{{#Wiki_filter:Westinghouse Non-Proprietary Class 3 Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, Pennsylvania  16066 USA
{{#Wiki_filter:}}
 
Mr. Jerry Segner                                      Direct Telephone:  (860) 731-6260 Principal Project Manager                                      E-mail: shakunma@westinghouse.com Constellation Energy Generation, LLC                          Contract: 00800304 Limerick Generating Station                                Sales Order:                              156102 3146 Sanatoga Road                                            Our Ref:                              LIM-24-090, Revision 0 Pottstown, PA 19464 jerry.segner@constellation.com                                            June 18, 2024
 
CONSTELLATION ENERGY GENERATION LIMERICK UNITS 1 AND 2 DIGITAL MODERNIZATION PROJECT Submittal of Limerick PPS LAR Proprietary and Non-Proprietary Documents
 
==Dear Mr. Segner:==
 
The purpose of this letter is to provide proprietary and non-proprietary versions of documents that were previously submitted to the NRC on the  Limerick docket to support the PPS Upgrade LAR.
The documents do not contain any technical changes from the versions that were previously submitted; only the proprietary redactions were updated. Please note, during the preparation of EQ-QR-433-GLIM, it was discovered that Figure 2.2-1 was erroneously deleted from Revision 2 to Revision 3. Therefore, Revision 4 was created to add the figure back, and it will be provided in this submittal.
 
Attachments:
: 1.                              EQ-EV-386-GLIM-P, Revision 2, Comparis on of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements (Proprietary)
: 2.                              EQ-EV-386-GLIM-NP, Revision 2, Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements (Non-Proprietary)
: 3.                              EQ-QR-433-GLIM-P, Revision 4, Qualification Summary Report for the Plant Protection System Upgrade for Limerick Units 1 & 2 (Proprietary)
: 4.                              EQ-QR-433-GLIM-NP, Revision 4, Qualification Summary Report for the Plant Protection System Upgrade for Limerick Units 1 & 2 (Non-Proprietary)
: 5.                              APP-GW-GLR-611-P, Revision 3, ITAAC 2.5.02.14: Component Interface Module Design Process Technical Report (Proprietary)
: 6.                              APP-GW-GLR-611-NP, Revision 3, ITAAC 2.5.02.14: Component Interf ace Module Design Process Technical Report (Non-Proprietary)
 
                        ©2024 Westinghouse Electric Company LLC. All Rights Reserved
 
*** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Westinghouse Non-Proprietary Class 3                                                                                                                                                                Page 2 of 2 Our Ref: LIM-24-090, Revision 0
 
If you have any questions or require additional information regarding this transmittal, please feel free to contact me at (860) 731-6260.
 
Sincerely, WESTINGHOUSE ELECTRIC COMPANY LLC Electronically Approved
 
Matthew Shakun Principal Licensing Engineer
 
cc:                          Constellation Energy Steven Hesse                                                                                                                                                                                                                                                                                                    steven.hesse@constellation.com Kayla Marriner                                                                                                                                                                                                                                                                                          kaylalover.marriner@constellation.com Zina Gavin                                                                                                                                                                                                                                                                                                                                                            zina.gavin@constellation.com Mark Samselski                                                                                                                                                                                                                                                                  mark.samselski@constellation.com David Molteni                                                                                                                                                                                                                                                                                                          david.molteni@constellation.com Ashley Rickey                                                                                                                                                                                                                                                                                                  ashley.rickey@constellation.com Frank Mascitelli                                                                                                                                                                                                                                                                      francis.mascitelli@constellation.com
 
Westinghouse Electric Company LLC Courtney Frank                                                                                                                                                                                                          Westinghouse Parastoo Muse                                                                                                                                                                                                                Westinghouse Boyan Setchenski                                                                                                                                                              Westinghouse Andrew Lutz                                                                                                                                                                                                                                                              Westinghouse Steve Merkiel                                                                                                                                                                                                                                          Westinghouse Andrew Barth                                                                                                                                                                                                                                          Westinghouse Cynthia Olesky                                                                                                                                                                                                                Westinghouse Warren Odess-Gillett                                                                                                        Westinghouse
 
Electronically Approved Records Are Authenticated in the Electronic Document Management System
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Westinghouse Non-Proprietary Class 3
 
Attachment 2
 
EQ-EV-386-GLIM-NP, Revision 2, Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements (Non-Proprietary)
 
Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066
 
                                                                                      © 2024 Westinghouse Electric Company LLC All Rights Reserved
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Westinghouse Non-Proprietary Class 3 Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements
 
EQ-EV-386-GLIM-NP, Rev. 2
 
Nuclear Safety Related
 
September 2022
 
APPROVALS
 
Function                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Name and Signature Authors                                                                                                                                                                          Daniel W. Martin*
Principal Engineer, Qualification Operations Verifier                                                                                                                                                                              Jonathan W. Drexler*
Principal Engineer, Qualification Operations Reviewer                                                                                                                                                Robert W. Beasley*
Senior Engineer, Safety & Reactor Systems Engineering Approver                                                                                                                                            Jason E. Mears* for Dante Mincin**
Manager, Qualification Operations
              *Electronically approved records are authenticated in the elect ronic document management system.
              **LTR-EQ-22-8
 
                                                        © 2022 Westinghouse Electric Company LLC All Rights Reserved
 
*** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                                                                                    Common Q Applications to Limerick Requirements
 
LIST OF CONTRIBUTORS
 
Revision                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            Name and Title 0 None.
1, 2                                                                                                                        Jennifer E. Moon Principal Engineer, Qualification Operations Suresh Channarasappa Consulting Engineer, Global Instrumentation and Control
 
Template Version 0.2 EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                                              i                                                                                                                                                                                                                                                            Westinghouse Non-Proprietary Class 3
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                                                  Common Q Applications to Limerick Requirements
 
REVISION HISTORY
 
RECORD OF CHANGES
 
Revision Author(s)                            Description                    Completed 0                                                                                                                Jonathan W. Drexler Original Issue.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              3/7/2022 Jennifer E. Moon 1                                                                                                                                          Daniel W. Martin Revised to incorporate NE-402, Rev.2                            8/30/2022 Added Reference to WCAP-16097-P, EQLR-232, and EPRI TR-102323-R4 and renumbered reference list.
Section 2.1: Clarified spectra included NE-402 as bounding in-equipment requirements.
Section 2.2: Updated environmental parameters Section 3.1: Removed evaluation of IERS as the basis for seismic qualification Section 3.2: Added reference to previous test program (EQLR-232) and clarified conclusion of qualification basis for mild environment.
Section 4.2: Added clarification that any additional requirements will be included in the final EQ summary report Section 5: Revised entire section.
 
No technical changes were made to EMC sections.
 
2                                                                                                                                          Daniel W. Martin                                                                Revised to incorporate customer comments. See EDMS Updated Section 2.2, 3.2, and 5.
Removed Reference 8 and Table 2.2-2 Minor editorial changes made throughout.
Changed marked with revision bars.
No technical changes were made to EMC and Seismic sections.
 
OPEN ITEMS
 
Item          Description Status
          - None.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            -
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                                        ii                                                                                                                                                                                                                                                        Westinghouse Non-Proprietary Class 3
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                                                                                                                                                              Common Q Applications to Limerick Requirements
 
TABLE OF CONTENTS
 
Section Title Page
 
LIST OF CONTRIBUTORS .......................................................................................i REVISION HISTORY ................................................................................................ii TABLE OF CONTENTS .............................................................................................iii LIST OF TABLES .......................................................................................................iv LIST OF FIGURES .....................................................................................................iv ACRONYMS AND TRADEMARKS  .........................................................................v GLOSSARY OF TERMS ............................................................................................vi REFERENCES ............................................................................................................x
 
SECTION 1                                                                                INTRODUCTION .......................................................................................................1-1
 
SECTION 2                                                        LIMERICK QUALIFICATION REQUIREMENTS ..................................................2-1
 
2.1                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        SEISMIC ......................................................................................................................2      -1 2.2                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              ENVIRONMENTAL ...................................................................................................2-4 2.3                                                                                                                                                                                                                        ELECTROMAGNETIC COMPATIBILITY ..............................................................2-5
 
SECTION 3                                                          ASSESSMENT OF QUALIFICATION ......................................................................3-1
 
3.1                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        SEISMIC ......................................................................................................................3      -1 3.2                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              ENVIRONMENTAL ...................................................................................................3-5 3.3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            EMC ...........................................................................................................................      ..3-6
 
SECTION 4                                                          INSTALLATION REQUIREMENTS AND MAINTENANCE, SURVEILLANCE, AND REPLACEMENT PROGRAM ..........................................4-1
 
4.1                                                                                                                                                                                                                            INSTALLATION LIMITATIONS ..............................................................................4-1 4.2                                                                                                                                                                                                                            MAINTENANCE, SURVEILLANCE, AND REPLACEMENT PROGRAM ...........4-1
 
SECTION 5                                                                                                                                                                                                                                                 
 
==SUMMARY==
.................................................................................................................5-1
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                                    iii                                                                                                                                                                                                                                                  Westinghouse Non-Proprietary Class 3
 
      *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                                                                    Common Q Applications to Limerick Requirements
 
TABLE OF CONTENTS (cont.)
 
LIST OF TABLES
 
Table Title Page Table 2.2-1.                                                              [
                                                                                    ]a,c ..........................................................................................................2-4 Table 3.1-1.                                                              [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ]a,c .........................................3-4 Table 3.3-1.                                                              [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ]a,c ...................................3-7 Table 3.3-2.                                                              Test Standard Comparison ...........................................................................................3-8 Table 3.3-3.                                                              Emissions Comparison ................................................................................................3-10 Table 3.3-4.                                                              Susceptibility Comparison - Conducted Disturbances ................................................3-20 Table 3.3-5.                                                              Susceptibility Comparison - Surge Withst and Capability Disturbances .....................3-21 Table 3.3-6.                                                              Susceptibility Comparison - Radiated Fi eld Immunity Disturbances .........................3-23 Table 3.3-7.                                                              [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ]a,c ..................................................3-25
 
LIST OF FIGURES
 
Figure Title Page Figure 2.1-1.                                                Limerick SSE FRS at Elevation 269 ..........................................................................2-2 Figure 2.1-2.                                                Limerick SSE FRS at Elevation 289 ..........................................................................2-3 Figure 3.1-1.                                                Comparison of Limerick SSE FRS at Elevation 269 to JID:2312-R SSE TRS .........3-2 Figure 3.1-2.                                                Comparison of Limerick SSE FRS at Elevation 289 to JID:2312-R SSE TRS .........3-3 Figure 3.3-1.                                                Low Frequency Conducted Emissions Test Limit (CE101) - U.S. NRC RG 1.180, Revision 1 .........................................................................................................3-11 Figure 3.3-2.                                                Low Frequency Conducted Emissions Test Limit (CE101) - U.S. NRC RG 1.180, Revision 2 .........................................................................................................3-12 Figure 3.3-3.                                                Low Frequency Conducted Emissions Test Limit (CE101) - EPRI TR-102323, Revision 4 ....................................................................................................................      3-13 Figure 3.3-4.                                                High Frequency Conducted Emissions T est Limit (CE102) - U.S. NRC RG 1.180, Revision 1 and Revision 2 ................................................................................3-14 Figure 3.3-5.                                                High Frequency Conducted Emissions T est Limit (CE102) - EPRI TR-102323, Revision 4 ....................................................................................................................      3-15 Figure 3.3-6.                                                Low Frequency Radiated Emissions Test Limit (RE101) - U.S. NRC RG 1.180, Revision 1 and Revision 2 ................................................................................3-16 Figure 3.3-7.                                                Low Frequency Radiated Emissions Test Limit (RE101) - EPRI TR-102323, Revision 4 ....................................................................................................................3-17 Figure 3.3-8.                                                High Frequency Radiated Emissions Test Limit (RE102) - U.S. NRC RG 1.180, Revision 1 and Revision 2 ................................................................................3-18 Figure 3.3-9.                                                High Frequency Radiated Emissions Te st Limit (RE102) - EPRI TR-102323, Revision 4 ....................................................................................................................3-19
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                                    iv                                                                                                                                                                                                                                                  Westinghouse Non-Proprietary Class 3
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                                    Common Q Applications to Limerick Requirements
 
ACRONYMS AND TRADEMARKS
 
Acronyms used in the document are defined below  to ensure unambiguous understanding of their use within this document.
 
Acronym Definition
 
cont. Continued DBA Design Basis Accident DBE Design Basis Event EMC Electromagnetic Compatibility EMI Electromagnetic Interference EMI/RFI                                                                                                                    Electromagnetic Interference/Radio Frequency Interference EPRI                                                                                                                                                                                    Electric Power Research Institute EQ Equipment Qualification ESD Electrostatic Discharge EUT                                                                                                                                                                                              Equipment Under Test F Fahrenheit g                                                                                                                                                                                                                                                              Free-Fall, Gravity, Acceleration Hz Hertz LOCA                                                                                                                                                            Loss-of-Coolant Accident NRC                                                                                                                                                                                          Nuclear Regulatory Commission OBE                                                                                                                                                                                            Operating Basis Earthquake PPS                                                                                                                                                                                                          Plant Protection System Ref. Reference RRS                                                                                                                                                                                                Required Response Spectra SSE                                                                                                                                                                                                        Safe Shutdown Earthquake TID                                                                                                                                                                                                          Total Integrated Dose TRS                                                                                                                                                                                                    Test Response Spectra WCAP                                                                                                                                                      Westinghouse Commercial Atomic Power ZPA Zero Period Acceleration
 
All product and corporate names used in this document  may be trademarks or registered trademarks of other companies, and are used only for explanation and  to the owners benefit, without intent to infringe.
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                                          v                                                                                                                                                                                                                                                        Westinghouse Non-Proprietary Class 3
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                      Common Q Applications to Limerick Requirements
 
GLOSSARY OF TERMS
 
Standard terms used in the document are defined be low to ensure unambiguous understanding of their use within this document.
 
Term Definition
 
Class 1E                                                                                                                                                                                                                                                                                                                                                                                                                        The safety classification of electric equipment and systems that are essential to emergency reactor shutdown,  containment isolation, reactor core cooling and containment and react or heat removal that are otherwise essential in preventing significant release of radioactive material to the environment.
 
Damping                                                                                                                                                                                                                                                                                                                                                                                                                An energy dissipation mechanism that reduces the amplification and broadens the vibratory response in the region of response. Damping is usually expressed as a percentage of critical damping. Critical damping is defined as the least amount of viscous damping that causes a single-degree-of-freedom- system to return  to its original position without oscillation after initial disturbance.
 
Design Basis Accident (DBA)                                Those plant conditions resulting from various postulated equipment and piping failures during which safety -related equipment shall operate without impairment of the safety- related function in a harsh environment. A design basis accident is a subset of a design basis event.
 
Design Basis Event (DBE)                                                                                            Any of the events specified in the stations safety analysis that are used to establish the acceptable performance for safety functions: events include anticipated transients, design basis accidents, external events, and natural phenomena.
 
Electromagnetic                                                                                                                                                                                                                                                                          The ability of an equipment or system to function satisfactorily Compatibility (EMC)                                                                                                                                                                                        in its electromagnetic environment without introducing intolerable electromagnetic disturbances to anything in that environment.
 
Electromagnetic                                                                                                                                                                                                                                                                          Electromagnetic disturbance which manifests itself in performance Interference (EMI)                                                                                                                                                                                                                                        degradation, malfunction, or  failure of electrical or electronic equipment.
 
Electrostatic Discharge (ESD)                                Refers to static electricity discharge.
 
Floor Acceleration                                                                                                                                                                                                                                          The acceleration of a particular building floor (or equipment mounting) resulting from the motion of a given earthquake. The maximum floor acceleration is the zero period acceleration of the floor response spectrum.
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                                      vi                                                                                                                                                                                                                                                  Westinghouse Non-Proprietary Class 3
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                                  Common Q Applications to Limerick Requirements
 
GLOSSARY OF TERMS (cont.)
 
Term Definitions
 
Functionality                                                                                                                                                                                                                                                                                                                                          Ability of an active component  or equipment to perform the mechanical and electrical motion required to fulfill its specified function when subjected to the prescribed service conditions.
 
Harsh Environment                                                                                                                                                                                                                          An environment expected  as a result of the postulated service conditions appropriate for the design basis and post-design basis accidents of the station.
 
Maintenance                                                                                                                                                                                                                                                                                                                                                Work performed on an item to k eep it operable or restore it to operable condition.
 
Mild Environment                                                                                                                                                                                                                                              An environment expected as a result of normal service conditions and extremes (abnormal) in-service conditions where seismic is the only design basis event of consequence.
 
Natural Frequency                                                                                                                                                                                                                                            The frequency(s), at which body vibrates due to its own physical characteristics (mass and stiffness) when the body is distorted in a specific direction and then released.
 
Non-Safety Related                                                                                                                                                                                                                        Equipment that is not relied upon to perform a nuclear safety function.
 
Non-Seismic Category                                                                                                                                                              Non-Seismic Category applies to systems and components that are not designed for seismic loads. The anchorage of non-seismic systems and components shall be designed, using acceptance criteria for commercial structures, for equivalent static horizontal accelerations applied at the center of mass of the system or component.
 
Octave                                                                                                                                                                                                                                                                                                                                                                                                                                                      A frequency ratio of 2 to 1. One decade equals 3.32 octaves.
 
Operating Basis Earthquake                                                                      An earthquake that could  reasonably be expected to occur at the plant (OBE)                                                                                                                                                                                                                                                                                                                                                                                                                                                              site during the operating life of  the plant considering the regional and local geology and seismology and specific characteristics of local subsurface material. It is that earthquake that produces the vibratory ground motion for which those features of nuclear power plant, necessary for continued operation with out undue risk to the health and safety of the public, are designed to remain functional.
 
Power Spectral Density (PSD)                            The mean squared amplitude per unit frequency  of a waveform. PSD is expressed in g2/Hz versus frequency for acceleration waveforms.
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                              vii                                                                                                                                                                                                                                              Westinghouse Non-Proprietary Class 3
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                            Common Q Applications to Limerick Requirements
 
GLOSSARY OF TERMS (cont.)
 
Term Definitions
 
Qualification                                                                                                                                                                                                                                                                                                                                            The generation and maintenance of evidence to demonstrate that the equipment shall operate on demand  to meet the system performance requirements.
 
Qualified Life                                                                                                                                                                                                                                                                                                                          The period of time prior to the start of a design basis event for which the equipment was demonstrated to meet the design requirements for the specified service conditions. The determination of qualified life shall consider potential aging mechanisms resulting from significant in-service thermal, radiation, and vibration sources and the effects of operational cycling (mechanical, electrical or both).
 
Required Response Spectrum                                            The response spectrum issued by the user or agent as part of the (RRS)                                                                                                                                                                                                                                                                                                                                                                                                                                                                  equipment specifications for seismic qualification purposes. The RRS is a plot of acceleration versus frequency describing the energy content of the earthquake time history. The RRS constitutes a requirement to be met during qualification activities.
 
Resonant Frequency                                                                                                                                                                                                            A frequency at which a response peak occurs in a system subjected to forced vibration. This frequency  is accompanied by a phase shift of response relative to the excitation.
 
Response Spectrum                                                                                                                                                                                                                        A plot of the maximum response, as a function of oscillator frequency, of an array of single-degree-of-freedom da mped oscillators subjected to the same base excitation.
 
Safe Shutdown Earthquake                                                                            An earthquake that is based on an evaluation of the maximum earthquake (SSE)                                                                                                                                                                                                                                                                                                                                                                                                                                                                          potential considering the regiona l and local geology and seismology and specific characteristic of local subsurface materials. It is that earthquake that produces the maximum vibratory ground motion for which certain structures, systems, and components are designed to remain functional.
These structures are those defined as safety-related.
 
Safety Function                                                                                                                                                                                                                                                                                            One of the processes or conditions (e.g., emergency negative insertion, post-accident heat removal, emergency core cooling, and post-accident radioactivity removal and containment isolation) essential to maintain plant parameters within acceptable limits established for a design basis event.
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                          viii                                                                                                                                                                                                                                        Westinghouse Non-Proprietary Class 3
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                                  Common Q Applications to Limerick Requirements
 
GLOSSARY OF TERMS (cont.)
 
Term Definitions
 
Safety-Related                                                                                                                                                                                                                                                                                                              Equipment that is relied upon to remain functional during and following design basis event to ensure the integrity of the reactor coolant pressure boundary; the capability to shut down the reactor and maintain it in a safe shutdown condition; and, the capability to prevent or mitigate the consequences of accidents that could result in potential off-site exposures comparable to the 10CFR Part 50.34 or 100.11 guidelines.
 
Seismic Category I                                                                                                                                                                                                                                    A classification of structures, systems and components that shall be designed to withstand the effects of  the SSE and maintain the specified design function and integrity.
 
Seismic Category II                                                                                                                                                                                                                    Non-safety-related equipmen t whose continued function is not required but whose failure could reduce the functioning of adjacent safety-related Seismic Category I equipment to an unacceptable level. This equipment shall be designed to withstand the effects of the SSE and maintain its structural integrity so that such failure shall not occur.
 
Service Conditions                                                                                                                                                                                                                                    Environmental, loading, power and signal conditions expected as a result of normal operating requirements, expected extremes (abnormal) in operating requirements and postulated conditions appropriate for the design basis events of the plant.
 
Structural Integrity                                                                                                                                                                                                                                    A condition describing an assembly or grouping of equipment relative to their ability to carry applicable loads within the limits of acceptable structural behavior.
 
Test Response Spectrum                                                                                                                        The response spectrum that is developed from the actual time history of (TRS)                                                                                                                                                                                                                                                                                                                                                                                                                                                                    motion of the shake table.
 
Zero Period Acceleration                                                                                                              The acceleration level of high frequency, non-amplified portion of the (ZPA)                                                                                                                                                                                                                                                                                                                                                                                                                                                                  response spectrum. This acceleration corresponds to the maximum peak acceleration of the time history used to derive the response spectrum.
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                                    ix                                                                                                                                                                                                                                                  Westinghouse Non-Proprietary Class 3
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                          Common Q Applications to Limerick Requirements
 
REFERENCES
 
Following is a list of references used throughout this document.
: 1.                                                                Constellation (Exelon) Specification NE-402, Re vision 2, Plant Protection System (PPS)
Performance Specification.
: 2.                                                                Westinghouse Drawing 10172D13, Revision (see  ECO-20-01098-32), Limerick PPS Project PBOM. (Westinghouse Proprietary)
: 3.                                                                Westinghouse Document, WCAP-16097-P-A, Revisi on 5, Common Qualified Platform Topical Report, May 2021. (Westinghouse Proprietary)
: 4.                                                                Westinghouse Document, WCAP-17415-P, Revision 1, Addendum to Summary Qualification Report of Hardware Testing for Common Q Applications, September 2019. (Westinghouse Proprietary)
: 5.                                                                Westinghouse Document EQ-MR-13-GLIM, Revision 0, Equipment Qualification Strategy and Plan for the Plant Protection System Upgr ade, September 2022. (Westinghouse Proprietary)
: 6.                                                                Constellation (Exelon) Document LS-0192, Revision 0, Dynamic Qualification Requirements for Control Room Panels, March 2, 1998. (attached)
: 7.                                                                Constellation (Exelon) Document A1656919 E13,  Seismic RRS (Required Response Spectra)
Curves for Aux Equipment Room Control Panels at EL 289 of Control Building/Structure, May 30, 2008. (attached)
: 8.                                                                Not Used.
: 9.                                                                EPRI Technical Report, TR-102323, Revision 4, Guidelines for Electromagnetic Interference Testing in Power Plants, September 2016.
: 10.                                          U.S. NRC Regulatory Guide 1.180, Revision 1, Guidelines for Evaluating Electromagnetic and Radio-Frequency Interference in Safety-Related Instrumentation and Control Systems, October 2003.
: 11.                                          Westinghouse Document JID:2312-R, Revision 0, Seismic Test for the Westinghouse Electric Company Three (3) AP1000  PMS Pentair Cabinets, June 2013. (Westinghouse Proprietary)
: 12.                                          Westinghouse Document, EQLR-232, Revision 0, Environmental Test Report for the AP1000 Protection and Safety Monitoring System and Nucl ear Instrumentation System Auxiliary Panels, November 2012. (Westinghouse Proprietary)
: 13.                                          Westinghouse Document EQ-QR-252-APP, Revision 0, AP1000 Plant Protection and Safety Monitoring System Pentair Cabinets Seismic Qualification Report, August 2013. (Westinghouse Proprietary)
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                                          x                                                                                                                                                                                                                                                        Westinghouse Non-Proprietary Class 3
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                    Common Q Applications to Limerick Requirements
: 14.                                          Department of Defense Interface Standard,  MIL-STD-461, Requirements for the Control of Electromagnetic Interference Characteristic of Subsystems and Equipment, Applicable revision identified in text.
: 15.                                          Oak Ridge National Laboratory Technical Repor t, ORNL/SPR-2016/108-R2, Technical Basis for Electromagnetic Compatibility Regulatory Guidance Update, July 2017.
: 16.                                          Commercial Standard, IEC 61000-4-6, Electroma gnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 6: Immunity  to Conducted Disturbances, Induced by Radio Frequency Fields, See text for applicable year of issue.
: 17.                                          Commercial Standard, IEC 61000-4-13 1, Electromagnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 13: Immun ity to Harmonics and Interharmonics, See text for applicable year of issue.
: 18.                                          Commercial Standard, IEC 61000-4-16, Electroma gnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 16: Test  for Immunity to Conducted, Common Mode Disturbances in the Frequency Range 0 Hz to 150 kHz, See text for applicable year of issue.
: 19.                                          Commercial Standard, IEC 61000-4-4, Electroma gnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 4: Electrical Fast Transient/Burst Immunity Test, See text for applicable year of issue.
: 20.                                          Commercial Standard, IEC 61000-4-5, Electroma gnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 5: Surge Immunity Test, See text for applicable year of issue.
: 21.                                          Commercial Standard, IEC 61000-4-12 2, Electromagnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 12: Oscilla tory Waves Immunity Tests, See text for applicable year of issue.
: 22.                                          Commercial Standard, IEC 61000-4-18, Electroma gnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 18: Damped  Oscillatory Wave Imunity Test, See text for applicable year of issue.
: 1.                                The 1998 version of IEC 61000-4-13 referenced in U.S. NRC Regulatory Guide 1.180 (Reference 10) does not exist since no version of this standard was issued in 1998. Therefore, it is assumed that the U.S. NRC had access to a draft copy of IEC 61000-4-13 when the U.S. NRC Regulatory Guide was released, and that the intended version to be referenced was the first versio n that was issued after 1995. The resulting version, IEC 61000-4-13:2002 (Reference 17), is referenced herein in order to satisfy the intent of Reference 10.
: 2.                                The 1996 version of IEC 61000-4-12 referenced in U.S. NRC Regulatory Guide 1.180 (Reference 10) does not exist. It is assumed that the U.S. NRC intended to reference the 1995 version of IEC 61000-4-12.
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                                    xi                                                                                                                                                                                                                                                  Westinghouse Non-Proprietary Class 3
 
*** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                            Common Q Applications to Limerick Requirements
: 23.                                          Commercial Standard, IEC 61000-4-3, Electroma gnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 3: Radiated, Radio-Frequency, Electromagnetic Field Immunity Test, See text for applicable year of issue.
: 24.                                          Commercial Standard, IEC 61000-4-8, Electroma gnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 8: Power  Frequency Magnetic Field Immunity Test, See text for applicable year of issue.
: 25.                                          Commercial Standard, IEC 61000-4-9, Electroma gnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 9: Pulse Magnetic Field Immunity Test, See text for applicable year of issue.
: 26.                                          Commercial Standard, IEC 61000-4-10, Electroma gnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 10: Damped  Oscillatory Magnetic Field Immunity Test, See text for applicable year of issue.
: 27.                                          Commercial Standard, IEC 61000-4-2, Electroma gnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 2: Electrostatic Discharge Immunity Test, See text for applicable year of issue.
 
(Last Page of Front Matter)
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                              xii                                                                                                                                                                                                                                              Westinghouse Non-Proprietary Class 3
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                  Common Q Applications to Limerick Requirements
 
SECTION 1 INTRODUCTION
 
Limerick PPS upgrade is implemented using previously qualified Common Q platform and other qualified equipment. An interim evaluation, prior to  completion of formal plant specific qualification is documented in this report. The intent of this ev aluation is to establish a confidence level that the previously qualified equipment is within the Constellation specification NE-402 (Reference 1) requirements for the Plant Protection System (PPS)  digital modernization project. This evaluation does not address site specific PPS hardware configuration or installation requirements. The equipment being provided to Limerick Generating Station Units 1 and 2 for the PPS digital modernization project is identified by Westinghouse drawing 10172D13 (Reference 2).
 
The basic objectives for qualification of safety-related equipment are:
 
To reduce the potential for common mode fa ilure due to environmental effects.
 
To demonstrate that the safety-related equipment is capable of performing its designated safety function during and after a Design Basis Event (DBE).
 
The seismic, environmental, and Electromagnetic Compatibility (EMC) qualification of the safety-related Common Q equipment documented by WCAP-1609 7-P-A (Reference 3) and WCAP-17415-P (Reference 4) is based on a combination of test and analysis.
 
The Equipment Qualification (EQ) strategy and pl an for the PPS digital modernization project is documented by EQ-MR-13-GLIM (Reference 5). Section 2.3 of EQ-MR-13-GLIM (Reference 5) discusses that the goals of this EQ comparison to the previously qualified equipment are to show that the existing qualification can envelop the Limerick requi rements. Additional/Subsequent analyses will be performed to ensure that the previous qualificati on is applicable for the PPS at Limerick Units 1&2.
 
(Last Page of Section 1)
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                          1-1                                                                                                                                                                                                                                        Westinghouse Non-Proprietary Class 3
 
*** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                                                                                                                                                                                                                      Common Q Applications to Limerick Requirements
 
SECTION 2 LIMERICK QUALIFICATION REQUIREMENTS
 
2.1                                                                                                                                                                        SEISMIC
 
[
 
                                                                                                                                                            ]a,c
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                          2-1                                                                                                                                                                                                                                        Westinghouse Non-Proprietary Class 3
 
      *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                                                                                                                                                            Common Q Applications to Limerick Requirements
 
Limerick SSE  FRS  for Elevation 269 1% damping 10
 
1
 
0.1 1                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    10                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              100Frequency (Hz)
 
Horizontal                                                                                                                                                              Vertical
 
Figure 2.1-1.                                                                                              Limerick SSE FRS at Elevation 269
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                          2-2                                                                                                                                                                                                                                        Westinghouse Non-Proprietary Class 3
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                                                                                                                                                            Common Q Applications to Limerick Requirements
 
Limerick SSE  FRS  for Elevation 289 1% damping 10
 
1
 
0.1 1                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    10                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              100Frequency (Hz)
 
Horizontal                                                                                                                                                              Vertical
 
Figure 2.1-2.                                                                                              Limerick SSE FRS at Elevation 289
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                          2-3                                                                                                                                                                                                                                        Westinghouse Non-Proprietary Class 3
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                                                                                                                                                                                                                                                                                                    Common Q Applications to Limerick Requirements
 
2.2                                                                                                                                                                        ENVIRONMENTAL
 
                                                                    ]a,c
 
Table 2.2-1.                                                        [
                                                                                                                                                                                                                                                                                                                                                                                                            ]a,c                                                                                                                                                                                                                                                                                                                                                              a,c
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ]a,c
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                          2-4                                                                                                                                                                                                                                        Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                                                                                                                                                                                                                  Common Q Applications to Limerick Requirements
 
2.3                                                                                                                                                                      ELECTROMAGNETIC COMPATIBILITY
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                        ]a,c
 
(Last Page of Section 2) (Last Page of Section 2)
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                          2-5                                                                                                                                                                                                                                        Westinghouse Non-Proprietary Class 3
 
      *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                                                                                                                                                                                                                  Common Q Applications to Limerick Requirements
 
SECTION 3 ASSESSMENT OF QUALIFICATION
 
3.1                                                                                                                                                                        SEISMIC
 
[
 
]a,c
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                          3-1                                                                                                                                                                                                                                        Westinghouse Non-Proprietary Class 3
 
      *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                                                                                                            Common Q Applications to Limerick Requirements
 
Limerick SSE  FRS  for Elevation 269 Compared to JID:2312-R SSE TRS 5% damping 100.00
 
10.00
 
1.00
 
0.10 1                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              10                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        100
 
Frequency (Hz)
 
Horizontal                                                                                                          Vertical                                                                                                            JID:2312-R a1 FB SSE TRS JID:2312-R a2 SS SSE TRS                                                                                            JID:2312-R V SSE TRS
 
Figure 3.1-1.                                                                                              Comparison of Limerick SSE  FRS at Elevation 269 to JID:2312-R SSE TRS
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                          3-2                                                                                                                                                                                                                                        Westinghouse Non-Proprietary Class 3
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                                                                                                    Common Q Applications to Limerick Requirements
 
Limerick SSE  FRS  for Elevation 289 Compared to JID:2312-R SSE TRS 5% damping 100.00
 
10.00
 
1.00
 
0.10 1                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              10                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        100
 
Frequency (Hz)
 
Horizontal                                                                                                    Vertical                                                                                                      JID:2312-R a1 FB SSE TRS JID:2312-R a2 SS SSE TRS                                                                                      JID:2312-R V SSE TRS
 
Figure 3.1-2.                                                                                              Comparison of Limerick SSE  FRS at Elevation 289 to JID:2312-R SSE TRS
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                          3-3                                                                                                                                                                                                                                        Westinghouse Non-Proprietary Class 3
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
LIM-24-090, Rev is  i o n 0, Attachme      nt 2
 
Compari        s on of Equipment          Qualification                    Hardware            Tes ting for Limerick          Units 1  and    2                                                                          Common        Q  Applications                to  Limerick          Requirement                s
 
Table      3.1-1.                                                                                                                              ) a,c                              a,c
 
EQ-EV-386-GLIM-NP,                          Rev . 2                                                3-4                                                                                                                                                                                                    We stinghouse Non-Proprietar                      y Clas    s 3
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                                                                                  Common Q Applications to Limerick Requirements
 
3.2                                                                                                                                                                        ENVIRONMENTAL
 
The Common Q platform equipment to be installed at  Limerick is in a mild environment. A mild environment is an environment expected as a result of normal service conditions and extremes (abnormal) in service conditions where seismic is the only design basis event (DBE) of consequence.
When the equipment in installed in a mild enviro nment where no significant aging mechanism exist, a design life is specified in lieu of a qualified life  and the equipment reliability is managed through maintenance and surveillance activities.
 
The Common Q platform is comprised of commercial off-the-shelf components which are commercially dedicated for nuclear safety applications.  [
 
                                                  ]a,c
: 1.                          WCAP-16097-P-A (Reference 3) and WCAP-17415-P  (Reference 4) identify the environmental test profile used for generic qualification of Common Q equipment located in a mild environment.  [
 
                                          ]a,c
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                          3-5                                                                                                                                                                                                                                        Westinghouse Non-Proprietary Class 3
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                                                                                                                                                                      Common Q Applications to Limerick Requirements
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                ]a,c
 
3.3                                                                                                                                                                        EMC
 
The Common Q platform equipment were required to  be qualified in accordance with the requirements of U.S. NRC Regulatory Guide 1.180 Revision 1 (Reference 10) for emissions and susceptibility. [
 
                                                                                                                                                                                                                                                                                                        ]a,c EMC for the Limerick PPS configuration shall be performed by type test to  meet the requirements of EPRI TR-102323, Revision 4 and U.S. NRC Regulatory Guide 1.180, Revision 2.  [
 
                                                                                                                                                                                                                                                                                                                                                                                              ]a,c
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                          3-6                                                                                                                                                                                                                                        Westinghouse Non-Proprietary Class 3
 
      *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
 
Comparison of Equipment Qualification Hardware Testing for Common Q Applications Limerick Units 1 and 2                                                                                                                                                                                                                                                                                                    to Limerick Requirements
 
[
 
                                                                                                                        ]a,c
 
Emissions:
 
[
 
                                                                                                                                ]a,c Technical report ORNL/SPR-2016/108-R2 (Reference 15) was commissioned by the U.S. Department of Energy to provi  de the U.S. NRC the technical basis for revising Regulatory Guide1.180. Reference 15 includes co mparisons of MIL-STD-461E, MIL-STD-461F, and MIL-STD-461G military standards. The review c oncluded that MIL-STD-461F had no change of significance from the MIL-STD-461E test methods; most  of the changes were refinements to improve test outcomes. Similarly, the review concluded that  MIL-STD-461G had no change of significance from the MIL-STD-461F or MIL-STD-461E test methods. Therefor e, other than subtle changes implemented to improve the test methods, MIL-STD-461G and MI L-STD-461E are concluded to be comparable.
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                  3-9                                                                                                                                                                                                                                        Westinghouse Non-Proprietary Class 3
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
 
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                                                                                                                                              Common Q Applications to Limerick Requirements
 
Susceptibility - Conducted
 
[
 
                                                                                                                                                                                                                                                                  ]a,c
 
Table 3.3-4.                                                        Susceptibility Comparison - Conducted Disturbances
 
Test                                          U.S. NRC Regulatory Guide                                                                                                                                    EPRI TR-102323 Standard                                                                                                    1.180                                                                                                                    Revision 4 Description                                                                                                              Category                                                                Revision 1/Revision 2 IEC 61000-4-6 (1996/2013)                                                                                                                [
Disturbances induced by                                                                                                                                                                                  150 kHz to 80 MHz radio-frequency fields                                                                                                            Commercial                                                Test Level 3 (140 dBµV)                                                                                                                                                                                                    ]a,c (Reference 16)
IEC 61000-4-13 (2002/2015)                                                                                                                [
Commercial                                                                                16 Hz to 2.4 kHz Class 2                                                                                                                                                      ]a,c Conducted susceptibility,                                                                                                                                                                                          (Reference 17) low frequency                                                                                                                                                                        IEC 61000-4-16 (1998/2011)                                                                                                                [
Commercial                                                                              15 Hz to 150 kHz Level 3 (Reference 18)                                                                                                                                                                                              ]a,c
[
                                                                                                                                                                                                                                                                                                                                                                                                                                  ]a,c
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                3-20                                                                                                                                                                                                                              Westinghouse Non-Proprietary Class 3
 
      *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                                                    Common Q Applications to Limerick Requirements
 
Susceptibility - Surge Withstand Capability
 
[
 
]a,c
 
Table 3.3-5.                                                        Susceptibility Comparison - Surge Withstand Capability Disturbances
 
U.S. NRC Regulatory                                                                  EPRI TR-102323 Guide 1.180                                                                      Revision 4 Description          Method Revision 1/Revision 2 Electrically Fast                                                                                    IEC 61000-4-4 (1995/2012)                                                        [
Transients/Bursts                                                                                                                                  Commercial [
                                                                                                                                                            ]a,c                                                                          ]a,c IEC 61000-4-5 (1995/2014)                                                        [
Surges          Commercial                                                                                  [
 
                                                                                                                                                            ]a,c                                                                          ]a,c IEC 61000-4-12 (1996/2006)                                                        [
100 kHz ring wave                                                                                                        Commercial [
 
                                                                                                                                                            ]a,c                                                                          ]a,c
[                                                                            [
    ]a,c                                                                      ]a,c                                                                                                                                                                                                                                                                                                                [                                                                            ]a,c                                                                                                                                                                                                                                              [  ]a,c
 
[
 
              ]a,c
 
[
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                3-21                                                                                                                                                                                                                                      Westinghouse Non-Proprietary Class 3
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                                                  Common Q Applications to Limerick Requirements
 
                                                                                  ]a,c
 
Susceptibility - Radiated Field Immunity
 
[
 
                                                                                                                                                                      ]a,c
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                3-22                                                                                                                                                                                                                                      Westinghouse Non-Proprietary Class 3
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                                                                                                                                                                Common Q Applications to Limerick Requirements
 
Table 3.3-6.                                                        Susceptibility Comparison - Radiated Field Immunity Disturbances
 
U.S. NRC Regulatory                                                                                                                                        EPRI TR-102323 Guide 1.180                                                                                                                                        Revision 4 Description Method Revision 1/Revision 2 IEC 61000-4-3 (1995/2010)                                                                                                                            [
26 MHz to 1 GHz(1)
Commercial                                                                                      26 MHz to 6 GHz(2)
Radiated                                                                                                                                                                                    [                                                                                                                                                                                                                                                                                                                                                                                                          ]a,c Susceptibility,                                                                                                                                                                                                                                                              ]a,c Electric Field                                                                                                                                                                      MIL-STD-461E/G, RS103                                                                                                                            [
Military                                                                                  30 MHz to 10 GHz
[
                                                                                                                                                                                                                                                                                    ]a,c                                                                                                                                          ]a,c IEC 61000-4-8 (1993/2009)                                                                                                                            [
50 Hz/60 Hz Commercial                                                                [
 
                                                                                                                                                                                                                                                                                    ]a,c                                                                                                                                          ]a,c Magnetic Field                                                                                                                                                                    IEC 61000-4-9 (1993/2001)                                                                                                                            [
Immunity(5)                                                                                        Commercial                                                                                        50/60 Hz to 50 kHz
[
                                                                                                                                                                                                                                                                                    ]a,c                                                                                                                                          ]a,c IEC 61000-4-10 (1993/2001)                                                                                                                        [
Commercial                                                                                  100 kHz and 1 MHz
[
                                                                                                                                                                                                                                                                                  ]a,c                                                                                                                                            ]a,c
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                          ]a,c
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                3-23                                                                                                                                                                                                                              Westinghouse Non-Proprietary Class 3
 
      *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                                                                                                                                                                                                                                    Common Q Applications to Limerick Requirements
 
[
 
]a,c
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                3-24                                                                                                                                                                                                                              Westinghouse Non-Proprietary Class 3
 
      *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                                                                                                                                                                                                                                                                                                                                                      Common Q Applications to Limerick Requirements
 
Susceptibility - Electrostatic Discharge
 
[
                                                                                                                                                                                                                                                                                                                                                                ]a,c
 
Table 3.3-7.                                                        [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ]a,c a,c
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                  ]a,c
 
(Last Page of Section 3)
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                3-25                                                                                                                                                                                                                              Westinghouse Non-Proprietary Class 3
 
          *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                                                                                                                                                                                                                                                                            Common Q Applications to Limerick Requirements
 
SECTION 4 INSTALLATION REQUIREMENTS AND MAINTENANCE, SURVEILLANCE, AND REPLACEMENT PROGRAM
 
4.1                                                                                                                  INSTALLATION LIMITATIONS
 
[
                                                                                                                                                                                                                                                                          ]a,c
 
4.2                                                                                                                  MAINTENANCE, SURVEILLANCE, AND REPLACEMENT PROGRAM
 
[
 
                                                                                                                                                                            ]a,c
 
(Last Page of Section 4)
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                          4-1                                                                                                                                                                                                                                        Westinghouse Non-Proprietary Class 3
 
      *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Comparison of Equipment Qualification Hardware Testing for Limerick Units 1 and 2                                                Common Q Applications to Limerick Requirements
 
SECTION 5
 
==SUMMARY==
 
A qualification program is in process to demonstrate that the PPS equipment to be supplied by Westinghouse Electric Company will be qualified for u se at Limerick in accordance with Constellation specification NE-402 (Reference 1).
 
The seismic, environmental and EMC assessments discussed in Section 3 provide platform confidence that the existing qualification of representative Common  Q equipment is also compliant with the Limerick requirements.
 
The qualification assessment discussed in Section 3.1 de monstrate that the previous seismic qualification of the Common Q platform envelops the Limerick  requirements identified in Section 2.2; however, additional analysis and testing are  required before seismic qualification can be justified in order to reconcile any differences between the previous test configurations and the Limerick configuration.
 
The qualification assessment discussed in Section 3.2 demonstrate that the Common Q platform is designed to continuously operate across the required temperature/humidity ranges for Limerick as specified in Section 2.2. However, additional analysis and testing are requi  red before environmental qualification can be completed in order to reconcile any differences between the previous test configurations and the Limerick configuration. Specifically, all new (active) components will be environmentally evaluated and type tested simila r to Common Q platform equipment to confirm the adequacy of the design.
 
The evaluations provided in Section 3.3 identify the  differences between the various test methods and standards. EMC compliance of the safety-related equipment will be confirmed for the Limerick PPS upgrade by performing fully configured representativ e cabinet type-testing in compliance with the requirements identified in NE-402 (Reference 1).
 
Site specific installation of the equipment as well as seismic, environmental and EMC qualification of all safety-related equipment being provided by Westinghouse will be addressed in the plant specific PPS equipment qualification summary report for Limerick.
 
(Last Page of Section 5)
 
EQ-EV-386-GLIM-NP, Rev. 2                                                                                                                                                                                                                                                                                                                                                                                          5-1                                                                                                                                                                                                                                        Westinghouse Non-Proprietary Class 3
 
*** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Westinghouse Non-Proprietary Class 3
 
Attachment 4
 
EQ-QR-433-GLIM-NP, Revision 4, Qualification Summary Report for the Plant Protection System Upgrade for Limerick Units 1 & 2 (Non-Proprietary)
 
Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066
 
                                                                                        © 2024 Westinghouse Electric Company LLC All Rights Reserved
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Westinghouse Non-Proprietary Class 3 Global Instrumentation & Control Limerick Generating Station Constellation Energy Qualification Summary Report for the Plant Protection System Upgrade for Limerick Units 1 & 2
 
EQ-QR-433-GLIM-NP, Rev. 4 Nuclear Safety Related June 2024 APPROVALS Function                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Name and Signature Author                                                                                                                                                                                      Louis C. Jesso*
Principal Engineer, Qualification Operations Verifier                                                                                                                                                                              Daniel W. Martin*
Principal Engineer, Qualification Operations Reviewers                                                                                                                              Robert Beasley*
Principal Engineer, Safety & Reactor Systems Engineering Boyan A. Setchenski*
Program Manager, Major Projects I&C Approver                                                                                                                                            Dante Mincin*
Manager, Qualification Operations
                *Electronically approved records are authenticated in the elect ronic document management system.
 
                                                            © 2024 Westinghouse Electric Company LLC All Rights Reserved
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
LIST OF CONTRIBUTORS
 
Revision                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            Name and Title 0 None 1 None 2 None 3 None 4 None
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                                              i                                                                                                                                                                                                                                                                    Westinghouse Non-Proprietary Class 3
 
      *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
REVISION HISTORY
 
RECORD OF CHANGES
 
Revision Author                                                    Description                                              Completed
 
0                                                                                                                                J.E. Mears                                                            Original Issue                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  October 2023
 
Revision 1 issued to address customer comments regarding                                                                                                                                                November 1 J.E. Mears IEEE Std 344. The review/comment resolution form is                                                                                                                                                                                                                        2023 attached in EDMS.
Updated with the following major changes:
Addition of a discussion of the test specimen and test configurations Addition of the environment testing results for components Addition of the environmental testing results for cabinets Addition of the EMC testing results for components Addition of the EMC testing results for cabinets 2 L.C. Jesso                                                                                                                                                                                                                                                                        January Addition of a discussion of the hardware reconciliation of the                                                                                                                                                  2024 EQ test specimen and production PPS hardware.
 
Content enhanced based upon feedback from the NRC inspection for the Limerick PPS in December 2023.
 
Due to the scope of changes, no change bars are used in this revision of the document.
 
Open Item OI-EQ-23-001 is closed.
 
3                                                                                                                                  L.C. Jesso                                                              Updated to address customer review comments.                                                                                                                                                                                                                                                                                                                                    January 2024
 
4 L.C. Jesso Updated to add missing Figure 2.2-1 to address CAPs issue                                                                                                                                                                                                                    See IR-2024-6048.                                                                                                                                                                                                EDMS
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                                        ii                                                                                                                                                                                                                                                              Westinghouse Non-Proprietary Class 3
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
DOCUMENT TRACEABILITY & COMPLIANCE
 
Created to Support the Following Document(s)                                                                                                                                                                                                Document Number                                                                                                      Executed Limerick Plant Protection System (PPS) Digital Upgrade                                                                                                                                                                                                                                                                          00800304 02/2022 Project
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                                  iii                                                                                                                                                                                                                                                        Westinghouse Non-Proprietary Class 3
 
      *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
OPEN ITEMS
 
Item            Description Status Limerick speicific environmental and EMC test programs and evaluations are currently in progress. Later revisions of this document will include information related to the environmental and EMC test programs and evaluations once they are completed.
OI-EQ-23-001                                                                                                                                                                                        Closed The enviromental and EMC testing programs are completed. Section 3.2, Section 3.3, and Section 4 have been added to discuss the environmental and EMC testing and  evaluations. This open item is closed.
Hardware reconciliations between the EQ test specimen hardware and the production hardware for the Limerick Units 1 & 2 PPS equipment are in progress. Based on the results of the hardware analysis in Section 4.4, a number of component differences between the EQ test specimen and the production PPS cabin ets require additional anaylsis and/or testing in order to demonstrate qualification.
OI-EQ-23-002                          The issues documented in CAP Issue Report IR-2023-12161 and CAP                                                                                                Open Issue Report IR-2023-12158 shall be resolved as part of this reconciliation process.
The issues documented in RITS 78714, 78715, and 79463 shall be resolved as part of this reconciliation process.
This open item will be closed after the reconciliation process has been completed and all identified hardware has been qualified with results incorporated into this summary report.
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                                    iv                                                                                                                                                                                                                                                          Westinghouse Non-Proprietary Class 3
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
TABLE OF CONTENTS
 
Section Title Page
 
LIST OF CONTRIBUTORS .......................................................................................i REVISION HISTORY ................................................................................................ii TABLE OF CONTENTS .............................................................................................v LIST OF TABLES .......................................................................................................vii LIST OF FIGURES .....................................................................................................viii ACRONYMS AND TRAD EMARKS  .........................................................................ix GLOSSARY OF TERMS ............................................................................................x REFERENCES ............................................................................................................xiii
 
SECTION 1                                                                                INTRODUCTION .......................................................................................................1-1
 
SECTION 2                                                          EQUIPMENT TO BE QUALIFIED ............................................................................2-1
 
2.1                                                                                                                                                                                                                            EQUIPMENT DESCRIPTION ...................................................................................2-1 2.1.1                                                                                                                                                                                            Equipment Identification .............................................................................................2-1 2.1.2                                                                                                                                                                                            Equipment Interface/Boundary Conditions .................................................................2-4 2.2                                                                                                                                                                                                                            EQ REQUIREMENTS ................................................................................................2-5 2.2.1                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Seismic .......................................................................................................................      ..2-5 2.2.2                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Environmental ..............................................................................................................2-9 2.2.3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    EMC ...........................................................................................................................      ..2-10 2.2.3.1                                                                                                                                                          Performance Criteria for EMC .....................................................................................2-11 2.3                                                                                                                                                                                                                            EQUIPMENT QUALIFICATION TEST SPECIMENS .............................................2-24 2.3.1                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Overview ......................................................................................................................      2-24 2.3.2                                                                                                                                                                                            Critical Hardware Co            mponents ....................................................................................2-28 2.3.3                                                                                                                                                                                            Functional Monitoring and Test Procedures ................................................................2-30
 
SECTION 3                                                          TYPE TESTING PERFORMED .................................................................................3-1
 
3.1                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        SEISMIC ......................................................................................................................3      -1 3.1.1                                                                                                                                                                                            Component Seismic Testing ........................................................................................3-1 3.1.1.1                                                                                                                                                          Anomalies During Component Level Seismic Testing ................................................3-5 3.1.2                                                                                                                                                                                            Cabinet Level Seismic Testing ....................................................................................3-6 3.1.2.1                                                                                                                                                          Anomalies Prior To and After Cabinet Level Seismic Testing ...................................3-8 3.2                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              ENVIRONMENTAL ...................................................................................................3-14 3.2.1                                                                                                                                                                                            Component Environmental Testing .............................................................................3-14 3.2.1.1                                                                                                                                                          Anomalies During Component Leve l Environmental Testing ....................................3-17 3.2.2                                                                                                                                                                                            Cabinet Level Environmental Testing .........................................................................3-18 3.2.2.1                                                                                                                                                          Anomalies During Cabinet Level Environmental Testing ...........................................3-22 3.3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            EMC ...........................................................................................................................      ..3-23 3.3.1                                                                                                                                                                                            Component EMC Testing ............................................................................................3-23 3.3.1.1                                                                                                                                                          Anomalies During MCR Component Level EMC Testing ..........................................3-25 3.3.2                                                                                                                                                                                            Cabinet Level EMC Testing ........................................................................................3-28
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                                        v                                                                                                                                                                                                                                                                Westinghouse Non-Proprietary Class 3
 
      *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
3.3.2.1                                                                                                                                                          Failures or Deviations During Cabinet Level EMC Testing ........................................3-30 3.3.2.2                                                                                                                                                          Anomalies During Cabinet Level EMC Testing ..........................................................3-32
 
SECTION 4                                                          ANALYSIS PERFORMED AND BASIS FOR QUALIFICATION ..........................4-1
 
4.1                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        SEISMIC ......................................................................................................................4      -1 4.1.1                                                                                                                                                                                            Seismic Evaluations Performed ...................................................................................4-1 4.1.1.1                                                                                                                                                          Main Control Room Component Evaluation ...............................................................4-1 4.1.2                                                                                                                                                                                            Dynamic Similarity Analysis .......................................................................................4-3 4.1.3                                                                                                                                                                                            Basis for Seismic Qualification ...................................................................................4-3 4.2                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              ENVIRONMENTAL ...................................................................................................4-4 4.2.1                                                                                                                                                                                            Environmental Evaluation ...........................................................................................4-4 4.2.2                                                                                                                                                                                            Basis for Environmental Qualification ........................................................................4-8 4.3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            EMC ...........................................................................................................................      ..4-9 4.3.1                                                                                                                                                                                            EMC Evaluation ..........................................................................................................4-9 4.3.2                                                                                                                                                                                            Basis for EMC Qualification .......................................................................................4-9 4.4                                                                                                                                                                                                                            HARDWARE RECONCILIATION ............................................................................4-10 4.4.1                                                                                                                                                                                            Hardware Reconciliation Methodology .......................................................................4-10 4.4.2                                                                                                                                                                                            Hardware Reconciliation Conclusions .........................................................................4-10
 
SECTION 5                                                          INSTALLATION REQUIREMENTS AND MAINTENANCE, SURVEILLANCE, AND REPLACEMENT PROGRAM ....................................................................................5-1
 
5.1                                                                                                                                                                                                                            INSTALLATION LIMITATIONS ..............................................................................5-1 5.1.1                                                                                                                                                                                            Use of Ferrites for EMC Qualification ........................................................................5-4 5.2                                                                                                                                                                                                                            MAINTENANCE, SURVEILLANCE, AND REPLACEMENT PROGRAM ...........5-6
 
SECTION 6                                                       
 
==SUMMARY==
AND CONCLUSIONS ..........................................................................6-1
 
==6.1                                                                                                                                                                                                                                                CONCLUSION==
S .........................................................................................................6-1
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                                  vi                                                                                                                                                                                                                                                          Westinghouse Non-Proprietary Class 3
 
      *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
TABLE OF CONTENTS (cont.)
 
LIST OF TABLES
 
Table Title Page Table 2.1-1.                                                              [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ]a,c ...................................................................................2-1 Table 2.1-2.                                                              [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ]a,c ....................................................................2-4 Table 2.2-1.                                                              [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ]a,c ...............................................................2-5 Table 2.2-2.                                                              [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ]a,c ..............2-9 Table 2.2-3.                                                                EMC Type Tests .........................................................................................................2-12 Table 2.3-1.                                                              [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ]a,c ...2-27 Table 2.3-2.                                                              [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ]a,c ............................................................2-28 Table 2.3-3.                                                              [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ]a,c ....................................2-29 Table 2.3-4.                                                              Test Procedures and Test Reports for the PPS Equipment EQ Testing .......................2-31 Table 3.1-1.                                                              [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ]a,c ...............................3-1 Table 3.1-2.                                                              [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ]a,c .....................................3-6 Table 3.2-1.                                                    [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ]a,c ....................3-14 Table 3.2-2.                                                    [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ]a,c .3-16 Table 3.2-3.                                                    [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ]a,c ..........................3-18 Table 3.2-4.                                                    [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ]a,c .......3-20 Table 3.3-1.                                                    [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ]a,c ...................................3-23 Table 3.3-2.                                                    Summary of Component Level EMC Test Results ......................................................3-24 Table 3.3-3.                                                    [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ]a,c .............3-25 Table 3.3-4.                                                    [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ]a,c .........................................3-28 Table 3.3-5.                                                    Summary of Cabinet Level EMC Test Results ............................................................3-29 Table 3.3-6.                                                              [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ]a,c ...................................................................3-30 Table 4.1-1.                                                              [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ]a,c ...........4-1 Table 4.2-1.                                                              [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ]a,c ...4-4 Table 5.1-1.                                                              [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ]a,c ........................................................................5-4
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                            vii                                                                                                                                                                                                                                                    Westinghouse Non-Proprietary Class 3
 
          *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
TABLE OF CONTENTS (cont.)
 
LIST OF FIGURES
 
Figure Title Page Figure 2.2-1.                                                Limerick SSE FRS at Elevation 269 ..........................................................................2-6 Figure 2.2-2.                                                Limerick SSE FRS at Elevation 289 ..........................................................................2-7 Figure 2.2-3.                                                Limerick SSE MCR IERS ...........................................................................................2-8 Figure 2.2-4.                                                Low Frequency Conducted Emissions (CE101)  Test Limit (U.S. NRC RG 1.180) ....2-14 Figure 2.2-5.                                                Low Frequency Conducted Emissions (CE101)  Test Limit (EPRI TR-102323) ........2-15 Figure 2.2-6.                                                High Frequency Conducted Emissions (CE102)  Test Limit (U.S. NRC RG 1.180) ...2-16 Figure 2.2-7.                                                High Frequency Conducted Emissions (CE102)  Test Limit (EPRI TR-102323) ........2-17 Figure 2.2-8.                                                Magnetic Field Radiated Emissions (RE101) Test Limit (U.S NRC RG 1.180) .........2-18 Figure 2.2-9.                                                Low Frequency Radiated Emissions (RE 101) Test Limit (EPRI TR-102323) ............2-19 Figure 2.2-10.                          Electric Field Radiated Emissions (RE102) Test Limit (U.S NRC RG 1.180) ...........2-20 Figure 2.2-11.                          High Frequency Radiated Emissions (RE102) Test Limit (EPRI TR-102323) ...........2-21 Figure 2.2-12.                          [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ]a,c ...................................................2-22 Figure 2.3-1.                                                [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ]a,b ..................2-25 Figure 2.3-2.                                                [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ]a,c ......................................2-26 Figure 3.1-1.                                                [
                                                                                                                                                                                                                                                                    ]a,c ..........................................................................................3-3 Figure 3.1-2.                                                [
                                                                                                                                                                                                                                                                    ]a,c ..........................................................................................3-4 Figure 3.1-3.                                                [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ]a,c ............................................................3-7 Figure 3.1-4.                                                [
                                                                                                                                                                                                                                                                    ]a,c ..........................................................................................3-11 Figure 3.1-5.                                                [
                                                                                                                                                                                                                                                                    ]a,c ..........................................................................................3-12 Figure 3.1-6.                                                [
                                                                                                                                                                            ]a,c .................................................................................................................3-13 Figure 3.2-1.                                                [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ]a,c ..................................3-15 Figure 3.2-2.                                                [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ]a,c ........................................3-19 Figure 3.2-3.                                                [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ]a,c ....................................3-21 Figure 4.1-1.                                                [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ]a,c .......................4-2 Figure 4.2-1.                                                [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ]a,c ............................................4-5 Figure 4.2-2.                                                [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              ]a,c ................4-6 Figure 4.2-3.                                                [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ]a,c .......................................................4-7 Figure 4.2-4.                                                [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              ]a,c ................4-8 Figure 5.1-1.                                                [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              ]a,c .......................................5-5
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                      viii                                                                                                                                                                                                                                              Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
ACRONYMS AND TRADEMARKS
 
Standard acronyms used in the document are defi ned in WNA-PS-00016-GEN, Standard Acronyms and Definitions (Reference 1), or included below to ensu re unambiguous understanding of their use within this document.
 
Acronym Definition
 
AER                                                                                                                                                                                            Auxiliary Equipment Room CEG                                                                                                                                                                                            Constellation Energy Group CIM                                                                                                                                                                                                  Component Interface Module DBA Design Basis Accident ECCS                                                                                                                                                            Emergency Core Cooling System EMC Electromagnetic Compatibility EMI Electromagnetic Interference EQ Equipment Qualification EUT                                                                                                                                                                                              Equipment Under Test FRS                                                                                                                                                                                                      Floor Response Spectra IEEE                                                                                                                                                                                    Institute of Electrical and Electronics Engineers, Inc.
IERS                                                                                                                                                                                    In-Equipment Response Spectra LLC                                                                                                                                                                                                  Limited Liability Company MCR                                                                                                                                                                                  Main Control Room NRC                                                                                                                                                                                          Nuclear Regulatory Commission NSSSS                                                                                                                                        Nuclear Steam Supply Shutoff System PA Pennsylvania PGCC                                                                                                                                                                  Plant Generation Control Center PPS                                                                                                                                                                                                          Plant Protection System OBE                                                                                                                                                                                            Operating Basis Earthquake PPS                                                                                                                                                                                                          Plant Protection System RCIC                                                                                                                                                                              Reactor Core Isolation Cooling RFI                                                                                                                                                                                                                Radio Frequency Interference RNI                                                                                                                                                                                                        Remote Node Interface RPS                                                                                                                                                                                                      Reactor Protection System RRS                                                                                                                                                                                                Required Response Spectra SSE                                                                                                                                                                                                        Safe Shutdown Earthquake TID                                                                                                                                                                                                          Total Integrated Dose TRS                                                                                                                                                                                                    Test Response Spectra U.S. United States ZPA Zero Period Acceleration
 
All other product and corporate names used in this do cument may be trademarks or registered trademarks of other companies and are used only for explanatio n and to the owners benefit, without intent to infringe.
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                                    ix                                                                                                                                                                                                                                                          Westinghouse Non-Proprietary Class 3
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
GLOSSARY OF TERMS
 
Standard terms used in the document are defined in WNA-PS-00016-GEN, Standard Acronyms and Definitions (Reference 1), or included below to ensu re unambiguous understanding of their use within this document.
 
Term Definition
 
Class 1E                                                                                                                                                                                                                                                                                                                                                                                                                        The safety classification of the electric equipment and systems that are essential to emergency reactor shutdown,  containment isolation, reactor core cooling and containment and react or heat removal or are otherwise essential in preventing significant release of radioactive material to the environment.
 
Electromagnetic Compatibility                      The ability of equipmen t or system to function satisfactorily in its (EMC) electromagnetic environment without introducing intolerable electromagnetic disturbances to anything in that environment.
 
Electromagnetic Interference                                                    Electromagnetic distur bance which manifests itself in performance (EMI)                                                                                                                                                                                                                                                                                                                                                                                                                                                                      degradation, malfunction or failure of electrical or electronic equipment.
 
Mild Environment                                                                                                                                                                                                                                              An environment expected as a result of normal service conditions and extremes (abnormal) in service conditions where seismic is the only design basis event of consequence.
 
Non-Seismic                                                                                                                                                                                                                                                                                                                                              Non-safety related equipment that is not located near safety-related Class 1E equipment. Functional or structural failure of this equipment would not reduce the functioning of safety-related Class 1E equipment to an unacceptable level and seismic qualification of this equipment is not required.
 
Operating Basis Earthquake                                                                      An earthquake that coul d reasonably be expected to occur at the plant (OBE)                                                                                                                                                                                                                                                                                                                                                                                                                                                              during the operating life of the plant considering the regional and local geology and seismology and specific characteristics of local subsurface material. It is that earthquake that produces the vibratory ground motion for which those features of the Nuclear Power plant, necessary for continued operation without undue risk to the health and safety of the public, are designed to remain functiona l. (For seismic qualification, five seismic events equal to one-half th e Safe Shutdown Earthquake (SSE) are applied)
 
Qualification                                                                                                                                                                                                                                                                                                                                            The generation and maintenance of evidence to ensure that the equipment will operate on demand to  meet the system performance requirements.
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                                        x                                                                                                                                                                                                                                                                Westinghouse Non-Proprietary Class 3
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
GLOSSARY OF TERMS (cont.)
 
Term Definition
 
Radio Frequency Interference                                        RFI is used inte rchangeably with EMI. EMI includes the entire (RFI)                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  electromagnetic spectrum; RFI is more restricted to the radio-frequency band, generally considered to be between 10 kHz and 10 GHz.
 
Required Response Spectrum                                            The response spectrum issued by the user or agent as part of the (RRS)                                                                                                                                                                                                                                                                                                                                                                                                                                                                  equipment specification for seismic qualification purposes. The RRS is a plot of the acceleration versus frequency describing the energy content of the earthquake time history. The RRS constitutes the requirement to be met during qualification activities.
 
Response Spectrum                                                                                                                                                                                                                        A plot of the maximum response, as a function of oscillator frequency, of any array of single-degree-of-freedom damped oscillators subjected to the same base excitation.
 
Safe Shutdown Earthquake                                                                                      An earthquake that  is based upon an evaluation of the maximum (SSE)                                                                                                                                                                                                                                                                                                                                                                                                                                                                          earthquake potential considering the regional and local geology and seismology and specific characteristic of local subsurface material. It is the earthquake that produces the maximum vibratory ground motion for which certain structures, systems and components are designed to remain functional. These structures, systems and components are those necessary to ensure the integrity of the reactor coolant pressure boundary; the capability to shut down the reactor and maintain it in a safe shutdown condition; and the capability to prevent or mitigate the consequences of accidents that could result in potential off-site exposures comparable to the 10 CFR Part 100 guidelines.
 
Safety-Related                                                                                                                                                                                                                                                                                                              Equipment that is relied upon to remain functional during and following design basis event to ensure the integrity of the reactor coolant pressure boundary; the capability to shut down the reactor and maintain it in a safe condition; and the capability to pr event or mitigate consequences of accidents that could result in potential off-site exposures comparable to the 10 CFR Part 50.34 guidelines.
 
Seismic Category I                                                                                                                                                                                                                                    A classification of structures, systems and components that shall be designed to withstand the effects of a SSE and maintain the specified design function and integrity.
 
Seismic Category II                                                                                                                                                                                                                    Non-safety related equipment whose function is not required but whose failure could reduce the functioning of adjacent safety-related Seismic Category I equipment to an unacceptable level. This equipment shall be designed to withstand the effects of a SSE and maintain its structural integrity so that such failure shall not occur.
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                                  xi                                                                                                                                                                                                                                                          Westinghouse Non-Proprietary Class 3
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
GLOSSARY OF TERMS (cont.)
 
Term Definition
 
Test Response Spectrum                                                                                                                                  The respon se spectrum that is developed from the actual time history of (TRS)                                                                                                                                                                                                                                                                                                                                                                                                                                                                      the motion of the shake table.
 
Zero Period Acceleration                                                                                                                        The acceleration level of the high frequency, non-amplified portion of (ZPA)                                                                                                                                                                                                                                                                                                                                                                                                                                                                  the response spectrum. This acceleration corresponds to the maximum peak acceleration of the time history used to derive the spectrum.
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                            xii                                                                                                                                                                                                                                                    Westinghouse Non-Proprietary Class 3
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
REFERENCES
 
Following is a list of references used throughout this  document. Revisions cited were used at the time of writing. Users of this document should refer to the revision specified. Notify the author regarding any issues of conflict.
: 1.                                                                Westinghouse Document, WNA-PS-00016-GEN, Revi sion 8, Automation and Field Services Instrumentation and Control Systems Standard  Acronyms and Definitions, September 2016.
(Westinghouse Proprietary)
: 2.                                                                Constellation (Exelon) Specification NE-402, Re vision 3, Plant Protection System (PPS)
Performance Specification, September 2022.
: 3.                                                                Westinghouse Document EQ-MR-13-GLIM, Revision 0, Equipment Qualification Strategy and Plan for the Plant Protection System Upgr ade, September 2022. (Westinghouse Proprietary)
: 4.                                                                Westinghouse Drawing, 10173D29, Revision 0, Lim erick Unit 1 & 2 Plant Protection System Cabinet Outline and Installation.. (Westinghouse Proprietary)
: 5.                                                                10173D49, Rev. 0, LIMERICK UNIT 1  & 2 PPS MCR OUTLINE AND INSTALLATION DRAWING. (Westinghouse Proprietary)
: 6.                                                                IEEE Std 344-1975, IEEE Recommended Practice for Seismic Qualification of Class 1E Equipment for Nuclear Power Generating Stations , The Institute of Electrical and Electronics Engineers, Inc.
: 7.                                                                IEEE Std 344-1987, IEEE Recommended Practice for Seismic Qualification of Class 1E Equipment for Nuclear Power Generating Stations , The Institute of Electrical and Electronics Engineers, Inc.
: 8.                                                                U.S. NRC Regulatory Guide 1.100, Revision 2, Seismic Qualification of Electric and Mechanical Equipment for Nuclear Power Plants, June 1988.
: 9.                                                                Westinghouse Letter, LTR-EQ-14-31, Revision 0,  Reconciliation of the Differences between IEEE Std. 344-1987 and IEEE Std. 344-1975, Fe bruary 20, 2014. (Westinghouse Proprietary)
: 10.                                          Constellation (Exelon) Document LS-0192, Revision 0, Dynamic Qualification Requirements for Control Room Panels, March 2, 1998. (attached in EDMS)
: 11.                                          Constellation (Exelon) Document A1656919 E13,  Seismic RRS (Required Response Spectra)
Curves for Aux Equipment Room Control Panels  at EL 289 of Control Building/Structure, May 30, 2008. (attached in EDMS)
: 12.                                          IEEE Std 323-1974, IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations, The Institute of Electrical and Electronics Engineers, Inc.
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                        xiii                                                                                                                                                                                                                                              Westinghouse Non-Proprietary Class 3
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
: 13.                                          U.S. NRC Regulatory Guide 1.89, Revision 1, E nvironmental Qualification of Certain Electric Equipment Important to Safety for Nuclear Power Plants, June 1984.
: 14.                                          IEEE Std 323-1983, IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations, The Institute of Electrical and Electronics Engineers, Inc.
: 15.                                          EPRI Technical Report, TR-102323, Revision 4, Guidelines for Electromagnetic Interference Testing in Power Plants, September 2016.
: 16.                                          U.S. NRC Regulatory Guide 1.180, Revision 2, Guidelines for Evaluation Electromagnetic and Radio-Frequency Interference in Safety-Related Instrumentation and Control Systems, December 2019.
: 17.                                          Westinghouse Document, WNA-TS-00216-GEN, Revision 2, Plant Protection System Upgrade Equipment Qualification Unit Configuration and Test Specification, June 2023. (Westinghouse Proprietary)
: 18.                                          Westinghouse Drawing 10173D40 (ECO-23-00088-16)  , Rev. 4, Limerick PPS Equipment Qualification Cabinet Assembly Conf igurations. (Westinghouse Proprietary)
: 19.                                          Westinghouse Drawing 10173D41, Revision 2 (ECO-23-00143-7). Limerick PPS Equipment Qualification Support Equipment. (Westinghouse Proprietary)
: 20.                                          Westinghouse Drawing 10172D14, Rev. 1 (ECO 00910), Limerick PPS Project Deliverables.
(Westinghouse Proprietary)
: 21.                                          Westinghouse Document, EQLR-529, Revision 0, S eismic Qualification Test Report for the Limerick Generating Station Main Control Room Components, July 2023. (Westinghouse Proprietary)
: 22.                                          Westinghouse Document, WNA-TP-07651-GEN, Revision 2, Plant Protection System Upgrade MCR Components Equipment Qualification Test Monitoring Procedure, May 2023.
(Westinghouse Proprietary)
: 23.                                          Clark Test Report, JID 23-00364, Revision 4, Qualification Test Report for the Westinghouse Limerick PPS Cabinets. October 2023
: 24.                                          Westinghouse Document, WNA-TR-06567-GEN, Revision 0, Plant Protection System Upgrade Equipment Qualification Test Cabinet Pr econditioning Test Report, September 2023.
(Westinghouse Proprietary)
: 25.                                          Westinghouse Document WNA-TP-07320-GEN, Revision 1, Plant Protection System Upgrade Equipment Qualification Test Monitoring Procedure, July 2023. (Westinghouse Proprietary)
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                        xiv                                                                                                                                                                                                                                              Westinghouse Non-Proprietary Class 3
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
: 26.                                          Westinghouse Document WNA-TR-06618-GEN, Revision 0, Plant Protection System Upgrade Equipment Qualification Test Cabinet Seismic  Functional Monitoring Test Report, September 2023. (Westinghouse Proprietary)
: 27.                                          Westinghouse Document EQLR-536, Revision 0, Envi  ronmental Test Report for the Main Control Room Class 1E Components for Limerick Units  1&2, July 2023 (Westinghouse Proprietary)
: 28.                                          Westinghouse Document EQLR-555, Revision 0, Environmental Test Report for the Plant Protection System for Limerick Units 1&2, January 2024. (Westinghouse Proprietary).
: 29.                                          Westinghouse Document EQLR-522, Revision 0, E lectromagnetic Compatibility Test Report for the Plant Protection System Upgrade for Limeri ck Units 1 and 2, January 2024. (Westinghouse Proprietary)
: 30.                                          Westinghouse Document EQLR-544, Revision 0,  Electromagnetic Compatibility Report for the Plant Protection System Upgrade for Limerick Units 1 and 2, January 2024. (Westinghouse Proprietary)
: 31.                                          Westinghouse Document, CN-EQT-22-8, Revision 1, Qualification Evaluation of Plant Protection System Equipment for Limerick Generating Sta tion Units 1 and 2 Main Control Room, April 2023. (Westinghouse Proprietary)
: 32.                                          Westinghouse Document, EQLR-517, Revision 0, S eismic Qualification Test Report for Flat Panel Displays, March 2023. (Westinghouse Proprietary)
: 33.                                          Westinghouse Document, CN-EQT-23-4, Revision 1,  Dynamic Similarity of the Plant Protection System Cabinets for the Digital Modernization  Program at Limerick Units 1&2, September 2023.
(Westinghouse Proprietary)
: 34.                                          Westinghouse Document 00000-ICE-37764, Revision  4, Summary Qualification Report of Hardware Testing for Common Q Applicati ons, March 2014. (Westinghouse Proprietary)
: 35.                                          Westinghouse Document, WCAP-16166-P Supplement 1-E05, Revision 5, Equipment Qualification Report for AC160 Platform - PC  Node Box / Flat Panel Display System Components, September 2019. (Westinghouse Proprietary)
: 36.                                          Westinghouse Document, EQLR-470, Revision 0, Mild Environment Test Report for the Core Protection Calculator System Equipment,  September 2020. (Westinghouse Proprietary)
: 37.                                          Westinghouse Document, WCAP-16166-P Supplement 1-E07, Revision 0, Equipment Qualification Report for AC160 Platform - QUI NT Power Supplies and Input Line Filter, October 2010. (Westinghouse Proprietary)
: 38.                                          Westinghouse Document, WNA-AR-01283-GLIM, Revisi on 0, Limerick Generation Station Units 1&2 Digital Modernization Project Plant Protec tion System Hardware Reconciliation Report, December 2023. (Westinghouse Proprietary)
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                              xv                                                                                                                                                                                                                                                      Westinghouse Non-Proprietary Class 3
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
: 39.                                          Westinghouse Document, EQ-EV-386-GLIM, Re vision 3, Comparison of Equipment Qualification Hardware Testing for Common Q  Applications to Limerick Requirements, November 2022. (Westinghouse Proprietary)
: 40.                                          Westinghouse Document, EQ-TP-538-GLIM, Revision  0, Environmental Test Procedure for the Main Control Room Class 1E Components for Limerick Units 1&2, May 2023. (Westinghouse Proprietary)
: 41.                                          Westinghouse Document, EQ-TP-547-GLIM, Revision  0, Environmental Test Procedure for the Plant Protection System for Limerick Units 1&2, November 2023. (Westinghouse Proprietary)
: 42.                                          Westinghouse Document, EQ-TP-542-GLIM, Revision 0, Seismic Test Procedure for the Limerick Generation Station Main Contro l Room Components, May 2023. (Westinghouse Proprietary)
: 43.                                          Westinghouse Document, EQ-TP-544-GLIM, Revision 0, Seismic Test Procedure for the Limerick PPS Equipment Qualification Cabinets, July 2023. (Westinghouse Proprietary)
: 44.                                          Westinghouse Document, EQ-TP-528-GEN, Revision 1, U.S. NRC Regulatory Guide 1.180, Revision 2 Generic Electromagnetic Compatibility Qualification Procedure, March 2023.
(Westinghouse Proprietary)
: 45.                                          Westinghouse Document, EQ-TP-517-GEN, Revision  1, Generic Electromagnetic Compatibility Qualification Test Procedure to meet the Requirements of EPRI TR-102323, Revision 4, September 2021. (Westinghouse Proprietary)
: 46.                                          Westinghouse Document, WNA-DS-04900-GLIM, Revi sion 3, Limerick Generating Station Units 1&2 Digital Modernization Project Plant Protection System - System Design Specification, February 2023. (Westinghouse Proprietary). Note: The reconciliation of later revisions of this document in comparison to Revision 3 is part of the reconciliation process for Open Item OI-EQ-23-002.
 
(Last Page of Front Matter)                                                                    Template Version 1.9
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                        xvi                                                                                                                                                                                                                                                Westinghouse Non-Proprietary Class 3
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
SECTION 1 INTRODUCTION
 
The purpose of this report is to demonstrate  the seismic, environmental, and Electromagnetic Compatibility (EMC) Equipment Qualification (EQ) of  the Plant Protection System (PPS) in accordance with the requirements specified in the Performan ce Specification NE-402 (Reference 2) for Limerick Units 1 & 2.
 
This document describes the seismic, environmenta l, and EMC qualification for the PPS. The PPS equipment is identified in the Limerick Units  1 & 2 Equipment Qualification Strategy and Plan EQ-MR-13-GLIM (Reference 3) as:
 
Safety Class: 1E Seismic Category: I Environment: Mild
 
The method of qualification employed for the PPS  is a combination of test and analysis.
 
The process to perform the EQ of the PPS is summarized as follows:
 
The list of equipment (components and sub-assemblie s) to be used in the PPS was identified.
 
A preliminary evaluation was performed on the ma jor components to determine if any previous qualifications could be applied for the PPS. Additional (new) testing was identified.
 
Representative test specimens were designed to qualify the PPS cabinets and MCR components.
These specimens were constructed in a manner consistent with the production equipment and the test software was developed in th e same manner as the production software.
 
EQ testing was performed.
 
The EQ test specimen hardware was reconciled with the as-built production PPS hardware for Unit 1 and Unit 2.  (Open Item OI-EQ-23-002).
 
(Last Page of Section 1)                                                                                  Template Version 1.9
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                        1-1                                                                                                                                                                                                                                              Westinghouse Non-Proprietary Class 3
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
SECTION 2 EQUIPMENT TO BE QUALIFIED
 
2.1                                                                                                                                                                      EQUIPMENT DESCRIPTION
 
2.1.1                                                                                                                                                                      Equipment Identification
 
The PPS performs the necessary safety-related signal  acquisition, calculations, setpoint comparison, coincidence logic, Reactor Protection System (RPS)/Nuclear Steam Supply Shutoff System (NSSSS)/Emergency Core Cooling System (ECCS) actua  tion functions, and compone  nt control functions to achieve and maintain the plant in a safe shutdow  n condition. ECCS also includes the Reactor Core Isolation Cooling (RCIC) functions  . The PPS contains maintenance and test functions to verify proper operation of the system. The PPS is also responsible for meeting Class 1E post-accident monitoring and display requirements.
 
The PPS consists of four redundant di  visions, designated 1, 2, 3, and 4. Redundant divisions are provided to satisfy single failure criteria and improve  plant availability. Interdivisional communication is accomplished through optically coupled unidirectional datalinks that maintain independence and prevent fault propagation across divisions. For intra-divisi  onal communication, each division utilizes a separate data bus to prevent propagation of failures acr  oss divisions and to enhance availability.
 
[
                                                                                                                                                                                                                                                                                              ]a,c The PPS is built upon the Common Q platform used in many safety-related applications. [
 
        ]a,c a,c Table 2.1-1.                                                        [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ]a,c
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                        2-1                                                                                                                                                                                                                                              Westinghouse Non-Proprietary Class 3
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
Table 2.1-1.                                                        [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ]a,c a,c
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                        2-2                                                                                                                                                                                                                                              Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
Table 2.1-1.                                                        [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ]a,c a,c
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                        2-3                                                                                                                                                                                                                                              Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
Table 2.1-2.                                                        [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ]a,c a,c
 
2.1.2                                                                                                                                                                      Equipment Interface/Boundary Conditions
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ]a,c
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                        2-4                                                                                                                                                                                                                                              Westinghouse Non-Proprietary Class 3
 
          *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
2.2                                                                                                                                                                      EQ REQUIREMENTS
 
2.2.1                                                                                                                                                                      Seismic
 
[                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ]a,c seismic testing was performed in accordance with IEEE Std 344-1987 (Ref  erence 7) and United States Nuclear Regulatory Commission (U.S. NRC) Regulatory Guide 1.100 (Ref  erence 8). [
 
                                                                            ]a,c
 
In accordance with U.S. NRC Regulatory Guide 1.100 (Reference 6) and IEEE Std 344-1987 (Reference 7), the equipment must demonstrate its requ  ired safety functions during and after the effects of five Operating Basis Earthquake (OBE) and one Safe  Shutdown Earthquake (SSE) events without loss of functional or physical integrity.
 
[
 
                                                                                                                                                        ]a,c
 
Table 2.2-1.                                                        [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              ]a,c a,c
 
[
                                                                                                                                                                                                                                                                ]a,c
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                        2-5                                                                                                                                                                                                                                              Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
Limerick SSE  FRS for Elevation 269 1% damping 10
 
1
 
0.1 1                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    10                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              100Frequency (Hz)
 
Horizontal                                                                                                                                                                                                                                      Vertical
 
Figure 2.2-1.                                        Limerick SSE FRS at Elevation 269
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                        2-6                                                                                                                                                                                                                                              Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
Limerick SSE  FRS for Elevation 289 1% damping 10
 
1
 
0.1 1                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                10                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          100Frequency (Hz)
 
Horizontal                                                                                                                                                                                                                                      Vertical
 
Figure 2.2-2.                                        Limerick SSE FRS at Elevation 289
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                        2-7                                                                                                                                                                                                                                              Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
Figure 2.2-3.                                        Limerick SSE MCR IERS
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                        2-8                                                                                                                                                                                                                                              Westinghouse Non-Proprietary Class 3
 
      *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
2.2.2                                                                                                                                                                      Environmental
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ]a,c
 
Table 2.2-2.                                                        [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ]a,c a,c
 
The PPS is located in a mild environment and is not subject to the Design Basis Accident (DBA);
however, the PPS must be designed to operate in the    environmental conditions for its installed location.
 
[
 
                                                                                          ]a,c
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                                        2-9                                                                                                                                                                                                                                              Westinghouse Non-Proprietary Class 3
 
          *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
2.2.3                                                                                                                                                                      EMC
 
[
 
                                                                                                                                                          ]a,c
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                              2-10                                                                                                                                                                                                                                    Westinghouse Non-Proprietary Class 3
 
          *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
2.2.3.1                                                Performance Criteria for EMC
 
[
 
                                                                                                                            ]a,c The following EMC performance criteria are defined by the industry standards:
 
Performance Criterion A:                                                                                                                  The equipment shall cont inue to operate as intended during and after the test. No degradation of performance or  loss of function is allowed below a performance level specified by the manufacturer, when the equipment is used as intended. If the performance level is not specified by the manufacturer, this may be derived from the product description and documentation and what the user may reasonably expect from the equipment if used as intended.
 
Performance Criterion B:                                                                                                                      The equipment shall cont inue to operate as intended after the test. No degradation of performance or lo ss of function is allowed below a performance level specified by the manufacturer, when the EUT is used as intended. The performance level may be replaced by a permissible loss of performance. However, during the test degradation of performance is allowed but no change  of actual operating state or stored data is allowed. If the minimum performance level or the permissible performance loss is not specified by the manufacturer, either of these may be derived from the product  description and documentation and what the user may reasonably expect from the equipment if used as intended.
 
Performance Criterion C:                                                                                                                      Temporary loss of func tion is allowed during the test, provided the function is self-recoverable or can be  restored by the operation of the controls.
 
[
 
                                                                                                                                                                                                                                                                                                                          ]a,c
 
Template Version 1.9 EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                                              2-11                                                                                                                                                                                                                                    Westinghouse Non-Proprietary Class 3
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
 
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
Table 2.2-4.                                                        IEC 61000-4-13 Operating Envelope
 
Harmonic #                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    % of Supply Voltage 2 3 3 8 4 1.5 5 9 6 -
7 7.5 8 -
9 2.5 10 -
11 5 12 -
13 4.5 15 -
17 3 19 2 21 -
23 2 25 2 27 -
29 1.5 31 1.5 33 -
35 1.5 37 1.5 39 -
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                    2-23                                                                  Westinghouse Non-Proprietary Class 3
 
*** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
2.3                                                                                                                                                                      EQUIPMENT QUALIFICATION TEST SPECIMENS
 
2.3.1                                                                                                                                                                        Overview
 
As described in Section 2.1, the PPS consists of multip le electrical cabinets that are separated into four divisions.  [
 
]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                    2-24                                                                  Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2 a,c
 
Figure 2.3-1.                                        [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ]a,b
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                    2-25                                                                  Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
 
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
[
 
                                                                                                                                                                                                                            ]a,c
 
Table 2.3-1.                                                        [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ]a,c a,ca,
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                    2-27                                                                  Westinghouse Non-Proprietary Class 3
 
            *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
2.3.2                                                                                                                                                                        Critical Hardware Components
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ]a,c
 
Table 2.3-2.                                                        [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ]a,ca,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                    2-28                                                                  Westinghouse Non-Proprietary Class 3
 
          *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
Table 2.3-3.                                                        [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              ]a,c a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                    2-29                                                                  Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
2.3.3                                                                                                                                                                            Functional Monitoring and Test Procedures
 
[
 
                                                                                                                                                            ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                    2-30                                                                  Westinghouse Non-Proprietary Class 3
 
      *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
 
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
SECTION 3 TYPE TESTING PERFORMED
 
3.1                                                                                                                SEISMIC
 
3.1.1                                                                                                                                                                        Component Seismic Testing
 
Component level seismic testing was performed for the PPS and associated MC    R equipment as discussed in EQLR-529 (Reference 21). The tests were conduc  ted at the Westinghouse facility in New Stanton, Pennsylvania (PA) in May 2023 under the directi  on of Westinghouse personnel. The seismic testing was performed in accordance with U.S. NRC Regulatory    Guide 1.100 (Reference 8) and IEEE Std 344-1987 (Reference 7).
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                      ]a,c
 
Table 3.1-1.                                                        [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ]a,c a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                              3-1                                                                            Westinghouse Non-Proprietary Class 3
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
Note 1. The PPS Cabinets were qualified by a separate cabinet-leve l type-test program discussed in  Section 3.1.2. The Isolation Barrier, Fiber Optic Bulkhead Connector, and Weed  Modem (Receiver) were not included in the cabinet test specimens and were tested as componen ts.
 
[
 
                                                                                                                                                        ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                              3-2                                                                            Westinghouse Non-Proprietary Class 3
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2                                                                                                                                                                                                                                                      a,c
 
Figure 3.1-1.                                        [
                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                              3-3                                                                            Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2 a,c
 
Figure 3.1-2.                                        [
                                                                                                                                                                                                                                                                                                                                                                                                                                                              ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                              3-4                                                                            Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
[
 
                                                                                                                                                                                                  ]a,c
 
3.1.1.1                                                Anomalies During Component Level Seismic Testing
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                              3-5                                                                            Westinghouse Non-Proprietary Class 3
 
          *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
3.1.2                                                                                                                                                                        Cabinet Level Seismic Testing
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ]a,c
 
Table 3.1-2.                                                                                              [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ]a,c a,c
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                              3-6                                                                            Westinghouse Non-Proprietary Class 3
 
            *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
[
                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ]a,c                                                                                                                                                                                                                                                                                                                                                                                                                                  a,c
 
Figure 3.1-3.                                        [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ]a,c
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                              3-7                                                                            Westinghouse Non-Proprietary Class 3
 
          *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ]a,c
 
3.1.2.1                                                Anomalies Prior To and After Cabinet Level Seismic Testing
 
3.1.2.1.1                                    RITS 78685 - SCRAM HARP Circuit from EQ2 DO620 Channel 1
 
[
 
                                                                                                        ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                              3-8                                                                            Westinghouse Non-Proprietary Class 3
 
          *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
3.1.2.1.2                                    RITS 78714 - EQ1 CSI Temperature Sensor Error due to AI688 Circuit and Fuse
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ]a,c
 
3.1.2.1.3                                    Corrective Action Identified After Seismic Testing
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                              3-9                                                                            Westinghouse Non-Proprietary Class 3
 
          *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
3.1.2.1.4                                    RITS 78715 - ISOl2-K1 Driven by DI621 Ch. 4 Does Not Supply Enough Wetting Voltage
 
[
 
                                                                                                                                                                                                                                                                                                                                                                  ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                    3-10                                                                  Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
 
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
3.2                                                                                                                                                                        ENVIRONMENTAL
 
3.2.1                                                                                                                                                                      Component Environmental Testing
 
[
 
                                                                                                                                                                                                                                                                                                                                                  ]a,c
 
Table 3.2-1.                                              [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ]a,c a,c
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                3-14                                                                                                                                      Westinghouse Non-Proprietary Class 3
 
            *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
 
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ]a,c
 
3.2.1.1                                                Anomalies During Component Level Environmental Testing
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                3-17                                                                                                                                      Westinghouse Non-Proprietary Class 3
 
          *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
3.2.2                                                                                                                                                                        Cabinet Level Environmental Testing
 
Component level mild environment testing was pe  rformed on representative PPS  cabinets as discussed in EQLR-555 (Reference 28). The tests were conducted  at the Westinghouse facility in New Stanton, Pennsylvania (PA) in December 2023 under the direc  tion of Westinghouse personnel. The environmental testing was performed in accordance with IEEE Std 323-1974 (Reference 12) as endorsed by U.S. NRC Regulatory Guide 1.89 (Reference 13) and clarified by IEEE Std 323-1983 (Reference 14).
 
[
 
                                                                                                                                                                                                                      ]a,c
 
Table 3.2-3.                                              [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              ]a,c a,c
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                3-18                                                                                                                                      Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
 
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
[
 
                                                                                                                                                                                                                            ]a,c
 
3.2.2.1                                                Anomalies During Cabinet Level Environmental Testing
 
[
 
                                                                                                                                                                                                                                            ]a,c
 
3.2.2.1.1                                    Corrective Action During Cabinet Level Environmental Testing
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                3-22                                                                                                                                      Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
3.3                                                                                                                                                                      EMC
 
3.3.1                                                                                                                                                                        Component EMC Testing
 
Component level EMC was performed for the    PPS MCR equipment as discussed in EQLR-522 (Reference 29). The tests were conducted at the Westinghouse facility in New Stanton, Pennsylvania (PA) from April through November of 2023 under the direction of Westinghouse personnel.
 
The EMC testing was performed in accordance with    EPRI Topical Report TR-102323 (Reference 15) and U.S. NRC RG 1.180 (Reference 16) as discussed in Section 2.3
 
[
                                                                                                                                                                                                                                                                                                                                                                                                                                                        ]a,c
 
Table 3.3-1.                                              [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ]a,c a,c
 
[
 
                                                                                                                                                                                                                                                                    ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                3-23                                                                                                                                      Westinghouse Non-Proprietary Class 3
 
      *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
Table 3.3-2.                                              Summary of Component Level EMC Test Results
 
Test Standard                                                                                                                                                                                                                                                                                Description                                                                                                                                                                                                                                                                                                                            Results MIL-STD-461G, CE101                                                                                                          Conducted Emissions                                                                                                                                                                                                                          [
30 Hz to 10 kHz                                                                                                                                                                                                                                    ]a,c MIL-STD-461G, CE102                                                                                                          Conducted Emissions                                                                                                                                                                                                                                    [
10 kHz to 10 MHz                                                                                                                                                                                                                                                  ]a,c MIL-STD-461G, RE101                                                                                                                            Radiated Emissions                                                                                                                                                                                                                    [
30 Hz to 100 kHz                                                                                                                                                                                                                                              ]a,c MIL-STD-461G, RE102                                                                                                                            Radiated Emissions                                                                                                                                                                                                                    [
2 MHz to 10 GHz                                                                                                                                                                                                                                                ]a,c MIL-STD-461G, RS103                                                                                              Radiated Susceptibility                                                                                                                                                                                                                              [
6 GHz to 10 GHz(4)                                                                                                                                                                                                                                            ]a,c IEC 61000-4-2                                                                                                                                                                              Electrostatic Discharge                                                                                                                          [
(ESD)                                                                                                                                                                                                                        ]a,c IEC 61000-4-3                                                                                                                                                                                  Radiated Susceptibility                                                                                                                      [
26 MHz to 6 GHz(4)                                                                                                                                                                                                                                              ]a,c IEC 61000-4-4                                                                                                                                                                        Electrical Fast Transient                                                                                                                              [
(EFT)                                                                                                                                                                                                                  ]a,c IEC 61000-4-5                                                                                                                                                                                                              Surge, Combination                                                                                                [
Wave                                                                                                                                                                                                                        ]a,c IEC 61000-4-6                                                                                                                                                                Conducted Susceptibility                                                                                                                                      [
150 kHz to 80 MHz                                                                                                                                                                                                                                                ]a,c Power Frequency                                                                                                                                                  [
IEC 61000-4-8                                                                                                                                                                    Magnetic Field                                                                                                                                                                                                                                    ]a,c Susceptibility IEC 61000-4-9                                                                                                                                                                                                    Pulse Magnetic Field                                                                                                        [
Susceptibility                                                                                                                                                                                                                                ]a,c IEC 61000-4-10                                                                                                                                                                                                  Damped Oscillatory                                                                                                              [
Magnetic Field                                                                                                                                                                                                                                    ]a,c
 
IEC 61000-4-12                                                                                                                                                                                                                Surge, Ring Wave                                                                                                                                                      [                                                                                                                                                                                                                                                                                                                                                        ]a,c
 
IEC 61000-4-13                                                                                                                                                                                                                                        Harmonics and                                                                            [
Interharmonics                                                                                                                                                                                                                                    ]a,c IEC 61000-4-16                                                                                                                                                      Conducted Susceptibility                                                                                                                                                  [
15 Hz to 150 kHz                                                                                                                                                                                                                                          ]a,c
[
 
                                                                                                          ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                3-24                                                                                                                                      Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
3.3.1.1                                                Anomalies During MCR Component Level EMC Testing
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ]a,c
 
3.3.1.1.1                                    High Frequency Conducted Emissions (CE102) Exceed Test Limits
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                  ]a,c
 
Table 3.3-3.                                              [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ]a,c a,c
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                3-25                                                                                                                                      Westinghouse Non-Proprietary Class 3
 
            *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
3.3.1.1.2                                    Magnetic Field Radiated Emissions (RE101) Exceed Test Limits
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                3-26                                                                                                                                      Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
3.3.1.1.3                                    Electric Field Radiated Emissions (RE102) Exceed Test Limits
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ]a,c
 
3.3.1.1.4                                    Power Supply Output Out-of-Tolerance During IEC 61000-4-5 Surge Test
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                3-27                                                                                                                                      Westinghouse Non-Proprietary Class 3
 
          *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
3.3.2                                                                                                                                                                        Cabinet Level EMC Testing
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ]a,c
 
Table 3.3-4.                                              [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ]a,c a,c
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                3-28                                                                                                                                      Westinghouse Non-Proprietary Class 3
 
            *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
Table 3.3-5.                                              Summary of Cabinet Level EMC Test Results
 
Test Standard                                                                                                                                                                                                                                                                            Description                                                                                                                                                                                                                                                                                                                                                                                                                  Results MIL-STD-461G, CE101                                                                                                      Conducted Emissions                                                                                                                                                                                                                                                                                              [
30 Hz to 10 kHz                                                                                                                                                                                                                                                                                  ]a,c MIL-STD-461G, CE102                                                                                                      Conducted Emissions                                                                                                                                                                                                                                                                                              [
10 kHz to 10 MHz                                                                                                                                                                                                                                                                                        ]a,c MIL-STD-461G, RE101                                                                                                                        Radiated Emissions 30 Hz to 100 kHz                                                                                                                                        [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ]a,c
 
MIL-STD-461G, RE102                                                                                                                        Radiated Emissions 2 MHz to 10 GHz                                                                                                                                      [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ]a,c MIL-STD-461G, RS103                                                                                          Radiated Susceptibility                                                                                                                                                                                                                                                                                              [
6 GHz to 10 GHz(3)                                                                                                                                                                                                                                                                                        ]a,c IEC 61000-4-2                                                                                                                                                                          Electrostatic Discharge                                                                                                                                                                                  [
(ESD)                                                                                                                                                                                                                                                        ]a,c IEC 61000-4-3                                                                                                                                                                              Radiated Susceptibility                                                                                                                                                                                [
26 MHz to 6 GHz(3)                                                                                                                                                                                                                                                                                          ]a,c IEC 61000-4-4                                                                                                                                                                    Electrical Fast Transient                                                                                                                                                                                        [
(EFT)                                                                                                                                                                                                                                                      ]a,c IEC 61000-4-5                                                                                                                                                Surge, Combination Wave                                                                              [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ]a,c IEC 61000-4-6                                                                                                                                                            Conducted Susceptibility                                                                                                                                                                                                [
150 kHz to 80 MHz                                                                                                                                                                                                                                                                                            ]a,c IEC 61000-4-8                                                                                                                                        Power Frequency Magnetic                                                                                                                                                                                                                    [
Field Susceptibility                                                                                                                                                                                                                                                                                      ]a,c IEC 61000-4-9                                                                                                                                                                                                Pulse Magnetic Field                                                                                                                                                                [
Susceptibility                                                                                                                                                                                                                                                                        ]a,c IEC 61000-4-10                                                                                                                                                                                              Damped Oscillatory                                                                                                                                                                        [
Magnetic Field                                                                                                                                                                                                                                                                              ]a,c IEC 61000-4-12                                                                                                                                                                                                            Surge, Ring Wave                                                                                                                                                      [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ]a,c IEC 61000-4-13                                                                                                                                                                                                                                    Harmonics and                                                                                                                                      [
Interharmonics                                                                                                                                                                                                                                                                              ]a,c IEC 61000-4-16                                                                                                                                                  Conducted Susceptibility                                                                                                                                                                                                              [
15 Hz to 150 kHz                                                                                                                                                                                                                                                                                    ]a,c
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                3-29                                                                                                                                      Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
3.3.2.1                                                Failures or Deviations During Cabinet Level EMC Testing
 
[
 
a,c
 
Table 3.3-6.                                                        [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ]a,c a,c
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ]a,c
 
3.3.2.1.1                                    Evaluation of Over-the-Limit Magnetic Field Radiated Emissions
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                3-30                                                                                                                                      Westinghouse Non-Proprietary Class 3
 
            *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
[
 
                                                                                                                                                                                                                                                                                                                                                                          ]a,c
 
3.3.2.1.2                                    Disposition of Over-the-Limit Electric Field Radiated Emissions
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                3-31                                                                                                                                      Westinghouse Non-Proprietary Class 3
 
          *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
3.3.2.2                                                Anomalies During Cabinet Level EMC Testing
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ]a,c
 
(Last Page of Section 3)
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                3-32                                                                                                                                      Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
SECTION 4 ANALYSIS PERFORMED AND BASIS FOR QUALIFICATION
 
During the initial phase of the PPS digital modernization program, evaluation EQ-EV-386-GLIM (Reference 39) was performed to evaluate the Co  mmon Q platform against the Limerick seismic, environmental and EMC requirements. The evaluation concluded that while the generic Common Q platform qualification provides confidence that the previous qualification is compliant with the Limerick requirements, it also concluded that additional seismic, environmental, and EMC testing and/or analyses were required to qualify the differences which exist be  tween the previously qualified configurations and the Limerick configuration. Based on those differenc  es, the additional testing documented in Section 3 was performed. [
 
                                                                                                                                                                                                                                                                                                      ]a,c
 
4.1                                                                                                                                                                      SEISMIC
 
4.1.1                                                                                                                                                                        Seismic Evaluations Performed
 
4.1.1.1                                                Main Control Room Component Evaluation
 
[
 
                                                                                                                                                                                                                                                                                                                                                    ]a,c
 
Table 4.1-1.                                                        [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ]a,c a          c
 
[
 
                                                                                                                                                                                                                                                      ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                          4-1                                                                                                                                                Westinghouse Non-Proprietary Class 3
 
      *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                          4-2                                                                                                                                                Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
4.1.2                                                                                                                                                                        Dynamic Similarity Analysis
 
[
 
                                                                                                        ]a,c
 
4.1.3                                                                                                                                                                      Basis for Seismic Qualification
 
[
 
a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                          4-3                                                                                                                                                Westinghouse Non-Proprietary Class 3
 
            *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
4.2                                                                                                                                                                        ENVIRONMENTAL
 
4.2.1                                                                                                                                                                      Environmental Evaluation
 
[
 
                                                                                                                                                                                                                                                                                                                                                                      ]a,c
 
Table 4.2-1.                                                        [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ]a,c a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                          4-4                                                                                                                                                Westinghouse Non-Proprietary Class 3
 
          *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
[
 
                                                                                                                                                                                                                                  ]a,c                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    a,c
 
Figure 4.2-1.                                        [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                          4-5                                                                                                                                                Westinghouse Non-Proprietary Class 3
 
            *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
LIM-24-090, Rev is  i o n 0, Attachme      nt 4
 
Qualification                    S ummar      y  Repo11 fo1*
Constellation                  Energy                                                      the  Plant    Protection              S ys tem  Upgrade                fo1* Limerick            Units    1 &          2
 
a,c
 
Figure      4.2-2.
 
EQ-QR-433-GLIM-NP,                          Rev . 4                                                      4-6                                                                                                                                                                      Wes tinghouse            Non-Proprietar                      y  Clas    s 3
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for a,c Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
Figure 4.2-3.                                        [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                          4-7                                                                                                                                                Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2                                                                                                                                                                                                                                                              a,c
 
Figure 4.2-4.                                        [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ]a,c
 
4.2.2                                                                                                                                                                      Basis for Environmental Qualification
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                          4-8                                                                                                                                                Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
4.3                                                                                                                                                                        EMC
 
4.3.1                                                                                                                                                                      EMC Evaluation
 
[
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              ]a,c
 
4.3.2                                                                                                                                                                        Basis for EMC Qualification
 
[
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                          4-9                                                                                                                                                Westinghouse Non-Proprietary Class 3
 
            *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
4.4                                                                                                                                                                        HARDWARE RECONCILIATION
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ]a,c
 
4.4.1                                                                                                                                                                        Hardware Reconciliation Methodology
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              ]a,c
 
4.4.2                                                                                                                                                                        Hardware Reconciliation Conclusions
 
[
 
                                                                                                                                                                                                                                            ]a,c
 
(Last Page of Section 4)
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                4-10                                                                                                                                      Westinghouse Non-Proprietary Class 3
 
            *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
SECTION 5 INSTALLATION REQUIREMENTS AND MAINTENANCE, SURVEILLANCE, AND REPLACEMENT PROGRAM
 
5.1                                                                                                                                                                        INSTALLATION LIMITATIONS
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                          5-1                                                                                                                                                Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                          5-2                                                                                                                                                Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                          5-3                                                                                                                                                Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2
 
5.1.1                                                                                                                                                                        Use of Ferrites for EMC Qualification
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ]a,c
 
Table 5.1-1.                                                        [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ]a,c a,c
 
[                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                          5-4                                                                                                                                                Westinghouse Non-Proprietary Class 3
 
            *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                                the Plant Protection System Upgrade for Limerick Units 1 & 2                                                                                                                                                                                                                                                a,c
 
Figure 5.1-1.                                        [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ]a,c
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                          5-5                                                                                                                                                Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                                                                                                                                                                                                                                                                                                                                                                                                                              the Plant Protection System Upgrade for Limerick Units 1 & 2
 
5.2                                                                                                                                                                        MAINTENANCE, SURVEILLANCE, AND REPLACEMENT PROGRAM
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ]a,c
 
(Last Page of Section 5)
 
EQ-QR-433-GLIM-NP, Rev. 4                                                                                                                                                                                                                                                                                                                                                          5-6                                                                                                                                                Westinghouse Non-Proprietary Class 3
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy                                            the Plant Protection System Upgrade for Limerick Units 1 & 2
 
SECTION 6
 
==SUMMARY==
AND CONCLUSIONS
 
==6.1                                                                                                                                                                        CONCLUSION==
S
 
An equipment qualification program was performed to demonstrate that the PPS equipment is qualified for use at Limerick Units 1 & 2. The equipment was qualified as Class 1E, and it was proven that it will perform its safety related functions during and after design basis ev ents and in postulated abnormal environments. The equipment was shown to be i mmune to electromagnetic disturbances and to not produce excessive electromagnetic emissions in accordance with the industry testing standards and regulatory guidance for EMC qualification.
 
Seismic qualification was performed in accordance with U.S. NRC Regulatory Guide 1.100 (Reference 8) and IEEE Std 344-1987 (Reference 7). This meets the technical requirements of IEEE Std 344-1975 (Reference 6).
 
Environmental qualification was performed in acco rdance with IEEE Std 323-1974 (Reference 12) as endorsed by U.S. NRC Regulatory Guide 1.89 (Reference 13) and clarified by IEEE Std 323-1983 (Reference 14)
 
EMC qualification was performed in accordance w ith U.S NRC Regulatory Guide 1.180 (Reference 16) and EPRI Topical Report TR-102323 (Reference 15). While  some of the EPRI test limits were not met, it was shown that sufficient margin exists to provid e reasonable assurance that the equipment will perform as designed within the expected EMC environment.
 
The qualification testing identified in Section 3 fo r the PPS along with the supportive analyses identified in Section 4 demonstrate seismic qualification to the Limerick Units 1 & 2 requirements.
 
Based on the discussions above, it is concluded that  the Limerick Units 1 & 2 PPS equipment meets the plant-specific EQ requirements as defined in Perfo rmance Specification NE-402 (Reference 2), LS-0192 (Reference 10), and A1656919 (Reference 11). The in stallation restrictions and limitations associated with this qualification are discussed in Section 5.1.
 
Closure of all open items identified in this report is  required before the PPS equipment can be used in Limerick Units 1&2.
 
(Last Page of Section 6)
EQ-QR-433-GLIM-NP, Rev. 4                                    6-1                          Westinghouse Non-Proprietary Class 3
 
*** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Westinghouse Non-Proprietary Class 3
 
Attachment 6
 
APP-GW-GLR-611-NP, Revision 3, ITAAC 2.5.02.14: Component Interface Module Design Process Technical Report (Non-Proprietary)
 
Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066
 
                                                                                          © 2024 Westinghouse Electric Company LLC All Rights Reserved
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Westinghouse Non-Proprietary Class 3
 
APP-GW-GLR-611-NP December 2016 Revision 3
 
AP1000 Design Certification ITAAC 2.5.02.14:
Component Interface Module Design Process Technical Report
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
WESTINGHOUSE NON-PROPRIETARY CLASS 3
 
APP-GW-GLR-611-NP Revision 3 AP1000 Design Certification ITAAC 2.5.02.14:
 
Component Interface Module Design Process Technical Report
 
Shawn M. Downey*, Principal Engineer Standard Hardware Components
 
December 2016
 
Reviewer:                                          Sarah T. DiTommaso*, Manager AP1000 ITAAC & Inspection Support
 
Verifier:                                                                        Michael C. Shaffer*, Manager Independent Verification and Validation II
 
Approved:                                  Robert B. Phillips*, Manager Standard Hardware Components
 
*Electronically approved records are authenticated in the electronic document management system.
 
Westinghouse Electric Company LLC 1000 Westinghouse Drive Cranberry Township, PA  16066, USA
                                                  © 2016 Westinghouse Electric Company LLC All Rights Reserved
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
TABLE OF CONTENTS
 
RECORD OF REVISIONS ...........................................................................................................          ............... 5 LIST OF TABLES ................................................................................................................          ........................ 6 LIST OF FIGURES ...............................................................................................................          ....................... 6 LIST OF ACRONYMS AND TRADEMARKS ........................................................................................... 7 1                                                                                                                                                  INTRODUCTION ..................................................................................................................          ......... 8 1.1                                                                                                                                                                                                                                                PURPOSE .......................................................................................................................          .... 8 1.2                                                                                                                                                                                              SCOPE .........................................................................................................................          ....... 8 1.3                                                                              OVERVIEW OF CIM DESIGN PROCESSES .................................................................. 9 2                                                                                                              ITAAC 2.5.02.14 -  ACCEPTANCE CRITERIA A ....................................................................... 13 2.1                                                                              PROCESS FOR DESIGN REQUIREMENTS PHASE ................................................... 13 2.2                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      CONCL USION .................................................................................................................                                              14 3                                                                                                              ITAAC 2.5.02.14 - ACCEPTANCE CRITERIA B ....................................................................... 15 3.1                                                                              PROCESS FOR SYSTEM DEFINITION PHASE .......................................................... 15 3.2                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      CONCL USION .................................................................................................................                                              16 4                                                                                                              ITAAC 2.5.02.14 - ACCEPTANCE CRITERIA C ....................................................................... 17 4.1                                                                              PROCESS FOR HARDWARE AND SOFTWARE DEVELOPMENT PHASE ............. 17 4.2                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      CONCL USION .................................................................................................................                                              18 5                                                                                                              ITAAC 2.5.02.14 - ACCEPTANCE CRITERIA D ....................................................................... 19 5.1                                                                              PROCESS FOR SYSTEM INTEGRATION AND TEST PHASE ................................... 19 5.2                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      CONCL USION .................................................................................................................                                              20 6                                                                                                              ITAAC 2.5.02.14 - ACCEPTANCE CRITERIA E ....................................................................... 21 6.1                                                                              PROCESS FOR INSTALLATION PHASE ..................................................................... 21 6.2                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      CONCL USION .................................................................................................................                                              21 7                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            CONCL USION ....................................................................................................................          .......... 22 8                                                                                                                                  REFERENCES ....................................................................................................................          .......... 23 APPENDIX A                    - RELATIONSHIP BETWEEN ITAAC 2.5.02.14 AND 2.5.02.11 ................................. 27 APPENDIX B                    - CIM LIFECYCLE PROCESS IMPLEMENTATION ................................................... 28
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 4 of 34
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
RECORD OF REVISIONS
 
Revision Date                Revision Description
 
0                                                                                                                                                      October, 2015                                                                                                                                Initial issue
 
1 November, 2015 Modified Appendix A - Figure 1 to show the lines from the requirements documents going to both the CIM design phase and PMS system definition phase.
 
Modified title of sub-section headers.
 
2 January, 2016 Per CAPAL # 100353533, added a reference for WEC 3.3.1 in the References section and corrected the reference for WEC 3.3.1 in Section 2.1.
 
Removed DCD from the acronym list.
 
Defined SHA in Section 2.1.
 
3                                                                                                                                                      December, 2016                                                                                          Clarified hardware testing in Section 5.1.
 
Added Appendix B to address process implementation. Added discussion of appendix B to Section 1.2.
 
Made minor revisions to  Section 1.2 (Scope) and to Sections 2-7 to clarify inspections performed and conclusions.
 
Added revision numbers to references 16 and 42.
 
Added references 42-59.
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 5 of 34
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
TABLE OF CONTENTS (cont.)
 
LIST OF TABLES
 
Table Title Page
 
Table 1                                                                                                                                        [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ]a,c .................................................................. 10
 
LIST OF FIGURES
 
Figure Title Page
 
Figure 1                                                                                                                                [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ]a,c ............................................. 27
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 6 of 34
 
      *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
LIST    OF ACRONYMS AND  TRADEMARKS
 
Acronyms used in the document are defined  in WNA-PS-00016-GEN, Standard Acronyms and Definitions (Reference 31) or are included below  to ensure unambiguous understanding of their use within this document.
 
CIM                                                                                                                                                                                                                                                                        Component Interface Module EQ Equipment Qualification FMEA                                                                                                                                                                                                                                  Failure Modes and Effects Analysis FPGA                                                                                                                                                                                                                                            Field Programmable Gate Array HDL                                                                                                                                                                                                                                                                  Hardware Description Language IDI                                                                                                                                                                                                                                                                                              Isolated Development Infrastructure ISE                                                                                                                                                                                                                                                                                          IV&V Simulation Environment ITAAC                                                                                                                                                                                                                                                                                        Inspections,  Tests, Analyses    and Acceptance    Criteria IV&V                                                                                                                                                                                                                                                                    Independent Verification  and Validation PLS                                                                                                                                                                                                                                                                      Plant Control System QA Quality Assurance PMS                                                                                                                                                                                                                                                                    Protection and Safety Monitoring System RTL Register Transfer Logic SHA Software Hazards Analysis SIOS                                                                                                                                                                                                                                                            Standard I/O Simulator SPM                                                                                                                                                                                                                                                                    Software Program Manual SRNC                                                                                                                                                                                                                                          Safety Remote Node Controller
 
Verilog is a registered trademark of Cadence Design Systems, Inc.
 
AP1000 is a registered trademark in the United States of Westinghouse Electric Company LLC, its subsidiaries and/or its affiliates. This mark may al so be used and/or registered in other countries throughout the world. All rights reserved. Un authorized use is strictly prohibited.
 
All other product and corporate names used in this do cument may be trademarks or registered trademarks of other companies, and are used only for explanatio n and to the owners benefit, without intent to infringe.
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 7 of 34
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
1                                                                                                    INTRODUCTION
 
1.1                                                                                                                                    PURPOSE
 
The purpose of this document is to provide a roadmap to the documentation that fulfills the inspections, tests, analyses and acceptance criteria (ITAAC) for PMS ITAAC 2.5.02.14.
 
1.2                                                                                                                                  SCOPE
 
Sections 2 through 6 of this report covers the  Component Interface Module - Safety Remote Node Controller (CIM-SRNC) Subsystem lifecycle process es used to support the design requirements phase, system definition phase, hardware and software development phase, system integration and test phase, and installation phase. Appendix B of this repor t addresses implementation of the processes utilized during the design requirements phase, system definition phase, hardware and                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            software development phase, system integration and test phase, and inst allation phase. This appendix summarizes previous inspections performed on the CIM implementation docum ents throughout the lifecycle process to ensure that the lifecycle processes were adequately followed, and ensures th at the IV&V phase summary report was produced indicating that the IV&V tasks were completed.
 
The ITAAC 2.5.02.14 Design Commitment is:
: 14. The Component Interface Module (CIM) is deve loped using a planned design process which provides for specific design documentation and reviews.
 
The ITAAC 2.5.02.14 Inspections, Tests, Analyses is:
 
An inspection and or an audit will be performed of the processes used to design the hardware, development software, qualification and testing.
 
The ITAAC 2.5.02.14 Acceptance Criteria are:
 
A report exists and concludes that CIM meets the below listed life cycle stages.
 
Life cycle stages:
: a. Design requirements phase, may be referred to as conceptual or project definition phase
: b. System definition phase
: c. Hardware and software development phase, consisting of hardware and software design and implementation
: d. System integration and test phase
: e. Installation phase
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 8 of 34
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
This report will document the processes inspected for each of the acceptance criteria. Although the ITAAC wording only covers the CIM, this document covers the life cycle process for the entire CIM-SRNC subsystem.  [
 
              ]a,c
 
1.3                                                                                                                                  OVERVIEW OF CIM DESIGN PROCESSES
 
This report describes the process used for the development of the Component Interface Module (CIM) -
Safety Remote Node Controller (CIM-SRNC) subsystem. The CIM-SRNC subsystem consists of standard components used within the Protection and Safety Monitoring System (PMS). A standard component is a component available for  use by any project, and is not limited to  AP1000 projects. The components include: CIM, SRNC, CIM base plate, SR NC base plate, single-width transition panel, double-width transition panel, and branch terminating  device. Two of the components - the CIM and the SRNC - are based on field programmable gate array (FPGA) technology. The CIM-SRNC subsystem provides the interface to control Class 1E component s and several non-class 1E components. It can receive inputs from PMS, the Plant Control System (PLS), and local controls on the CIM module. The CIM uses a priority-based logic to determine which input to act upon. The SRNC provides the communication interface to PMS for the CIM-SRNC subsystem. The CIM-SRNC subsystem is developed using a planned design process which provides for specific design documentation and reviews.
 
[
 
                                                                                                                                                  ]a,c
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 9 of 34
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                          AP1000
 
Table 1                                                        [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ]a,c a,c
 
[
 
                                                                                                                                                                                                                                                                          ]
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Page 10 of 34
 
            *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ]a,c
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 11 of 34
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
[
 
                                                                                                                                                        ]a,c
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 12 of 34
 
            *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
2                                                                                                    ITAAC 2.5.02.14 -  ACCEPTANCE CRITERIA A
 
The acceptance criteria item a) in ITAAC 2.5.02.14 states:
 
A report exists and concludes that CIM meets the below listed life cycle stages.
: a. Design requirements phase, may be referred to as conceptual or project definition phase
 
2.1                                                                                                                                  PROCESS FOR DESIGN REQUIREMENTS PHASE
 
The COL Appendix C ITAAC Design Requirement s Phase corresponds to the concept phase and planning phase per Table 1. During the concept phase, the CIM-SRNC project team works with other Westinghouse project teams to develop the CIM-SR NC requirements. Concept phase activities include:
 
Reviewing and providing feedback on project re quirements documents. This review includes design review activities per WEC 3.3.1, Design Reviews (Reference 42).
Defining overall project strategy, schedule, milestones, assurance requirements and verification strategy Exploring conceptual approaches to new CIM/SR NC design. Considerations include budgetary data and life cycle constraints and benefits.
 
The planning phase is initiated upon completion of  the project requirements documents to drive subsequent creation of the required planning document s. These requirements documents are listed below:
 
WNA-PD-00050-GEN, Component Interface Module (CIM) and Safety Remote Node Controller (SRNC) Development Project Plan (Reference 9).
WNA-DS-01272-GEN, Safety System Remote Node Controller Requirements Specification (Reference 14).
WNA-DS-01271-GEN, Component Interfa ce Module Hardware Requirements Specification (Reference 12).
WNA-DS-02331-GEN, Component Interface Module Logic Specification (Reference 13).
 
The following planning documents are created afte r the project requirements documents above are completed. Descriptions of the plans are given in section 1.3 of this document.
 
6105-00015, CIM-SRNC Software Program Manual, (Reference 1).
6105-00000, CIM-SRNC Management Plan, (Reference 2).
6105-00001, CIM-SRNC QA Plan, (Reference 3).
6105-00013, CIM-SRNC IV&V Plan, (Reference 4).
6105-00002, CIM-SRNC CM Plan, (Reference 6).
6105-00005, CIM-SRNC Test Plan, (Reference 7).
6105-00014, CIM-SRNC FPGA Development Plan, (Reference 8).
 
[
 
                                                                                                                                                                                                                  ]a,c
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 13 of 34
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
[
                                                                                                                                                                                                                                                                                                ]a,c
 
==2.2                                                                                                                                    CONCLUSION==
 
[
 
                                                                                                                                                                      ]a,c
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 14 of 34
 
              *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
3                                                                                                    ITAAC 2.5.02.14 - ACCEPTANCE CRITERIA B
 
The acceptance criteria for item b) in ITAAC 2.5.02.14 are:
 
A report exists and concludes that CIM meets the below listed life cycle stages.
: b. System Definition Phase
 
3.1                                                                                                                                  PROCESS FOR SYSTEM DEFINITION PHASE
 
The COL Appendix C ITAAC System Definition Ph ase corresponds to the requirements phase per Table 1. During the requirements phase, both the soft ware requirements and the hardware requirements are developed.
 
6105-00014, CIM-SRNC FPGA Development Plan (Reference 8) controls the development and documentation of software requirements. Software Requirements Specifications (SRSs) are developed during the planning and requirements phases for the CIM and SRNC. Inputs, such as installation support requirements, system constraints, CIM-SRNC management plan, risk analysis, system functional software requirements, and any applicable system interface requirements from the system requirements specification provide the necessary system and functional requirements to develop software requirements and hardware design.
 
The CIM and SRNC FPGA requirements are developed and refined per NA 4.51, Field Programmable Gate Array (FPGA) Development Procedure (Reference 11). The CIM FPGA requirements are derived from higher-level requirements [
 
                                                                                                                                                                                                                                                                  ]a,c
 
Following the completion of the software require ments documents, the IV&V team independently reviews them in accordance with 6105-00013,  CIM-SRNC IV&V Plan (Reference 4).
 
[
 
                                                                                                                                                                                                                                                                                                                                ]a,c
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 15 of 34
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
[
 
]a,c
 
==3.2                                                                                                                                    CONCLUSION==
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ]a,c
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 16 of 34
 
              *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
4                                                                                                    ITAAC 2.5.02.14 - ACCEPTANCE CRITERIA C
 
The acceptance criteria item c) in ITAAC 2.5.02.14 states:
 
A report exists and concludes that CIM meets the below listed life cycle stages.
: c. Hardware and software development phase, consisting of hardware and software design and implementation
 
4.1                                                                                                                                  PROCESS FOR HARDWARE AND SOFTWARE DEVELOPMENT PHASE
 
The COL Appendix C ITAAC Hardware and Software Development Phase corresponds to the design and implementation phases per Table 1. During the design and implementation phases, both software and hardware are developed.
 
6105-00014, CIM-SRNC FPGA Development Plan (Reference 8), controls the design of the CIM and SRNC software. The software design documentation is produced during the design  phase. The design team produces the CIM and SRNC FPGA designs and  documents these designs in accordance with 6105-00014 in software design descriptions for both the  CIM and SRNC. The software design descriptions provide a detailed description of the software architecture and the interfaces between the software components and between the software, hardware, and  instrumentation of the FPGA design in the CIM and SRNC. [
 
]a,c  The FPGA design documents are placed under conf iguration control in accordance with 6105-00002, CIM-SRNC CM Plan (Reference 6). [
 
a,c  The design team implements the CIM and SRNC FPGA software designs in accordance with 6105-00014, CIM-SRNC FPGA Development Plan (Reference 8) using the tools identified in 6105-00030, CIM-SRNC Design Tools (Reference 30).
 
[
                                                                                                                                                                                                                                                                                                        ]a,c
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 17 of 34
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
[
 
]a,c
 
The hardware team ensures that detailed specifications and documentation of th e hardware are completed as required by 6105-00000, CIM-SRNC Management  Plan (Reference 2). [
 
                                                                                                                                                                                                                                                                                                                                                          ]a,c
 
==4.2                                                                                                                                    CONCLUSION==
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ]a,c
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 18 of 34
 
          *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
5                                                                                                    ITAAC 2.5.02.14 - ACCEPTANCE CRITERIA D
 
The acceptance criteria for item d) in ITAAC 2.5.02.14 states:
 
A report exists and concludes that CIM meets the below listed life cycle stages.
: d. System integration and test phase
 
5.1                                                                                                                                  PROCESS FOR SYSTEM INTEGRATION AND TEST PHASE
 
The COL Appendix C ITAAC System Integration and Test Phase corresponds to the test phase of the development stage per Table 1. During the system integration and test phase, so ftware and hardware are integrated and type tested to confirm that the design requirements are being met.
 
[
 
                                                                                                                                                                                                                                                                                                                                                              ]a,c Building the RTL for the CIM to create the image to be flashed is controlled by 6105-20025, CIM FPGA Build Procedure (Reference 19), and building the RTL for the SRNC to create the image to be flashed is controlled by 6105-10025, SRNC FPGA Build Procedure (Reference 20)  . [
 
]a,c
 
Overall testing of the CIM and SRNC is described in 6105-00005 CIM-SRNC Test Plan (Reference 7).
[
 
                                                                                                                                                                                                                          ]a,c  The validation testing results are documented in the IV&V Phase Summary Report. In addition, IV&V validation testing [
                                ]a,c is conducted per WNA-TP-04019-GEN, CIM SR NC Subsystem Test Procedure (Reference 24).
 
[
 
                                                                  ]a,c
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 19 of 34
 
      *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
==5.2                                                                                                                                    CONCLUSION==
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              ]a,c
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 20 of 34
 
              *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
6                                                                                                    ITAAC 2.5.02.14 - ACCEPTANCE CRITERIA E
 
The acceptance criteria for item e) in ITAAC 2.5.02.14 states:
 
A report exists and concludes that CIM meets the below listed life cycle stages.
: e. Installation phase
 
6.1                                                                                                                                  PROCESS FOR INSTALLATION PHASE
 
The COL Appendix C ITAAC Installation Phase corresponds to the manufacturing and test phases per Table 1.  [
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ]a,c
 
==6.2                                                                                                                                    CONCLUSION==
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              ]a,c
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 21 of 34
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ]a,c
 
7                                                                                                    CONCLUSION
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ]a,c
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 22 of 34
 
            *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
8                                                                                                    REFERENCES
 
[
 
                                                                                                                                                                                                                    ]a,c
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 23 of 34
 
            *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ]a,c
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 24 of 34
 
            *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
[
 
                                                                                                ]a,c
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 25 of 34
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
[
 
a,c
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 26 of 34
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                          AP1000
 
APPENDIX A  - RELATIONSHIP BETWEEN ITAAC 2.5.02.14 AND 2.5.02.11                                                                                                                                                                                                                                                                                                                                                                                                      a,c
 
Figure 1                                              [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ]a,c
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Page 27 of 34
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
APPENDIX B    - CIM LIFECYCLE PROCESS IMPLEMENTATION
 
[
 
                                                                                                                                                                                                                                  ]a,c
 
A.                  Design Requirements Phase
 
As described in section 2.1 of this report, th e design requirements phase consists of a concept phase and a planning phase. As discussed in secti on 2.1 of this report, the planning phase was initiated upon completion of the requirements documents below to drive subsequent creation of the required planning documents:
 
WNA-PD-00050-GEN, Component Interface Module (CIM) and Safety Remote Node Controller (SRNC) Development Project Plan (Reference 9).
WNA-DS-01272-GEN, Safety System Remote Node Controller Requirements Specification (Reference 14).
WNA-DS-01271-GEN, Component Interfa ce Module Hardware Requirements Specification (Reference 12).
WNA-DS-02331-GEN, Component Interface Module Logic Specification (Reference 13).
 
The following planning documents were created after the project plan and requirements documents above are completed. These plans are the documents which implement the above requirements documents:
 
6105-00015, CIM-SRNC Software Program Manual, (Reference 1).
6105-00000, CIM-SRNC Management Plan, (Reference 2).
6105-00001, CIM-SRNC QA Plan, (Reference 3).
6105-00013, CIM-SRNC IV&V Plan, (Reference 4).
6105-00002, CIM-SRNC CM Plan, (Reference 6).
6105-00005, CIM-SRNC Test Plan, (Reference 7).
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 28 of 34
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
6105-00014, CIM-SRNC FPGA Development Plan, (Reference 8).
 
[
 
                          ]a,c
 
B.                    System Definition Phase
 
As described in section 3.1 of this report, both  the CIM software requirements and the hardware requirements were developed during the system definition phase. The CIM software requirements were released in 6105-20004, C IM FPGA Software Requirements Specification (Reference 43) and the SRNC software requirements were released in 6105-10004, SRNC FPGA Software Requirements Specification (Reference 44). Following the completion of the software requirements documents, the IV&V team independently reviewed them in accordance with 6105-00013, CIM-SRNC IV&V Plan (Refer ence 4) and documented the results in 6105-00092, CIM-SRNC IVV Phase Summary Report (Reference 48).
 
[
 
                                                                                                                                  ]a,c
 
Also in the system definition phase, the requirements traceability matrix (RTM) documents, 6105-10010, Safety Remote Node Controller Re quirements Traceability Matrix (Reference 56) and 6105-20010, Component Interface Module Re quirement Traceability Matrix (Reference
: 57) were produced by the design team in  accordance with 6105-00014, CIM-SRNC FPGA Development Plan (Reference 8). These RTMs trace high level CIM and SRNC hardware and software requirements to specific requirements, ensuring each requirement is met with accuracy.
These documents are maintained through  the subsequent life cycle phases.
 
The IV&V team performed an evaluation of ac tivities in this phase per 6105-00013, CIM SRNC IV&V Plan (Reference 4). The results of the evaluations performed by                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              IV&V were documented
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 29 of 34
 
  *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                          AP1000
 
in the applicable revision of 6105-00092, C  IM-SRNC IVV Phase Summary Report (Reference 48).
 
System Definition Phase Process Implementation Documents 6105-20004, CIM FPGA Software Requirements Specification (Reference 43) 6105-10004, SRNC FPGA Software Requirements Specification (Reference 44) 6105-00092, CIM-SRNC IVV Phase Summary Report (Reference 48) 6105-60019, CIM-SRNC Software Hazard    Analysis Report (Reference 45) 6105-20008, CIM Reliability Analysis (Reference 46) 6105-10008, SRNC Reliability Analysis (Reference 47) 6105-10010, Safety Remote Node Contro  ller Requirements Traceability Matrix (Reference 56) 6105-20010, Component Interface Module Requirement Traceability Matrix (Reference 57)
 
Table 2: [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ]a,c a,c
 
C.                    Hardware and Software Development Phase
 
As described in section 4.1 of this report,  the Hardware and Software Development Phase corresponds to the design and implementation phases per Table 1. During the design and implementation phases, both the CIM software and  hardware were developed. The design team produced the CIM and SRNC FPGA designs and    documented these designs in accordance with 6105-00014 in software design descriptions for both    the CIM and SRNC. The software design for the CIM was documented in 6105-20014, CIM  FPGA Software Design Description (Reference
: 49) and the software design for the SRNC was documented in 6105-10014, SRNC FPGA Software Design Description (Reference 50).  [
 
                                                                                                                                                                                                                                                                                        ]a,c
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Page 30 of 34
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                                    AP1000
 
[
 
                                                                                                                                                                                                      ]a,c
 
The IV&V team performed an evaluation of activities in this phase per 6105-00013, CIM SRNC IV&V Plan (Reference 4). The results of the evaluations performed by IV&V were documented in the applicable revision of 6105-00092, C IM-SRNC IVV Phase Summary Report (Reference 48).
 
[
 
                                                                                                                                                                                                                                                                                                                                        ]a,c
 
Hardware and Software Implementation Phase Process Implementation Documents 6105-60019, CIM-SRNC Software Hazard  Analysis Report (Reference 45) 6105-00092, CIM-SRNC IVV Phase Summary Report (Reference 48) 6105-20014, CIM FPGA Software Design Description (Reference 49) 6105-10014, SRNC FPGA Software Design Description (Reference 50)
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page 31 of 34
 
    *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                          AP1000
 
1200-00007, CIM Binary, Actel FPGA (Reference 52) 1200-00008, SRNC Binary, Actel FPGA (Reference 53)
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ]a,c
 
Table 3: [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ]a,c a,c
 
D.                System Integration and Test Phase
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              ]a,c
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Page 32 of 34
 
            *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                          AP1000
 
[
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ]a,c
 
Table 4: [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ]a,c a,c
 
E.                      Installation Phase
 
As described in section 6.1 of this report,  the Installation phase of the CIM life cycle is defined to be a manufacturing activity in which software images are loaded into the CIM and SRNC and the CIM and SRNC modules are tested in the  production environment [
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ]a,c
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Page 33 of 34
 
        *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP                                                                                                                        WESTINGHOUSE NON-PROPRIETARY CLASS 3                                                                                                                                                                                                                                                                                                                                                                          AP1000
 
[
 
a,c
 
IV&V performed an evaluation of the insta  llation activities in accordance with 6105-00013, CIM SRNC IV&V Plan (Reference 4) and the r  esults of this review is documented in 6105-00092, CIM-SRNC IVV Phase Summary Report (Reference 48).
 
Installation Phase Process Implementation Documents 6105-00092, CIM-SRNC IVV Phase Summary Report (Reference 48)
[                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              ]a,c
 
Table 5: [                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              ]a,c a,c
 
Revision 3                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Page 34 of 34
 
      *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
LIM-24-090 Revision 0                                                                                                                                                                                                              Proprietary Class 2 (R)
 
          **This page was added to the quality record by the PRIME system upon its validation and shall not be considered in the page numbering of this document.**
Approval Information
 
Author Approval Shakun Matthew A Jun-19-2024 09:58:36
 
Files approved on Jun-19-2024
 
              *** This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)}}

Latest revision as of 11:49, 4 October 2024

EQ-EV-386-GLIM-NP, Revision 2, Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements
ML24180A159
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 06/18/2024
From: Shakun M
Westinghouse
To:
Office of Nuclear Reactor Regulation
Shared Package
ML24180A156 List:
References
LIM-24-090, Rev 0 EQ-EV-386-GLIM-NP, Rev. 2
Download: ML24180A159 (1)