|
|
(One intermediate revision by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML103400158 | | | number = ML103400158 |
| | issue date = 12/20/2010 | | | issue date = 12/20/2010 |
| | title = Request for Additional Information Regarding Fourth Inservice Inspection Interval Relief Requests l4R-02 and l4R-04 (TAC Nos. ME4519 and ME4521) | | | title = Request for Additional Information Regarding Fourth Inservice Inspection Interval Relief Requests l4R-02 and l4R-04 |
| | author name = Bamford P | | | author name = Bamford P |
| | author affiliation = NRC/NRR/DORL/LPLI-2 | | | author affiliation = NRC/NRR/DORL/LPLI-2 |
Line 48: |
Line 48: |
| These portions of the RISI Program have been and will continue to be reevaluated and revised as major revisions of the site Probabilistic Risk Assessment (PRA) occur and modifications to plant configuration are made. The Consequence Evaluation, Degradation Mechanism Assessment, Risk Ranking, Element Selection, and Risk Impact Assessment steps encompass the complete living program process applied under the TMI, Unit 1 RISI Program. | | These portions of the RISI Program have been and will continue to be reevaluated and revised as major revisions of the site Probabilistic Risk Assessment (PRA) occur and modifications to plant configuration are made. The Consequence Evaluation, Degradation Mechanism Assessment, Risk Ranking, Element Selection, and Risk Impact Assessment steps encompass the complete living program process applied under the TMI, Unit 1 RISI Program. |
| Please provide the date of the last PRA reevaluation and revision that is described above, and a brief description of the results of the reevaluations and revisions undertaken at that date. Specifically, please provide the baseline CDF and the baseline LERF for the most current PRA. In addition, please explain how any modifications to the plant since the date of the last reevaluation and revision may impact the RISI program. | | Please provide the date of the last PRA reevaluation and revision that is described above, and a brief description of the results of the reevaluations and revisions undertaken at that date. Specifically, please provide the baseline CDF and the baseline LERF for the most current PRA. In addition, please explain how any modifications to the plant since the date of the last reevaluation and revision may impact the RISI program. |
| : 3. Are the inspection locations in the RISI program that have been developed for the fourth 10-year interval the same locations as those in the third interval RISI program approved in the NRC staff's November 12, 2003, safety evaluation (ADAMS Accession No. | | : 3. Are the inspection locations in the RISI program that have been developed for the fourth 10-year interval the same locations as those in the third interval RISI program approved in the NRC staff's November 12, 2003, safety evaluation (ADAMS Accession No. ML032930264)? If not, please summarize the changes to the program and what caused those changes. |
| ML032930264)? If not, please summarize the changes to the program and what caused those changes. | |
| : 4. If there are changes in the inspection locations for the TMI-1 fourth 1O-year interval RISI program, please provide information for the fourth interval program regarding: | | : 4. If there are changes in the inspection locations for the TMI-1 fourth 1O-year interval RISI program, please provide information for the fourth interval program regarding: |
| examinations/system/components/degradation mechanisms/class, etc. similar to that provided in Tables 2, 3 and 4 of the original submittal of the RISI program for the TMI-1 third 1O-year lSI interval dated October 1, 2002 (ADAMS Accession No. ML022830211). | | examinations/system/components/degradation mechanisms/class, etc. similar to that provided in Tables 2, 3 and 4 of the original submittal of the RISI program for the TMI-1 third 1O-year lSI interval dated October 1, 2002 (ADAMS Accession No. ML022830211). |
Letter Sequence RAI |
---|
|
|
MONTHYEARTMI-10-079, Submittal of Relief Requests Associated with the Fourth Inservice Inspection Interval2010-08-10010 August 2010 Submittal of Relief Requests Associated with the Fourth Inservice Inspection Interval Project stage: Request ML1026402792010-09-21021 September 2010 Non-Acceptance, with Opportunity to Supplement, for TMI-1 RR-I4R-02, TAC No. ME4519 Project stage: Other ML1026406132010-09-23023 September 2010 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Relief l4R-02, Fourth Inservice Inspection Interval, Alternate Risk Informed Selection and Examination Criteria for Project stage: Acceptance Review TMI-10-101, Three Mile, Unit 1, Supplemental Information Request - Fourth Inservice Inspection (ISI) Interval Relief Request I4R-022010-10-0808 October 2010 Three Mile, Unit 1, Supplemental Information Request - Fourth Inservice Inspection (ISI) Interval Relief Request I4R-02 Project stage: Supplement ML1029303472010-10-21021 October 2010 Acceptance of Requested Licensing Action Request for Relief l4R-02, Fourth Inservice Inspection Interval, Alternate Risk Informed Selection and Examination Criteria for Pressure Retaining Welds Project stage: Acceptance Review TMI-10-111, Submittal of Relief Requests Associated with the Fourth Inservice Inspection (ISI) Interval - Relief Request I4R-012010-10-29029 October 2010 Submittal of Relief Requests Associated with the Fourth Inservice Inspection (ISI) Interval - Relief Request I4R-01 Project stage: Request ML1034405552010-12-10010 December 2010 Electronic Transmission, Draft Request for Additional Information Regarding Relief Request 14R-02 Project stage: Draft RAI ML1034001582010-12-20020 December 2010 Request for Additional Information Regarding Fourth Inservice Inspection Interval Relief Requests l4R-02 and l4R-04 Project stage: RAI TMI-11-007, Response to Request for Additional Information Concerning Relief Requests Associated with the Fourth Inservice Inspection Interval2011-01-25025 January 2011 Response to Request for Additional Information Concerning Relief Requests Associated with the Fourth Inservice Inspection Interval Project stage: Response to RAI ML1111804942011-04-28028 April 2011 Electronic Transmission, Draft Request for Additional Information Regarding Fourth Interval Inservice Inspection Relief Request I4R-04 Project stage: Draft RAI ML1111806402011-05-0606 May 2011 Request for Additional Information Regarding Fourth Inservice Inspection Interval Relief Request I4R-04 Project stage: RAI TMI-11-084, Response to Request for Additional Information Concerning Relief Requests Associated with the Fourth Inservice Inspection (ISI) Interval2011-05-11011 May 2011 Response to Request for Additional Information Concerning Relief Requests Associated with the Fourth Inservice Inspection (ISI) Interval Project stage: Response to RAI ML1117304752011-07-20020 July 2011 Fourth Inservice Inspection Interval Relief Requests I4R-02, I 4R-03, I4R-04, I4R-05, and I4R-06 Project stage: Other 2010-09-21
[Table View] |
|
---|
Category:Letter
MONTHYEARRS-24-097, Notice of Intent to Pursue Subsequent License Renewal for Three Mile Island Nuclear Station, Unit 12024-10-23023 October 2024 Notice of Intent to Pursue Subsequent License Renewal for Three Mile Island Nuclear Station, Unit 1 ML24256A0422024-10-0404 October 2024 Updated Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24242A3032024-09-0909 September 2024 Letter - Three Mile Island Station, Unit 2, Issuance of Amendment No. 68, Historic and Cultural Resources IR 05000320/20240012024-08-28028 August 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report Nos. 05000320/2024001 and 05000320/2024002 ML24240A2222024-08-27027 August 2024 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24220A2742024-08-15015 August 2024 Request for Additional Information Clarification Call Regarding Three Mile Island Station, Unit 2, Amended Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24135A3292024-08-0909 August 2024 Amendment No 68, Historic and Cultural Resources Cover Letter IR 07200077/20240012024-06-18018 June 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 07200077/2024001 ML24157A3672024-06-13013 June 2024 Updated Post-Shutdown Decommissioning Activities Report Request for Additional Information Transmittal Letter ML24135A1972024-06-13013 June 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0091 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24120A3242024-05-24024 May 2024 TMI-2 Email to Fws RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24121A2472024-04-29029 April 2024 And Three Mile Island, Unit 2 - 2023 Occupational Radiation Exposure Annual Report ML24120A2552024-04-29029 April 2024 Annual Radiological Environmental Operating Report ML24113A0212024-04-18018 April 2024 (TMI-2), Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24092A0012024-03-28028 March 2024 (TMI-2), Decommissioning Trust Fund Annual Report ML24065A0042024-03-28028 March 2024 Submittal of 2023 Aircraft Movement Data Annual Report ML24088A0122024-03-28028 March 2024 Notification of Amended Post-Shutdown Decommissioning Activities Report (PSDAR) in Accordance with 10 CFR 50.82(a)(7), Revision 6 ML24085A2152024-03-25025 March 2024 (TMI-2) - Annual Notification of Property Insurance Coverage RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. ML24052A0602024-03-20020 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0061 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24074A3922024-03-14014 March 2024 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 ML24075A0062024-03-14014 March 2024 List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML24073A2312024-03-13013 March 2024 And Three Mile Island Nuclear Station, Unit 2 - Management Change ML24044A0092024-02-12012 February 2024 License Amendment Request – Three Mile Island, Unit 2, Historic and Cultural Resources Review, Response to Request for Additional Information IR 05000320/20230042024-02-0707 February 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023004 ML24038A0222024-02-0505 February 2024 Achp Letter on Section 106 Programmatic Agreement Participation IR 05000289/20230062024-01-29029 January 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 05000289/2023006 ML23342A1242024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23325A1092024-01-0505 January 2024 Review of the Management Plan for Three Mile Island Station, Unit No. 2, Debris Material ML23354A2062023-12-20020 December 2023 (TMI-2), Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23354A2112023-12-20020 December 2023 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 IR 05000320/20230032023-11-28028 November 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2, NRC Inspection Report No. 05000320/2023003 ML23243A9082023-08-29029 August 2023 SHPO Letter to TMI-2 Regarding Section 106 Activities IR 05000320/20230022023-08-17017 August 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023002 ML23216A1782023-08-14014 August 2023 Consultation Letter to Steve Letavic for TMI-2 IR 05000289/20230052023-08-14014 August 2023 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report 05000289/2023005 ML23216A1772023-08-14014 August 2023 Consultation Letter to Rebecca Countess for TMI-2 ML23216A1732023-08-14014 August 2023 Consultation Letter to Christine Turner for TMI-2 ML23216A1742023-08-14014 August 2023 Consultation Letter to David Morrison for TMI-2 ML23216A1752023-08-14014 August 2023 Consultation Letter to Joanna Cain for TMI-2 ML23221A1402023-08-0808 August 2023 (TMI-2), Response to Requests for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 ML23213A2342023-08-0101 August 2023 Submittal of Defueled Safety Analysis Report and Decommissioning Quality Assurance Plan ML23200A1882023-07-31031 July 2023 TMI-2 Correction Letter Amendment 67 ML23209A7632023-07-28028 July 2023 Letter from PA SHPO to TMI-2 Solutions on Cultural and Historic Impacts of Decommissioning ML23192A8272023-07-10010 July 2023 TMI-2 Solutions, LLC - Response to SHPO Request for Additional Information for Er Project 2021PR03278.006, TMI-2 Decommissioning Project ML23167A4642023-07-0505 July 2023 Letter - TMI-2- Exemption 10 CFR Part 20 Append G Issuance 2024-09-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24220A2742024-08-15015 August 2024 Request for Additional Information Clarification Call Regarding Three Mile Island Station, Unit 2, Amended Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24157A3672024-06-13013 June 2024 Updated Post-Shutdown Decommissioning Activities Report Request for Additional Information Transmittal Letter ML24011A2352024-01-11011 January 2024 Eco Request for Additional Information for 2023 License Amendment Request 1-11-24 ML23187A0202023-06-29029 June 2023 TMI Unit 2 – RAI Related to the Amended Post-Shutdown Decommissioning Activities Report ML23187A0332023-06-29029 June 2023 TMI Unit 2, PSDAR Rev. 5 RAIs ML23082A3432023-03-31031 March 2023 Enclosure - RAI - Three Mile Island, Unit 2 - Acceptance Review and Request for Additional Information for the Historic and Cultural Resources License Amendment Request - EPID: 2023-LLA-0026 ML22357A0142022-12-22022 December 2022 NRC Request for Additional Information Related to the TMI-2 Pdms Transition License Amendment Request ML22210A0882022-07-29029 July 2022 Enclosure - Three Mile Island, Unit No. 2 - Request for Additional Information for Requested Licensing Action Regarding Decommissioning Technical Specifications ML22143A8902022-05-23023 May 2022 Request for Additional information- TMI-1 ISFSI Only Physical Security License Amendment Request ML22125A0122022-04-28028 April 2022 Clarification RAI Partial Response Email from C Smith to a Snyder ML22110A0202022-04-19019 April 2022 Unit 1 Request for Additional Information ML22038A9362022-02-0707 February 2022 TMI2 Accident Analyses Questions ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML20164A0902020-06-10010 June 2020 Request for Additional Information Related to TMI-1 License Amendment Request to Delete Permanently Defueled Technical Specification 3/4.1.4 (L-2019-LLA-0250) ML19319B2082019-11-15015 November 2019 NRR E-mail Capture - Request for Additional Information Related to TMI-1 Request for Exemption from Portions of 10 CFR 50.47 and Part 50 Appendix E (L-2019-LLA-0216) ML19179A0612019-07-19019 July 2019 Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879 ML18220A7832018-08-0707 August 2018 NRR E-mail Capture - Request for Additional Information Related to TMI Fall 2017 Steam Generator Tube Inspection Report ML18212A2712018-07-31031 July 2018 NRR E-mail Capture - Request for Additional Information Related to Amendment Regarding Decommissioning ERO Staffing Changes ML17285B1962017-10-27027 October 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. ML17062A4912017-03-0303 March 2017 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative to RPV Threads in Flange Examination (CAC Nos. MF8712-MF8729) ML16356A4802016-12-21021 December 2016 NRR E-mail Capture - RAIs on TMI License Amendment Request for Approval of Changes to the Three Mile Island Nuclear Station Emergency Plan Related to Staffing ML16337A0072016-12-0101 December 2016 NRR E-mail Capture - Draft RAIs Three Mile Island Nuclear Station, Units 1 and 2, License Amendment Request for Approval of Changes to the Three Mile Island Nuclear Station Emergency Plan Related to Staffing ML16287A4042016-10-11011 October 2016 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML15230A5332015-08-18018 August 2015 Draft Request for Additional Information ML15020A7372015-03-0808 March 2015 Request for Additional Information Regarding Related to December 22, 2014, Report Submitted Pursuant to 10 CFR 50.46 ML14307A1172014-11-14014 November 2014 Request for Additional Information Regarding Relief Request RR-14-01 Concerning Alternative Root Mean Square Depth Sizing Requirements ML14240A4122014-09-0404 September 2014 Request for Additional Information Regarding License Amendment Request to Eliminate Certain Technical Specification Reporting Requirements (Tac MF0628) ML14134A3222014-05-22022 May 2014 Request for Additional Information Regarding Review of Three Mile Island Nuclear Station Unit 1 Cycle 20 Core Operating Limits Report ML14134A1722014-05-14014 May 2014 Draft RAIs in Support of NRC Staff Review of TMI Cycle 20 COLR ML14052A2592014-02-27027 February 2014 Request for Additional Information Regarding Proposed License Amendment Request to Revise Technical Specification Reporting Requirements ML14030A5832014-01-29029 January 2014 Draft Request for Additional Information Proposed Revision to Technical Specifications Reporting Requirements Exelon Generation Company, LLC Three Mile Island Nuclear Station, Unit 1 ML13266A2852013-10-21021 October 2013 Request for Additional Information on Three Mile Island Nuclear Station Unit 2 - post-shutdown Decommissioning Activities Report ML13276A6492013-10-0303 October 2013 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML13269A1792013-09-25025 September 2013 Draft Request for Additional Information ML13253A2252013-09-10010 September 2013 Draft Request for Additional Information ML13249A2072013-09-0505 September 2013 Draft Request for Additional Information ML13193A1752013-07-22022 July 2013 Request for Additional Information Regarding Revision to Pressure and Temperature Limit Curves and Exemption Request for Initial Reference Temperature Values ML13196A3382013-07-15015 July 2013 2013 Decommissioning Fund Report RAI ML13193A1452013-07-12012 July 2013 Electronic Transmission, Draft Request for Additional Information Regarding Proposed Revision to Pressure and Temperature Limit Curves and Exemption Request for Initial Reference Temperature Values (TAC Nos. MF0425 & MF0426) ML13176A4702013-06-26026 June 2013 Request for Additional Information Regarding Overall Integrated Plan in Response to Order Number EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13177A3902013-06-26026 June 2013 Electronic Transmission, Draft Request for Additional Information Regarding Overall Integrated Plan in Response to Order Number EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13066A2442013-03-19019 March 2013 Request for Additional Information Regarding Fifth Inservice Test Interval Relief Request PR-01 Nuclear Services Closed Cooling Water Flow Measurement ML13066A1262013-03-0707 March 2013 Electronic Transmission, Draft Request for Additional Information Regarding Fifth Inservice Test Interval Relief Request PR-01 Nuclear Services Closed Cooling Water Flow Measurement ML13044A3212013-03-0505 March 2013 Request for Additional Information Regarding 30-Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML13045A6432013-02-25025 February 2013 Request for Additional Information Regarding Relief Request VR-01, Associated with the Fifth Inservice Testing Interval ML13051A3852013-02-25025 February 2013 Request for Additional Information Regarding End-of-Interval Relief Request RR-12-01, Pressure Nozzle-to-Head Weld Exams ML13050A6362013-02-20020 February 2013 Draft RAI Memo ML13044A3122013-02-13013 February 2013 Electronic Transmission, Draft Request for Additional Information Regarding 30-Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML13044A6652013-02-13013 February 2013 Electronic Transmission, Draft Request for Additional Information Regarding Relief Request VR-01, Associated with the Fifth Inservice Testing Interval 2024-08-15
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 20, 2010 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
THREE MILE ISLAND NUCLEAR STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING FOURTH INSERV1CE INSPECTION INTERVAL RELIEF REQUESTS 14R-02 AND 14R-04 (TAC NOS. ME4519 AND ME4521)
Dear Mr. Pacilio:
By letter dated August 10, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102290162), Exelon Generation Company, LLC submitted a set of relief requests for Three Mile Island Nuclear Station, Unit 1 (TMI-1). The relief requests are all associated with the fourth Inservice Inspection (lSI) interval at TMI-1. The U.S. Nuclear Regulatory Commission (NRC) staff has been reviewing the submittal and has determined that additional information is needed to complete its review. This information request relates to Relief Requests 14R-02, "Request for Relief for Alternate Risk-Informed Selection and Examination Criteria for Examination Category B-F, B-J, C-F-1, and C-F-2 Pressure Retaining Piping Welds," and 14R-04, "Request for Relief for lSI Snubbers Included in the Technical Specifications Snubber Visual Examination and Functional Testing Program."
The NRC staff has been reviewing the response and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The questions were sent via electronic transmission on December 1,2010, and on December 8,2010, to Mr. Thomas Loomis, of your staff. The draft questions were sent to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed. The draft questions were discussed in a teleconference with your staff on December 14, 2010, and a minor edit was made to RAI number 1, regarding Relief Request 14R-02. It was agreed that a response to this RAI would be submitted by January 28, 2011.
Please contact me at 301-415-2833, if you have any questions.
Sd?;k~
Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289
Enclosure:
As stated cc: Distribution via Listserv
REQUEST FOR ADDITIONAL II\lFORMATION THREE MILE ISLAND NUCLEAR STATION, UNIT 1 RELIEF REQUESTS ASSOCIATED WITH THE FOURTH INSERVICE INSPECTION INTERVAL RELIEF REQUESTS 14R-02AND 14R-04 DOCKET NO. 50-289 By letter dated August 10, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102290162), Exelon Generation Company, LLC submitted a set of relief requests for Three Mile Island Nuclear Station, Unit 1 (TMI-1).
The relief requests are all associated with the fourth Inservice Inspection (lSI) interval at TMI-1. The U.S. Nuclear Regulatory Commission (NRC) staff has been reviewing the submittal and has determined that additional information is needed to complete its review. This information request relates to Relief Requests 14R-02, "Request for Relief for Alternate Risk-Informed Selection and Examination Criteria for Examination Category B-F, B-J, C-F-1, and C-F-2 Pressure Retaining Piping Welds," and 14R-04, "Request for Relief for lSI Snubbers Included in the Technical Specifications Snubber Visual Examination and Functional Testing Program."
Relief Request 14R-02
- 1. The relief request includes the following paragraph:
The Risk Impact Assessment completed as part of the original baseline [Risk-Informed Inservice Inspection] RISI Program was an implementation/transition check on the initial impact of converting from a traditional [American Society of Mechanical Engineers] ASME Section XI program to the new RISI methodology. For the fourth interval lSI update, there is no transition occurring between two different methodologies, but rather, the currently approved RISI methodology and evaluation will be maintained for the new interval.
The NRC staff does not agree with the implication that, if there is no change in methodology, the change in risk assessment is not part of the living process.
Furthermore, the submittal is requesting relief to implement a RISI program instead of an ASME program for the fourth interval, so there is a change from the methodology that would normally be used (i.e., without a relief request). Electrical Power Research Institute Topical Report 112657, Revision B-A, which is cited in the application as the evaluation methodology for the RISI program, requires an evaluation of the change in risk (core damage frequency (CDF) and large early release frequency (LERF)) arising from the proposed change in the lSI program.
Please provide an estimate of the potential change in risk between the RISI program proposed for implementation in the fourth interval and the ASME Section XI requirements which existed prior to the implementation of the RISI program.
Enclosure
-2
- 2. The relief request states:
These portions of the RISI Program have been and will continue to be reevaluated and revised as major revisions of the site Probabilistic Risk Assessment (PRA) occur and modifications to plant configuration are made. The Consequence Evaluation, Degradation Mechanism Assessment, Risk Ranking, Element Selection, and Risk Impact Assessment steps encompass the complete living program process applied under the TMI, Unit 1 RISI Program.
Please provide the date of the last PRA reevaluation and revision that is described above, and a brief description of the results of the reevaluations and revisions undertaken at that date. Specifically, please provide the baseline CDF and the baseline LERF for the most current PRA. In addition, please explain how any modifications to the plant since the date of the last reevaluation and revision may impact the RISI program.
- 3. Are the inspection locations in the RISI program that have been developed for the fourth 10-year interval the same locations as those in the third interval RISI program approved in the NRC staff's November 12, 2003, safety evaluation (ADAMS Accession No. ML032930264)? If not, please summarize the changes to the program and what caused those changes.
- 4. If there are changes in the inspection locations for the TMI-1 fourth 1O-year interval RISI program, please provide information for the fourth interval program regarding:
examinations/system/components/degradation mechanisms/class, etc. similar to that provided in Tables 2, 3 and 4 of the original submittal of the RISI program for the TMI-1 third 1O-year lSI interval dated October 1, 2002 (ADAMS Accession No. ML022830211).
Relief Request 14R-04
- 1. TMI-1 Technical Specification (TS) 4.17.1 (e)(2) provides for an optional functional testing of snubbers in accordance with TMI-1 TS Figure 4.17-1. Please verify that (1) this plan is equivalent to the 37 or 55 testing sample plan of ASME/ANSl [American National Standards Institute] OM Code Part 4,1987 Edition with OMa-1988 Addendum (OM-4);
and (2) explain whether and how the requirement of additional sampling of at least one half of the size of the initial sample lot as required by OM-4, Section 3.2.3.2(b), will be met while using TMI-1 TS Figure 4.17-1. If the TS requirements do not meet the OM-4 requirements, please explain how the proposed alternative provides an acceptable level of quality and safety.
- 2. The requested alternative and TMI-1 TS 4.17 do not address the requirements of OM-4, Section 2.3.4.3, "Examination Failure Mode Groups," and Section 3.2.4.2, "Test Failure Mode Groups," related to examination and functional testing of snubbers. Please explain how TMI-1 TS 4.17 meets these requirements or provides an acceptable level of quality and safety.
- 3. ASME,Section XI, 2004 Edition, Article IWF-5000, Subsections IWF-5200(c) and IWF 5300(c), clearly state that integral and non-integral attachments for snubbers (including lugs, bolting, pins, and clamps), shall be examined in accordance with the requirements of Subsection IWF. Please explain whether and how these requirements will be met. If
-3 they will not be met, please explain how the proposed alternative provides an acceptable level of quality and safety.
- 4. TMI-1 TS 4.17.1 (b), footnote "**" states:
The inspection interval for each type of snubber shall not be lengthened more than one step at a time unless a generic problem has been identified and corrected; in that event the inspection interval may be lengthened one step the first time and two steps thereafter if no inoperable snubbers of that type are found.
OM-4, Section 2.3.2.3, "Subsequent Examination Schedule Adjustment," states that the time to subsequent examination shall not be lengthened more than one increment at a time. Please explain why the inspection intervals described in TMI-1 TS 4.17.1 (b) are acceptable in lieu of the examination schedule requirement noted in OM-4, Section 2.3.2.3.
- 5. In TMI-1 TS 4.17.1 (e), "Functional Tests", the footnote "*" states:
The four 555,000 Ib reactor coolant pump snubbers are not included.
The functional test program for reactor coolant pump snubbers is implemented in accordance with the schedule and other requirements of the snubber testing program.
Please provide details on how the reactor coolant pump snubbers will be tested as compared to the OM-4 requirements.
December 20,2010 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville,lL 60555
SUBJECT:
THREE MILE ISLAND NUCLEAR STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING FOURTH INSERVICE INSPECTION INTERVAL RELIEF REQUESTS 14R-02AND 14R-04 (TAC NOS. ME4519 AND ME4521)
Dear Mr. Pacilio:
By letter dated August 10, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102290162), Exelon Generation Company, LLC submitted a set of relief requests for Three Mile Island Nuclear Station, Unit 1 (TMI-1). The relief requests are all associated with the fourth Inservice Inspection (lSI) interval at TMI-1. The U.S. Nuclear Regulatory Commission (NRC) staff has been reviewing the submittal and has determined that additional information is needed to complete its review. This information request relates to Relief Requests 14R-02, "Request for Relief for Alternate Risk-Informed Selection and Examination Criteria for Examination Category B-F, B-J, C-F-1, and C-F-2 Pressure Retaining Piping Welds," and 14R-04, "Request for Relief for lSI Snubbers Included in the Technical Specifications Snubber Visual Examination and Functional Testing Program."
The NRC staff has been reviewing the response and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The questions were sent via electronic transmission on December 1, 2010, and on December 8, 2010, to Mr. Thomas Loomis, of your staff. The draft questions were sent to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed. The draft questions were discussed in a teleconference with your staff on December 14, 2010, and a minor edit was made to RAI number 1, regarding Relief Request 14R-02. It was agreed that a response to this RAI would be submitted by January 28, 2011.
Please contact me at 301-415-2833, if you have any questions.
Sincerely,
/raj Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289
Enclosure:
As stated cc: Distribution via Listserv DISTRIBUTION:
RidsNrrPMThreeMilelsland Resource PUBLIC LPLI-2 R/F RidsAcrsAcnw_MailCTR Resource RidsNrrDraApla Resource RidsOgcRp Resource RidsRgn1MailCenter Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl1-2 Resouce RidsNrrLAABaxter Resource MOrenak, NRR RidsNrrDciCptb Resource DChung, NRR KHoffman, NRR RidsNrrDciCpnb Resource ADAMS Accession Number' ML103400158 *concurrence via email OFFICE LPL1-2/PM LPL1-2/LA APLAlBC CPTB/BC CPNB/BC LPLI-2/BC NAME PBamford ABaxter
- DHarrison* AMcMurtray* TLupold* HChernoff (REnnis for)
DATE 12/14/2010 12/14/10 11/26/2010 11/30/2010 12/09/2010 12/20/10 OFFICIAL RECORD COpy