| number = ML20064G267
| number = ML20064G267
| issue date = 12/31/1993
| issue date = 12/31/1993
| title = 1993 Annual Environ Operating Rept. W/940308 Ltr
| title = 1993 Annual Environ Operating Rept
| author name = Hutchinson C
| author name = Hutchinson C
| author affiliation = ENTERGY OPERATIONS, INC.
| author affiliation = ENTERGY OPERATIONS, INC.

Latest revision as of 14:32, 6 January 2021

1993 Annual Environ Operating Rept
ML20064G267
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 12/31/1993
From: Hutchinson C
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GNRO-94-00028, GNRO-94-28, NUDOCS 9403160090
Download: ML20064G267 (16)


Text

, .

M Entergy operetiono, Inc.

-- ENTERGY *

"c e Fbr! G!:srn, M'; 3%i0 T.:i 601437 2800 C. R. Hutchinson

v.  ; a March 8, 1994 $,CC u., :.. s-

-U.S. Nuclear Regu.*.abory Commission Mail Station P1-37 Washington, D.C. 20555 Attentiont Document Control Desk

Subject:

Grand Gulf Nuclear Station Docket No. 50-416 License No. NPF-29 1993 Grand Gulf Nuclear Station (GGNS) Annual Environmental Operating Report (AEOR)

GNRO-94/00028 Gentlemen Attached is the Grand Gulf Nuclear Station (GGNS) Annual-Environmental Operating Report (AEOR) for the period January 1, 1993 through December 31, 1993. This report is submitted in accordance with the Environmental Protection Plan, Appendix B to the GGNS Operating License (NPF-29),

Section 5.4, " Station Reporting Requirements.

If you have any questions or require additional information concerning this report, please contact Jewel Summers at (601) 437-2149, or this office.

Yours truly,

/ -

/ *

, ' $ ? ,ypv4- -

CRH/JS/ams attachment: 1993 Annual Environmental Operating Report cc (See Next Page) 0 0 f.;tj

/

-l 9403160090 931231 G9402152-PDR ADOCK 05000416 l- '

R PDR !I

l

}

.. )

March 8, 1994  ;

GNRO-94/00028  !

l Page 2 of 3 cc Mr. R. xi . Bernhard (w/a) ,

Mr. H. w. Keiser (w/a)

Mr. R. B. McGehee (w/a)

Mr. N. S. Reynolds (w/a)

Mr. H. L. Thomas (w/o)

Mr. Stewart D. Ebneter (w/a)

Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 Mr. P. W. O'Connor, Project Manager (w/2)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C. 20555 G9402152

l

)

l GRAND GULF NUCLEAR STATION 1593 ANNUAL '

ENVIRONMENTAL '

OPERATING REPORT

, .. s eo

. . . . , .. .. . . _ . _.. _ __.. _ ._ . _.,_ _-- - _ . .... . . _ _ _ - . . . m.._ _. . . . .

]

PREFACE j l

The Annual Environmental Operating Report (AEOR) provides information and -1

- data obtained from implementation of Grand Gulf Nuclear Station's (GGNS)

Environmental Protection Plan (EPP), Appendix B to the GGNS Operating License .,

(NPF-29), which only requires terrestrial issues to be addressed, for the period January 1 through December 31, 1993. j The GGNS Final Environmental Statement did not identify any aquatic issues.

Consequently, the EPP does not address any. The GGNS National Pollutant Discharge Elimination System Permit issued by the Mississippi Department of Environmental 4

Quality (MDEQ) contains effluent. limitations and monitoring requirements for aquatic matters. The MDEQ regulates matters involving water quality and aquatic.

biota.

Tnis report addresses only those issues required by the EPP. In the past, the AEOR included activities associated with the GGNS Construction Permit,. and an Updated Final Safety Analysis Report (UFSAR) requirement which involved reporting '

regional and perched groundwater levels and preciptation data in the AEOR.

However, the Nuclear Regulatory Commission approved cancellation of Construction Permit CPPR-119 for Unit 2 on August 21, 1991 (GNRI-91/00176), and GGNS deleted-the UFSAR reporting requirement in 1993 (GNRI- 93 /00025 ) ; therefore, GGNS I

terminated reporting activities associated with these items.

l i

i l

l M:\ TECH _ PUB \PROCED\SRREVFLR\AEOR.RPD-ii I n - -

w ..m....> , , - - , , - e -

BBLE OF CONTENTS ,

EAGE PREFACE........ .... .... . . ..... ....... ....... ..... ... .......... ii LIST OF APPENDICES...... . .... . .. .... . . ..........................., iv ECIJQB TOPIC

1.0 INTRODUCTION

.. .... ... .. ..... . .............................. 1-1 1.1 Impact Assessment and Summary...... ............... ..... 1-1 2.0 ENVIRONMENTAL SURVEILIANCE ACTIVITIES. . . . ...................... 2-1 2.1 Transmission Line Surveys..... ......... ............... 2-1 2.2 Cooling Tower Drift Program............... ...... ....... 21 2.3 Environmental Evaluations. ......... ... .. ............. 21 3.0 OBSERVATIONS AND DISCUSSIONS. .... .. . .... ... .... ...... ..... 3-1 3.1 Environmental Evaluations........ .... .. ... .........., 3-1 4.0 ADMINISTRATIVE REQUIREMENTS... ............... .... .............. 4-1 4.1 EPP Changes.... ........ ...... .. . ................... 41 4.2 EPP Noncompliances.... .. .. ...................... . .. 4-1 4.3 Nonroutine Reports.. ........ ..... ..................... 4-1 4.4 Potentially Significant Unreviewed Environmental Issues. .................................. 4-1 M:\ TECH _ PUB \PROCED\SRREVFLR\AEOR.RPU-iii

l LIST OF APPENDICES

~ APPENDIX I q y2 PAGE I Environmental Evaluations...... .... . . . . . . . . . . . . . . . . . .I-i l

1 l

i

.I

)

l 1

l 1

i l

M : \TECil_ PUB \ PROCED \ SRREVFLR \ AEOR . RPD - iv I

l 1

ms - . - . , , , . , . . . , , . . .

t, , - _ . ... ,

1

- ... - . .-.. _ - - .- = . . _ _ .

5 4

t SECTION 1.0 ,

INTRODUCTION L

v s

N:\Tscrt_, PUB \PROCED\SRREVFLR\AEOR.RPD-1-1

1.1 IMPACT ASSESSME!TT AND

SUMMARY

GGNS personnel monitored the environmental impact of plant operational activities between January 1 and December 31, 1993. The monitoring results contained in the following sections indicate no adverse impact on the environment due to the operation of GGNS. In addition, GG9S personnel have.

not observed harmful effects or evidence of trends' coward irreversible damage.

to the surrounding environment at GGNS. >

b M:\ TECH _ PUB \PROCED\SRREVFLR\AEOR.RPD-1-1

._ , - .- .-- . .-. c.

SECTION 2.0 l-ENVIRONMENTAL SURVEILLANCE ACTIVITIES M:\ TECH _ PUB \PROCED\SRREVFLR\AEOR.RPD-2-1

a b

2.1 TRANSMISSION LINE SURVEYS GGNS discontinued this program in 1988.

2.2 COOLING TOWER DRIFT PROGRAM GGNS discontinued this program in 1992.

2.3 ENVIRONMENTAL EVALUATIOllS The EPP permits changes in GGNS design or operation and performance of tests or experiments that affect the environment, provided they do not involve a change in the EPP or an unreviewed environmental question.

However, EPP requirements do not apply to changes, tests or experiments which T

do not affect the environment. Also, EPP requirements do not relieve GGNS of.

10 CPR 50.59 requirements, " Changes, Tests and Experiments," which address the question of safety associated with propoced changes, tests and experiments.

The EPP excludes changes, tests or experiments from the evaluation:

o If all measurable environmental effects confined to onsite areas previously disturbed during site preparation and plant construction, or o If required to achieve compliance with other federal, state or local .

requirements. t Mi\ TECH _ PUB \PROCED\SRREVFLR\AEOR.RPD-2-1

-,- , ~ .

1 l

l

.t .

1 1

SECTION 3.0 OBSERVATIONS AND DISCUSSIONS i

b M:\ Teen _ PUB \PROCED\SRREVFLR\AEOR,RPD 3-1 l

_ . . . , , . - . . - . = . _ . . - _ . . . - . . . - . _ . . . - . , ,.

+

1 l

3.1- E!WIRONMENTAL' EVALUATIONS During 1993,.GGNS activities did not include any.unreviewed environmental questions. Chemistry's review of environmental evaluations indicated routine matters within the scope of expected activities. GGNS did:

I not observe any environmental consequences as a result of conduct of the activities evaluated. Appendix I contains completed evaluations for 1993.

a b

I i

i 4

M:\ TECH _ PUB \PROCED\SRREVFLR\AEOR.RPD-3-1

-+. .-..

I t

A SECTION 4.0  ;

i ADMINISTRATIVE REQUIREMENTS

.. I

-l l

l 1

x:\Tsen_ pts \PROCED\SRREVFLR\AEOR.RPD-4 i l

.a

-~

4

.3 e ,

' 4.1 BPP CHANGER.

GGNS made no changes to the EPP in 1993.

- 4.2 HPP NONCOMPLIANCES  ;

GGNS activities con;ained no EPP noncompliances during 1993. GGNS personnel successfully conducted sampling and surveillance activities-according to the EPP ochedule without a reportable deviation.

4.3 NONROUTINE REPORTS i

GGNS submitted no nonroutine reports in 1993.

4.4 EOTENTIALLI SIGNIFICANT UNREVIEWED EINIRONMENTAL ISSUES GGNS encountered no potentially significant unreviewed environmental issues in 1993. GGNS personnel made changes in station design and operation, testo and experiments, of which none resulted in an unreviewed environmental question, in accordance with the EPP, paragraph 3.1, Plant Design ar.d Operation.

l 1

l l

!! : \ TECH _ PUB \ PROCED \ S RREVFLR\AEOR . RPD 1

- . . . - ~ . . .=-_.. .. . . .-

P b

d APPENDIX I ENVIRONMENTAL EVALUATIONS 1

l l

l

'l'

.1

)

M:\ TECH _ PUB \PROCED\SRREVFLR\AEOR.RPD-I-i

e .

O e

I ENVIRONMENTAL EVALUATION 93-0114 l

l (Temporarily change the Refueling Platform Monorail and Frame Mouated Auxiliary Hoist Load Cell Setpoints from 500 to 1000 pounds and perform functional test.)

.l l

l

~

M:\ TECH _ PUB \PROCED\SRREVFLR\AEOR.RPD-I-1