Final Review and Approval
                          -                                              Page 1 of 2                                                       CA0033 APA-ZZ-OO 101                                                                                                                               Rev. 002
()RU Meeting:
J, Q
_p IL3 rJ2Y/ 3 (f1%t&vt I0 I I
\\
Dept. Head or Designated Approver Senior Director Nuclear Operations (Signature/PIN/Date)
\\
(Signature/PIN/Date)
Date CA0139 Attached 18/2023 N/A 05/1 8/2023 LI Yes No c/:%il;&s Yes No 3/:3/3 DYes jNo LIYes LINo A1900001, 2, 5, 35
- A210.0062, 65, 69; M190.000I Page 1 of 2 APA-ZZ-OO 101 Continued: [1 50.59 Review CA25 1 0 L1CA25 1 1 LICA251 2 I,tii N()1e PUge 2 provides iflsttLfCliOflV to COtflf)/tO this/birn ant may he discarded CA0033 Rev. 002


APPLICABILITY DETERMINATION Address the questions below for all aspects of the activity. If the answer s YES for any portion of the activity, apply (he identified procedures to tha( portion of the activity. Note that it is not unilsual to have more than one process apply to a given activity. Refer to Section 4 of the 10 CFR 50.59 Resource Manual (RM) and the instructions on pages 5-6 for additional guidance.
APPLICABILITY DETERMINATION Address the questions below for all aspects of the activity. If the answer s YES for any portion of the activity, apply (he identified procedures to tha( portion of the activity. Note that it is not unilsual to have more than one process apply to a given activity. Refer to Section 4 of the 10 CFR 50.59 Resource Manual (RM) and the instructions on pages 5-6 for additional guidance.
I. Activity/Document Number: EIP-ZZ-OO24OAddendum G                                             Revision Number: 015
I.
Activity/Document Number: EIP-ZZ-OO24OAddendum G Revision Number:
015


==Title:==
==Title:==
ChemistryCoordüiatorChecklist BriefDescription of activity (what is being changed and why):
ChemistryCoordüiatorChecklist BriefDescription of activity (what is being changed and why):
CR202301425     Page 6 & 7, Operations, Step 6, 8, and 1 1 were reordered to better match the potential event progression.
CR202301425 Page 6 & 7, Operations, Step 6, 8, and 1 1 were reordered to better match the potential event progression.
If YES, no further 50.59 (or 7248) review beyond this Applicability II,                                                                                        Determination (AD) is required, but Does the proposed activity fall within the scope of an activity         Response      complete the remainder of this form.
If YES, no further 50.59 (or 7248) review beyond this Applicability Determination (AD) is required, but
that has been previously approved by the NRC or for which a Identify the applicable 50.59/72.48 50.59/72.48 Screen or evaluation has already been performed?
 
NO LIYES Evaluation Log                  , License (See Section 4.2 of the RM.)
===Response===
Amendment No., or applicable document number.
complete the remainder of this form.
Identify the applicable 50.59/72.48 Evaluation Log
, License Amendment No., or applicable document number.
IfYES, process per APA-ZZ-00 108 and GDP-ZZ-00600 and related facility or procedure change programs.
IfYES, process per APA-ZZ-00 108 YES and SDP-ZZ00030 for Security Plan and related facility or procedure change programs.
NO LIYES
 
===Response===
II, Does the proposed activity fall within the scope of an activity that has been previously approved by the NRC or for which a 50.59/72.48 Screen or evaluation has already been performed?
(See Section 4.2 of the RM.)
III.
Does the proposed activity involve a change to the:
I Technical Specifications or the Renewed Operating License?
(5cc 10 CFR 50.90.)
2.
Quality Assurance Plan? (See 10 CFR 50.54(a).)
3.
Security Plan which also includes the Cyber Security Plan? 1 (See 10 CFR 50.54(p).)
4.
Radiological Emergency Response Plan (RERP) or Emergency Action Levels (EALS)? (See 10 CFR 50.54(q).)
Document #
Document #
III. Does the proposed activity involve a change to the:                      Response      See Section 4.2.1 ofthe RM.
See Section 4.2.1 ofthe RM.
I    Technical Specifications or the Renewed Operating                                IfYES, process per APA-ZZ-00 108 NO  fl YES    and FDP-ZZ-00 103.
NO fl YES IfYES, process per APA-ZZ-00 108 and FDP-ZZ-00 103.
License? (5cc 10 CFR 50.90.)
JN() 1YES Note: Ifyour proposed change alters a RERP IfYES, process per APA-ZZ-00 108 implementing procedure [any EIP-ZZ-XXXX], equipment LI NO YES and KDP-ZZ-00400 for RERP and identified as important to emergency response [refer to related facility or procedure change KDP-ZZ-000 13], or could alter response time, staffing, or other items covered in the 1 6 Planning Standards or in Appendix E to Part 50.47(b) [refer to KDPZZ-00400],
IfYES, process per APA-ZZ-00 108 and GDP-ZZ-00600 and related
: 2. Quality Assurance Plan? (See 10 CFR 50.54(a).)                  JN() 1YES facility or procedure change programs.
IfYES, process per APA-ZZ-00 108
: 3. Security Plan which also includes the Cyber Security Plan? 1                        and SDP-ZZ00030 for Security YES (See 10 CFR 50.54(p).)                                                          Plan and related facility or procedure change programs.
: 4. Radiological Emergency Response Plan (RERP) or Emergency Action Levels (EALS)? (See 10 CFR 50.54(q).)
IfYES, process per APA-ZZ-00 108 Note: Ifyour proposed change alters a RERP and KDP-ZZ-00400 for RERP and implementing procedure [any EIP-ZZ-XXXX], equipment           LI NO       YES related facility or procedure change identified as important to emergency response [refer to KDP-ZZ-000 13], or could alter response time, staffing, or other items covered in the 1 6 Planning Standards or in Appendix E to Part 50.47(b) [refer to KDPZZ-00400],
answer this question YES.
answer this question YES.
APA-ZZ-OO 143                                                 Page 1                                                          CA2510 A 170.0010                                                                                                                   Rev. 005
APA-ZZ-OO 143 A 170.0010 Page 1 CA2510 Rev. 005


APPLICABILITY DETERMINATION (Continued)
APPLICABILITY DETERMINATION (Continued) 7.
Fire Protection Program? (See Operating License Condition 2C(5).)
8.
Storage Cask Certificate of Compliance (CoC), including appendices?
(See 10 CfR 72.244.)
IfYES, process APA-ZZ-00356 for ASME code compliance and related facility or procedure change programs.
IfYES, process APA-ZZ-00356 for ASME code compliance and related facility or procedure change programs.
: 5. 1ST Program Plan? (See 10 CFR 50.55a(O.)                    NO      YES IfYES, process per EDP-ZZ-O 1003 for ASME code compliance and j
IfYES, process per EDP-ZZ-O 1003 for ASME code compliance and j related facility or procedure change programs.
related facility or procedure change programs.
See FP Screening questions in EDP ZZ-04044. If any of the screening NO i:i YES questions are answered YES, a Fire Protection review is needed in accordance with EDP-ZZ-04044.
: 6. 151 Program Plan? (See 10 CFR 50.55a(g).)                  NO LYES See FP Screening questions in EDP ZZ-04044. If any of the screening
IF YES, then contact Regulatory NO LI YES Affairs/Licensing to determine next steps.
: 7. Fire Protection Program? (See Operating License Condition 2C(5).)
If YES, indicate the applicable LI YES program in Brief Description Section.
NO   i:i YES questions are answered YES, a Fire Protection review is needed in accordance with EDP-ZZ-04044.
Iv.
: 8. Storage Cask Certificate of Compliance (CoC), including                    IF YES, then contact Regulatory appendices? (See 10 CfR 72.244.)                          NO LI   YES Affairs/Licensing to determine next steps.
Does the proposed activity involve:
: 9. Does the proposed activity impact other programs (e.g.,
1. Maintenance which restores SSCs to their original (as designed) condition?
the ODCM) that are controlled by regulations, the Operating License (including Orders and License                            If YES, indicate the applicable Conditions) or the Technical Specifications? (See Section  NO  LI YES     program in Brief Description Section.
(See 10 CFR 50.65(a)(4).)
4.2.1 of the RM.)
Note: Ifthe maintenance is on ISFSI or cask-related items, the Maintenance Rule does NOT apply, and the activity is subject to a 10 CFR 72.48 Screen on a CA3 145.
Iv. Does the proposed activity involve:                             Response        See Section 4.2.2 ofthc RlvI 1 . Maintenance which restores SSCs to their original (as designed) condition? (See 10 CFR 50.65(a)(4).)                             IfYES, process change per APA-ZZ-0010l for procedure NO LIYES Note: Ifthe maintenance is on ISFSI or cask-related items,                 changes or APA-ZZ-00320/330/340 the Maintenance Rule does NOT apply, and the activity is                   for Maintenance activities.
 
subject to a 10 CFR 72.48 Screen on a CA3 145.
===Response===
IfYES, process per APA-ZZ-00101 for procedure changes or APA-ZZ-00605 for facility changes
NO LIYES See Section 4.2.2 ofthc RlvI IfYES, process change per APA-ZZ-0010l for procedure changes or APA-ZZ-00320/330/340 for Maintenance activities.
: 2. A temporary alteration (to procedures or the facility) or Procedurally Controlled supporting maintenance (TASM) that will be in effect       NO LIYES Temporary Modifications or during at-power operations for 90 days or less?
2.
MDP-ZZ-fSOO1 for Freeze Seals.
A temporary alteration (to procedures or the facility) supporting maintenance (TASM) that will be in effect during at-power operations for 90 days or less?
NO LIYES IfYES, process per APA-ZZ-00101 for procedure changes or APA-ZZ-00605 for facility changes or Procedurally Controlled Temporary Modifications or MDP-ZZ-fSOO1 for Freeze Seals.
Evaluate risk using APA-ZZ-003 15, Appendix A.
Evaluate risk using APA-ZZ-003 15, Appendix A.
APA-ZZ-OO 143                                           Page 2                                                    CA25 10 A170.OO1O                                                                                                         Rev. 005
APA-ZZ-OO 143 A170.OO1O CA25 10 Rev. 005 NO YES 5.
1ST Program Plan? (See 10 CFR 50.55a(O.)
6.
151 Program Plan? (See 10 CFR 50.55a(g).)
NO LYES 9.
Does the proposed activity impact other programs (e.g.,
the ODCM) that are controlled by regulations, the Operating License (including Orders and License Conditions) or the Technical Specifications? (See Section NO 4.2.1 of the RM.)
Page 2


APPLICABILITY DETERMINATION (Continued)
1.
V. Does the PI0I)SeCl aciivi*ty involve a change to the:           Response   See Section 4 2 3 ofthe R1VI Process the FSAR change per
FSAR NO EJYES If the above response is NO, check N/A in the Response column at right.
: 1. FSAR NO EJYES APA-ZZ-00108 arid FDP-ZZ-00 103 If the above response is NO, check N/A in the Response                        for revising License Documents.
If the above response is YES, does the proposed activity involve an FSAR change that may be excluded from the requirement to perform a 50.59 ScrecnlEvaluation by NEI 9607 or NEI 9803? (Provide a YES or NO response to this question in the Response column at right.)
column at right.
Note: In lieu ofthe exclusion criteria ofRM Section 4.23, a YES response may also be provided if the fSAR change requires no further 5059 review based on a YES response to the question in Section II of this Applicability Determination form.)
2.
Technical Specification Bases?
NO LI YES If the above response is NO, check N/A in the Response column at right.
If the above response is YES, does the proposed activity involve a TS Bases change comparable to that which may be excluded from the requirement to perform a 50.59 Screen/Evaluation by NET 9607 or NEI 9803 (as described for an FSAR change)? (Provide a YES or NO response to this question in the Response column at right.)
Note: In lieu ofthe exclusion criteria ofRM Section 4.2.3, a YES response may also be provided if the 1$ Bases change requires no further 50.59 review based on a YES response to the question in Section TI ofthis Applicability Determination form.)
VI.
Does the iI01)OSed activity involve a chante ttL 1
Managerial or administrative procedures, controls, or activities (including software used only for the implementation of administrative procedures, controls, or activities) governing the conduct of facility operations (subject to the control of TOCFR5O. Appendix B)?
2.
Regulatory conmiitment not covered by another regulation based change pwees? (See NEI 99-04.)
APA-ZZ-OO 143 A170.OOlO
 
===Response===
See Section 4 2 3 ofthe R1VI Process the FSAR change per APA-ZZ-00108 arid FDP-ZZ-00 103
. for revising License Documents.
Note:
A NO response in the Response r NO El YES column at left means that the FSARITS Bases change is one that N/A requires further 50.59 review (i.e., is not excludable from further review).
A YES response means that the fSAR does NOT require further 50.59 review.
Process the TS Bases change per APA-ZZ-00108 and FDP-ZZ-00 103 for revising License Documents.
Note:
Note:
If the above response is YES, does the proposed activity A NO response in the Response involve an FSAR change that may be excluded from the requirement to perform a 50.59 ScrecnlEvaluation by r NO  El YES  column at left means that the FSARITS Bases change is one that NEI 9607 or NEI 9803? (Provide a YES or NO response to            N/A      requires further 50.59 review (i.e., is this question in the Response column at right.)
A NO response in the Response column at left means that the TS E NO Li YES Bases change is one that requires further 50.59 review (i.e., is not N/A excludable from further review).
not excludable from further review).
A YES response means that the TS Bases Change does NOT require further 50.59 review.
Note: In lieu ofthe exclusion criteria ofRM Section 4.23, a A YES response means that the YES response may also be provided if the fSAR change fSAR does NOT require further requires no further 5059 review based on a YES response to 50.59 review.
 
the question in Section II of this Applicability Determination form.)
===Response===
Process the TS Bases change per
See Section 4.2.4 /4.2.6 ofthe RM NO El YES IfYES, process per APA-ZZ-00 101 or APA-ZZ-00 109.
: 2. Technical Specification Bases?        NO   LI YES                         APA-ZZ-00108 and FDP-ZZ-00 103 If the above response is NO, check N/A in the Response                        for revising License Documents.
IfYES, process per APA-ZZ-00540.
column at right.
IfYES, perform a 72.48 Screen per APA-ZZ-00l43 unless the change is completely covered by the response to Section II.
Note:
Note:
If the above response is YES, does the proposed activity A NO response in the Response involve a TS Bases change comparable to that which may be column at left means that the TS excluded from the requirement to perform a 50.59 E NO Li YES Bases change is one that requires Screen/Evaluation by NET 9607 or NEI 9803 (as described further 50.59 review (i.e., is not for an FSAR change)? (Provide a YES or NO response to this          N/A      excludable from further review).
question in the Response column at right.)
A YES response means that the TS Note: In lieu ofthe exclusion criteria ofRM Section 4.2.3, a Bases Change does NOT require YES response may also be provided if the 1$ Bases change further 50.59 review.
requires no further 50.59 review based on a YES response to the question in Section TI ofthis Applicability Determination form.)
VI. Does the iI01)OSed activity involve a chante ttL                  Response      See Section 4.2.4 /4.2.6 ofthe RM 1 Managerial or administrative procedures, controls, or activities (including software used only for the IfYES, process per APA-ZZ-00 101 implementation of administrative procedures, controls, or  NO El YES or APA-ZZ-00 109.
activities) governing the conduct of facility operations (subject to the control of TOCFR5O. Appendix B)?
: 2. Regulatory conmiitment not covered by another regulation                    IfYES, process per based change pwees? (See NEI 99-04.)                      1NO DYES APA-ZZ-00540.
IfYES, perform a 72.48 Screen per APA-ZZ-00l43 unless the change is completely covered by the response Does the proposed activity potentially affect the design,                      to Section II.
VII .
operation, or maintenance ofthe ISfSI facility as described in NO DYES the dry cask storage FSAR or the 72.212 Report? (See fDP zz-00105 and Attachment 1 ofAPA-ZZ-00143.)                                    Note:
Editorial or administrative changes are excluded from the requirement to pert()tm a 72.48 Review.
Editorial or administrative changes are excluded from the requirement to pert()tm a 72.48 Review.
APA-ZZ-OO 143                                                Page 3                                                 CA2510 A170.OOlO                                                                                                          Rev. 005
APPLICABILITY DETERMINATION (Continued)
V.
Does the PI0I)SeCl aciivi*ty involve a change to the:
VII Does the proposed activity potentially affect the design,
. operation, or maintenance ofthe ISfSI facility as described in the dry cask storage FSAR or the 72.212 Report? (See fDP zz-00105 and Attachment 1 ofAPA-ZZ-00143.)
1NO DYES NO DYES Page 3 CA2510 Rev. 005


                                                *&) *
*&)
                          . C)             Q     C g
C)
* zi C                   E 2
Q C
                                .!        I    -I
g zi E
                                )
C 2
V   )
-I
j)D                   cD c
)
Q c   Lf
V
                          &a
)
-\
j)D c
cD Q
c Lf
&a
-\\
c
c
        ;Q               Lr
;Q Lr
  )                                             -
)
c                 c c                I) 1-   0
c c
.      Q                  0
I) c 1-0 Q
                          ,+
0 (p.4
(p.4
,+
                                )
)
    .    %C               -
%C
                            )
)
C     +-,   *                )
)
_>              -)
C
..d                               ,
+-,
\-/
)
          )J                     I)
..d
                            )   >
 
z       L)0
\\-/
          )               c
I)
)J
)
z L)0 c
)
c cr
 
-)
)
r
)Q V
riD-Q
)zO
-.-I 0
1) z j*1/4 I1 ii E
N cIL(I C
C
 
Q.


r c
                            -)
cr
                                )
        )Q riD-Q            -
V
          )zO                  -
-.-I      0                -
1) z              j*1/4 I1    E ii N
,        cIL(I
      -;                        C C
Q.                >    >
0                       
                          =
0
0
.        -                b c         -e C)                   -
 
-st                       .>  :
=0 b
ri C                   >
c
C.) *,4::           .
-e
 
C)
-st
 
ri C
C.)
*,4::
c
c
      -  _D:               ?             1)
_D:
?
C
C
      ?               .
?
j
j C
        -e) i                         C c              Sd   CC E           ©         1 LI        o     NC
-e)
          )G) c              E&     c I
 
i Sd CC c
E
© 1
o NC c
)G)
I I
1)
LI E&
c


50.54(q) Screening Form Document #, Rev #, &
50.54(q) Screening Form Document #, Rev #, &


==Title:==
==Title:==
EIP-ZZ-00240 Addendum G, Revision 01 5, Chemistry Coordinator Checklist EP Tracking #:     2023022 Activity Description and  
EIP-ZZ-00240 Addendum G, Revision 01 5, Chemistry Coordinator Checklist EP Tracking #:
2023022 Activity Description and  


==References:==
==References:==
CR202301425 Steps reordered as many post-accident sampling actions would depend on working through Reactor Trip Checklist and current steps do not reference Reactor Trip Checklist until already in the post-accident sampling.
CR202301425 Steps reordered as many post-accident sampling actions would depend on working through Reactor Trip Checklist and current steps do not reference Reactor Trip Checklist until already in the post-accident sampling.
Steps aligned as follows Operations:
Steps aligned as follows Operations:
    . Step 6 changed to be Step 9.
Step 6 changed to be Step 9.
    . Step 7 is unchanged
Step 7 is unchanged Step 8 changed to be Step 10 Step 9 changed to be Step 8 Step 1 0 changed to be Step II Step I 1 changed to be Step 6 These actions improve the monitoring of evolving plant conditions during major events as seen during the 2023 NRC raded exercise.
    . Step 8 changed to be Step 10
Activity Scope:
    . Step 9 changed to be Step 8
YES NO revise the Radio1oical Ernergencyçponse PNn (RERP) or Implementing Proceduies7 H
    . Step 1 0 changed to be Step II
Change Type:
    . Step I 1 changed to be Step 6 These actions improve the monitoring of evolving plant conditions during major events as seen during the 2023 NRC raded exercise.
YES NO Is this activityeditorial or typographical?
Activity Scope:                                                                                                             YES       NO revise the Radio1oical Ernergencyçponse PNn (RERP) or Implementing Proceduies7                                   H Change Type:                                                                                                                 YES     NO Is this activityeditorial or typographical? .. . .. ..  .....  .....      . ...
H I
H I Previously Approved Change:                                                                                                   YES     NO Is this activity being processed to conform to a previously approved activity?                               ....                 H IfYES, what is the previously approved activity?
Previously Approved Change:
YES NO Is this activity being processed to conform to a previously approved activity?
.... H IfYES, what is the previously approved activity?
Planning Standard Determination:
Planning Standard Determination:
Does this activity impact any ofthe 50.47(b) Planning Staadards or Part 50 Appendix F:                                       YES     NO 50.47(b)(1) Assignment ofRcsponsibility (Organization Control)?
Does this activity impact any ofthe 50.47(b) Planning Staadards or Part 50 Appendix F:
                      -                                                              * ,                                    .. H 50.47(b)(2) Onsite Emergency Organization?
YES NO 50.47(b)(1)
H 50.47(b)(3) Emergency Response Support and Resources7 H
- Assignment ofRcsponsibility (Organization Control)?
50.47(b)(4) Emergency Classification System?
.. H 50.47(b)(2)
H 50.47(b)(5) Notification Methods and Procedures9
- Onsite Emergency Organization?
                                                                                                            .. ...    .*....     H 50.47(b)(6) Emergency Cornrnunications LI 50.47(b)(7) Public Education and Information7
H 50.47(b)(3)
                                                                                          .      .      .          .            H 50.47(b)(8) Emergency facility and Equipment?
- Emergency Response Support and Resources7 H
                      -                                            .  ..                                                        ü 50.47(b)(9) Accident Assessment7 H
50.47(b)(4)
50.47(b)(10) Protective Response7 H
- Emergency Classification System?
50.47(b)(11) Radiological Exposure Control?
H 50.47(b)(5)
                        -                                    .                                                                  H 50.47(b)(12) Medical and Public Health Support?
- Notification Methods and Procedures9
                        -                                            .                              .                          . H 50.47(b)(13) Recovery Planning and Post Accident Operations?
.*.... H 50.47(b)(6)
                                                                                                                            .     H 50.47(b)(14) Drills and Exercises7
- Emergency Cornrnunications LI 50.47(b)(7)
                                                                                                                                . E 50.47(b)(15) Emergency Responder Training?
- Public Education and Information7 H
                        -                                      ...                                            . ..    .  ... H 50.47(b)(16) Emergency Plan Maintenance?
50.47(b)(8)
H Part 50 Appendix E                                                                 ..      ..                  .... H Commitment Impact Determination:                                                                                             YES   NO Does this activity impact a Site Specific EP Commitment not associated with a Planning Standard or Element?                       H If Yes, record the Commitment number:
- Emergency facility and Equipment?
ü 50.47(b)(9)
- Accident Assessment7 H
50.47(b)(10)
- Protective Response7 H
50.47(b)(11)
- Radiological Exposure Control?
H 50.47(b)(12)
- Medical and Public Health Support?
. H 50.47(b)(13)
- Recovery Planning and Post Accident Operations?
. H 50.47(b)(14)
- Drills and Exercises7
.E 50.47(b)(15)
- Emergency Responder Training?
... H 50.47(b)(16)
- Emergency Plan Maintenance?
H Part 50 Appendix E
.... H Commitment Impact Determination:
YES NO Does this activity impact a Site Specific EP Commitment not associated with a Planning Standard or Element?
H If Yes, record the Commitment number:
Explanation of Determination: (Enter an explanation to each determination-answer that needs clarifIcation.)
Explanation of Determination: (Enter an explanation to each determination-answer that needs clarifIcation.)
Revision of EIP-ZZ-00240 Add G, Chemistry Coordinator Checklist is associated with Planning Standards 50.47(b)(8)
Revision of EIP-ZZ-00240 Add G, Chemistry Coordinator Checklist is associated with Planning Standards 50.47(b)(8)
Emergency Facility and Equipment and 50.47(b)(9) Accident Assessment. However, the activity only slightly reorders actions in the checklist and the actions themselves were unchanged. This activity has no impact on any of the regulatory required functions of the associated planning standards. Therefore, an evaluation in accordance with 50.54(q) is not required.
Emergency Facility and Equipment and 50.47(b)(9) Accident Assessment. However, the activity only slightly reorders actions in the checklist and the actions themselves were unchanged. This activity has no impact on any of the regulatory required functions of the associated planning standards. Therefore, an evaluation in accordance with 50.54(q) is not required.
File # A210.0038                                           Page 1 of2                                                    CA1523 KDP-ZZ-00400                                                                                                               Rev. 002
File # A210.0038 KDP-ZZ-00400 Page 1 of2 CA1523 Rev. 002


50.54(q) Screening Form Screening Evaluation Results:
50.54(q) Screening Form Screening Evaluation Results:
Based on the results of the information above, can the activity be implemcntcd without performing a                 YES   NO full 50.54(q) Effectiveness Evaluation?       ..  .. .    ... . ....  .  ...
Based on the results of the information above, can the activity be implemcntcd without performing a YES NO
                                                                                                              *.*) ,    U Review/Approval                         -
 
Preparer (Sign/PIN) ri: &s, must
full 50.54(q) Effectiveness Evaluation?
*.*)
U Review/Approval Preparer (Sign/PIN)
__LYgg_
__LYgg_
be qualified nZ)ençv 1?Lcfs:se Coctzltatoi.
Date Z9 Z3 ri: &s, must be qualified nZ)ençv 1?Lcfs:se Coctzltatoi.
Date  Z9 Z3 Reviewer (Sign/PIN)                                         2 SZQ 1? i rit 1 fi IS! F) 4T ci I         n   i Response C noidinotot Emergency Prcparedness NI       gei (Sign/PIN)                                         itfl1 File#A2l0.0038                                                 Pagc2of2                                           CA1523 KDP-ZZ-00400                                                                                                       Rev. 002}}
Reviewer (Sign/PIN) 2 SZQ 1?
i rit 1 fi IS! F) 4T ci I n
i Response C noidinotot Emergency Prcparedness NI gei (Sign/PIN) itfl1 File#A2l0.0038 Pagc2of2 CA1523 KDP-ZZ-00400 Rev. 002}}

Latest revision as of 03:20, 27 November 2024

Procedure Review Form - Chemistry Coordinator Checklist
ML23164A029
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/13/2023
From: Fortman J
Ameren Missouri
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23164A027 List:
References
EIP-ZZ-00240, Add. G, Rev. 15
Download: ML23164A029 (1)


Text

PROCEDURE REVIEW FORM (PRF) 1.0 Initiation Initiator: Joseph Fortman Date: 05/1812023 Procedure Dept:

EP Document #: EIP-ZZ-00240 Addendum G New Rev. #

015

Title:

ChemistryCoordinator Checklist Level of Use:

EjContinuous Reference Infonnation UMultiple LN/A 2A)

Reason for Change/Description of Change (List commitments, CRs, eB Change Recjuests, OERs, Plant Mods etc. and record numbers here.)

CR202301425 Page 6 & 7, Operations, Step 6, 8, and 1 1 were reordered to better match the potential event progression 3.0.

Documcnt Disposition LiTemp Change DNew I)ocument LiMajor Revision Minor Revision flCancellation LIAdministrative Correction DepL Head or [)csignatcd Approver required for Adrninisttative Corrections (Signature/PIN/Date) no other signatures regttired 4.0 Interim Approval (Thrnp. Change Only)

Temp. Change #:

Expiration Date:

CbgrnzantSUpc.L visot tSignatui c/P1N/Dat.)

SRO (Sign iturc/PIN/D itc)

5.0 Comments

Continued:

6.0 Reviews and Signatures (NOT Revieies Required Dept PIN Preparer EP j 14588 Technical Review EP I 4588 1 ehrncal Review CfEb\\,

Addl Review f 3O AddI Review DAdditional Reviews (See Attached CAOI39forrns).

Number ofadditional CAOI39s:

Type Coordinator - PIN Sijitature Date CA0139 Attached DVahdation Yes LI No (Dept. Head or Designated Approver) Is a Change Management Plan required?

EYes No (IF YES, attach CA277% or CA2774)

Is a Cross-Disciplinary review required? EYes LINo 7O Approval (Either approvttt must be qicati/led as PA T/APVR or PA T/G4PR in QttnhWaster)

Senior Director Nuclear Operations Approval (per APA-ZZ-OO1O1)

ORC is required in accordance with APA-ZZOOO91 Department iiel Final Review and Approval

()RU Meeting:

J, Q

_p IL3 rJ2Y/ 3 (f1%t&vt I0 I I

\\

Dept. Head or Designated Approver Senior Director Nuclear Operations (Signature/PIN/Date)

\\

(Signature/PIN/Date)

Date CA0139 Attached 18/2023 N/A 05/1 8/2023 LI Yes No c/:%il;&s Yes No 3/:3/3 DYes jNo LIYes LINo A1900001, 2, 5, 35

- A210.0062, 65, 69; M190.000I Page 1 of 2 APA-ZZ-OO 101 Continued: [1 50.59 Review CA25 1 0 L1CA25 1 1 LICA251 2 I,tii N()1e PUge 2 provides iflsttLfCliOflV to COtflf)/tO this/birn ant may he discarded CA0033 Rev. 002

APPLICABILITY DETERMINATION Address the questions below for all aspects of the activity. If the answer s YES for any portion of the activity, apply (he identified procedures to tha( portion of the activity. Note that it is not unilsual to have more than one process apply to a given activity. Refer to Section 4 of the 10 CFR 50.59 Resource Manual (RM) and the instructions on pages 5-6 for additional guidance.

I.

Activity/Document Number: EIP-ZZ-OO24OAddendum G Revision Number:

015

Title:

ChemistryCoordüiatorChecklist BriefDescription of activity (what is being changed and why):

CR202301425 Page 6 & 7, Operations, Step 6, 8, and 1 1 were reordered to better match the potential event progression.

If YES, no further 50.59 (or 7248) review beyond this Applicability Determination (AD) is required, but

Response

complete the remainder of this form.

Identify the applicable 50.59/72.48 Evaluation Log

, License Amendment No., or applicable document number.

IfYES, process per APA-ZZ-00 108 and GDP-ZZ-00600 and related facility or procedure change programs.

IfYES, process per APA-ZZ-00 108 YES and SDP-ZZ00030 for Security Plan and related facility or procedure change programs.

NO LIYES

Response

II, Does the proposed activity fall within the scope of an activity that has been previously approved by the NRC or for which a 50.59/72.48 Screen or evaluation has already been performed?

(See Section 4.2 of the RM.)

III.

Does the proposed activity involve a change to the:

I Technical Specifications or the Renewed Operating License?

(5cc 10 CFR 50.90.)

2.

Quality Assurance Plan? (See 10 CFR 50.54(a).)

3.

Security Plan which also includes the Cyber Security Plan? 1 (See 10 CFR 50.54(p).)

4.

Radiological Emergency Response Plan (RERP) or Emergency Action Levels (EALS)? (See 10 CFR 50.54(q).)

Document #

See Section 4.2.1 ofthe RM.

NO fl YES IfYES, process per APA-ZZ-00 108 and FDP-ZZ-00 103.

JN() 1YES Note: Ifyour proposed change alters a RERP IfYES, process per APA-ZZ-00 108 implementing procedure [any EIP-ZZ-XXXX], equipment LI NO YES and KDP-ZZ-00400 for RERP and identified as important to emergency response [refer to related facility or procedure change KDP-ZZ-000 13], or could alter response time, staffing, or other items covered in the 1 6 Planning Standards or in Appendix E to Part 50.47(b) [refer to KDPZZ-00400],

answer this question YES.

APA-ZZ-OO 143 A 170.0010 Page 1 CA2510 Rev. 005

APPLICABILITY DETERMINATION (Continued) 7.

Fire Protection Program? (See Operating License Condition 2C(5).)

8.

Storage Cask Certificate of Compliance (CoC), including appendices?

(See 10 CfR 72.244.)

IfYES, process APA-ZZ-00356 for ASME code compliance and related facility or procedure change programs.

IfYES, process per EDP-ZZ-O 1003 for ASME code compliance and j related facility or procedure change programs.

See FP Screening questions in EDP ZZ-04044. If any of the screening NO i:i YES questions are answered YES, a Fire Protection review is needed in accordance with EDP-ZZ-04044.

IF YES, then contact Regulatory NO LI YES Affairs/Licensing to determine next steps.

If YES, indicate the applicable LI YES program in Brief Description Section.

Iv.

Does the proposed activity involve:

1. Maintenance which restores SSCs to their original (as designed) condition?

(See 10 CFR 50.65(a)(4).)

Note: Ifthe maintenance is on ISFSI or cask-related items, the Maintenance Rule does NOT apply, and the activity is subject to a 10 CFR 72.48 Screen on a CA3 145.

Response

NO LIYES See Section 4.2.2 ofthc RlvI IfYES, process change per APA-ZZ-0010l for procedure changes or APA-ZZ-00320/330/340 for Maintenance activities.

2.

A temporary alteration (to procedures or the facility) supporting maintenance (TASM) that will be in effect during at-power operations for 90 days or less?

NO LIYES IfYES, process per APA-ZZ-00101 for procedure changes or APA-ZZ-00605 for facility changes or Procedurally Controlled Temporary Modifications or MDP-ZZ-fSOO1 for Freeze Seals.

Evaluate risk using APA-ZZ-003 15, Appendix A.

APA-ZZ-OO 143 A170.OO1O CA25 10 Rev. 005 NO YES 5.

1ST Program Plan? (See 10 CFR 50.55a(O.)

6.

151 Program Plan? (See 10 CFR 50.55a(g).)

NO LYES 9.

Does the proposed activity impact other programs (e.g.,

the ODCM) that are controlled by regulations, the Operating License (including Orders and License Conditions) or the Technical Specifications? (See Section NO 4.2.1 of the RM.)

Page 2

1.

FSAR NO EJYES If the above response is NO, check N/A in the Response column at right.

If the above response is YES, does the proposed activity involve an FSAR change that may be excluded from the requirement to perform a 50.59 ScrecnlEvaluation by NEI 9607 or NEI 9803? (Provide a YES or NO response to this question in the Response column at right.)

Note: In lieu ofthe exclusion criteria ofRM Section 4.23, a YES response may also be provided if the fSAR change requires no further 5059 review based on a YES response to the question in Section II of this Applicability Determination form.)

2.

Technical Specification Bases?

NO LI YES If the above response is NO, check N/A in the Response column at right.

If the above response is YES, does the proposed activity involve a TS Bases change comparable to that which may be excluded from the requirement to perform a 50.59 Screen/Evaluation by NET 9607 or NEI 9803 (as described for an FSAR change)? (Provide a YES or NO response to this question in the Response column at right.)

Note: In lieu ofthe exclusion criteria ofRM Section 4.2.3, a YES response may also be provided if the 1$ Bases change requires no further 50.59 review based on a YES response to the question in Section TI ofthis Applicability Determination form.)

VI.

Does the iI01)OSed activity involve a chante ttL 1

Managerial or administrative procedures, controls, or activities (including software used only for the implementation of administrative procedures, controls, or activities) governing the conduct of facility operations (subject to the control of TOCFR5O. Appendix B)?

2.

Regulatory conmiitment not covered by another regulation based change pwees? (See NEI 99-04.)

APA-ZZ-OO 143 A170.OOlO

Response

See Section 4 2 3 ofthe R1VI Process the FSAR change per APA-ZZ-00108 arid FDP-ZZ-00 103

. for revising License Documents.

Note:

A NO response in the Response r NO El YES column at left means that the FSARITS Bases change is one that N/A requires further 50.59 review (i.e., is not excludable from further review).

A YES response means that the fSAR does NOT require further 50.59 review.

Process the TS Bases change per APA-ZZ-00108 and FDP-ZZ-00 103 for revising License Documents.

Note:

A NO response in the Response column at left means that the TS E NO Li YES Bases change is one that requires further 50.59 review (i.e., is not N/A excludable from further review).

A YES response means that the TS Bases Change does NOT require further 50.59 review.

Response

See Section 4.2.4 /4.2.6 ofthe RM NO El YES IfYES, process per APA-ZZ-00 101 or APA-ZZ-00 109.

IfYES, process per APA-ZZ-00540.

IfYES, perform a 72.48 Screen per APA-ZZ-00l43 unless the change is completely covered by the response to Section II.

Note:

Editorial or administrative changes are excluded from the requirement to pert()tm a 72.48 Review.

APPLICABILITY DETERMINATION (Continued)

V.

Does the PI0I)SeCl aciivi*ty involve a change to the:

VII Does the proposed activity potentially affect the design,

. operation, or maintenance ofthe ISfSI facility as described in the dry cask storage FSAR or the 72.212 Report? (See fDP zz-00105 and Attachment 1 ofAPA-ZZ-00143.)

1NO DYES NO DYES Page 3 CA2510 Rev. 005

  • &)

C)

Q C

g zi E

C 2

-I

)

V

)

j)D c

cD Q

c Lf

&a

-\\

c

Q Lr

)

c c

I) c 1-0 Q

0 (p.4

,+

)

%C

)

)

C

+-,

)

..d

\\-/

I)

)J

)

z L)0 c

)

c cr

-)

)

r

)Q V

riD-Q

)zO

-.-I 0

1) z j*1/4 I1 ii E

N cIL(I C

C

Q.

0

=0 b

c

-e

C)

-st

ri C

C.)

  • ,4::

c

_D:

?

C

?

j C

-e)

i Sd CC c

E

© 1

o NC c

)G)

I I

1)

LI E&

c

50.54(q) Screening Form Document #, Rev #, &

Title:

EIP-ZZ-00240 Addendum G, Revision 01 5, Chemistry Coordinator Checklist EP Tracking #:

2023022 Activity Description and

References:

CR202301425 Steps reordered as many post-accident sampling actions would depend on working through Reactor Trip Checklist and current steps do not reference Reactor Trip Checklist until already in the post-accident sampling.

Steps aligned as follows Operations:

Step 6 changed to be Step 9.

Step 7 is unchanged Step 8 changed to be Step 10 Step 9 changed to be Step 8 Step 1 0 changed to be Step II Step I 1 changed to be Step 6 These actions improve the monitoring of evolving plant conditions during major events as seen during the 2023 NRC raded exercise.

Activity Scope:

YES NO revise the Radio1oical Ernergencyçponse PNn (RERP) or Implementing Proceduies7 H

Change Type:

YES NO Is this activityeditorial or typographical?

H I

Previously Approved Change:

YES NO Is this activity being processed to conform to a previously approved activity?

.... H IfYES, what is the previously approved activity?

Planning Standard Determination:

Does this activity impact any ofthe 50.47(b) Planning Staadards or Part 50 Appendix F:

YES NO 50.47(b)(1)

- Assignment ofRcsponsibility (Organization Control)?

.. H 50.47(b)(2)

- Onsite Emergency Organization?

H 50.47(b)(3)

- Emergency Response Support and Resources7 H

50.47(b)(4)

- Emergency Classification System?

H 50.47(b)(5)

- Notification Methods and Procedures9

.*.... H 50.47(b)(6)

- Emergency Cornrnunications LI 50.47(b)(7)

- Public Education and Information7 H

50.47(b)(8)

- Emergency facility and Equipment?

ü 50.47(b)(9)

- Accident Assessment7 H

50.47(b)(10)

- Protective Response7 H

50.47(b)(11)

- Radiological Exposure Control?

H 50.47(b)(12)

- Medical and Public Health Support?

. H 50.47(b)(13)

- Recovery Planning and Post Accident Operations?

. H 50.47(b)(14)

- Drills and Exercises7

.E 50.47(b)(15)

- Emergency Responder Training?

... H 50.47(b)(16)

- Emergency Plan Maintenance?

H Part 50 Appendix E

.... H Commitment Impact Determination:

YES NO Does this activity impact a Site Specific EP Commitment not associated with a Planning Standard or Element?

H If Yes, record the Commitment number:

Explanation of Determination: (Enter an explanation to each determination-answer that needs clarifIcation.)

Revision of EIP-ZZ-00240 Add G, Chemistry Coordinator Checklist is associated with Planning Standards 50.47(b)(8)

Emergency Facility and Equipment and 50.47(b)(9) Accident Assessment. However, the activity only slightly reorders actions in the checklist and the actions themselves were unchanged. This activity has no impact on any of the regulatory required functions of the associated planning standards. Therefore, an evaluation in accordance with 50.54(q) is not required.

File # A210.0038 KDP-ZZ-00400 Page 1 of2 CA1523 Rev. 002

50.54(q) Screening Form Screening Evaluation Results:

Based on the results of the information above, can the activity be implemcntcd without performing a YES NO

full 50.54(q) Effectiveness Evaluation?

  • .*)

U Review/Approval Preparer (Sign/PIN)

__LYgg_

Date Z9 Z3 ri: &s, must be qualified nZ)ençv 1?Lcfs:se Coctzltatoi.

Reviewer (Sign/PIN) 2 SZQ 1?

i rit 1 fi IS! F) 4T ci I n

i Response C noidinotot Emergency Prcparedness NI gei (Sign/PIN) itfl1 File#A2l0.0038 Pagc2of2 CA1523 KDP-ZZ-00400 Rev. 002