ML17037B890
| ML17037B890 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point, Columbia, Limerick, LaSalle, Zimmer, Shoreham, Bailly File:Long Island Lighting Company icon.png |
| Issue date: | 09/23/1977 |
| From: | Sobon L General Electric Co |
| To: | Parr O Office of Nuclear Reactor Regulation |
| References | |
| NEDO-21667 | |
| Download: ML17037B890 (4) | |
Text
STANDARD DISTRIBUTION INCOMING ifATERIALRELATING TO 5
M II CONTAINMENT TO:
Mr~ Oland D. Parr FROM: General Electric San Jose, California 95125 L. J.
So hon NRC FORM 195 U.S. NUCLEAR REQULATORY COMMISSION IE-7SI NRC DISTRlBUTlON FoR PART 50 DOCKET MATER(AL TOP ICAL REPORT OAFE OF OOCUMENT 9/23/77 OAgfEC)IV/0 LETTER CfORIQINAL QCOPY QNOTORIZEO
)BLANCLASS I F I E0 PROP INPUT FORM NUMBER OF COPIES RECEIVEO.
OESCRIPTION jcm 11/18/77 1p LETTERS OF INCORPORATION WILL BE PLACED IN EACH DOCKET LISTED BELOW>>
NOTE-CYS WILL BE PLACED IN THE LPDR FOR THE FOLLOWING:
ZIMMER 50-358 NINE MILE POIN 50-/s10 LIMERICK 50-352/353 WPPS-2 50-397 BAl'LLY 50 367 SHOREHAM
$0-332 LA SALLE 50-373/37/s ENCLOSURE Consists of the Mark II Containment Report "COMPARISON OF THE1/13 SCALE MARK II CONTIANMENT MULTIVENT POOL SWELL DATA WITH ANALYTICALMETHODS," NEDO-12667~ August 1977...
1/ 2II FOR ACTION/INFORMATION GE~4L F 2
W 9 VR&rP-DR LPDR'S 7
See Note A
T C NSIC AWS 6
I>>
S IHWELL 2
G>>
LAMIAS 7
J KNIGHT C>>
ANDERSON I>> PELTIER R
J>>
SNELL A>> BOURNIA I~
W, KAK S>> MZIER t s fo ach o
e INTERNAI 0 RlBUTION LETTER ONLY R>>
DEYOUNG D>> VASSALLO K>> KNIEL 0>>
PARR J ~
TOL R>>
TEDESCO iM~
RUSHBROOK W>> PIKE S>>
VARGA EXTERNALOISTRIBUTION CONTROL NUMBER
0 E MERAL '
ELECTRIC
"",',",'-'",'"",,'""i/,",f7 SYSTEMS DIVISION BWR PROJECTS DEPARTMENT MFP 3(5-77
'I l
'krj f
- cubi, I
O,y Mr. Olan D. Parr, Chief Light Water Reactors Branch No.
3 Division of Project Management September 23, 1977 U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.
C.
20555 Attention:
GENERAL ELECTRIC COMPANY, 175 CURTNER AVE., SAN JOSE, CALIFORNIA95125 MC 681, (408) 925-3495 Gentlemen:
SUBJECT:
Reference:
MARK II CONTAINMENT PROGRAM REPORT, "COMPARISON OF THE 1/13 SCALE MARK II CONTAINMENT MULTIVENT POOL SWELL DATA WITH ANALYTICALMETHODS," NED0-21667, August 1977 1.
DYNAMIC MODELING OF A MARK II PRESSURE SUPPRESSION
- SYSTEM, EPRI NP-441, April 1977 2.
General Electric Topical Report, NEDE-21544P, MARK II PRESSURE SUPPRESSION CONTAINMENT SYSTEMS:
AN ANALYTICALMODEL OF THE POOL SWELL PHENOMENON, December 1976 Forty (40) copies of the subject report are being provided by General Electric for the Mark II Owners Group for your review as part of the Mark II Containment Supporting Program.
This report compares the results of the 1/13 scale Mark II multivent tests conducted by EPRI (Reference
- 1) with predictions derived from the application of the DFFR pool swell model (Reference 2).
Any questions regarding this report should be directed to L. H. Frauenholz, the Mark II Containment Licensing Engineer, Telephone Number (408) 925-2623.
Sincerely, L. J.
- Sobon, Manager BWR Containment Licensing Containment Improvement Programs LJS:slk
Enclosures:
(40) cc:
H.
C. Brinkman (Mark II Owners Group)
L. S. Gifford (GE, Bethesda) 77=" ZOO:-8 S. Miner R. L. Tedesco