Enclosure 2: Callaway Plant, Unit 1 - Marked-up Copy of Affected Pages of the RERP
ML22039A320
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/08/2022
From:
Ameren Missouri, Union Electric Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML22039A317 List:
References
ULNRC-06710
Download: ML22039A320 (11)


Text

Enclosure 2 to ULNRC-06710 Page 1 of 11 Marked-up Copy of Affected Pages of the RERP to ULNRC-06710 Page 2 of 11 RERP Rev. 053 Committed Dose Equivalent (CDE) - The dose equivalent to organs or tissues of reference that will be received from an intake of radioactive material by an individual during the 50-year period following the intake.

Committed Effective Dose Equivalent (CEDE) - The sum of the products of the weighting factors applicable to each of the body organs or tissues that are irradiated and the committed dose equivalent to these organs or tissues.

Confinement Boundary - The barrier(s) between areas containing radioactive substances and the environment.

Containment Closure - Is the action to secure Containment as a functional barrier to fission product release during cold shutdown conditions. Containment closure means that all potential escape paths are closed or capable of being closed (ref. 3.1.6). Containment Closure exits if, for each containment penetration (ref. 3.1.7)

1. The system associated with the penetration is in service providing pressure or providing a water seal to prevent escape of Containment atmosphere to outside of containment, or
2. The inside containment isolations of a penetration are in their required state or the outside Containment isolations of the penetrations are in the required state, or
3. Alternate means of isolating at least one side of a penetration have been established per OSP-GT-00003 Attachment 6, or
4. Administrative controls have been established to isolate a breached penetration when required as described in OSP-GT-00003 Attachment 7.

Contiguous - Being in actual contact; touching along a boundary or at a point.

Control Room (CR) - The area located on the 2047'-6" elevation of the Control Building from which the reactor and its auxiliary systems are controlled.

Corrective Actions - Emergency measures taken to mitigate or terminate an emergency situation at or near the source of the problem.

Deep Dose Equivalent (DDE) - The dose equivalent at a tissue depth of 1 cm.

Department of Health (DOH) - A department of the State responsible for evaluating the effects of a radiological emergency on the population at risk.

Desired Numbers - As this term appears in Table 5-2, it is the complete or full staffing of the organization (all positions filled with the optimum number of responders) so as not to be confused with minimum staffing or numbers.

Dose Equivalent (DE) - The product of the absorbed dose in tissue, quality factor, and all other necessary modifying factors at the location of interest. The unit of dose equivalent is the rem.

Drill - A supervised instruction period aimed at testing, developing, and improving skills.

Duty - Rotating on-call coverage, scheduled around the clock, to ensure response during off normal working hours.

Duty Manager (DM) - A designated member of the Callaway Plant management staff who is assigned the responsibility of being the initial contact for problems when the Shift Manager needs guidance during normal plant operations.

Page 8 of 138 to ULNRC-06710 Page 3 of 11 RERP Rev. 053 Lower Flammability Limit (LFL) - The minimum concentration of a combustible substance that is capable of propagating a flame through a homogenous mixture of the combustible and a gaseous oxidizer.

Maintain - Continuously control a parameter to some required guideline. Example:

MAINTAIN steam generator levels at 50% (45%-55%).

Minimum Staffing - Pre-designated Emergency Response Personnel assigned to activate the Technical Support Center and the Emergency Operations Facility sufficiently to relieve Control Room personnel of emergency functions not directly related to operation of the Plant.

Minimum Staffing personnel are designated on a rotating basis to be available for mobilization via the Cellular Paging System. When designated on duty, personnel must remain fit for duty and within their designated response time of the Plant.

Mobilization - The process of staffing the Emergency Response Facilities. This includes announcements over the Plant Gai-tronics system and activation of the Cellular Paging System.

Multi-Purpose Canister (MPC) - MPCs are the sealed spent nuclear fuel canisters which consist of a honeycombed fuel basket contained in a cylindrical canister shell which is welded to a baseplate, lid with welded port cover plates, and closure ring. The MPC provides the confinement boundary for the contained radioactive materials.

Non-Essential Personnel - All personnel who are not actively filling an emergency response position or providing support to the Emergency Response Organization.

Normal Plant Operations - Activities at the plant site associated with routine testing, maintenance, or equipment operations, in accordance with normal operating or administrative procedures. Entry into abnormal or emergency operating procedures, or deviation from normal security or radiological controls posture, is a departure from Normal Plant Operations.

Normal Working Hours - Current standard core hours per Company and Plant policies and procedures. Off hours are the remaining hours in the week, including weekends and holidays.

Off-site - Any area outside of the Protected Area fencing.

On-site - Any area located within the Protected Area fencing.

Operable - Able to perform its intended function.

Owner Controlled Area - The fenced area contiguous to the Protected Area, designated by Callaway Plant to be controlled for security purposes.

Personnel Monitoring Devices - Any device designed to be worn or carried by an individual for the purpose of measuring the radiation exposure received, such as film badges, self-reading dosimeters, thermoluminescent dosimeters, optically stimulated luminescent dosimeters, etc.

Physically Operable - Plant systems, equipment, or devices shall be physically operable when they are capable of performing their specific function, regardless of Technical Specifications criteria, and could be available for use during emergency operations.

Plant Operating Procedures - A set of procedures to be used to provide the guidance and control of the Plant operation.

Page 12 of 138

Enclosure 2 to ULNRC-06710 Page 4 of 11 RERP Rev. 053 Table 5-2 Emergency Staffing Requirements / Emergency Response Organization (On-Site/TSC)

Sheet 1 of 6 Response Response Desired Emergency Position Function Major Tasks Response Level Goal + Goal + Location Number Off Hours Normal Hours Direction and Control of On-Site Emergency Emergency Coordinator # 1 Emergency Management Response, accident assessment and emergency ALERT 15 Minutes 75 Minutes TSC declarations TSC Communicator Notifications/

1 Maintain NRC ENS Communications link ALERT 15 Minutes 75 Minutes TSC (ENS) # Communications Administrative Coordination of Direct Administrative/Clerical Support including 1 ALERT 15 Minutes 75 Minutes TSC Coordinator Administrative Support logistics, Coordinates Activation of Facility Records retrieval, document reproduction, Clerical Support Staff

  • Administrative Support ALERT 15 Minutes As Needed TSC messengers, filing, etc.

Directs Assessment of On-Site Radiological Health Physics 1 Radiological Assessment Conditions, Directs Radiological Support for ALERT 15 Minutes 75 Minutes TSC Coordinator #

Emergency Activities Coordination of corrective Directs and Coordinates corrective and Operations Support 1 actions by Emergency emergency maintenance, and Forms, Briefs and ALERT 15 Minutes 75 Minutes TSC Coordinator Teams Debriefs Emergency Teams Obtains parts, supplies, and materials from Stores Personnel 1 Supply Support ALERT 15 Minutes 75 Minutes TSC Warehouse Emergency Team Coordinators Coordination of Directs Emergency Team formation, briefing, 1 ALERT 15 Minutes 75 Minutes TSC

  • Mechanical Emergency Teams dispatch, tracking and support 1
  • Electrical Coordination and transfer Control CR/TSC Liaison 1 Coordinate CR to TSC Communications ALERT 15 Minutes 75 Minutes of information Room

+ Facility activation will be done as soon as practical. Facility Activation Goals for the TSC and EOF are 90 minutes for off hours and 30 minutes during normal working hours (assumes 15 minutes from arrival at the facility). Response times may vary due to inclement weather and/or road conditions.

  1. Minimum positions needed for facility activation. A facility is considered activated when designated minimum personnel are ready to assume their responsibilities.
  • As needed Page 56 of 138

Enclosure 2 to ULNRC-06710 Page 5 of 11 RERP Rev. 053 Table 5-2 Emergency Staffing Requirements / Emergency Response Organization (On-Site/TSC)

Sheet 2 of 6 Response Response Desired Goal +

Emergency Position Function Major Tasks Response Level Goal + Location Number Normal Off Hours Hours Directs technical analysis of plant Technical Support and Technical Assessment conditions to formulate EAL and 1 Recommendations for ALERT 15 Minutes 75 Minutes TSC Coordinator # emergency mitigating recommendations to Emergency Declarations the EC Supervise Engineering Assist TAC in command and control of TSC Lead Engineer 1 ALERT 15 Minutes 75 Minutes TSC Staff Engineering Staff Engineering Maintains logs and status Maintains logs and statusboards for 3 ALERT 15 Minutes 75 Minutes TSC Statusboard/Logkeepers boards Technical Assessment group TSC Engineering Staff

  • Mechanical Engineer 1 Engineering evaluation of Analyze Plant Engineering Problems,
  • Electrical Engineer 1 Plant Systems and Recommend courses of Action, Maintain ALERT 15 Minutes 75 Minutes TSC
  • Reactor/Nuclear Engineer 1 Conditions Technical Status Boards, Evaluate EALs
  • I&C Engineer 1 Direct primary and secondary Chemistry Chemistry Coordinator 1 Chemistry Support ALERT 15 Minutes 75 Minutes TSC activities, evaluate chemical conditions Security Coordinator 1 Security Direct Security activities per Security Plan ALERT 15 Minutes 75 Minutes TSC On-shift Emergency See See Table 5-1 UNUSUAL EVENT Immediate Immediate Response Table 5-1

+ Facility activation will be done as soon as practical. Facility Activation Goals for the TSC and EOF are 90 minutes for off hours and 30 minutes during normal working hours (assumes 15 minutes from arrival at the facility). Response times may vary due to inclement weather and/or road conditions.

  1. Minimum positions needed for facility activation. A facility is considered activated when designated minimum personnel are ready to assume their responsibilities.

Page 57 of 138

Enclosure 2 to ULNRC-06710 Page 6 of 11 RERP Rev. 053 Table 5-2 Emergency Staffing Requirements / Emergency Response Organization (On-Site/TSC)

Sheet 3 of 6 Response Response Desired Emergency Position Function Major Tasks Response Level Goal + Goal + Location Number Off Hours Normal Hours Emergency repair, search and rescue, Support Area Personnel Emergency Team firefighting, team members, support TSC Support ALERT 15 Minutes Including: Support emergency operations. Obtaining supplies Area and materials from the Warehouse Health Physics Radiological Support for Emergency Teams, Coordinator, Chemistry additional radiological support, Field TSC Support

  • Rad/Chem Support 14 Coordinator, and ALERT 15 Minutes 75 Minutes Monitoring Teams, Dose Assessment Staff, Area Emergency Team Chemistry activities Support Evaluation and repair of mechanical TSC Support
  • Mechanics 2 Mechanical repairs ALERT 15 Minutes 75 Minutes problems impacting plant operations Area Evaluation and repair of electrical problems TSC Support
  • Electricians 2 Electrical Repairs ALERT 15 Minutes 75 Minutes impacting plant operations Area Evaluation and repair of I&C problems TSC Support
  • I&C Technicians 1 I&C Repairs ALERT 15 Minutes 75 Minutes impacting plant operations Area

+ Facility activation will be done as soon as practical. Facility Activation Goals for the TSC and EOF are 90 minutes for off hours and 30 minutes during normal working hours (assumes 15 minutes from arrival at the facility). Response times may vary due to inclement weather and/or road conditions.

Page 58 of 138

Enclosure 2 to ULNRC-06710 Page 7 of 11 RERP Rev. 053 Table 5-2 Emergency Staffing Requirements / Emergency Response Organization (EOF)

Sheet 4 of 6 Response Response Desired Emergency Position Function Major Tasks Response Level Goal + Goal + Location Number Off Hours Normal Hours Manage Overall Callaway Plant Emergency Response, Protective Action Recovery Manager # 1 Emergency Management Recommendations, Off- Site Notifications and ALERT 15 Minutes 75 Minutes EOF Communication, Interface with Off-Site Authorities Review and Validate Recommendation for Protective Measures Recommend Protective 1 Protective Actions using Plant Conditions and ALERT 15 Minutes 75 Minutes EOF Coordinator Actions to RM Off-Site Dose Assessments Direct Field Monitoring Activities, Calculate Dose Assessment Off-site Dose Projections, Perform 1 Dose Assessment ALERT 15 Minutes 75 Minutes EOF Coordinator # Assessments, Confirm PARs based upon Dose Projections Calculate Off-site Dose Projections, Perform Assistant Dose Assessment 1 Dose Assessment Assessments, Confirm PARs based upon ALERT 15 Minutes 75 Minutes EOF Coordinator Dose Projections Communicate with and Record Field Field Team Monitoring Teams data, coordinate team Dose Assessment Staff 2** Communications, Maintain efforts as directed by Dose Assessment ALERT 15 Minutes 75 Minutes EOF Status Boards Coordinator, maintain status boards, man the HPN Line when directed Plume tracking, collection Collect radiological environmental data as Field Monitoring Teams 2** of radiological data from ALERT 15 Minutes 75 Minutes Mobile directed the field

+ Facility activation will be done as soon as practical. Facility Activation Goals for the TSC and EOF are 90 minutes for off hours and 30 minutes during normal working hours (assumes 15 minutes from arrival at the facility). Response times may vary due to inclement weather and/or road conditions.

  1. Minimum positions needed for facility activation. A facility is considered activated when designated minimum personnel are ready to assume their responsibilities.
    • Can be filled from paged personnel and/or dispatched from personnel in the TSC Support Area.

Page 59 of 138

Enclosure 2 to ULNRC-06710 Page 8 of 11 RERP Rev. 053 Table 5-2 Emergency Staffing Requirements / Emergency Response Organization (EOF)

Sheet 5 of 6 Response Response Desired Emergency Position Function Major Tasks Response Level Goal + Goal + Location Number Off Hours Normal Hours Review of Plant Reviews and validates plant conditions and Plant Assessment 1 Conditions and EALs to verify existing and formulate new ALERT 15 Minutes 75 Minutes EOF Coordinator Recommendation of PARs protective action recommendations Analyze and interpret plant conditions to Recommend PARs based Plant Assessment Staff 2 Evaluate PARs, Maintain Technical Status ALERT 15 Minutes 75 Minutes EOF on Plant Conditions Boards Direct Support activities and assist in procurement of identified materials, initiate Logistical Support Procurement of goods and 1 contracts for goods and services, Provide ALERT 15 Minutes 2 Hours EOF Coordinator services Administrative and Clerical direction and support Logistical Support Staff

  • Material Eng. Buyer, Develop Purchase specifications, solicit bids etc. 2 Procurement of goods and for goods and services, Assist Logistical ALERT 15 Minutes 2 Hours EOF services Support Coordinator, Provide Clerical Support
  • Clerical Support
  • General Clerical Tasks Notifications/

EOF Communicator # 1 Off-site Notifications/Communications ALERT 15 Minutes 75 Minutes EOF Communications Coordinate activities of Coordinate: EOF Activities, Support for Local, Off-site Liaison 1 Off-Site personnel State and Federal Responders. Man EOF ALERT 15 Minutes 75 Minutes EOF Coordinator working at the EOF communication links.

+ Facility activation will be done as soon as practical. Facility Activation Goals for the TSC and EOF are 90 minutes for off hours and 30 minutes during normal working hours (assumes 15 minutes from arrival at the facility). Response times may vary due to inclement weather and/or road conditions.

  1. Minimum positions needed for facility activation. A facility is considered activated when designated minimum personnel are ready to assume their responsibilities.
  • As needed Page 60 of 138

Enclosure 2 to ULNRC-06710 Page 9 of 11 RERP Rev. 053 Table 5-2 Emergency Staffing Requirements / Emergency Response Organization (JIC)

Sheet 6 of 6 Response Response Emergency Position Min. # Function Major Tasks Location Level Goal +

Official Company representative, Obtain and disseminate Company Spokesperson 1 Media Interface ALERT 2 Hours JIC emergency information, Conduct Media briefings Provide technical information to Company Spokesperson, JIC Technical Representatives 2 Technical Support Provide technical input for media briefings and news ALERT 2 Hours JIC / EOF releases Support the Company Spokesperson, Coordinate JIC Coordinator 1 Public/Media Relations information on Callaway Plant with SEMA ALERT 2 Hours JIC JIC Administrator 1 Public/Media Relations Administration and Logistics of JIC ALERT 2 Hours JIC JIC Editor 1 Public/Media Relations Composes written news releases ALERT 2 Hours JIC JIC Media Host 1 Public/Media Relations Accommodate Media Needs ALERT 2 Hours JIC

+ Facility activation will be done as soon as practical. Facility Activation Goals for the JIC is 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for off hours and normal working hours.. Response times may vary due to inclement weather and/or road conditions.

Page 61 of 138 to ULNRC-06710 Page 10 of 11 RERP Rev. 053 6.3. Notification After the declaration of an emergency, the Emergency Coordinator ensures that notifications are made to:

  • Emergency Coordinator (TSC);
  • State and local notification points;
  • Nuclear Regulatory Commission;
  • Recovery Manager;
  • Institute for Nuclear Power Operations (at ALERT or higher emergency classification);
  • American Nuclear Insurers (at ALERT or higher emergency classification).

Initial notifications to the State and local authorities shall be initiated within 15 minutes after the declaration of an emergency. Periodic updates are made to the State and local authorities upon activation of the State and local Emergency Operations Centers. These follow up notifications should be made whenever significant changes in Plant status occur, or approximately every half hour when until conditions are relatively stable. Follow-up notifications should be made with the same urgency as initial notifications when changes in Protective Action Recommendations are involved. When event conditions are relatively stable and the Plant remains at an UNUSUAL EVENT, the follow--up notification frequency may be reduced to an agreed upon frequency, with the consensus of SEMA and the EPZ counties. Updates and notifications should be shared with State and local authorities present in the EOF.

Notifications inform the State and local authorities of the emergency classification, release information, plant status, Protective Action Recommendations, and radiological and meteorological data used to form protective action recommendations.

6.3.1. Emergency Coordinator (TSC)

The Emergency Coordinator (TSC) is notified by the Shift Manager (Emergency Coordinator) upon declaration of any emergency classification. At a minimum, the following topics should be discussed:

  • Classification of the emergency (potential need to reclassify);
  • Current Plant status and actions taken;
  • Augmentation/Paging of Emergency Response Organization (necessary or required augmentation);
  • Notification of authorities.

6.3.2. Nuclear Regulatory Commission (NRC)

Notification of the NRC will be initiated by a Communicator (upon direction from the Emergency Coordinator) utilizing the Emergency Notification System (ENS).

Once communications with the NRC is established, it will be maintained until the NRC directs otherwise.

Page 63 of 138 to ULNRC-06710 Page 11 of 11 RERP Rev. 053 6.4. Mobilization The number and types of personnel needed to mitigate the circumstances of an emergency will depend upon three factors:

  • Classification of the emergency (providing a relative indication of the severity);
  • Probability for the situation to escalate or de-escalate;
  • Specific nature of the emergency (e.g., radiological, equipment failure, natural disaster).

The classification of an emergency is utilized for determining the minimum number and types of personnel anticipated to be needed. The Emergency Coordinator determines if additional personnel are necessary to mitigate or terminate the events leading to or resulting from the emergency. If necessary, the Emergency Coordinator may augment/page portions of the Emergency Response Organization prior to their mandated time. EIPs provide for both the timely callout of the Emergency Response Organization (Chapter 5.0) and the staffing of their associated Emergency Response Facilities (Chapter 7.0).

In addition to personnel needed to mitigate the consequences of the emergency, personnel are also needed to ensure an accurate and timely release of information to the media and general public. The Emergency Response Organization also provides for the timely dissemination of emergency information to the media and general public. For emergency classifications, where greater media interest is anticipated, provisions are made for establishing a Joint Public Information Center (JIC) for more extensive coordinated media briefings and conferences.

During normal working hours, plant alarms, the public address system, and the cellular paging system are the primary means of notifying plant personnel.

If an ALERT (or higher) classification is declared during normal working hours, all qualified personnel (Fit for Duty) report to their Emergency Response Facility and then unnecessary personnel will be dismissed. Some departments have policies or procedures that designate specific personnel to respond during normal working hours.. Emergency response during off hours is by Emergency Response Duty Personnel and Emergency Response Augmentation Personnel.

During off normal working hours, The plant alarms, public address system, and the cellular paging system are used to notify ERO personnel. An automated calling system is an alternate or additional method of mobilizing selected ERO personnel.

When the Emergency Response Organization is notified via the Cellular Paging System.

Emergency Response Duty personnel (Minimum Staffing) report to the TSC and the EOF within approximately 75 minutes to relieve the Control Room of emergency response functions not directly related to Plant operation.

Emergency Response Augmentation Personnel respond to their designated facilities within approximately 75 minutes (2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for some positions). Together, the Emergency Response Organization is capable of fulfilling all intended functions for each Emergency Response Facility as detailed in Chapter 7.0.

Page 65 of 138