ML20195J239: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:.                          -          . .. - .  -.  .-    .
l DEC.ONTROLLED WHEN 2.790 INFORMATION IS REMOVED DOCUMENT TRANSMITTED HEREWITH CONTAINS 2.790 INFORMATION U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS Docket No.:              70-1151 License No.:              SNM-1107 l
Report No.:              70-1151/98-205 Safeguards Group.        111 Licensee:                CBS Corporation, acting through its Westinghouse Electric Company Division Commercial Nuclear Fuel Division Columbia Fuel Fabrication Facility Location:                P.O. Box R Columbia, S.C. 29250 Dates:                    October 19-23,1998 W. Smith, MC&A Physical Scientist Inspectors:
D. Whaley, MC&A Physical Scientist i-l            Approved by:              P. Ting, Chief l                                        Operations Branch i                                        Division of Fuel Cycle Safety and Safeguards, NMSS 9811240220 981118      1 PDR    ADOCK 0700 C                                                            Enclosure 1 DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED DOCUME,NT TRANSMITTED HEREWITH CONTAINS 2.790 INFORMATION
(}}

Latest revision as of 14:59, 13 November 2020

Partially Withheld Insp Rept 70-1151/98-205 on 981019-23. Violations Noted.Details Withheld,Per 10CFR2.790
ML20195J239
Person / Time
Site: Westinghouse
Issue date: 11/18/1998
From:
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
Shared Package
ML20138L744 List:
References
70-1151-98-205, NUDOCS 9811240220
Download: ML20195J239 (1)


Text

. - . .. - . -. .- .

l DEC.ONTROLLED WHEN 2.790 INFORMATION IS REMOVED DOCUMENT TRANSMITTED HEREWITH CONTAINS 2.790 INFORMATION U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS Docket No.: 70-1151 License No.: SNM-1107 l

Report No.: 70-1151/98-205 Safeguards Group. 111 Licensee: CBS Corporation, acting through its Westinghouse Electric Company Division Commercial Nuclear Fuel Division Columbia Fuel Fabrication Facility Location: P.O. Box R Columbia, S.C. 29250 Dates: October 19-23,1998 W. Smith, MC&A Physical Scientist Inspectors:

D. Whaley, MC&A Physical Scientist i-l Approved by: P. Ting, Chief l Operations Branch i Division of Fuel Cycle Safety and Safeguards, NMSS 9811240220 981118 1 PDR ADOCK 0700 C Enclosure 1 DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED DOCUME,NT TRANSMITTED HEREWITH CONTAINS 2.790 INFORMATION

(