Summary of Environ Protection Program Re Const of Grand Gulf Station Unit 2 for 6 Months Ending 891231. W/900126 Ltr
ML20006D834
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 12/31/1989
From: Cottle W
SYSTEM ENERGY RESOURCES, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AECM-90-2-0001, AECM-90-2-1, NUDOCS 9002150122
Download: ML20006D834 (3)


Text

-

3

+1___/ System System Energy em m Port tvtison. MS 39150 Y. W 601437 M33 WHuam T. Cottle w r rvuoc, tJdW Opr%D'4$

Janaury 26, 1990 U.S. Nuclear Regulatory Commission

. Hail Station P1-137 Washington, D.C. 20555 Attention: Document Control Desk Gentlemen:

SUBJECT:

Grand Gulf Nuclear Station Unit 2 Docket No. 50-417 Construction Permit No. CPPR 119 Transmittal of Environmental Protection Program Report for Six Months Ending December 31, 1989 AECM-90/2-0001 Attached is a report entitled " Summary of Environmental Protection Program Respecting Construction of Grand Gulf Nuclear Station (GCNS) Unit 2 for Six Months Ending December 31, 1989". This report is submitted as required by Staff Exhibit 2-A referenced in Subsection 3.E.1 of Applicant's Construction Permit No. CPPR-119.

Yours truly, j WTC:beb e n C C.  %

Attachment l cc: Mr. D. C. !!1ntz (w/a) l Mr. T.11. Cloninger (w/a) 1 Mr. R. B. McGehee (w/a) l Mr. N. S. Reynolds (w/a)

F r Mr.11. L. Thomas (w/o)

Mr. !!. O. Christensen (w/a)

N Mr. Stewart D. Ebneter (w/a) 48 Regional Administrator

$CA -U.S. Nuclear Regulatory Commission .

b Region II I

$$ 101 Marietta St., N.W., Suite 2900 gg Atlanta, Georgia 30323 NU 80 Mr. L. L. Kintner, Project Manager (w/a)

$C Office of Nuclear Reactor Regulation N U.S. Nuclear Regulatory Commission 8$ Mall Stop 14B20 SOE- Washington, D.C. 20555

}

pp ^

8

,1 A9001231/SNLICFLR - 1 i

f* Att:ch::nt't3 AECM-90/2-0001'

.j

SUMMARY

OF ENVIRONMENTAL PROTECTION PROGRAM RESPECTING CONSTRUCTION OF GRAND GULF NUCLEAR STATION 1GGNS) UNIT 2 -

[0R SIX MONTHS ENDING DECEMBER 31. 198P

[.

Construction Hiehlfahts jc -

Unit 2 construction was suspended in Septemuer 1985 with

[* approximately 35% of field construction coep!nted based on the estimated manhours needed to complete the tait. Minimal Unit 2

[ activities were for the purpose of long term equipment and-

! structural' maintenance.

p Vehicular Movement g

No "off limit" violations were observed during the reporting period.

L' '

i Dust Control No dust control violations were observed during the reporting

( period.

L.

Smoke Control No smoke violations occurred during the reporting period.

Erosion Control.

Rainfall was recorded on 41 occasions during the reporting period, with an accumulated total of 21.51 inches.

Chemical & Solid Waste Control No violations or improprieties of Mississippi waste disposal regulations occurred during the reporting period.

i Noise Control p

No excessive noise levels were detected during the reporting period.

Sediment Basins A & B There were no construction-associated problems with Sediment Basins I

A or B during the reporting period.

e L

TA9001231/SNLICFLR - 3  ;

, l

,p . ,.

,=i . . . . .

t J , . .' ' Att0ch:ent to AECH-90/2-0001!

r f; "

' <:,j: .

.. g ' . . *

.- 3 maalanal arounriwater Dewaterine Walla p -

The 12 regional. groundwater wells were read 13' times during the.

. reporting period with no problems encountered.-

Venet.ation Survav.

No vegetational abnormalities were observed during the reporting period.

v.

ti Tranmainalon Linen Transmission line surveys were suspended'in 1988 based on the.

stabilization of soil and vegetation observed along these' lines.

-during' previous surveys.

t l-

.i t

7 I

t A9001231/SNLICFLR - 4 L:

.