ML23234A140
| ML23234A140 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 06/01/2023 |
| From: | Keene E Ameren Missouri |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| EIP-ZZ-00201, Add., Rev. 041 | |
| Download: ML23234A140 (1) | |
Text
PROCEDURE REVIEW FORM (PRF) 1.0 Initiation Initiator: Ed Keene Date: 06/01/2023 Procedure Dept:
EP Document#: EIP-ZZ-00201 Addendum A New Rev.#
041 (3 digils required)
Title:
Control Room Notification Flowchart Level of Use:
Continuous Reference iz;Jinformation Multiple NIA 2.0 Reason for Change/Description of Change (List commitments, CRs, eB Change Requests, OERs, Plant Mods etc. and record numbers here.)
CR 202303427 - Per NRC recommendation, changed flowchart to notify the NRC Operation Center prior to notifying the NRC Resident Inspector. Moved the Resident Inspector to only be notified when an initial classification is made or when a change of classification is made per the Resident Inspector.
Continued: D 3.0. Document Disposition 0Temp Change 0New Document 0Major Revision iz;JMinor Revision Cancellation Administrative Correction Dept. Head or Designated Annrover required for Administrative Con-ections (Signature/PIN/Date)- no other signatures required 4.0 Interim Approval (Temp. Change Only)
Temp. Change#:
Expiration Date:
Cognizant Supervisor (Signature/PIN/Date)
SRO (Signature/PIN/Date)
5.0 Comments
None Continued: D 6.0 Reviews and Signatures (NOT required for Administrative Corrections)
Revie111i; Required Dept PIN
~
Si1mature Date CAOJ 39 Attached Preparer EP 77971 ~--
w-01
\\~~
6/1/2023 NIA Technical Review EP 77971 F-:::.n:.~,,],I kS~
6/1/2023 0Yes ~No Technical Review ~p I'/.5J1 B,~c::::2 ~~ -
6* ol, J..3 0Yes !0No Add'l Review 0Yes No Add'l Review 0Yes No Additional Reviews (See Attached CAOJ 39 forms).
Number of additional CAO 139s:
Validation I Tvne Coordinator - PIN I
Sig11ature Date CAO 139 Attached I
I 0Yes No 50.59 Review ~CA2510 0CA2511 0CA2512 / ONI A (per APA-ZZ-00143)
Screener Initial I PIN Reviewer Initial I PIN (Dept. Head or Designated Approver) Is a Change Management Plan required? OYes lz;JNo (IF YES, attach CA2773 or CA2774)
Is a Cross-Disciplinary review required? OYes iz;JNo 7.0 Approval (Either approval must be qualified as PATIA PVR or PAT/GA PR in Qua/Master)
~ Senior Director Nuclear Operations Approval (per APA-ZZ-00I0L)
~
ea{ Final Review and Approval
,l~.,,~,,..,
t / 7/ ;,.o-;..J ept. Head or Designated Approver (Signature/PIN/Date)
Note: Page 2 provides instructions to complete this form and may be discarded Al90.0001, 2, 5, 35 -A210.0062, 65, 69; Ml90.0001 Page 1 of2 APA-ZZ-00101 lz;J ORC is required in accordance with APA-ZZ-00091 ORC Meeting: OZ~0'-1
[{ ~
13Qo&
I -c-QJ
~tor Nuclear Operations (Signature/Pl N/Datc)
CA0033 Rev.002
50.54(q) Screening Form Document #, Rev #, &
Title:
EIP-ZZ-00201, Addendum A, Rev 041, Control Room Notification Flowchart EP Tracking #:
2023024 Activity Description and
References:
Per NRG recommendation, changed flowchart to notify the NRG Operation Center prior to notifying the NRC Resident Inspector.
Activity Scope:
YES NO Does this activity revise the Radiological Emergency Response Plan {RERP) or Implementing Procedures?........................ !Zl Change Type:
YES NO Is this activity editorial or typographical?.......................................................................................................................................................... D
~
Previously Approved Change:
YES NO Is this activity being processed to conform to a previously approved activity?..................................................................................
IZl IfYES, what is the previously approved activity?
Planning Standard Determination:
Does this activity impact any of the 50.47(b) Planning Standards or Part 50 Appendix E:
YES NO 50.47(b)(l)- Assignment of Responsibility (Organization Control)?..................................................................................
IZl 50.4 7(b )(2) - Onsite Emergency Organization?............................................................................................................................ D
~
50.47(b)(3) - Emergency Response Support and Resources?................................................................................................... D IZl 50.47(b)(4) - Emergency Classification System?........................................................................................................................ D IZl 50.47(b)(5) - Notification Methods and Procedures?.................................................................................................................. D IZl 50.47(b)(6) - Emergency Communications? *************************************............................................................................................. IZl 50.4 7(b )(7) - Public Education and Information?......................................................................................................................... D IZl 50.47(b)(8) - Emergency Facility and Equipment?..................................................................................................................... D IZl 50.47(b)(9) - Accident Assessment?................................................................................................................................................. D IZl 50.47(b)(10)- Protective Response?................................................................................................................................................. IZl 50.47(b)(l 1) - Radiological Exposure Control?............................................................................................................................ IZl 50.47(b)(12) - Medical and Public Health Support?................................................................................................................... D IZl 50.47(b)(13) - Recovery Planning and Post Accident Operations?........................................................................................ D IZl 50.47(b)(14) - Drills and Exercises?...................................................,.............................................................................................
~
50.47(b)(l5)- Emergency Responder Training?..........................................................................................................................
~
50.47(b)(16) - Emergency Plan Maintenance?.............................................................................................................................. D
~
Part 50 Appendix E?............................................................................................................................................................................... D IZl Commitment Impact Determination:
YES NO Does this activity impact a Site Specific EP Commitment not associated with a Planning Standard or Element?................. 0 IZl If "Yes", record the Commitment number:
Explanation of Determination: (Enter an explanation to each determination-answer that needs clarification.)
CR 202303427 - Per NRC recommendation, changed flowchart to notify the NRC Operation Center prior to notifying the NRC Resident Inspector. Moved the Resident Inspector to only be notified when an initial classification is made or when a change of classification is made per the Resident Inspector. This change is associated with Planning Standard 50.47(b)(5). The procedure process remains unchanged, but the order of the steps was changed. Notifications to the NRC Operations Center and Resident Inspector are still made and therefore, there is no impact to the Planning Standard.
Screening Evaluation Results:
Based on the results of the information above, can the activity be implemented without performing a YES NO full 50.54(q) Effectiveness Evaluation?........................................................................................................................................... IZJ Review/Approval:
~ ~
Preparer (Sign/PIN):.........
J~
77<}_7 I Reviewer (Sign/PIN):.......
~~
must be qualified Emergency ~
rtli11111or.
{
r J.--,
/1.J-'{'i?ff 11eviewer must broEr y Response Coordinator.
Emergency Preparedness Manager (Sign/PIN):
/ 6 3 'i 7 File# A210.0038 KDP-ZZ-00400 Page 1 of 1 Date:
Date:
Date:
06/01/2023 6 -61 <J..VJ3
,/ 7/:J~:>-::S CA1523 Rev.002
APPLICABILITY DETERMINATION Address the questions below for all aspects of the activity. If the answer is YES for any portion of the activity, apply the identified procedures to that portion of the activity. Note that it is not unusual to have more than one process apply to a given activity. Refer to Section 4 of the 10 CFR 50.59 Resource Manual (RM) and the instructions on pages 5-6 for additional guidance.
I.
Activity/Document Number: EIP-ZZ-00201 Addendum A
Title:
Control Room Notification Flowchart Brief Description of activity (what is being changed and why):
Revision Number: 041 Per NRC recommendation, changed flowchart to notify the NRC Operation Center prior to notifying the NRC Resident Inspector.
II. Does the proposed activity fall within the scope of an activity that has been previously approved by the NRC or for which a 50.59/72.48 Screen or evaluation has already been performed?
(See Section 4.2 of the RM.)
III.
Does the proposed activity involve a change to the:
- 1. Technical Specifications or the Renewed Operating License? (See 10 CFR 50.90.)
- 2. Quality Assurance Plan? (See 10 CFR 50.54(a).)
- 3. Security Plan which also includes the Cyber Security Plan?
(See 10 CFR 50.54(p).)
- 4. Radiological Emergency Response Plan (RERP) or Emergency Action Levels (EALS)? (See 10 CFR 50.54(q).)
Note: If your proposed change alters a RERP implementing procedure [any EIP-ZZ-XXXX], equipment identified as important to emergency response [refer to KDP-ZZ-00013), or could alter response time, staffing, or other items covered in the 16 Planning Standards or in Appendix E to Part 50.47(b) [refer to KDP-ZZ-00400),
answer this auestion YES.
APA-ZZ-00143 Al 70.0010 Page 1
Response
[gjNO YES
Response
[gj NO YES
[gjNO YES
[gj NO YES NO [gj YES If YES, no further 50.59 (or 72.48) review beyond this Applicability Determination (AD) is required, but complete the remainder of this form.
Identify the applicable 50.59/72.48 Evaluation Log No., License Amendment No., or applicable document number.
Document#
See Section 4.2.1 of the RM.
IfYES, process per APA-ZZ-00108 and FDP-ZZ-00103.
If YES, process per AP A-ZZ-00108 and GDP-ZZ-00600 and related facility or procedure change programs.
If YES, process per AP A-ZZ-00 I 08 and SDP-ZZ-00030 for Security Plan and related facility or procedure change programs.
If YES, process per AP A-ZZ-00108 and KDP-ZZ-00400 for RERP and related facility or procedure change programs.
CA2510 Rev.005
APPLICABILITY DETERMINATION (Continued)
- 5. 1ST Program Plan? (See 10 CFR 50.55a(t).)
- 6. ISi Program Plan? (See 10 CFR 50.55a(g).)
- 7. Fire Protection Program? (See Operating License Condition 2.C(S).)
- 8.
Storage Cask Certificate of Compliance (CoC), including appendices? (See 10 CFR 72.244.)
- 9. Does the proposed activity impact other programs (e.g.,
the ODCM) that are controlled by regulations, the Operating License (including Orders and License Conditions) or the Technical Specifications? (See Section 4.2.1 of the RM.)
IV. Does the proposed activity involve:
- 1. Maintenance which restores SSCs to their original (as designed) condition? (See 10 CFR 50.65(a)(4).)
Note: If the maintenance is on ISFSI or cask-related items, the Maintenance Rule does NOT apply, and the activity is subject to a 10 CFR 72.48 Screen on a CA3145.
- 2. A temporary alteration (to procedures or the facility) supporting maintenance (T ASM) that will be in effect during at-power operations for 90 days or less?
APA-ZZ-00143 A170.0010 Page2
[:8J NO YES
[:8J NO YES
[:8J NO YES
[:8J NO YES
[:8J NO YES
Response
[:8J NO YES
[:8J NO YES IfYES, process APA-ZZ-00356 for ASME code compliance and related facility or procedure change programs.
IfYES, process per EDP-ZZ-01003 for ASME code compliance and related facility or procedure change programs.
See FP Screening questions in EDP-ZZ-04044. If any of the screening questions are answered YES, a Fire Protection review is needed in accordance with EDP-ZZ-04044.
IF YES, then contact Regulatory Affairs/Licensing to determine next steps.
IfYES, indicate the applicable program in Brief Description Section.
See Section 4.2.2 of the RM If YES, process change per AP A-ZZ-00101 for procedure changes or AP A-ZZ-00320/330/340 for Maintenance activities.
IfYES, process per APA-ZZ-00101 for procedure changes or AP A-ZZ-00605 for facility changes or Procedurally Controlled Temporary Modifications or MDP-ZZ-FS00l for Freeze Seals.
Evaluate risk using APA-ZZ-00315, Appendix A.
CA2510 Rev.005
APPLICABILITY DETERMINATION (Continued)
V.
Does the proposed activity involve a change to the:
VI.
VII.
- 1. FSAR [8J NO O YES If the above response is NO, check NI A in the Response column at right.
If the above response is YES, does the proposed activity involve an FSAR change that may be excluded from the requirement to perform a 50.59 Screen/Evaluation by NEI 96-07 or NEI 98-03? (Provide a YES or NO response to this question in the Response column at right.)
Note: In lieu of the exclusion criteria of RM Section 4.2.3, a YES response may also be provided if the FSAR change requires no further 50.59 review based on a YES response to the question in Section II of this Applicability Determination form.)
- 2. Technical Specification Bases? [8J NO DYES If the above response is NO, check NIA in the Response column at right.
If the above response is YES, does the proposed activity involve a TS Bases change comparable to that which may be excluded from the requirement to perform a 50.59 Screen/Evaluation by NEI 96-07 or NEI 98-03 (as described for an FSAR change)? (Provide a YES or NO response to this question in the Response column at right.)
Note: In lieu of the exclusion criteria of RM Section 4.2.3, a YES response may also be provided if the TS Bases change requires no further 50.59 review based on a YES response to the question in Section II of this Applicability Determination form.)
Does the proposed activity involve a change to:
J. Managerial or administrative procedures, controls, or activities (including software used only for the implementation of administrative procedures, controls, or activities) governing the conduct of facility operations (subject to the control of 10CFR50, Appendix B)?
- 2. Regulatory commitment not covered by another regulation based change process? See NEI 99-04.)
Does the proposed activity potentially affect the design, operation, or maintenance of the ISFSI facility as described in the dry cask storage FSAR or the 72.212 Report? (See FDP-ZZ-00105 and Attachment l of APA-ZZ-00143.)
APA-ZZ-00143 Al 70.0010 Page 3
Response
ONO YES
[8J N/A See Section 4.2.3 of the RM Process the FSAR change per APA-ZZ-00108 and FDP-ZZ-00103 for revising License Documents.
Note:
A NO response in the Response column at left means that the FSAR/TS Bases change is one that requires further 50.59 review (i.e., is not excludable from further review).
A YES response means that the FSAR does NOT require further 50.59 review.
Process the TS Bases change per APA-ZZ-00108 and FDP-ZZ-00103 for revising License Documents.
Note:
A NO response in the Response column at left means that the TS D NO D YES Bases change is one that requires further 50.59 review (i.e., is not
[8J NIA excludable from further review).
Response
A YES response means that the TS Bases Change does NOT require further 50.59 review.
See Section 4.2.4 I 4.2.6 of the RM.
IfYES, process per APA-ZZ-00101
[8J NO O YES or APA-ZZ-00109.
1v1 NO YES If YES, process per k:::.I APA-ZZ-00540.
[8'.INO O YES If YES, perform a 72.48 Screen per APA-ZZ-00143 unless the change is completely covered by the response to Section II.
Note:
Editorial or administrative changes are excluded from the requirement to perfom, a 72.48 Review.
CA2510 Rev.005
APPLICABILITY DETERMINATION (Continued) viii. Justification/explanation for Response(s) (as needed):
CR 202303427 Per NRC recommendation, changed flowchart to notify the NRC Operation Center prior to notifying the NRC Resident Inspector. Moved the Resident Inspector to only be notified when an initial classification is made or when a change of classification is made per the Resident Inspector. This change modifies an RERP implementing procedure and is controlled frilly by IOCFR5O54(q). 10CFR5O59 is not required.
lx.
Conclusion:
iUpcci of the activity are controlled by one or more of the procedures above, therefore a 5059 Screen isnot required.
U A gfljo of the activity isnot controlled by one or more of the procedures above, therefore a 5059 Screen is required.
x.
- Preparer _ze.1 l)ate: _tIoi 1S
( Pd u iiCc)
- a 1SinPlN)
Qualified RevIcurcI;rnojh &W; ffi &n l)aic:
4 1 4 (Print mints!
7 (Sign PIN) 1107.?,
Ensure that once signed, this record is loaded into JiB with the Activity/Document Number listed above or submit this form to either the Regulatory Affairs clerk or another member of Administration in accordance with APA-ZZ-00220.
APA-ZZ-00143 Page 4 CA251O M70.OOlO Rev. 005