ML20214S997
Letter Sequence Meeting | |
---|---|
Initiation
Questions
| |
MONTHYEARML20209J5611985-10-31031 October 1985
[Table View]Informs of Safeguards Regulatory Effectiveness Review Scheduled During Wk of 860203-07.Review Will Evaluate Overall Effectiveness of Safeguards Program & Determine If Regulations Yield Intended Level of Protection Project stage: Other ML20151P0511985-12-24024 December 1985 Forwards Revised List of Participants in 860203-07 Regulatory Effectiveness Review at Facility Project stage: Other ML20137M8561986-01-0909 January 1986 Forwards New List of Team Members Scheduled to Conduct 860203-07 Onsite Regulatory Effectiveness Review.Current List Should Be Destroyed.W/O Encl Project stage: Other ML20141N5941986-03-10010 March 1986 Notification of 860312 Site Meeting W/Licensee to Discuss Implementation of Security Plan Per 10CFR73.55.Meeting Closed to Public Project stage: Meeting ML20209G7411986-08-28028 August 1986 Forwards Rept of 860203-07 Regulatory Effectiveness Review Re Facility Safeguards Sys Effectiveness,Vital Area Definition & Safety/Safeguards Interface.Rept Withheld (Ref 10CFR73.21) Project stage: Other ML20210C8241987-04-29029 April 1987 Notification of 870505 Meeting W/Util in Bethesda,Md to Discuss Proposed Changes to Site Safeguards Plan & Other site-related Mods Project stage: Meeting ML20210D1441987-05-0404 May 1987 Forwards Updated Response to Findings of Regulatory Effectiveness Review,Consisting of Changes to Original Conceptual Design & Final Design Concept.Response Withheld Project stage: Other ML20214S9971987-06-0202 June 1987 Summary of 870505 Meeting W/Util Re Planned Safeguards Mods at Facility Project stage: Meeting 1986-03-10 |
ML20214S997 | |
Person / Time | |
---|---|
Site: | Farley |
Issue date: | 06/02/1987 |
From: | Reeves E Office of Nuclear Reactor Regulation |
To: | Office of Nuclear Reactor Regulation |
References | |
TAC-65285, TAC-65286, NUDOCS 8706100080 | |
Download: ML20214S997 (3) | |
Similar Documents at Farley | |
---|---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20206L4921999-05-10010 May 1999
[Table view]Summary of 990416 Meeting with Util in Rockville MD to Discuss Matter Re SG Operational Assessments for Current Operating Cycle at Plant,Unit 1 ML20206G1181999-05-0505 May 1999 Summary of 990419-20 Meeting with Southern Nuclear Operating Co,Inc in Rockville,Md Re Matters Related to Implementation of Improved Standard TSs at Farley Nuclear Plant,Units 1 & 2 ML20198S2581998-12-31031 December 1998 Summary of 981215 Meeting with Southern Nuclear Operating Co in Rockville,Md to Discuss Technical Issues Associated with Kaowool Fire Barriers Installed at Farley Nuclear Plant, Units 1 & 2 ML20198M7031998-12-29029 December 1998 Summary of 981215 Meeting with Southern Nuclear Operating Co,Inc in Rockville,Md Re Matters Related to Current Steam Generator Tube Insp at Farley Nuclear Plant,Unit 1.List of Attendees & Meeting Handouts,Encl ML20195J1361998-11-17017 November 1998 Summary of 981026 Meeting with Util in Rockville,Md to Discuss Plant Analysis of Replacement SG & Evaluation of Other Small Changes for FNP Units 1 & 2 Best Etimate Large Break loss-of-coolant Accident ML20155C2451998-10-29029 October 1998 Summary of 981008 Meeting with Southern Nuclear Operating Co in Rockville,Md Re Util Repair of Joseph M Farley Nuclear Plant,Unit 1 B SG Tubes & Eddy Current Test Data for Tube R25C51 Submitted by .List of Attendees Encl ML20155C4141998-10-29029 October 1998 Summary of 981014 Meeting W/Southern Nuclear Operating Co, Inc in Rockville,Md Re Justification of Certain TS Changes Needed to Implement Improved Std TS & NRC Staff Request for Addl Info, .List of Attendees Encl ML20203C5501997-12-0505 December 1997 Summary of 971120 Meeting W/Southern Nuclear Operating Co to Discuss Matters Related to Steam Generator Replacement Projects Proposed for Both Farley Nuclear Units.List of Attendees Enclosed ML20199A0161997-10-30030 October 1997 Summary of 971022 Meeting W/Util in Rockville,Md Re Initiatives That Focus on Planned Licensing Actions & Corrective Measures Re Problems Considered by Mgt to Warrant Special Attention ML20217E1531997-09-25025 September 1997 Summary of 970916 Meeting W/Southern Nuclear Operating Co, Inc in Rockville,Maryland Re Licensees Improved Std TS Conversion Application & Schedule for Submittal.List of Meeting Attendees & Meeting Handouts Encl ML20217L8701997-08-14014 August 1997 Summary of 970731 Meeting W/Southern Nuclear Operating Co, Inc in Birmingham,Al Re Plant Status,Major Problems & Other Topics at Farley,Hatch & Vogtle Nuclear Plants.List of Attendees & Presentation Handouts Encl ML20134K7521997-02-12012 February 1997 Summary of 970205 Meeting W/Util & W for Initial Discussion of Utils Plans & Schedule for Submitting Proposed TS Amend Request Re Use of Direct Tube Repair in Repair of SG Tubes. List of Participants & Matl Presented Encl ML20029D9001994-05-0909 May 1994 Summary of 940426 Meeting W/Util & W in Rockville,Md Re TMI Issue II.d.1, Performance Testing of BWR & PWR Relief & Safety Valves. Attendees List & Handout Encl ML20056C5231993-06-18018 June 1993 Summary of 930602 Meeting W/Util Re Plant Proposal for Removing 2C Emergency Diesel Generator from TS as Part of Farley Implementation of Station Blackout Rule.List of Attendees Encl ML20056D6661993-06-0101 June 1993 Summary of Operating Reactors Events Briefing 93-19 on 930526 ML20128C1261992-11-25025 November 1992 Summary of 921026 Meeting W/Util in Houston County,Al Re Future Submittals Planned by Util,Status of NRC Review of Previous Submittals,Responses to Generic Communications,Nrc Concerns & General Coordination of Licensing Activities ML20128A0111992-11-25025 November 1992 Summary of 920727 Meeting W/Util,Westinghouse & Pnl in Rockville,Md Re Discussions on Steam Line Break Leakage Issues Relating to Licensees SG Tube Alternate Plugging Criteria Proposal.List of Attendees Encl ML20058K1841990-12-0404 December 1990 Summary of 901107 Meeting W/Util in Rockville,Md Re Steam Generator Tube Collapse Under Combined LOCA & Safe Shutdown Earthquake Loads ML20044A1971990-06-25025 June 1990 Summary of 900607 Meeting W/Util & Westinghouse in Rockville,Md Re Planned Amends Covering Steam Generator Tube Sleeving in Tube Support Plate Area,Increase in Steam Generator Tube Plugging Limit & RTD Bypass Removal ML20247R0161989-09-21021 September 1989 Summary of Operating Reactors Events Meeting 89-34 on 890920 to Brief Senior Managers & Regional Offices on Selected Events That Occured Since Last Meeting ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20150B2131988-07-0505 July 1988 Summary of 880601 Meeting W/Util in Rockville,Md Re Antitrust 2.206 Petition.Attendance List Encl ML20153B0061988-06-17017 June 1988 Summary of CRGR Meeting 137 on 880608 Re Proposed Draft Rule 10CFR52 Concerning Site Permits,Design Certifications & Combined Licenses & Proposed NRC Bulletin Regarding Thermal Stresses in Piping.List of Attendees Encl ML20153B0011988-06-17017 June 1988 Summary of CRGR Meeting 137 on 880608 Re Proposed Draft Rule 10CFR52 Concerning Site Permits,Design Certifications & Combined Licenses & Proposed NRC Bulletin Regarding Thermal Stresses in Piping.List of Attendees Encl.W/O Stated Encl ML20151C9691988-04-0808 April 1988 Summary of 880406 Meeting W/Util & Alabama Electric Power Cooperative in Rockville,Md Re Status of Settlement Proposal Presented to NRC in Jan 1988,per 2.206 Antitrust Proceeding. List of Attendees Encl ML20148L1801988-03-25025 March 1988 Summary of 880318 Meeting W/Utils in Rockville,Md Re Info That Would Be Required in Submittal of Amends to Licenses & CP Held by Utils.Attendees List & Viewgraphs Encl ML20196J7851988-03-10010 March 1988 Summary of Operating Reactors Events Meeting 88-10 on 880308.List of Attendees & Significant Elements of Events Discussed Encl ML20150C7261988-03-0909 March 1988 Summary of 880302 Meeting W/Utils in Rockville,Md Re Formation of Separate Operating Organization.List of Attendees & Viewgraphs Encl ML20149M1771988-02-0808 February 1988 Summary of 880115 Meeting W/Util Discussing Generic Implications of Cracked 6-inch Safety Injection Pipe at Plant.Meeting Attendees & Agenda Encl ML20196B1461988-01-11011 January 1988 Summary of CRGR Meeting 127 on 871223 Re Proposed Resolution of USI A-47, Safety Implications of Control Sys in LWR Nucl Nuclear Power Plants. Committee Recommended Forwarding Ofc Package to EDO Following Incorporation of CRGR Comments ML20149F4741988-01-0707 January 1988 Summary of Operating Reactors Events Meeting 88-01 on 870105 Re Events That Occurred Since 871222.List of Attendees & Viewgraphs Encl ML20237F2471987-12-18018 December 1987 Summary of Operating Reactor Events Meeting 87-44 on 871215. List of Attendees,Events Discussed,Significant Elements of Events & Summary of Reactor Scrams Encl ML20236L3201987-11-0505 November 1987 Summary of 870924 Meeting W/Util,Bechtel & Rl Cloug Assoc Re Problems Concerning Qualification of V-Type Electrical Splices at Facility.Attendance List Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20235W9431987-10-13013 October 1987 Summary of Operating Reactors Events Meeting 87-32 on 870922.Notes That Meeting 87-31 Did Not Occur.List of Attendees & Events Discussed & Significant Elements of Events Encl ML20216J4431987-06-26026 June 1987 Summary of 870619 Meeting W/Util & Southern Co Svcs to Discuss Commission Policy Statement for Tech Spec Improvements on Plant Specific Basis.List of Attendees & Pilot Application of Commission Interim Policy... Encl ML20214S9971987-06-0202 June 1987 Summary of 870505 Meeting W/Util Re Planned Safeguards Mods at Facility ML20236S4401986-12-30030 December 1986 Summary of 861120 Meeting W/Util Re Proposed Tech Spec Changes to Snubber Surveillance Insp Intervals ML20212E3601986-12-23023 December 1986 Summary of 861120 Meeting W/Bechtel,Southern Co,Svcs & Alabama Power Co in Bethesda,Md Re Proposed Tech Spec Changes to Snubber Surveillance Insp Intervals.Meeting Agenda,List of Attendees & Viewgraphs Encl ML20147E8911986-08-20020 August 1986 Trip Rept of 860721-25 Visit to Plant to Observe INPO Accreditation Team Evaluation of Six Training Programs, Including Instrumentation & Control Technician,Mechanical Maint & Electrical Maint.List of Team Members Encl ML20206L9081986-08-11011 August 1986 Summary of Operating Reactor Events Meeting 86-27 on 860804 W/Ofc Director,Div Directors & Representatives Re Briefing on Events Which Occurred Since Last Meeting on 860728.List of Attendees & Viewgraphs Encl ML20211P1361986-07-16016 July 1986 Summary of 860707 Operating Reactor Events Meeting 86-23 W/ Div Directors & Representatives Re Events Since Last Meeting on 860630.Notification of Inability to Meet Assigned Target Completion Dates for Actions Requested.Viewgraphs Encl ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20154P0071986-03-12012 March 1986 Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl ML20132C3761984-08-0808 August 1984 Trip Rept of 840618-20 Site Visit to Observe INPO Accreditation Team to Determine Adequacy of Process as Means of Implementing Sys Approach to Training in Commercial Nuclear Power Industry ML20033C2231981-11-0909 November 1981 Summary of 811029 Meeting W/Util in Bethesda,Md Re Util Presentation of Diesel Generator Reliability Improvements Program.Agenda Encl ML20031F1401981-10-0101 October 1981 Summary of 810918 Meeting W/Westinghouse Owners Group Re Pressurized Thermal Shock to Reactor Pressure Vessels. Attendance List & Handouts Encl ML20010B7411981-08-10010 August 1981 Summary of 810803 Meeting W/Util in Bethesda,Md Re NRC Concerns Relating to Diesel Generator 1C Failures.Failures Possibly Related to Reg Guide 1.108 Testing.Relevant Tech Specs & Attendance Lists Encl 1999-05-05 Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT) MONTHYEARML20206L4921999-05-10010 May 1999
[Table view]Summary of 990416 Meeting with Util in Rockville MD to Discuss Matter Re SG Operational Assessments for Current Operating Cycle at Plant,Unit 1 ML20206G1181999-05-0505 May 1999 Summary of 990419-20 Meeting with Southern Nuclear Operating Co,Inc in Rockville,Md Re Matters Related to Implementation of Improved Standard TSs at Farley Nuclear Plant,Units 1 & 2 ML20198S2581998-12-31031 December 1998 Summary of 981215 Meeting with Southern Nuclear Operating Co in Rockville,Md to Discuss Technical Issues Associated with Kaowool Fire Barriers Installed at Farley Nuclear Plant, Units 1 & 2 ML20198M7031998-12-29029 December 1998 Summary of 981215 Meeting with Southern Nuclear Operating Co,Inc in Rockville,Md Re Matters Related to Current Steam Generator Tube Insp at Farley Nuclear Plant,Unit 1.List of Attendees & Meeting Handouts,Encl ML20195J1361998-11-17017 November 1998 Summary of 981026 Meeting with Util in Rockville,Md to Discuss Plant Analysis of Replacement SG & Evaluation of Other Small Changes for FNP Units 1 & 2 Best Etimate Large Break loss-of-coolant Accident ML20155C2451998-10-29029 October 1998 Summary of 981008 Meeting with Southern Nuclear Operating Co in Rockville,Md Re Util Repair of Joseph M Farley Nuclear Plant,Unit 1 B SG Tubes & Eddy Current Test Data for Tube R25C51 Submitted by .List of Attendees Encl ML20155C4141998-10-29029 October 1998 Summary of 981014 Meeting W/Southern Nuclear Operating Co, Inc in Rockville,Md Re Justification of Certain TS Changes Needed to Implement Improved Std TS & NRC Staff Request for Addl Info, .List of Attendees Encl ML20203C5501997-12-0505 December 1997 Summary of 971120 Meeting W/Southern Nuclear Operating Co to Discuss Matters Related to Steam Generator Replacement Projects Proposed for Both Farley Nuclear Units.List of Attendees Enclosed ML20199A0161997-10-30030 October 1997 Summary of 971022 Meeting W/Util in Rockville,Md Re Initiatives That Focus on Planned Licensing Actions & Corrective Measures Re Problems Considered by Mgt to Warrant Special Attention ML20217E1531997-09-25025 September 1997 Summary of 970916 Meeting W/Southern Nuclear Operating Co, Inc in Rockville,Maryland Re Licensees Improved Std TS Conversion Application & Schedule for Submittal.List of Meeting Attendees & Meeting Handouts Encl ML20217L8701997-08-14014 August 1997 Summary of 970731 Meeting W/Southern Nuclear Operating Co, Inc in Birmingham,Al Re Plant Status,Major Problems & Other Topics at Farley,Hatch & Vogtle Nuclear Plants.List of Attendees & Presentation Handouts Encl ML20134K7521997-02-12012 February 1997 Summary of 970205 Meeting W/Util & W for Initial Discussion of Utils Plans & Schedule for Submitting Proposed TS Amend Request Re Use of Direct Tube Repair in Repair of SG Tubes. List of Participants & Matl Presented Encl ML20029D9001994-05-0909 May 1994 Summary of 940426 Meeting W/Util & W in Rockville,Md Re TMI Issue II.d.1, Performance Testing of BWR & PWR Relief & Safety Valves. Attendees List & Handout Encl ML20056C5231993-06-18018 June 1993 Summary of 930602 Meeting W/Util Re Plant Proposal for Removing 2C Emergency Diesel Generator from TS as Part of Farley Implementation of Station Blackout Rule.List of Attendees Encl ML20056D6661993-06-0101 June 1993 Summary of Operating Reactors Events Briefing 93-19 on 930526 ML20128A0111992-11-25025 November 1992 Summary of 920727 Meeting W/Util,Westinghouse & Pnl in Rockville,Md Re Discussions on Steam Line Break Leakage Issues Relating to Licensees SG Tube Alternate Plugging Criteria Proposal.List of Attendees Encl ML20128C1261992-11-25025 November 1992 Summary of 921026 Meeting W/Util in Houston County,Al Re Future Submittals Planned by Util,Status of NRC Review of Previous Submittals,Responses to Generic Communications,Nrc Concerns & General Coordination of Licensing Activities ML20058K1841990-12-0404 December 1990 Summary of 901107 Meeting W/Util in Rockville,Md Re Steam Generator Tube Collapse Under Combined LOCA & Safe Shutdown Earthquake Loads ML20044A1971990-06-25025 June 1990 Summary of 900607 Meeting W/Util & Westinghouse in Rockville,Md Re Planned Amends Covering Steam Generator Tube Sleeving in Tube Support Plate Area,Increase in Steam Generator Tube Plugging Limit & RTD Bypass Removal ML20247R0161989-09-21021 September 1989 Summary of Operating Reactors Events Meeting 89-34 on 890920 to Brief Senior Managers & Regional Offices on Selected Events That Occured Since Last Meeting ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20150B2131988-07-0505 July 1988 Summary of 880601 Meeting W/Util in Rockville,Md Re Antitrust 2.206 Petition.Attendance List Encl ML20153B0061988-06-17017 June 1988 Summary of CRGR Meeting 137 on 880608 Re Proposed Draft Rule 10CFR52 Concerning Site Permits,Design Certifications & Combined Licenses & Proposed NRC Bulletin Regarding Thermal Stresses in Piping.List of Attendees Encl ML20153B0011988-06-17017 June 1988 Summary of CRGR Meeting 137 on 880608 Re Proposed Draft Rule 10CFR52 Concerning Site Permits,Design Certifications & Combined Licenses & Proposed NRC Bulletin Regarding Thermal Stresses in Piping.List of Attendees Encl.W/O Stated Encl ML20151C9691988-04-0808 April 1988 Summary of 880406 Meeting W/Util & Alabama Electric Power Cooperative in Rockville,Md Re Status of Settlement Proposal Presented to NRC in Jan 1988,per 2.206 Antitrust Proceeding. List of Attendees Encl ML20148L1801988-03-25025 March 1988 Summary of 880318 Meeting W/Utils in Rockville,Md Re Info That Would Be Required in Submittal of Amends to Licenses & CP Held by Utils.Attendees List & Viewgraphs Encl ML20196J7851988-03-10010 March 1988 Summary of Operating Reactors Events Meeting 88-10 on 880308.List of Attendees & Significant Elements of Events Discussed Encl ML20150C7261988-03-0909 March 1988 Summary of 880302 Meeting W/Utils in Rockville,Md Re Formation of Separate Operating Organization.List of Attendees & Viewgraphs Encl ML20149M1771988-02-0808 February 1988 Summary of 880115 Meeting W/Util Discussing Generic Implications of Cracked 6-inch Safety Injection Pipe at Plant.Meeting Attendees & Agenda Encl ML20196B1461988-01-11011 January 1988 Summary of CRGR Meeting 127 on 871223 Re Proposed Resolution of USI A-47, Safety Implications of Control Sys in LWR Nucl Nuclear Power Plants. Committee Recommended Forwarding Ofc Package to EDO Following Incorporation of CRGR Comments ML20149F4741988-01-0707 January 1988 Summary of Operating Reactors Events Meeting 88-01 on 870105 Re Events That Occurred Since 871222.List of Attendees & Viewgraphs Encl ML20237F2471987-12-18018 December 1987 Summary of Operating Reactor Events Meeting 87-44 on 871215. List of Attendees,Events Discussed,Significant Elements of Events & Summary of Reactor Scrams Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20236L3201987-11-0505 November 1987 Summary of 870924 Meeting W/Util,Bechtel & Rl Cloug Assoc Re Problems Concerning Qualification of V-Type Electrical Splices at Facility.Attendance List Encl ML20235W9431987-10-13013 October 1987 Summary of Operating Reactors Events Meeting 87-32 on 870922.Notes That Meeting 87-31 Did Not Occur.List of Attendees & Events Discussed & Significant Elements of Events Encl ML20216J4431987-06-26026 June 1987 Summary of 870619 Meeting W/Util & Southern Co Svcs to Discuss Commission Policy Statement for Tech Spec Improvements on Plant Specific Basis.List of Attendees & Pilot Application of Commission Interim Policy... Encl ML20214S9971987-06-0202 June 1987 Summary of 870505 Meeting W/Util Re Planned Safeguards Mods at Facility ML20236S4401986-12-30030 December 1986 Summary of 861120 Meeting W/Util Re Proposed Tech Spec Changes to Snubber Surveillance Insp Intervals ML20212E3601986-12-23023 December 1986 Summary of 861120 Meeting W/Bechtel,Southern Co,Svcs & Alabama Power Co in Bethesda,Md Re Proposed Tech Spec Changes to Snubber Surveillance Insp Intervals.Meeting Agenda,List of Attendees & Viewgraphs Encl ML20206L9081986-08-11011 August 1986 Summary of Operating Reactor Events Meeting 86-27 on 860804 W/Ofc Director,Div Directors & Representatives Re Briefing on Events Which Occurred Since Last Meeting on 860728.List of Attendees & Viewgraphs Encl ML20211P1361986-07-16016 July 1986 Summary of 860707 Operating Reactor Events Meeting 86-23 W/ Div Directors & Representatives Re Events Since Last Meeting on 860630.Notification of Inability to Meet Assigned Target Completion Dates for Actions Requested.Viewgraphs Encl ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20154P0071986-03-12012 March 1986 Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl ML20033C2231981-11-0909 November 1981 Summary of 811029 Meeting W/Util in Bethesda,Md Re Util Presentation of Diesel Generator Reliability Improvements Program.Agenda Encl ML20031F1401981-10-0101 October 1981 Summary of 810918 Meeting W/Westinghouse Owners Group Re Pressurized Thermal Shock to Reactor Pressure Vessels. Attendance List & Handouts Encl ML20010B7411981-08-10010 August 1981 Summary of 810803 Meeting W/Util in Bethesda,Md Re NRC Concerns Relating to Diesel Generator 1C Failures.Failures Possibly Related to Reg Guide 1.108 Testing.Relevant Tech Specs & Attendance Lists Encl ML20126L2331981-05-0101 May 1981 Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Pressure Vessels.All Parties Agree That Thermal Shock W/Subsequent Repressurization Is Safety Concern Needing Prompt Evaluation ML20003D9551981-03-17017 March 1981 Summary of 810204 Meeting W/Util Re Facility Startup Schedule 1999-05-05 |
Text
,
Docket Nos. 50-348 DISTRIBUTION:
and 50-364 See attached list LICENSEE:
Alabama Power Company (APCo)
FACILITY:
Joseph M. Farley Nuclear Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF MEETING HELD ON MAY 5, 1987, BETWEEN NRC AND APCo REPRESENTATIVES TO DISCUSS PLANNED SAFEGUARDS MODIFICATIONS AT THE FARLEY SITE.
Introduction The NRC Project Manager (E. Reeves) reviewed the purpose of the meeting and noted that the meeting is closed to the public because Safeguards Information was to be discussed. This action is in accordance with 10 CFR 73.21. A list of attendees is attached.
Discussion R. Erickson, Chief, Safeguards Branch, NRR, reviewed recent organizational changes at NRC as it affects the Safeguards Area.
J. Garlington (APCo spokesperson) reviewed the approach that the licensee took to resolve the Regulatory Effectiveness Review (RER) team findings described by NRC letter dated August 28, 1986. These findings are based on the February 1986 site audit by the RER team.
J. Sims (APCo) then reviewed APCo's latest response, included in a letter dated May 4, 1987, reviewing APCo's earlier letter dated October 13, 1986.
On the basis of this meeting and the APCo letter dated May 4, 1987, the NRC staff agreed to perform an expedited review of APCo's request to support an early start of site modifications as discussed.
fS Edward A. Reeves, Project Manager Project Directorate 11-1 Division of Reactor Projects - I/II
Enclosure:
As Stated cc w/
Enclosure:
See next page f f1
.h PM:P I LA:P I
(
D:PDIT-U ERee sf PAnd son EAdensam
()$
87 OS/ f /87 OS7 /87
$/n G706100080 870602 PDH ADOCK 05000340 F
eon
Mr. R. P. Mcdonald Alabama Power Company Joseph M. Farley Nuclear Plant cc:
Mr. W. O. Whitt D. Biard MacGuineas Esquire Executive Vice President Volpe, Boskey and Lyons Alabama Power Company 918 16th Street, N.W.
Post Office Box 2641 Washington, DC 20006 Birmingham, Alabama 35291-0400 Charles R. Lowman Mr. Louis B. Long, General Manager Alabara Electric Corporation Southern Company Services, Inc.
Post Office Box 550 Post Office Box 2625 Andalusia, Alabama 36420 Birmingham, Alabama 35202 Chairman Regional Administrator, Region II Houston County Commission U.S. Nuclear Regulatory Commission Dothan, Alabama 36301 101 Marietta Street, Suite 2900 Atlanta, Georgia 30303 Ernest L. Blake, Jr., Esquire Shaw, Pittman, Potts and Trowbridge Claude Earl Fox, M.D.
2300 N Street, N.W.
State Health Officer Washington, DC 20037 State Department of Public Health State Office Building Robert A. Buettner, Esquire Balch, Bingham, Baker, Hawthorne, Mr. J. D. Woodard Williams and Ward General Manager - Nuclear Plant Post Office Box 306 Post Office Box 470 Birmingham, Alabama 35201 Ashford, Alabama 36312 Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 24 - Route 2 Columbia, Alabama 36319 hr m.
MEETING
SUMMARY
DISTRIBUTION i
E20eikiet Ns(s) I50i348'.asd[$~3MA
~
NRC PDR Local PDR PD 11-1 r/f E. Adensam Attorney, OGC P. Anderson E. Jordan J. Partlow ACRS(10)
Project Manager EReeves (2)
NRC PARTICIPANTS R. Erickson Loren Bush Barry Manili Jane Gibson J. H. Taylor i
l D. N. Orrik R. J. Dube l
C. D. Perny Region II I
bec: Applicant & Service List c.
- ~....
.