ML17301A001: Difference between revisions
From kanterella
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 15: | Line 15: | ||
| document type = CONTRACTED REPORT - RTA,QUICK LOOK,ETC. (PERIODIC, TEXT-PROCUREMENT & CONTRACTS | | document type = CONTRACTED REPORT - RTA,QUICK LOOK,ETC. (PERIODIC, TEXT-PROCUREMENT & CONTRACTS | ||
| page count = 14 | | page count = 14 | ||
}} | }} |
Revision as of 03:15, 26 February 2018
ML17301A001 | |
Person / Time | |
---|---|
Site: | Saint Lucie |
Issue date: | 09/28/1982 |
From: | LUDINGTON B W, OVERBECK G J, VOSBURY F W FRANKLIN INSTITUTE |
To: | CHOW E NRC |
Shared Package | |
ML17214A397 | List: |
References | |
CON-NRC-03-81-130, CON-NRC-3-81-130, RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.17, TASK-TM TER-C5506-296, NUDOCS 8210010343 | |
Download: ML17301A001 (14) | |
Similar Documents at Saint Lucie | |
---|---|
Category:CONTRACTED REPORT - RTA
MONTHYEARML17229B0671999-03-16016 March 1999
[Table view]Technical Evaluation Rept, Florida Power & Light Co, Unit 1 Third Ten-Year Interval Pump & Valve Inservice Testing Program,Unit 2 Second Ten-Year Interval Pump & Valve Inservice Testing Program. ML17355A2801998-09-30030 September 1998 Rev 1,Ltr Rept, Technical Evaluation of Florida Power & Light Fire Barrier Ampacity Derating Assessment for St.Lucie & Turkey Point. ML17229B0011998-01-31031 January 1998 Technical Evaluation Rept on 'Submittal-Only' Review of IPEEE at St Lucie Nuclear Plant,Units 1 & 2. ML17229A4151997-05-27027 May 1997 Technical Evaluation Rept of IPE Submittal & RAI Responses for St Lucie Nuclear Plant. ML17228B1261995-03-31031 March 1995 Technical Evaluation Rept on Second 10-Year Interval Insp Program Plan. ML17309A7471994-09-30030 September 1994 Technical Evaluation Rept;Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001:St.Lucie-1/-2. ML17228A8851994-09-30030 September 1994 Errata to TER, Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001,St Lucie 1 & 2, Replacing Every Other Missing Page in Original Rept ML20138E1481993-06-22022 June 1993 Pump & Valve Inservice Testing Program St Lucie Unit 2 FPL, Technical Evaluation Rept ML20105D0871992-08-31031 August 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the St. Lucie Unit 1 Nuclear Power Generation Station ML17309A6651991-11-30030 November 1991 Technical Evaluation Rept Pump & Valve Inservice Testing Program,St Lucie-Unit 1. ML17223B3231991-08-31031 August 1991 TER of Topical Rept CEN-396-P (Verification of Acceptability of a 1-PIN Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2). ML17308A5041990-08-17017 August 1990 Final Technical Evaluation Rept St Lucie Unit 1 Station Blackout Evaluation. ML17308A4821989-05-31031 May 1989 Conformance to Generic Ltr 83-28,Item 2.2.1,Equipment Classification for All Other Safety-Related Components,St Lucie 1/2, Technical Evaluation Rept ML17222A7411989-01-31031 January 1989 Technical Evaluation Rept on Second Ten-Year Interval Inservice Insp Program Plan:Florida Power & Light Co,St Lucie Plant,Unit 1. ML17223A1321988-12-31031 December 1988 Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 2. ML17223A1291988-12-31031 December 1988 Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 1. ML20244C2931988-11-30030 November 1988 Review of Florida Power & Light Co Safety Evaluations for Extending St Lucie Plant,Unit 2,ESFAS Subgroup Relay Test Interval, Technical Evaluation Rept ML17308A4461988-03-31031 March 1988 Technical Evaluation Rept for Natural Circulation,Boron Mixing & Cooldown at St Lucie Unit 2. ML20196G2921988-02-29029 February 1988 Technical Evaluation Rept,Evaluation of High Density Spent Fuel Rack Structural Analysis for St Lucie Plant - Unit 1 ML17347A5931987-07-31031 July 1987 Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept ML17308A2391987-06-30030 June 1987 Integrated Leak Rate Test for St Lucie Nuclear Power Plant (Unit 2) Apr 1987-June 1987, Technical Evaluation Rept ML17219A6871987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.2, 'Vendor Interface Program for All Other Safety-Related Components:St Lucie 1 & 2,' Final Rept ML20214R1531987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Maine Yankee,St Lucie 1 & 2 & Waterford 3, Informal Rept ML20215G2741987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface Maine Yankee,St Lucie Units 1 & 2 & Waterford 3 ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML17308A2891987-01-31031 January 1987 Review of Tech Spec Changes Supporting NUREG-0737 Accident Instrumentation,St Lucie Units 1 & 2, Technical Evaluation Rept ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML17308A2421986-05-31031 May 1986 Rev 1 to Conformance to Reg Guide 1.97,St Lucie Plant,Units 1 & 2. ML17308A2151986-04-30030 April 1986 First Interval Inservice Insp Program,St Lucie Unit 2, Technical Evaluation Rept ML20197C6021986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,St Lucie Units 1 & 2 & Waterford Unit 3 ML17216A4331986-01-13013 January 1986 SPDS Progress Review,St Lucie 1 & 2. ML17301A1841985-06-17017 June 1985 Masonry Wall Design (B-59),Florida Power & Light Co,St Lucie Unit 1, Technical Evaluation Rept ML17301A1671985-02-28028 February 1985 Conformance to Reg Guide 1.97,St Lucie Plant,Units 1 & 2. ML20080E0711984-01-13013 January 1984 Evaluations of Detailed Control Room Design Reviews for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4, Technical Evaluation Rept ML17301A0621983-10-31031 October 1983 Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant,Unit 2 (Phase Ii). ML17214A6931983-10-31031 October 1983 Conformance to NRR Generic Ltr 82-16,St Lucie Plant,Units 1 & 2, Preliminary Rept ML17214A2041983-04-30030 April 1983 Draft Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant,Unit 2 (Phase I), Technical Evaluation Rept ML17214A1581983-04-29029 April 1983 Control of Heavy Loads (C-10) St Lucie Unit 1, Draft Technical Evaluation Rept ML17214A1551983-04-26026 April 1983 Radiological Effluent Tech Specs (RETS) Implementation - St Lucie Unit 1 Nuclear Generating Plant. ML17214A4541983-03-0202 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML17301A0131982-11-24024 November 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),St Lucie Unit 1, Technical Evaluation Rept ML20065U2351982-10-31031 October 1982 Technical Evaluation Rept of Overpressure Mitigation Sys for St Lucie,Unit 1 ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML17301A0011982-09-28028 September 1982 ECCS Repts (F-47),TMI Action Plan Requirements,St Lucie Unit 1, Technical Evaluation Rept ML17213A7321982-09-17017 September 1982 Seismic Qualification of Auxiliary Feedwater Sys, Technical Evaluation Rept ML20066B3231982-08-31031 August 1982 Audit of Environ Qualification of Safety-Related Electrical Equipment at St Lucie Unit 2 Nuclear Generating Station, Interim Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20062E2041982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Saint Lucie Case Study.Docket Nos. 50-335 and 50-389.(Florida Power and Light Company) ML17212B7831982-05-31031 May 1982 Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant Unit 2,FL Power & Light Co, Draft Technical Evaluation Rept ML20052B5341982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, St Lucie,Unit 1, Technical Evaluation Rept 1999-03-16 Category:QUICK LOOK MONTHYEARML17229B0671999-03-16016 March 1999
[Table view]Technical Evaluation Rept, Florida Power & Light Co, Unit 1 Third Ten-Year Interval Pump & Valve Inservice Testing Program,Unit 2 Second Ten-Year Interval Pump & Valve Inservice Testing Program. ML17355A2801998-09-30030 September 1998 Rev 1,Ltr Rept, Technical Evaluation of Florida Power & Light Fire Barrier Ampacity Derating Assessment for St.Lucie & Turkey Point. ML17229B0011998-01-31031 January 1998 Technical Evaluation Rept on 'Submittal-Only' Review of IPEEE at St Lucie Nuclear Plant,Units 1 & 2. ML17229A4151997-05-27027 May 1997 Technical Evaluation Rept of IPE Submittal & RAI Responses for St Lucie Nuclear Plant. ML17228B1261995-03-31031 March 1995 Technical Evaluation Rept on Second 10-Year Interval Insp Program Plan. ML17309A7471994-09-30030 September 1994 Technical Evaluation Rept;Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001:St.Lucie-1/-2. ML17228A8851994-09-30030 September 1994 Errata to TER, Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001,St Lucie 1 & 2, Replacing Every Other Missing Page in Original Rept ML20138E1481993-06-22022 June 1993 Pump & Valve Inservice Testing Program St Lucie Unit 2 FPL, Technical Evaluation Rept ML20105D0871992-08-31031 August 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the St. Lucie Unit 1 Nuclear Power Generation Station ML17309A6651991-11-30030 November 1991 Technical Evaluation Rept Pump & Valve Inservice Testing Program,St Lucie-Unit 1. ML17223B3231991-08-31031 August 1991 TER of Topical Rept CEN-396-P (Verification of Acceptability of a 1-PIN Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2). ML17308A5041990-08-17017 August 1990 Final Technical Evaluation Rept St Lucie Unit 1 Station Blackout Evaluation. ML17308A4821989-05-31031 May 1989 Conformance to Generic Ltr 83-28,Item 2.2.1,Equipment Classification for All Other Safety-Related Components,St Lucie 1/2, Technical Evaluation Rept ML17222A7411989-01-31031 January 1989 Technical Evaluation Rept on Second Ten-Year Interval Inservice Insp Program Plan:Florida Power & Light Co,St Lucie Plant,Unit 1. ML17223A1321988-12-31031 December 1988 Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 2. ML17223A1291988-12-31031 December 1988 Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 1. ML20244C2931988-11-30030 November 1988 Review of Florida Power & Light Co Safety Evaluations for Extending St Lucie Plant,Unit 2,ESFAS Subgroup Relay Test Interval, Technical Evaluation Rept ML17308A4461988-03-31031 March 1988 Technical Evaluation Rept for Natural Circulation,Boron Mixing & Cooldown at St Lucie Unit 2. ML20196G2921988-02-29029 February 1988 Technical Evaluation Rept,Evaluation of High Density Spent Fuel Rack Structural Analysis for St Lucie Plant - Unit 1 ML17347A5931987-07-31031 July 1987 Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept ML17308A2391987-06-30030 June 1987 Integrated Leak Rate Test for St Lucie Nuclear Power Plant (Unit 2) Apr 1987-June 1987, Technical Evaluation Rept ML17219A6871987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.2, 'Vendor Interface Program for All Other Safety-Related Components:St Lucie 1 & 2,' Final Rept ML20214R1531987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Maine Yankee,St Lucie 1 & 2 & Waterford 3, Informal Rept ML20215G2741987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface Maine Yankee,St Lucie Units 1 & 2 & Waterford 3 ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML17308A2891987-01-31031 January 1987 Review of Tech Spec Changes Supporting NUREG-0737 Accident Instrumentation,St Lucie Units 1 & 2, Technical Evaluation Rept ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML17308A2421986-05-31031 May 1986 Rev 1 to Conformance to Reg Guide 1.97,St Lucie Plant,Units 1 & 2. ML17308A2151986-04-30030 April 1986 First Interval Inservice Insp Program,St Lucie Unit 2, Technical Evaluation Rept ML20197C6021986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,St Lucie Units 1 & 2 & Waterford Unit 3 ML17216A4331986-01-13013 January 1986 SPDS Progress Review,St Lucie 1 & 2. ML17301A1841985-06-17017 June 1985 Masonry Wall Design (B-59),Florida Power & Light Co,St Lucie Unit 1, Technical Evaluation Rept ML17301A1671985-02-28028 February 1985 Conformance to Reg Guide 1.97,St Lucie Plant,Units 1 & 2. ML20080E0711984-01-13013 January 1984 Evaluations of Detailed Control Room Design Reviews for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4, Technical Evaluation Rept ML17301A0621983-10-31031 October 1983 Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant,Unit 2 (Phase Ii). ML17214A6931983-10-31031 October 1983 Conformance to NRR Generic Ltr 82-16,St Lucie Plant,Units 1 & 2, Preliminary Rept ML17214A2041983-04-30030 April 1983 Draft Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant,Unit 2 (Phase I), Technical Evaluation Rept ML17214A1581983-04-29029 April 1983 Control of Heavy Loads (C-10) St Lucie Unit 1, Draft Technical Evaluation Rept ML17214A1551983-04-26026 April 1983 Radiological Effluent Tech Specs (RETS) Implementation - St Lucie Unit 1 Nuclear Generating Plant. ML17214A4541983-03-0202 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML17301A0131982-11-24024 November 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),St Lucie Unit 1, Technical Evaluation Rept ML20065U2351982-10-31031 October 1982 Technical Evaluation Rept of Overpressure Mitigation Sys for St Lucie,Unit 1 ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML17301A0011982-09-28028 September 1982 ECCS Repts (F-47),TMI Action Plan Requirements,St Lucie Unit 1, Technical Evaluation Rept ML17213A7321982-09-17017 September 1982 Seismic Qualification of Auxiliary Feedwater Sys, Technical Evaluation Rept ML20066B3231982-08-31031 August 1982 Audit of Environ Qualification of Safety-Related Electrical Equipment at St Lucie Unit 2 Nuclear Generating Station, Interim Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20062E2041982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Saint Lucie Case Study.Docket Nos. 50-335 and 50-389.(Florida Power and Light Company) ML17212B7831982-05-31031 May 1982 Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant Unit 2,FL Power & Light Co, Draft Technical Evaluation Rept ML20052B5341982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, St Lucie,Unit 1, Technical Evaluation Rept 1999-03-16 Category:ETC. (PERIODIC MONTHYEARML17229B0671999-03-16016 March 1999
[Table view]Technical Evaluation Rept, Florida Power & Light Co, Unit 1 Third Ten-Year Interval Pump & Valve Inservice Testing Program,Unit 2 Second Ten-Year Interval Pump & Valve Inservice Testing Program. ML17355A2801998-09-30030 September 1998 Rev 1,Ltr Rept, Technical Evaluation of Florida Power & Light Fire Barrier Ampacity Derating Assessment for St.Lucie & Turkey Point. ML17229B0011998-01-31031 January 1998 Technical Evaluation Rept on 'Submittal-Only' Review of IPEEE at St Lucie Nuclear Plant,Units 1 & 2. ML17229A4151997-05-27027 May 1997 Technical Evaluation Rept of IPE Submittal & RAI Responses for St Lucie Nuclear Plant. ML17228B1261995-03-31031 March 1995 Technical Evaluation Rept on Second 10-Year Interval Insp Program Plan. ML17309A7471994-09-30030 September 1994 Technical Evaluation Rept;Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001:St.Lucie-1/-2. ML17228A8851994-09-30030 September 1994 Errata to TER, Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001,St Lucie 1 & 2, Replacing Every Other Missing Page in Original Rept ML20138E1481993-06-22022 June 1993 Pump & Valve Inservice Testing Program St Lucie Unit 2 FPL, Technical Evaluation Rept ML20105D0871992-08-31031 August 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the St. Lucie Unit 1 Nuclear Power Generation Station ML17309A6651991-11-30030 November 1991 Technical Evaluation Rept Pump & Valve Inservice Testing Program,St Lucie-Unit 1. ML17223B3231991-08-31031 August 1991 TER of Topical Rept CEN-396-P (Verification of Acceptability of a 1-PIN Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2). ML17308A5041990-08-17017 August 1990 Final Technical Evaluation Rept St Lucie Unit 1 Station Blackout Evaluation. ML17308A4821989-05-31031 May 1989 Conformance to Generic Ltr 83-28,Item 2.2.1,Equipment Classification for All Other Safety-Related Components,St Lucie 1/2, Technical Evaluation Rept ML17222A7411989-01-31031 January 1989 Technical Evaluation Rept on Second Ten-Year Interval Inservice Insp Program Plan:Florida Power & Light Co,St Lucie Plant,Unit 1. ML17223A1321988-12-31031 December 1988 Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 2. ML17223A1291988-12-31031 December 1988 Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 1. ML20244C2931988-11-30030 November 1988 Review of Florida Power & Light Co Safety Evaluations for Extending St Lucie Plant,Unit 2,ESFAS Subgroup Relay Test Interval, Technical Evaluation Rept ML17308A4461988-03-31031 March 1988 Technical Evaluation Rept for Natural Circulation,Boron Mixing & Cooldown at St Lucie Unit 2. ML20196G2921988-02-29029 February 1988 Technical Evaluation Rept,Evaluation of High Density Spent Fuel Rack Structural Analysis for St Lucie Plant - Unit 1 ML17347A5931987-07-31031 July 1987 Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept ML17308A2391987-06-30030 June 1987 Integrated Leak Rate Test for St Lucie Nuclear Power Plant (Unit 2) Apr 1987-June 1987, Technical Evaluation Rept ML17219A6871987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.2, 'Vendor Interface Program for All Other Safety-Related Components:St Lucie 1 & 2,' Final Rept ML20214R1531987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Maine Yankee,St Lucie 1 & 2 & Waterford 3, Informal Rept ML20215G2741987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface Maine Yankee,St Lucie Units 1 & 2 & Waterford 3 ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML17308A2891987-01-31031 January 1987 Review of Tech Spec Changes Supporting NUREG-0737 Accident Instrumentation,St Lucie Units 1 & 2, Technical Evaluation Rept ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML17308A2421986-05-31031 May 1986 Rev 1 to Conformance to Reg Guide 1.97,St Lucie Plant,Units 1 & 2. ML17308A2151986-04-30030 April 1986 First Interval Inservice Insp Program,St Lucie Unit 2, Technical Evaluation Rept ML20197C6021986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,St Lucie Units 1 & 2 & Waterford Unit 3 ML17216A4331986-01-13013 January 1986 SPDS Progress Review,St Lucie 1 & 2. ML17301A1841985-06-17017 June 1985 Masonry Wall Design (B-59),Florida Power & Light Co,St Lucie Unit 1, Technical Evaluation Rept ML17301A1671985-02-28028 February 1985 Conformance to Reg Guide 1.97,St Lucie Plant,Units 1 & 2. ML20080E0711984-01-13013 January 1984 Evaluations of Detailed Control Room Design Reviews for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4, Technical Evaluation Rept ML17301A0621983-10-31031 October 1983 Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant,Unit 2 (Phase Ii). ML17214A6931983-10-31031 October 1983 Conformance to NRR Generic Ltr 82-16,St Lucie Plant,Units 1 & 2, Preliminary Rept ML17214A2041983-04-30030 April 1983 Draft Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant,Unit 2 (Phase I), Technical Evaluation Rept ML17214A1581983-04-29029 April 1983 Control of Heavy Loads (C-10) St Lucie Unit 1, Draft Technical Evaluation Rept ML17214A1551983-04-26026 April 1983 Radiological Effluent Tech Specs (RETS) Implementation - St Lucie Unit 1 Nuclear Generating Plant. ML17214A4541983-03-0202 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML17301A0131982-11-24024 November 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),St Lucie Unit 1, Technical Evaluation Rept ML20065U2351982-10-31031 October 1982 Technical Evaluation Rept of Overpressure Mitigation Sys for St Lucie,Unit 1 ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML17301A0011982-09-28028 September 1982 ECCS Repts (F-47),TMI Action Plan Requirements,St Lucie Unit 1, Technical Evaluation Rept ML17213A7321982-09-17017 September 1982 Seismic Qualification of Auxiliary Feedwater Sys, Technical Evaluation Rept ML20066B3231982-08-31031 August 1982 Audit of Environ Qualification of Safety-Related Electrical Equipment at St Lucie Unit 2 Nuclear Generating Station, Interim Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20062E2041982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Saint Lucie Case Study.Docket Nos. 50-335 and 50-389.(Florida Power and Light Company) ML17212B7831982-05-31031 May 1982 Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant Unit 2,FL Power & Light Co, Draft Technical Evaluation Rept ML20052B5341982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, St Lucie,Unit 1, Technical Evaluation Rept 1999-03-16 Category:TEXT-PROCUREMENT & CONTRACTS MONTHYEARML17229B0671999-03-16016 March 1999
[Table view]Technical Evaluation Rept, Florida Power & Light Co, Unit 1 Third Ten-Year Interval Pump & Valve Inservice Testing Program,Unit 2 Second Ten-Year Interval Pump & Valve Inservice Testing Program. ML17355A2801998-09-30030 September 1998 Rev 1,Ltr Rept, Technical Evaluation of Florida Power & Light Fire Barrier Ampacity Derating Assessment for St.Lucie & Turkey Point. ML17229B0011998-01-31031 January 1998 Technical Evaluation Rept on 'Submittal-Only' Review of IPEEE at St Lucie Nuclear Plant,Units 1 & 2. ML17229A4151997-05-27027 May 1997 Technical Evaluation Rept of IPE Submittal & RAI Responses for St Lucie Nuclear Plant. ML17228B1261995-03-31031 March 1995 Technical Evaluation Rept on Second 10-Year Interval Insp Program Plan. ML17309A7471994-09-30030 September 1994 Technical Evaluation Rept;Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001:St.Lucie-1/-2. ML17228A8851994-09-30030 September 1994 Errata to TER, Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001,St Lucie 1 & 2, Replacing Every Other Missing Page in Original Rept ML20138E1481993-06-22022 June 1993 Pump & Valve Inservice Testing Program St Lucie Unit 2 FPL, Technical Evaluation Rept ML20105D0871992-08-31031 August 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the St. Lucie Unit 1 Nuclear Power Generation Station ML17309A6651991-11-30030 November 1991 Technical Evaluation Rept Pump & Valve Inservice Testing Program,St Lucie-Unit 1. ML17223B3231991-08-31031 August 1991 TER of Topical Rept CEN-396-P (Verification of Acceptability of a 1-PIN Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2). ML17308A5041990-08-17017 August 1990 Final Technical Evaluation Rept St Lucie Unit 1 Station Blackout Evaluation. ML17308A4821989-05-31031 May 1989 Conformance to Generic Ltr 83-28,Item 2.2.1,Equipment Classification for All Other Safety-Related Components,St Lucie 1/2, Technical Evaluation Rept ML17222A7411989-01-31031 January 1989 Technical Evaluation Rept on Second Ten-Year Interval Inservice Insp Program Plan:Florida Power & Light Co,St Lucie Plant,Unit 1. ML17223A1321988-12-31031 December 1988 Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 2. ML17223A1291988-12-31031 December 1988 Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 1. ML20244C2931988-11-30030 November 1988 Review of Florida Power & Light Co Safety Evaluations for Extending St Lucie Plant,Unit 2,ESFAS Subgroup Relay Test Interval, Technical Evaluation Rept ML17308A4461988-03-31031 March 1988 Technical Evaluation Rept for Natural Circulation,Boron Mixing & Cooldown at St Lucie Unit 2. ML20196G2921988-02-29029 February 1988 Technical Evaluation Rept,Evaluation of High Density Spent Fuel Rack Structural Analysis for St Lucie Plant - Unit 1 ML17347A5931987-07-31031 July 1987 Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept ML17308A2391987-06-30030 June 1987 Integrated Leak Rate Test for St Lucie Nuclear Power Plant (Unit 2) Apr 1987-June 1987, Technical Evaluation Rept ML17219A6871987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.2, 'Vendor Interface Program for All Other Safety-Related Components:St Lucie 1 & 2,' Final Rept ML20206K6331987-04-0808 April 1987 Mod 3,changing Billing Address,To Quantify Performance of Waterborne Intruder Detection Sys Installed at St Lucie Nuclear Power Plant ML20206K6111987-04-0808 April 1987 Notification of Contract Execution,Mod 3,to Quantify Performance of Waterborne Intruder Detection Sys Installed at St Lucie Nuclear Power Plant. Contractor:Univ of Tx at Austin Applied Research Labs ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML20214R1531987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Maine Yankee,St Lucie 1 & 2 & Waterford 3, Informal Rept ML20215G2741987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface Maine Yankee,St Lucie Units 1 & 2 & Waterford 3 ML17308A2891987-01-31031 January 1987 Review of Tech Spec Changes Supporting NUREG-0737 Accident Instrumentation,St Lucie Units 1 & 2, Technical Evaluation Rept ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML20211L3111986-12-0808 December 1986 Notification of Contract Execution,Mod 2,to Quantify Performance of Waterborne Intruder Detection Sys Installed at St Lucie Nuclear Power Plant. Contractor: Univ of Texas, Applied Research Labs ML20211L3381986-12-0808 December 1986 Mod 2,extending Period of Performance to 870630 at No Addl Cost, to Quantify Performance of Waterborne Intruder Detection Sys Installed at St Lucie Nuclear Power Plant ML20205D3581986-08-0606 August 1986 Mod 1,extending Period of Performance Until 861130 at No Addl Cost,To Quantify Performance of Waterborne Intruder Detection Sys at St Lucie Nuclear Power Plant ML20205D3411986-08-0606 August 1986 Notification of Contract Execution,Mod 1,to Quantify Performance of Waterborne Intruder Detection Sys at St Lucie Nuclear Power Plant. Contractor:Univ of Texas ML20206H4421986-06-23023 June 1986 Contract: Quantify Performance of Waterborne Intruder Detection Sys Installed at St Lucie Nuclear Power Plant, Awarded to Univ of Texas at Austin ML20206H4171986-06-23023 June 1986 Notification of Contract Execution: Quantify Performance of Waterborne Intruder Detection Sys Installed at St Lucie Nuclear Power Plant, Awarded to Univ of Texas at Austin ML17308A2421986-05-31031 May 1986 Rev 1 to Conformance to Reg Guide 1.97,St Lucie Plant,Units 1 & 2. ML17308A2151986-04-30030 April 1986 First Interval Inservice Insp Program,St Lucie Unit 2, Technical Evaluation Rept ML20197C6021986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,St Lucie Units 1 & 2 & Waterford Unit 3 ML17216A4331986-01-13013 January 1986 SPDS Progress Review,St Lucie 1 & 2. ML17301A1841985-06-17017 June 1985 Masonry Wall Design (B-59),Florida Power & Light Co,St Lucie Unit 1, Technical Evaluation Rept ML17301A1671985-02-28028 February 1985 Conformance to Reg Guide 1.97,St Lucie Plant,Units 1 & 2. ML20080E0711984-01-13013 January 1984 Evaluations of Detailed Control Room Design Reviews for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4, Technical Evaluation Rept ML17214A6931983-10-31031 October 1983 Conformance to NRR Generic Ltr 82-16,St Lucie Plant,Units 1 & 2, Preliminary Rept ML17301A0621983-10-31031 October 1983 Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant,Unit 2 (Phase Ii). ML17214A2041983-04-30030 April 1983 Draft Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant,Unit 2 (Phase I), Technical Evaluation Rept ML17214A1581983-04-29029 April 1983 Control of Heavy Loads (C-10) St Lucie Unit 1, Draft Technical Evaluation Rept ML17214A1551983-04-26026 April 1983 Radiological Effluent Tech Specs (RETS) Implementation - St Lucie Unit 1 Nuclear Generating Plant. ML17214A4541983-03-0202 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML17301A0131982-11-24024 November 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),St Lucie Unit 1, Technical Evaluation Rept ML20065U2351982-10-31031 October 1982 Technical Evaluation Rept of Overpressure Mitigation Sys for St Lucie,Unit 1 1999-03-16 |
Retrieved from "https://kanterella.com/w/index.php?title=ML17301A001&oldid=355467"