{{#Wiki_filter:y OPERATING DATA REPORT DOCKET NO.
{{#Wiki_filter:}}
50-336 DATE      9-10-82 COMPLETED BY V G)D50n TELEPHONE (dVJ1 44/-1791 X.4431 OPERATING STATUS
: 1. Unit Name:
Millstone 2                                    Notes              -
August 1982                                      Items 22 and 21 cumulative
: 2. Reporting Period:                                                      are weighted ave. unit
: 3. Licensed Thermal Power (MWt): 2700                                    operated at 2560 MWT prior
: 4. Nameplate Rating (Gross MWe):      909                                to upratin9 to its current
: 5. Design Electrical Rating (Net MWe):      870                          2700 MW Thennal power level,
: 6. Maximum Dependable Capacity (Gross MWe): 895
: 7. Maximum Dependable Capacity (Net MWe):          004
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report, Give Reasons:
N/A
: 9. Power Level To which Restricted.If Any (Net MWe):              N/A
: 10. Reasons For Restrictions,1f Any:          N/A This Month            Yr to.Date          Cumulative 744                      5831            58583
: 11. Hours In Reporting Period
: 12. Number Of Hours Reactor Was Critical                      692                  3751.4            42338.7
: 13. Reactor Reserve Shutdown Hours                                0                  128.6            2205.5
: 14. Hours Generator On.Line                                    659                  3510.4
* 405i1.9 *
: 15. Unit Reserve Shutdown Hours                                  0                        0            468.2 l'
i                                                                1724588.2                9042760.9          101454000
: 16. Gross Thermal Energy Generated (MWH)
: 17. Gross Electrical Energy Generated (MWH)                560130 _,              2961950          32963448
: 18. Net Electrical Energy Generated (MWH)                537693.6                2830602.3            31584362
: 19. Unit Senice Factor                                        88.6                      60.2              69.2
: 20. Unit Availability Factor                                  88.6                      60.2              70.0
: 21. Unit Capacity Factor (Using MDC Net)                      83.6                      SFT              64.8
: 22. Unit Capacity Factor (Using DER Net)                      83.1                      55.8    .
63.8
: 23. Unit Forced Outage Rate                                    7.3                      8.3              20.1 h
l        24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Eacht:
N/A
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:      N/A
: 26. Units In Test Status (Prior o Commercial Operation):                        Forecast            Achiesed NA                    NA
(                                INITIAL CRITICALITY INITIAL ELECTRICITY                                        NA                    NA COMMERCIAL OPER ATION                                      NA                  'NA
* Corrects minor math error in July 1982 report.
8211020565 820910                                                                                        (O PDR ADOCK 05000336 R                          pyg i
 
    'g.    ..''
        ~    ** ,
AVER AGE DAILY UNIT power LEVEL                        ,
DOCKE7No. 50-336 UNIT llillstone 2 DATE  9-10-82
                                                  , f'                                COMPLETED Ey    J. GibSon
[
                                                    '                                      TELEPilONE (203)447_379j Ext. 4431 MONni          AUGUST 1982 DAY        ' AVER AGl' DAILY POWER LEVEL              DAY      AVER AGE DA1LY POWER LEVEL (MWe Net)                                        (MWe Net) 3              0 (-16)                                          847 37 2              0 (-27)                              is          849 3                0 (-27)                              19          846 4                      30 20          846 5                  470                                            846 21 6                  812                                            847 22 7      _          849                                          846 23 8                  849 24          845 9                  848 -                                        847 25 10                    847 26          847 11 848 27          847        .
i 12      -
833                                          847 28 13                    846 29          848 14                    846 84'9 30
* 846 is                                                                  848 31 16                    845-INSTRUCDONS l
l On this format, list the miage daily unit power levelin MWe Net for each day in the reporting month. Com
;          the nearest whole nwp att.
1 i
i i
(0/771 1
I
 
d DOCKET NO.      50-336          ,
UNITSHUTDOWNS AND POWER REDUCTIONS UNIT NAME m_I _Istone 4 u-4u-oc DATE AUGUST 82'                COteLETED BY      J. Gibson REPORT MONT11 TELEPHONE 447-179) E xt . 4431 9
                                                      'c _  re    % u,:i:
[                licen588
                                                ~
Nii.              Nie        &    55          g j 'd                  $ *.,
g"3 o.
                                                                                                        .              Cause & Currective x    "o    =    .c s ac      Event    aT                            gui,o, ,
56      E    jisy        Reporaw    AC          O              p,,,,,,g,c,[,,,,,
d 16          820804          F      85    A        1      82-32        CI    VALVEX    Continuation of end of July 1982 shutdown for excessive reactor cool-ant system leakage. Repaired leaks and resumed nonnal start-up proced-ures on 080482.
17          820812          F      0    A      N/A      82-35        PC    VALV0P    A reduction in power to 85% occurred due to inadvertent injection of highly borated water into the RCS.
The duration was short with immediate ramp to 100% power. See L.E.R.82-35.
(9/77)
I                                                                                    .
 
Date          9-lo-az
                                                              .                                Unit Name  ni ist.one c l                                                                                        Completed By J. Gibson l                                                                                            Telephone (203) 447-1/91                      ,
i Ext. 44J6 CORRECTIVE MAINTENANCE SU M ARY FOR SAFETY RELATED EQUIPMENT Report Month    AUGUST 1982 DATE          SYSTEM'                        COMPONENT                                MAINTENANCE ACTION 8/18    CVCS                    'A' Charging Pump                Repack pump 8/2    Main Steam              2-MS-64B
      ,                                                                        Re-inject Fumanite compound into clamp.
8/18    Process and area radiation monitoring    Process Rad Monitor for liquid    Replace 3600 CRA-73 circuit card chip.
S/G
          ,8/20    Process and area        Rad Monitor for aerated            Replace signal input card.
    ,              radiation monitoring    radwaste.
9 9
e
                                                                                                                                          .      l e
1
 
  'o .
Dock;t No. 50-336 Date:        9-10-82 Completed By: J. Gibson Telephone: (203) 447-1791 x 4431 REFUELING INFORMATION REQUEST
: 1. Name of facility:    Millstone 2
: 2. Scheduled date for next refuel,ing shutdown:      April 16, 1983
: 3. Schedule date for restart following refueling:            June 4, 1983
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
It is not anticipated that Cycle 6 operations will require Technical Specification changes or other License amendments.
: 5. Scheduled date(s) for submitting licensing action and supporting information:
N/A
: 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A
: 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel
'        storage pool:
(a)    In Core:      217                        (b)          288
: 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
667
: 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1985, Spent Fuel Pool, full core off load capability is reached, 1987, Core Full, Spent Fuel Pool contains 648 bundles.            .
E o
                                                                                                ,}}

Revision as of 10:01, 30 March 2020

Monthly Operating Rept for Aug 1982
ML20065T538
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/10/1982
From: Gibson J
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20065T521 List:
References
NUDOCS 8211020565
Download: ML20065T538 (5)


Text