ML23164A025
ML23164A025 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 06/13/2023 |
From: | Ameren Missouri |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
Shared Package | |
ML23164A024 | List: |
References | |
EIP-ZZ-00240 Add. A, Rev. 008 | |
Download: ML23164A025 (1) | |
Text
EIP-ZZ-00240 ADDENDUM A Rev. 008 EMERGENCY COORDINATOR (EC) CHECKLIST
TABLE OF CONTENTS Section Page Number
1.0 PURPOSE........................................................................................................................................... 3
2.0 SCOPE................................................................................................................................................ 3
3.0 RESPONSIBILITIES........................................................................................................................ 3
4.0 PROCEDURE INSTRUCTIONS..................................................................................................... 3
5.0 REFERENCES
................................................................................................................................... 3 5.1. Implementing........................................................................................................................... 3 5.2. Developmental......................................................................................................................... 3
6.0 RECORDS.......................................................................................................................................... 3
7.0 DEFINITIONS................................................................................................................................... 4
8.0
SUMMARY
OF CHANGES............................................................................................................. 4
EMERGENCY COORDINATOR (EC) CHECKLIST............................................................................. 5
Page 2of 8 INFORMATION USE EIP-ZZ-00240 ADDENDUM A Rev. 008 EMERGENCY COORDINATOR (EC) CHECKLIST
1.0 PURPOSE
Provide guidance in the performance of the Emergency Coordinator position for Radiological Emergency Response Plan (RERP) events.
2.0 SCOPE
This procedure covers the Emergency Coordinator position. Other positions are covered in separate procedures.
3.0 RESPONSIBILITIES
Emergency Coordinator responsibilities are covered in the body of the main procedure, EIP-ZZ-00240, Technical Support Center Operations.
4.0 PROCEDURE INSTRUCTIONS
Emergency Coordinator generic procedural instructions are covered in the body of the main procedure, E IP -ZZ-00240, Technical Support Center Operations.
5.0 REFERENCES
5.1. Implementing
5.1.1. KOA-ZZ-A0002, Command and Control Guidelines
5.1.2. EIP-ZZ-00102, Emergency Implementing Actions
5.1.3. EIP-ZZ-00240, Technical Support Center Operations
5.1.4. EIP-ZZ-00260, Event Closeout / Plant Recovery
5.1.5. CA2783, Emergency Response Facility Functionality Evaluation
5.2. Developmental
5.2.1. Callaway Plant RERP
6.0 RECORDS
This addendum becomes a record of the event and is given to the Administrative Coordinator or Emergency Preparedness staff following the event.
Page 3of 8 INFORMATION USE EIP-ZZ-00240 ADDENDUM A Rev. 008 7.0 DEFINITIONS
None
8.0
SUMMARY
OF CHANGES
Page(s) Section or Description Step Number Changes made due to CR202302005
5 Initiation, Added new Step 1 to 4.b -Briefing by SM to ensure plant events that led Step 4.b.1 to prior declarations are discussed and opportunity for EC to verify accuracy.
7 Operations, Added new Step 6 to remind EC of potential 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> notification Step 6 requirements for missed or miss -classified declarations.This change informs EC of potential notifications could be required.
Page 4of 8 INFORMATION USE EIP-ZZ-00240 ADDENDUM A Rev. 008 EMERGENCY COORDINATOR (EC) CHECKLIST Sheet 1 of 4 Date: _____________ Time: ___________
INITIATION
NOTE Some items in this section are shared with other groups and may have already been completed.
- 1. Initial entrance to the Technical Support Center (TSC) :
- a. CARD IN usingthe accountability card reader.
- b. SIGN IN on Facility Sign-in board.
- c. CLIP ON Emergency Coordinator badge retrieved from the EC Packet.
- d. REVIE W KOA -ZZ-A0002, Command and Control Guidelines.
- 2. INITIATE Log Sheet.
NOTE RERP Key Positions (min. staffing) required for Technical Support Center (TSC) activation are:
EC - ENS Communicator - TAC - HPC The TSC Activation time clock stops when these four positions " are ready to assume their responsibilities".
- 3. EVALUATE TSC Status:
- Minimum Staffing.
- Log when all Minimum Staffing positions are "ready to assume their responsibilities ".
- Functionality (Use CA2783, Emergency Response Facility Functionality Evaluationif needed).
- 4. RECEIVE briefing by:
- a. Technical Assessment Coordinator. (EAL Monitoring).
- b. Shift Manager:
- 1) Discuss plant conditions that led to current EAL declarations
- 2) Determine where on E IP -ZZ- 00102, Emergency Implementing Actions, Attachment 5 flowchart the SM is at, in order to take over actions in the flowchart.
- 3) RelieveShift Manager as Emergency Coordinator.
Page 5of 8 INFORMATION USE EIP-ZZ-00240 ADDENDUM A Rev. 008 Emergency Coordinator (EC) Checklist (Cont'd.)
Sheet 2 of 4
- 5. ENSURE following responsibilities have been transferred from Control Room:
- EAL Monitoring.
- ENS Communication.
- Health Physics Activities
- SAMG Implementation (if applicable).
- 6. MAKE a site-wide announcement, The T SC has accepted emergency responsibilities from the Control Room.
- 7. LOG the time the TSC accepted all emergency responsibilities from the Control Room.
NOTE
Until the EOF has been activated and has accepted responsibility for off-site notifications, the EC will need to coordinate with the Shift Manager to send any required off-site notifications from the Control Room.
- 8. REVIEW plant/group status with TSC Coordinators:
- Administrative
- Technical Assessment
- Chemistry
- Health Physics
- Security
- Operations Support/Support Area
- 9. INFORM TSC Coordinators to assess manpower needs and request additional personnel from the Admin Coordinator as needed. All excess responders to the TSC are to assemble in the Operations Support Area and await f urther instructions.
NOTE
Personnel sent home should remain fit for duty.
- 10. After assessing manpower needs, INSTRUCT all excess personnel to return home or return to work (ALERT or lower classification) and remain near their phones in case they are needed.
-END OF SECTION-
Page 6of 8 INFORMATION USE EIP-ZZ-00240 ADDENDUM A Rev. 008 Emergency Coordinator (EC) Checklist (Cont'd.)
Sheet 3 of 4
OPERATIONS Steps in this Section should be frequently reviewed.
NOTE
Priorities should be listed on the Priority Status Board.
- 1. Periodically UPDATE TSC personnel on priorities, habitability status of TSC and Site radiological conditions.
- 2. CONTINUE activities per E IP -ZZ- 00102, Emergency Implementing Actions.
- 3. PERFORM periodic briefs with the individuals below concerning on-site activities:
- TSC Coordinators.
- SM.
- On site NRC personnel.
- RM.
- 4. IF conditions change that result in changes to Event Classification OR Protective Action Recommendations, immediately NOTIFY the Recovery Manager ( RM) to ensure off -site notifications are timely.
- 5. ENSURE that NRC notifications per 10CFR50.72 are made. CONSIDER requesting assistance from Regulatory Affairs toevaluate reportability.
- 6. If review of EALs identifies an EAL declaration was missed or was miss -classified, a potential 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> report to the NRC may exist. Review EIP-ZZ-00101 Note prior to section 5.5 for details.
-END OF SECTION-
TURNOVER
- 1. BRIEF oncoming Emergency Coordinator on Plant and Faci lity status, transfer EC badge, and review log.
- 2. INFORM Recovery Manager, Shift Manager and TSC staff of change in personnel.
- 3. RECORD time turnover complete. _________________
- 4. LOG turnover.
- 5. INITIATE a new checklist using another copy of this procedure (EIP-ZZ- 00240 Addendum A, Emergency Coordinator (EC) Checklist).
-END OF SECTION-
Page 7of 8 INFORMATION USE EIP-ZZ-00240 ADDENDUM A Rev. 008 Emergency Coordinator (EC) Checklist (Cont'd.)
Sheet 4 of 4
EVENT CLOSEOUT/RECOVERY
- 1. CONTACT Recovery Manager.
- 2. CONTACT Shift Manager.
- 3. PERFORM applicable steps of E IP -ZZ- 00260, Event Closeout / Plant Recovery.
-END OF SECTION-
TERMINATION and SHUTDOWN
- 1. SHUTDOWN TSC (if required).
- 2. DIRECT coordinators to shutdown TSC, RECORD time ___________.
- 3. MAKE site wide announcement that the TSC has been shutdown.
- 4. CLIP Emergency Coordinator badge to the EC packet.
- 5. COLLECT documents and GIVE to Administrative Coordinator or Emergency Preparedness Staff.
-END OF SECTION-
Page 8of 8 INFORMATION USE