ML17037B892

From kanterella
Jump to navigation Jump to search
Letter Regarding GE Topical Report Nedo 23617 Mark II Lead Plant Topical Report: Pool Boundary and Main Vent Chugging Load Justification, Dated July, 1977
ML17037B892
Person / Time
Site: Nine Mile Point, Columbia, Limerick, LaSalle, Zimmer, Shoreham, Bailly  File:Long Island Lighting Company icon.png
Issue date: 10/25/1977
From: Sobon L
General Electric Co
To: Stolz J
Office of Nuclear Reactor Regulation
References
NEDO 23617
Download: ML17037B892 (8)


Text

STANDARD DISTRIBUTION FOR INCOMING MATERIAL RELATING TO MARK II CONTAINMENT TO:

Mr. John Fi Stolz FROM:

('eneral Electric Company San Jose, California Lo Ji Sabon NRC FoRM 1SB UAe NUCI EAR REGULATORY COMMISSION I2-78)

NRC DISTRIBUTION FoR PART 60 DOCKET MATERIAL OOCKET NUMBER MiKIIMMMII TOPICAL REPORT OATS OF OOCUMENT 10/25/77 OATE RECEIVEO 11/7/77 QLETTER QORIGINAL QCOPY 0 ES C R IPT I0 N QNOTORIZEO Q UN C LASS IFI E0 PROP INPUT FORM ENCI OSURE NUMBER OF COPIES RECEIVEO SEE ATTACHED FOR LISTING OF REPORTS' LETTERS OF INCORPORATION WILL BE PLACED IN EACH DOCKET LISTED BELOW NOTE CYS WILL BE PLACED IN THE LPDR FOR THE FOLLOWING:

ZIMMER 50-358

'INE MILE POINT 50-0 LIMERICK 50-352/353 RJL-ll/8/77 (2-P)

BAILLY 50-367 SHOREHAM.$0 332

~o->7~/~74 l5isrfkaldAKi'.I 7

(2-P)

]ft!~ lT4 'S

/gas.46bo

- st I7

]0

s. ow c -gzF68E~E gPr 8, NFORMATION FOR AC ION/I INTERNALDISTRI BUTION CENTRAL FILES+ 2 W 9 G-PER~~~

LPDRiS 7

See Note A

NSIC ACRS 6

Ie S XHWELL 2

Ge LAXNAS 7

Ja KNIGHT 2

Ce ANDERSON Xe PELTIER Ri BXRKEL LYNCH MD Jo SNELL Ao BCURNXA W ~

KANE Si MAR s

o eac LETTER ONLY Ro DEYOUNG De VASSALLO Ko KNIEL Oo PARR J ~

TO Ro TEDESCO Me RUSHBROOK Wo PIKE S ~ VARGA PFS LIUKE>l.WC R /04 Si Hump/ c-4R/u 5

EXTERNAL DISi RIBUTION CONTROL NUMBER I7v g 2O 1 ~~)

r ~

GENERAL ELECTRIC TOPICAL REPORT NEDO 23617 "MARK II LEAD PLANT TOPICAL REPORT:

POOL BOUNDARY AND t@IN VENT CHUGGING LOAD JUSTIFICATION," DATED JULY, 1977 1)

NEDO 24013, "Results of Pressure Suppression Systems Tests Employed by GE, Series No. 2," dated June, 1977 2)

NEDO 24014, "Calculation of the Spatial Pressure Distribution Mhen Several Condensation Events are Superimposed,"

dated June, 1977 3)

NEDO 24015, "Load Predictions for the Pressure Suppression System in Two BMR Plants,"

dated June, 1977 4)

NEDO 24016, "Pressure Oscillations Due to Condensation of Steam in a Water Pool," dated June, 1977 5)

NEDO 24017, "Influence of Backpressure During Chugging,"

dated June, 1977 6)

NEDO 23627, "Loads on the Vents'truts Due to Con-densation of Steam in a Mater Pool," dated June, 1977

~

'73120124 A

GENERAL

ELECTRIC NUCLEAR ENERGY GENERAL ELECTRIC COMPANY, 175 CURTNER AVE., SAN JOSE, CALIFORNIA95125 MC 681, (408) 925-3495 October 25, 1977 SYSTEMS DIVISION NUCLEAR ENERGY PROJECTS DIVISION MFN-413-77 U. S. Nuclear Regulatory Commission Division of Projects Management

~

Office of Nuclear Reactor Regulation Washington, D.

C.

20555 Attention:

Mr. John F. Stolz, Chief Light Water Reactors Branch No.

1 u,

l'p

,q, Jp e

~ CPj//y Gent 1 e'men:

SUBJECT:

References:

GENERAL ELECTRIC TOPICAL REPORT NEDO 23617 "MARK II LEAD PLANT TOPICAL REPORT:

POOL BOUNDARY AND MAIN VENT CHUGGING LOAD JUSTIFICATION," DATED JULY. 1977 1)

NEDO 24013, "Results of Pressure Suppression Systems Tests Employed by GE, Series No. 2," dated June, 1977 2)

NEDO 24014, "Calculation of the Spatial Pressure Distribution When Several Condensation Events are Superimposed,"

dated June, 1977 3)

NEDO 24015, "Load Predictions for the Pressure Suppression System in Two BWR Plants,"

dated

June, 1977 4)

NEDO 24016, "Pressure Oscillations Due to Condensation of Steam in a Water Pool," dated

June, 1977 5)

NEDO 24017, "Influence of Backpressure During Chugging,"

dated June, 1977 6)

NEDO 23627, "Loads on the Vents'truts Due to Con-densation of Steam in a Water Pool," dated

June, 1977 7)

Letter with report, "General Electr ic Topical Report NEDE 23617-,P, Mark II Lead Plant Topical Report:

Pool Boundary and Main Vent Chugging Load Justification, dated July, 1977," to 0.

D. Parr from L. J. Sobon, dated August 15, 1977 Seventy (70) copies of the subject report (NEDO 23617) are being provided by General Electric for the Mark II Owners Group for your review as part of the Mark-II Containment Supporting Progr am.

This report, which is the non-proprietary version of NEDE 23617-P provided to you earlier this year (reference 7), provides the justification for the chugging loads used in Mark II Containment Design Assessment.

GENERAL

@ ELECTlllC Mr. John F. Stolz Page 2

October 25, 1977 Also included with this submittal are ten (10) copies each of the non-proprietary version of the documents listed in Appendix 1 of NEDO 23617 (references 1 through 6).

The proprietary version 'of these documents was submitted with NEDE 23617-P, (reference 7).

Any questions regarding this report should be directed to L.

H. Frauenholz, the Mark II Containment Licensing Engineer, (408) 925-2623.

Sincerely, L. J.

Sobon, Manag r BWR Containment Licensing Containment Improvement Programs LJS:at/128-129

Enclosures:

130 cc:

C. J.

Anderson (NRC)

H.

C.

Brinkmann (Mark II Owners Group)

L. S. Gifford (GE Bethesda)

I. A. Peltier (NRC)

R. L. Tedesco (NRC)

File 3,4.4.7 3.2.7

A