| number = ML12289A076 | | number = ML12289A076 | ||
| issue date = 10/31/2012 | | issue date = 10/31/2012 | ||
| title = | | title = Withdrawal of Amendment Request to Revise Licensing Basis, Evaluation Process for New Seismic Information and Clarify Safe Shutdown Earthquake | ||
| author name = Sebrosky J | | author name = Sebrosky J | ||
| author affiliation = NRC/NRR/DORL/LPLIV | | author affiliation = NRC/NRR/DORL/LPLIV | ||
| addressee name = Halpin E | | addressee name = Halpin E | ||
| addressee affiliation = Pacific Gas & Electric Co | | addressee affiliation = Pacific Gas & Electric Co | ||
| docket = 05000275, 05000323 | | docket = 05000275, 05000323 | ||
| license number = DPR-080, DPR-082 | | license number = DPR-080, DPR-082 | ||
| contact person = Sebrosky J | | contact person = Sebrosky J | ||
| case reference number = TAC ME7502, TAC ME7503 | | case reference number = TAC ME7502, TAC ME7503 | ||
| document type = Letter | | document type = Letter | ||
| page count = 2 | | page count = 2 | ||
| project = TAC:ME7502, TAC:ME7503 | | project = TAC:ME7502, TAC:ME7503 | ||
| stage = Withdrawal | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 October 31, 2012 Mr. Edward Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424 DIABLO CANYON POWER PLANT UNITS 1 AND 2 -WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NOS. ME7502 AND ME7503) | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 31, 2012 Mr. Edward D. Halpin Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424 | ||
==SUBJECT:== | |||
DIABLO CANYON POWER PLANT UNITS 1 AND 2 - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NOS. ME7502 AND ME7503) | |||
==Dear Mr. Halpin:== | ==Dear Mr. Halpin:== | ||
By letter dated October 20,2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. | |||
By letter dated October 20,2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11312A166), as supplemented by letter dated December 6.2011 (ADAMS Accession No. ML11342A238), you applied for an amendment to the Diablo Canyon Power Plant (DCPP), Unit Nos. 1 and 2, Facility Operating License Nos. DPR-80, and DPR-82, respectively. Portions of the letter dated October 20, 2011, contained sensitive unclassified non-safeguards information and has been withheld from public disclosure. | |||
The amendment would have revised the current licensing basis, as described in the Final Safety Analysis Report Update and Technical Specifications, to provide requirements for the actions, evaluations, and reports necessary when Pacific Gas and Electric identified new seismic information relevant to the design and operation of DCPP. Subsequently, by letter dated October 25, 2012 (ADAMS Accession No. ML12300A105), you withdrew the amendment request. | |||
The purpose of this letter is to advise that the above-cited application is being treated as withdrawn. Notice of Consideration of Issuance of the proposed amendm had not been published in the Federal Register. | |||
r Project Manager Docket Nos. 50-275 and 50-323 cc: Distribution via Listserv | |||
October 31,2012 Mr. Edward D. Halpin Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424 | |||
==SUBJECT:== | |||
DIABLO CANYON POWER PLANT UNITS 1 AND 2 - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NOS. ME7502 AND ME7503) | |||
==Dear Mr. Halpin:== | ==Dear Mr. Halpin:== | ||
Sincerely,IRA! Joseph M. Sebrosky, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 cc: Distribution via Listserv DISTRIBUTION: PUBLIC RidsNrrDorlLpl4 Resource RidsRgn4MailCenter Resource LPL4 Reading RidsNrrDraAadb Resource JPatel. NRRJDRAlAPLA RidsAcrsAcnw_MailCTR Resource RidsNrrDssStsb Resource SAnderson, NRRJDSS/STSB RidsNrrDeEeeb Resource RidsNrrLAJBurkhardt Resource SMazumdar, NRRJDE/EICB RidsNrrDeEicb Resource RidsNrrPMDiabloCanyon Resource SBasturescu, NRRJDE/EEEB RidsNrrDorlDpr Resource RidsOgcRp Resource YLi, NRRJDE/EMCB ADAMS Accession Nos'" ML12289A076 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/8C NRR/LPL4/PM NAME JSebrosky J8urkhardt MMarkley JSebrosky DATE 10/31/12 10/17/12 10/31/12 10/31/12 OFFICIAL AGENCY RECORD}} | By letter dated October 20, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11312A166), as supplemented by letter dated December 6, 2011 (ADAMS Accession No. ML11342A238), you applied for an amendment to the Diablo Canyon Power Plant (DCPP), Unit Nos. 1 and 2, Facility Operating License Nos. DPR-80, and DPR-82, respectively. Portions of the letter dated October 20, 2011, contained sensitive unclassified non-safeguards information and has been withheld from public disclosure. | ||
The amendment would have revised the current licensing basis, as described in the Final Safety Analysis Report Update and Technical Specifications, to provide requirements for the actions, evaluations, and reports necessary when Pacific Gas and Electric identified new seismic information relevant to the design and operation of DCPP. Subsequently, by letter dated October 25,2012 (ADAMS Accession No. ML12300A105), you withdrew the amendment request. | |||
The purpose of this letter is to advise that the above-cited application is being treated as withdrawn. Notice of Consideration of Issuance of the proposed amendment had not been published in the Federal Register. | |||
Sincerely, IRA! | |||
Joseph M. Sebrosky, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 cc: Distribution via Listserv DISTRIBUTION: | |||
PUBLIC RidsNrrDorlLpl4 Resource RidsRgn4MailCenter Resource LPL4 Reading RidsNrrDraAadb Resource JPatel. NRRJDRAlAPLA RidsAcrsAcnw_MailCTR Resource RidsNrrDssStsb Resource SAnderson, NRRJDSS/STSB RidsNrrDeEeeb Resource RidsNrrLAJBurkhardt Resource SMazumdar, NRRJDE/EICB RidsNrrDeEicb Resource RidsNrrPMDiabloCanyon Resource SBasturescu, NRRJDE/EEEB RidsNrrDorlDpr Resource RidsOgcRp Resource YLi, NRRJDE/EMCB ADAMS Accession Nos' " ML12289A076 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/8C NRR/LPL4/PM NAME JSebrosky J8urkhardt MMarkley JSebrosky DATE 10/31/12 10/17/12 10/31/12 10/31/12 OFFICIAL AGENCY RECORD}} |
Latest revision as of 12:53, 20 March 2020
ML12289A076 | |
Person / Time | |
---|---|
Site: | Diablo Canyon ![]() |
Issue date: | 10/31/2012 |
From: | Joseph Sebrosky Plant Licensing Branch IV |
To: | Halpin E Pacific Gas & Electric Co |
Sebrosky J | |
References | |
TAC ME7502, TAC ME7503 | |
Download: ML12289A076 (2) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 31, 2012 Mr. Edward D. Halpin Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424
SUBJECT:
DIABLO CANYON POWER PLANT UNITS 1 AND 2 - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NOS. ME7502 AND ME7503)
Dear Mr. Halpin:
By letter dated October 20,2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11312A166), as supplemented by letter dated December 6.2011 (ADAMS Accession No. ML11342A238), you applied for an amendment to the Diablo Canyon Power Plant (DCPP), Unit Nos. 1 and 2, Facility Operating License Nos. DPR-80, and DPR-82, respectively. Portions of the letter dated October 20, 2011, contained sensitive unclassified non-safeguards information and has been withheld from public disclosure.
The amendment would have revised the current licensing basis, as described in the Final Safety Analysis Report Update and Technical Specifications, to provide requirements for the actions, evaluations, and reports necessary when Pacific Gas and Electric identified new seismic information relevant to the design and operation of DCPP. Subsequently, by letter dated October 25, 2012 (ADAMS Accession No. ML12300A105), you withdrew the amendment request.
The purpose of this letter is to advise that the above-cited application is being treated as withdrawn. Notice of Consideration of Issuance of the proposed amendm had not been published in the Federal Register.
r Project Manager Docket Nos. 50-275 and 50-323 cc: Distribution via Listserv
October 31,2012 Mr. Edward D. Halpin Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424
SUBJECT:
DIABLO CANYON POWER PLANT UNITS 1 AND 2 - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NOS. ME7502 AND ME7503)
Dear Mr. Halpin:
By letter dated October 20, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11312A166), as supplemented by letter dated December 6, 2011 (ADAMS Accession No. ML11342A238), you applied for an amendment to the Diablo Canyon Power Plant (DCPP), Unit Nos. 1 and 2, Facility Operating License Nos. DPR-80, and DPR-82, respectively. Portions of the letter dated October 20, 2011, contained sensitive unclassified non-safeguards information and has been withheld from public disclosure.
The amendment would have revised the current licensing basis, as described in the Final Safety Analysis Report Update and Technical Specifications, to provide requirements for the actions, evaluations, and reports necessary when Pacific Gas and Electric identified new seismic information relevant to the design and operation of DCPP. Subsequently, by letter dated October 25,2012 (ADAMS Accession No. ML12300A105), you withdrew the amendment request.
The purpose of this letter is to advise that the above-cited application is being treated as withdrawn. Notice of Consideration of Issuance of the proposed amendment had not been published in the Federal Register.
Sincerely, IRA!
Joseph M. Sebrosky, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrDorlLpl4 Resource RidsRgn4MailCenter Resource LPL4 Reading RidsNrrDraAadb Resource JPatel. NRRJDRAlAPLA RidsAcrsAcnw_MailCTR Resource RidsNrrDssStsb Resource SAnderson, NRRJDSS/STSB RidsNrrDeEeeb Resource RidsNrrLAJBurkhardt Resource SMazumdar, NRRJDE/EICB RidsNrrDeEicb Resource RidsNrrPMDiabloCanyon Resource SBasturescu, NRRJDE/EEEB RidsNrrDorlDpr Resource RidsOgcRp Resource YLi, NRRJDE/EMCB ADAMS Accession Nos' " ML12289A076 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/8C NRR/LPL4/PM NAME JSebrosky J8urkhardt MMarkley JSebrosky DATE 10/31/12 10/17/12 10/31/12 10/31/12 OFFICIAL AGENCY RECORD