ML20138A696: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[IR 05000271/1986005]]
{{Adams
| number = ML20138A696
| issue date = 03/17/1986
| title = Notification of Significant Licensee Meeting 86-035 on 860319 W/Util in King of Prussia,Pa to Discuss Inoperable Standby Liquid Control Sys Per Insp Rept 50-271/86-05
| author name = Tripp L
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee name =
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| docket = 05000271
| license number =
| contact person =
| document report number = NUDOCS 8603200032
| document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE
| page count = 2
}}
See also: [[see also::IR 05000271/1986005]]
 
=Text=
{{#Wiki_filter:__
                                                                                            _-
..N
                                        IlAR 1711E
                            U.S. NUCLEAR REGULATORY COPNISSION            No. 86-038
                                            REGION I
                          NOTICE OF SIGNIFICANT LICENSEE MEETING
    Licensee:            Vermont. Yankee Nuclear Power Corporation-
    Facility:            Vermont Yankee Nuclear Power Station
    Docket No.:          50-271
    Time and Date:        10:00 a.m., March 19, 1986
    Location:            Region I Office, King of Prussia, PA (Executive Conference Room)
    Purpose:              Enforcement Conference to Discuss Inoperable Standby Liquid
                          Control System (Inspection Report 50-271/86-05).
    NRC Attendees:        J. Allan, Deputy Regional Administrator
                          R. Starostecki, Director, Division of Reactor Projects (DRP)
                          E. Wenzinger, Chief, Projects Branch No. 3, DRP
                          L. Bettenhausen, Chief, Operations Branch, Division of Reactor
                            Safety (DRS)
                          L. Tripp, Chief, Reactor Projects Section 3A, DRP
                          T. Elsasser, Chief, Reactor Projects Section 3C, DRP
                          W. Raymond, Senior Resident Inspector
                          G. Meyer, Project Engineer, DRP
                          D. Holody, Enforcement Specialist
    Licensee Attendees: W. Murphy, Vice President and Manager of Operations
                          J. Pelletier, Plant Manager
                          R. Wanczyk, Technical Services Superintendent
                          D. McElwee, Senior Operations Engineer
    Note:    Attendance by NRC personnel at this meeting should be made known by 4:00
            p.m., March 18, 1986 via telephone call to L. Tripp, Region I, at FTS
            8-488-1227.
                                            Prepared by
                                                        L. E. Tripp, Chief, RPS 3A
    Distribution:
    Victor Stello, Jr., Acting Executive Director for~0perations
    James M. Taylor, Director, Office of Inspection and Enforcement
    Jane Axelrad, Director, Enforcement Staff, IE
    J. Lieberman, Director and Chief Counsel, Regional Operations and Enforcement
      Division, OELD
    R. Bernero, Division of BWR Licensing, NRR
    D. Muller, Director, BWR Project Directorate #2, NRR
    V. Rooney, LPM, NRR
    Public Document Room (PDR)
    Local Public Document Room (LPDR)
                                    8603200032 060317
                                    PDR    ADOCK 05000271
                                                                                      f., k
                                                                                                dt
 
  f
                    . . -
                  .
          ..n,
                                                                                  2
                                                                                    : EAR 17 M
                          bcc:
                          Regional Administrator
                          Deputy Regional Administrator
                          Division Directors
                          Branch Chiefs
                          Section Chiefs
                          Public Affairs Officer
                          Region I Receptionist
                          Regional Counsel
                          Enfo'rcement Specialist
                          DRMA Files
                                                                                                                          ,
                          R-    P
                          T    p/meo
                          3/14/86
                                                            0FFICIAL RECORD COPY
!
i
    _ _ _ _ _ _ _                  -- . - _ . . . . . . - .    . . . . - - . . .    . _ - , _ . , - _ . . -
                                                                                                            -
                                                                                                              - - . - . -
}}

Latest revision as of 20:32, 15 November 2020

Notification of Significant Licensee Meeting 86-035 on 860319 W/Util in King of Prussia,Pa to Discuss Inoperable Standby Liquid Control Sys Per Insp Rept 50-271/86-05
ML20138A696
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 03/17/1986
From: Lester Tripp
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8603200032
Download: ML20138A696 (2)


See also: IR 05000271/1986005

Text

__

_-

..N

IlAR 1711E

U.S. NUCLEAR REGULATORY COPNISSION No.86-038

REGION I

NOTICE OF SIGNIFICANT LICENSEE MEETING

Licensee: Vermont. Yankee Nuclear Power Corporation-

Facility: Vermont Yankee Nuclear Power Station

Docket No.: 50-271

Time and Date: 10:00 a.m., March 19, 1986

Location: Region I Office, King of Prussia, PA (Executive Conference Room)

Purpose: Enforcement Conference to Discuss Inoperable Standby Liquid

Control System (Inspection Report 50-271/86-05).

NRC Attendees: J. Allan, Deputy Regional Administrator

R. Starostecki, Director, Division of Reactor Projects (DRP)

E. Wenzinger, Chief, Projects Branch No. 3, DRP

L. Bettenhausen, Chief, Operations Branch, Division of Reactor

Safety (DRS)

L. Tripp, Chief, Reactor Projects Section 3A, DRP

T. Elsasser, Chief, Reactor Projects Section 3C, DRP

W. Raymond, Senior Resident Inspector

G. Meyer, Project Engineer, DRP

D. Holody, Enforcement Specialist

Licensee Attendees: W. Murphy, Vice President and Manager of Operations

J. Pelletier, Plant Manager

R. Wanczyk, Technical Services Superintendent

D. McElwee, Senior Operations Engineer

Note: Attendance by NRC personnel at this meeting should be made known by 4:00

p.m., March 18, 1986 via telephone call to L. Tripp, Region I, at FTS

8-488-1227.

Prepared by

L. E. Tripp, Chief, RPS 3A

Distribution:

Victor Stello, Jr., Acting Executive Director for~0perations

James M. Taylor, Director, Office of Inspection and Enforcement

Jane Axelrad, Director, Enforcement Staff, IE

J. Lieberman, Director and Chief Counsel, Regional Operations and Enforcement

Division, OELD

R. Bernero, Division of BWR Licensing, NRR

D. Muller, Director, BWR Project Directorate #2, NRR

V. Rooney, LPM, NRR

Public Document Room (PDR)

Local Public Document Room (LPDR)

8603200032 060317

PDR ADOCK 05000271

f., k

dt

f

. . -

.

..n,

2

EAR 17 M

bcc:

Regional Administrator

Deputy Regional Administrator

Division Directors

Branch Chiefs

Section Chiefs

Public Affairs Officer

Region I Receptionist

Regional Counsel

Enfo'rcement Specialist

DRMA Files

,

R- P

T p/meo

3/14/86

0FFICIAL RECORD COPY

!

i

_ _ _ _ _ _ _ -- . - _ . . . . . . - . . . . . - - . . . . _ - , _ . , - _ . . -

-

- - . - . -