{{#Wiki_filter:NORTH ANNA POWER STATION SLR DRAFT EIS COMMENT FORM
{{#Wiki_filter:NORTH ANNA POWER STATION SLR DRAFT EIS COMMENT FORM Page l 1 No.
 
Section Page Line Comment
No.           Section         Page           Line                                                       Comment                                                                   SUNSI Review Complete Template=ADM-013 E-RIDS=ADM-03
: 1.
: 1.       1.1               1-2         22               The identified page of the EIS states that CLI-22-03 was issued on September 28, 2022.                                   ADD: Tam Tran, Ashley Waldron, Antoinette Walker-Smith Mary Neely
1.1 1-2 22 The identified page of the EIS states that CLI-22-03 was issued on September 28, 2022.
 
EIS, Page xix correctly states that CLI-22-03 was issued February 24, 2022,
Comment (6)
: 2.
EIS, Page xix   correctly states that   CLI-22-03 was issued February 24, 2022         ,                               Publication Date:1/8/2024 Citation: 89 FR 960
3.2.1.3 3-7 4
: 2.       3.2.1.3           3-7         4                 The identified page of the EIS states, Section 15.2-223 of the Code of Virginia The Code of Virginia for comprehensive planning appears to be                                                                                                 Section 15.2         -2223.
The identified page of the EIS states, Section 15.2-223 of the Code of Virginia The Code of Virginia for comprehensive planning appears to be Section 15.2-2223.
: 3.       3.4.4             3-23         19               The identified page of the EIS lists the following  
: 3.
3.4.4 3-23 19 The identified page of the EIS lists the following  


==Reference:==
==Reference:==
 
(VEPCO 2020; VDMME 2021-TN8548).
(VEPCO 2020; VDMME 2021-                                                             TN8548).
The correct Reference might be (VEPCO 2020; https://www.energy.virginia.gov/geology/Earthquakes.shtml ).
The correct Reference might             be (VEPCO 2020; https://www.energy.virginia.gov/geology/Earthquakes.shtml ).
: 4.
: 4.       3.4.5             3-25         19               The identified page of the EIS states:
3.4.5 3-25 19 The identified page of the EIS states:
Regardless, stabilization measures to prevent erosion and sedimentation impacts to the North Anna site and surrounding area have been in place since construction began in the early 1970s and a Storm Water Pollution Prevention Plan (SWPPP) was implemented in 2015 (VEPCO 2020-                   TN8099).
Regardless, stabilization measures to prevent erosion and sedimentation impacts to the North Anna site and surrounding area have been in place since construction began in the early 1970s and a Storm Water Pollution Prevention Plan (SWPPP) was implemented in 2015 (VEPCO 2020-TN8099).
For clarification a suggestion to split into two sentences:
For clarification a suggestion to split into two sentences:
Regardless, stabilization measures to prevent erosion and sedimentation impacts to the North Anna site and surrounding area have been in place since construction began in the early 1970s. Following VDEQ regulatory review, a Storm Water Pollution Prevention Plan (SWPPP) was re-implemented in 2015 (VEPCO 2020-                                                           TN8099).
Regardless, stabilization measures to prevent erosion and sedimentation impacts to the North Anna site and surrounding area have been in place since construction began in the early 1970s. Following VDEQ regulatory review, a Storm Water Pollution Prevention Plan (SWPPP) was re-implemented in 2015 (VEPCO 2020-TN8099).
: 5.       3.5.1.3           3-34         39-40             The identified page of the EIS states:
: 5.
3.5.1.3 3-34 39-40 The identified page of the EIS states:
The sewage treatment plant monitors and discharges treated effluent at internal Outfall 101 in accordance with North Annas VPDES permit.
The sewage treatment plant monitors and discharges treated effluent at internal Outfall 101 in accordance with North Annas VPDES permit.
Perhaps typographical error - t        he correct outfall appear          s to be Outfall 111.
Perhaps typographical error - the correct outfall appears to be Outfall 111.
SUNSI Review Complete Template=ADM-013 E-RIDS=ADM-03 ADD: Tam Tran, Ashley Waldron, Antoinette Walker-Smith Mary Neely Comment (6)
Publication Date:1/8/2024 Citation: 89 FR 960


Page l 1 NORTH ANNA POWER STATION SLR DRAFT EIS COMMENT FORM
NORTH ANNA POWER STATION SLR DRAFT EIS COMMENT FORM Page l 2 No.
 
Section Page Line Comment
No.                       Section                         Page                         Line                                                                                                           Comment
: 6.
: 6.             3.5.2.3                           3-39                     38-41                           No reference                   was provided for the subsurface monitoring interval spans of the groundwater monitoring wells and piezometers installed at NAPS as part of the Groundwater Protection Program (GWPP),                                                       on the identified page of the                                     EIS.
3.5.2.3 3-39 38-41 No reference was provided for the subsurface monitoring interval spans of the groundwater monitoring wells and piezometers installed at NAPS as part of the Groundwater Protection Program (GWPP), on the identified page of the EIS.
Recommend citing a reference, if one is available.
Recommend citing a reference, if one is available.
: 7.             Appendix G.9                     G-7                     37-40                           No conclusion                     related to climate change impacts on environmental resources                                                                                   was provided on the identified page                                           of the EIS                 .
: 7.
 
Appendix G.9 G-7 37-40 No conclusion related to climate change impacts on environmental resources was provided on the identified page of the EIS.}}
Page l 2}}

Latest revision as of 20:21, 24 November 2024

Comment (6) of Anonymous on North Anna Power Station SLR Draft EIS
ML24045A007
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 02/14/2024
From:
- No Known Affiliation
To:
Office of Administration
References
89FR960 00006
Download: ML24045A007 (1)


Text

NORTH ANNA POWER STATION SLR DRAFT EIS COMMENT FORM Page l 1 No.

Section Page Line Comment

1.

1.1 1-2 22 The identified page of the EIS states that CLI-22-03 was issued on September 28, 2022.

EIS, Page xix correctly states that CLI-22-03 was issued February 24, 2022,

2.

3.2.1.3 3-7 4

The identified page of the EIS states, Section 15.2-223 of the Code of Virginia The Code of Virginia for comprehensive planning appears to be Section 15.2-2223.

3.

3.4.4 3-23 19 The identified page of the EIS lists the following

Reference:

(VEPCO 2020; VDMME 2021-TN8548).

The correct Reference might be (VEPCO 2020; https://www.energy.virginia.gov/geology/Earthquakes.shtml ).

4.

3.4.5 3-25 19 The identified page of the EIS states:

Regardless, stabilization measures to prevent erosion and sedimentation impacts to the North Anna site and surrounding area have been in place since construction began in the early 1970s and a Storm Water Pollution Prevention Plan (SWPPP) was implemented in 2015 (VEPCO 2020-TN8099).

For clarification a suggestion to split into two sentences:

Regardless, stabilization measures to prevent erosion and sedimentation impacts to the North Anna site and surrounding area have been in place since construction began in the early 1970s. Following VDEQ regulatory review, a Storm Water Pollution Prevention Plan (SWPPP) was re-implemented in 2015 (VEPCO 2020-TN8099).

5.

3.5.1.3 3-34 39-40 The identified page of the EIS states:

The sewage treatment plant monitors and discharges treated effluent at internal Outfall 101 in accordance with North Annas VPDES permit.

Perhaps typographical error - the correct outfall appears to be Outfall 111.

SUNSI Review Complete Template=ADM-013 E-RIDS=ADM-03 ADD: Tam Tran, Ashley Waldron, Antoinette Walker-Smith Mary Neely Comment (6)

Publication Date:1/8/2024 Citation: 89 FR 960

NORTH ANNA POWER STATION SLR DRAFT EIS COMMENT FORM Page l 2 No.

Section Page Line Comment

6.

3.5.2.3 3-39 38-41 No reference was provided for the subsurface monitoring interval spans of the groundwater monitoring wells and piezometers installed at NAPS as part of the Groundwater Protection Program (GWPP), on the identified page of the EIS.

Recommend citing a reference, if one is available.

7.

Appendix G.9 G-7 37-40 No conclusion related to climate change impacts on environmental resources was provided on the identified page of the EIS.