ML20216J443: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 13: Line 13:
| document type = MEETING MINUTES & NOTES--CORRESPONDENCE, MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
| document type = MEETING MINUTES & NOTES--CORRESPONDENCE, MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
| page count = 6
| page count = 6
| project =
| stage = Meeting
}}
}}



Latest revision as of 00:37, 7 October 2021

Summary of 870619 Meeting W/Util & Southern Co Svcs to Discuss Commission Policy Statement for Tech Spec Improvements on Plant Specific Basis.List of Attendees & Pilot Application of Commission Interim Policy... Encl
ML20216J443
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/26/1987
From: Reeves E
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8707020403
Download: ML20216J443 (6)


Text

~

Docket Nos. 50-348 and 50-364 LICENSEE: Alabama Power Company (APCo)

FACILITY: Joseph M. Farley Nuclear Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF MEETING HELD ON JUNE 19, 1987, BETWEEN NRC AND APCo REPRESENTATIVES TO DISCUSS USE OF THE COMMISSION POLICY STATEMENT FOR TECHNICAL SPECIFICATION IMPROVEMENTS ON A PLANT SPECIFIC BASIS Introduction The NRC Project Manager (E. Reeves) reviewed the purpose of the meeting and distributed copies of the meeting notice and the enclosed " Pilot Application of the Commission's Interim Policy Statement on Technical Specifications Improvements at Farley." The NRC staff had re consider Farley Technical Specifications (TS) quested changes in aAPCo management near-term test of to the feasibility of implementing the Policy Statement on a plant specific basis. At list of attendees is enclosed.

Discussion APCo (Mcdonald) stated his willingness to cooperate with NRC in the endeavor within certain limitations. Removal of certain TS sections and putting them ,

in plant procedures and in the Final Safety Analysis Report (FSAR) might be '

feasible according to APCo. However, the licensee was reluctant to consider the other TS changes being developed by the Westinghouse Owner's Group (WOG),

e. g. human factors and reformatting.

nRR (Fischer) discussed the Policy Statement and noted that a perceived improvement in safety would be possible when the entire Policy Statement is implemented. APCo (Morey) noted that from an operator's vievpoint, a reduction in the TS to simplify and reduce the amount of TS informatfon (which operators are now required to memorize) would be a definite plus. Se also noted that to " human engineer" the existing TS would be a long, time cot'suming effort and may not be worth the effort on a plant specific basis. j The NRC staff (Starostecki) noted that our intention is to determine if a

" pilot plant" could implement the Policy Statement on a plant specific basis in a significantly shorter time period than the current WOG schedule. He 8707020403 070626 PDR ADDCK 05000348 P PDn

r J

thanked the APCo management for considering the " pilot plant approach and agreed to send a proposal to APCo in the near future, if considered feasible, ,

Edward A. Reeves, Project Manager Project Directorate 11-1 Division of Reactor Projects - I/II  ;

Enclosures:

As stated cc: w/

Enclosures:

See next page DISTRIBUTION:

Docket Nos. 50-348/364 NRC PDR Local PDR PD21 r/f E. Adensam E. Reeves (2) i 0GC-B P. Anderson E. Jordan J. Partlow ACRS(10) j B. Buckley R. P. Mcdonald D. Morey D. McKinney l B. George R. Emch D. Fischer J. Youngblood C. Rossi ,

R. Starostecki l l

l PM: .  : 'RPR LA RPR Dih2.DRPR ER 'es/dsf P rson EAdeniam 0/p87 $/87 g 06 ?/87

(

l J

.y a

-i 1

Mr. R. P. Mcdonald .

-Alabama Power Company Joseph M. Farley Nuclear Plant cc: 1 Mr. W. O. Whitt D. Biard kacGuineas Esquire J Executive Vice President Volpe, Boskey and Lyons

Alabama Power Company 918 16th Street, N.W.

Post Office Box 2641 Washington, DC 20006 Birmingham, Alabama 35291-0400 Charles R. Lowman Mr. Louis B.- Long, General Manager Alabama Electric Corporation Southern Company Services, Inc. Post Office Box 550 Post Office Box 2625 Andalusia,' Alabama 36420 Birmingham, Alabama 35202 Chairman Regional Administrator, Region II Houston County Commission U.S. Nuclear Regulatory Commission Dothan, Alabama 36301 101 Marietta Street, Suite 2900 Atlanta, Georgia 30303 Ernest L. Blake, Jr., Esquire Shaw, Pittman, Potts and Trowbridge . Claude Earl Fox, M.D.

2300 N Street, N.W. State Health Officer __

Washington, DC 20037 State Department'of Public Health-State Office Building Robert A. Buettner, Esquire Balch, Bingham, Baker, Hawthorne, Mr. J. D. Woodard-Williams and Ward General Manager - Nuclear Plant j Post Office Box 306 Post Office Box 470 i Birmingham, Alabama 35201 Ashford, Alabama 36312 i Resident Inspector.

U.S. Nuclear Regulatory Commission Post Office Box 24 - Route 2 Columbia, Alabama 36319 )

o i

MEETING ATTEtiDEES-a c

NRC 2d..... .. ILu\es Bart C. Buckley i

Richard L. Emch David Fischer Joe Youngblood Charles E. Rossi .

Richard Starostecki j Alotion.o Power Corapany R. P. Mcdonald Dave Morey Doug McKinney Southern Compsny Services Ben J. George i

i I

4 l

I

v-PILOT APPLICATION OF THE CCFMISS10N'S INTERIM POLICY STATEf7NT f

0N TECHNICAL SPECIFICATION:IMPROVEfiENTS AT FARLFY OBJECTIVE OF THE PILOT PROGRAM:

s NEAR-TERM TEST OF THE FEASIBILITY OF IMPLEMENilllG THE 1 COMMISSION'S INTERIM POLICY STATEMENT ON TECHPICAL SPECIFICATION IMPROVEVENTS ON / PLANT SPECIFIC BASIS, GROUND RULES:

1. THE EXISTING FAFLEY TECHNICAL SPECIFICATIONS.WILL BE THE 4

BASE DOCUMENT TO WHICH TPE POLICY STATEMENT IS APPLIED,

2. THE CRITERIA CONTAINED IN THE. POLICY STATEVENT WILL BE USED TO EVALUATE ALL OF THE LCOs IN THE FARLEY TS,
3. THE PILOT APPLICATION VILL INCOPPORATE ALL TERPS AND PROVISIONS OF THE POLICY STATEMENT (E G., HUMAN FACTOPS IMPROVEMENTS, BASES UPGRADE),
4. CHANGES TO THE DETAILED TECHNICAL REQUIREMENTS (E,G., .

A0Ts, STis) PHICH REMAIN IN THE FARLEY TS WILL BE '

REVIEWED JUST AF IF THEY WERE SUBMITTED AS INDIVIDUAL LICENSE AMENDMEHTS,

)

5. TO THE EXTENT POSSIBLE, MAKE USE OF WHAT THE OWNERS 1 GROUPS HAVE DONE TO DATE (IN DEVELOPING THE NEW  !

STS) PITH REGARD TO HUMAN FACTORS IMPROVEMENTS AND I FORMATTING,

6. STAFF WILL CONTINUE TO IMPLEMENT THE TECHNICAL-SPECIFlCATION 1MPROVEMENT PROGPAM, (E.G,, TO DEVELOP NEW STS WHICH WILL BE IMPLEMENTED BY DESIGNATED LEAD PLANTS),

MEETING

SUMMARY

DISTRIBUTION hoc 5tN0(s)i l

NRC PDR Local PDR PD 11-1 r/f

, E. Adensam Attorney, 0GC P. Anderson E. Jordan J. Partlow ACRS(10)

Project Manager E, Reeves NRC PAPTICIPANTS B. Buckley R. P. Mcdonald D. Morey D. McKinney B. George R. Emch D. Fischer J. Youngblood C. Rossi R. Starostecki bec: Applicant & Service List