ML20084F886: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 2: | Line 2: | ||
| number = ML20084F886 | | number = ML20084F886 | ||
| issue date = 10/28/1974 | | issue date = 10/28/1974 | ||
| title = Informs of Periodic Insp of Hydraulic Shock Absorbers on 741010-14 Per Skovholt | | title = Informs of Periodic Insp of Hydraulic Shock Absorbers on 741010-14 Per Skovholt .Snubbers Considered Operable | ||
| author name = White L | | author name = White L | ||
| author affiliation = ROCHESTER GAS & ELECTRIC CORP. | | author affiliation = ROCHESTER GAS & ELECTRIC CORP. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 8304210306 | | document report number = NUDOCS 8304210306 | ||
| title reference date = 10-01-1973 | |||
| package number = ML20084F681 | | package number = ML20084F681 | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
Revision as of 00:48, 26 September 2022
| ML20084F886 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 10/28/1974 |
| From: | White L ROCHESTER GAS & ELECTRIC CORP. |
| To: | Goller K US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20084F681 | List: |
| References | |
| NUDOCS 8304210306 | |
| Download: ML20084F886 (1) | |
Text
(3 m
\Y N/
,7%
fk U * '). .-
ROCHES TER GAS AND ELECTRIC CORPCRATION e 89 EAST AVENUE, RCCHL: STER, N.Y. N64.3 t e em o v, o n 2 , ,,
October 28, 1974 g b 'p
~
0c7., . c/j A._
J t.: UQIb)' ,
~:
Mr. Karl Goller Assistant Director for Operating Reactors h[., f.Q.6))%y"- 0 Directorate of Licensing U. S. Atomic Energy Commission
'C/
t 5w;,__'
[4' ,,
Washington, D.C. 20545
Subject:
Inspection of Hydraulic Shock Absorbers (Snubbers)
R. E. Ginna Nuclear Power Plant, Unit No.1 Docket No. 50-244
Dear Mr. Goller:
In accordance with Mr. Skovholt's letter of October 1,1973 con-cerning periodic inspection of hydraulic shock absorbers (snubbers),
an inspection of all snubbers, both incide and outside of contain-ment, was conducted during the period of October 10, 1974 through October 14, 1974.
All snutbers were considered operoble at this inspection. A small quantity of hydraulic fluid was added to three snubbers which were located outside of the containment. This was the first addition of fluid to any of these units in approximately four months. There was no definite indications of leakage in the area.
Very truly yours ,
pv-$,T'-[m.
- s.
L^ 7
/
L. D. White , Jr.
.pel 8304210306 751223 /)(ud -111<
~' "> 1 : -
LU1'r ti6N1' REGION _
Z