ML24318C467

From kanterella
Jump to navigation Jump to search
HDP-ZZ-01500 - Radiological Postings
ML24318C467
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/19/2024
From: Kissock E
Ameren Missouri
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
HD-ZZ-01500
Download: ML24318C467 (1)


Text

PROCEDURE REVIEW FORM (PRF) 1.0 Initiation Initiator: Elijah Kissock Date: 09/19/2024 Procedure Dept:

>Wf Rf Document#: HDP-ZZ-01500 New Rev.#

054 (3 digits required)

,vie I

Title:

Radiological Postings t~"' tpt.'#

Level of Use:

Continuous Reference

[g!Information Multiple NIA 2.0 Reason for Change/Description of Change (Lisi commitments, CRs, eB Change Req11ests, OERs, Plant Mods etc. and record n11mbers here.)

CR 202207243-001 and CR 202307130-001. Reformatted procedure to align with Callaway Standards, added multiple steps, deleted multiple steps, deleted notes, added verbiage for clarity on multiple steps.

See SOC for more details.

Continued: D 3.0. Document Disposition 0Temp Change 0New Document Major Revision

[g!Minor Revision Cancellation Administrative Correction Deot. Head or Designated Aoorover reauired for Administrative Corrections (Signature/PIN/Date)- no other signatures reauired 4.0 Interim Approval (Temp. Change Only)

Temp. Change#:

Expiration Date:

Cognizant Supervisor (Signature/PIN/Date)

SRO (Signature/PIN/Date)

5.0 Comments

Continued: D 6.0 Reviews and Signatures (NOT required for Administrative Corrections)

Reviews Reauired Dent PIN Sienature Date CA0/39 Attached Preparer 0

,~~fli7 fkr lo/

lot.'fo~/f NIA Technical Review f._(J fo3JoL1

~ ) J/74

~\\I'"{~ --

lil 10/ 1-"\\

0Yes _g)No Technical Review Rr

!s'f1o5"

, C '(II D 'u

~

IO -iJ-)..'-/

0Yes ~No Add'l Review 0Yes 0No Add'l Review 0Yes 0No Additional Reviews (See Attached CA0139 forms).

Number of additional CAO 139s:

Validation I Tvoe Coordinator - PIN I

Signature Date CA0/39 Attached I

I D );"~s 0No 50.59 Review 0CA2510 0CA2511 0CA2512 / ~ NIA (perAPA-ZZ-00143) ~l '38A=l, c.. ~ ~1f?fl2 Screener Initial I PIN A eviewer Initial I PIN (Dept. Head or Designated Approver) Is a Change Management Plan required? OYes ~ No (IF YES, attach CA2773 or CA2774)

Is a Cross-Disciplinary review required? OYes

'No 7.0 Approval (Either approval m11st be q11alified as PATIAPVR or PAT/GAPR in Qua/Master)

D Senior Director Nuclear Operations Approval (per APA-ZZ-OO Io 1) 0 ORC is required in accordance with AP A-ZZ-00091

~

- D rtment Hee~d F" al Review a1_!9--Approval ORC Meeting:

/_.

lf'W~

//4

~ "':;,.._

.n _,,-

} (!),, 3/, Zo Z.

I'---"'""

Dept. Head or Designated Approver Senior Director Nuclear Operations (Signature/PIN/Date)

(Signature/PIN/Date)

Note: Page 2 provides ins/ructions to complete this form and may be discarded Al90.0001, 2, 5, 35 -A210.0062, 65, 69; Ml90.0001 Page 1 of 2 CA0033 ATIA '771\\1'1()1